Plot No. 39 Sector-14 Kharghar Bus Depot
Certificate SignedKharghar, Raigarh 410210 |Promoter: City And Industrial Development Corporation Of Maharashtra Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 11
- Unit types
- Shop, 1BHK1,709 units in all
- Address
- Plot No -39, Sector -14, KhargharPIN 410210
- Designated bank account
- 171
- Developed in phases
- Yes
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years and 10 months
- Registered
- 10 Feb 2021
- Promised
- 30 Jun 2025
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000028196 | 10 Feb 2021 | 30 Jun 2025 | 30 Apr 2028 | City And Industrial Development Corporation Of Maharashtra Limited | Project page |
11 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Commercial | 1 | 9 |
| E-B-01 | 27 | 170 |
| E-B-02 | 27 | 170 |
| E-B-03 | 27 | 170 |
| E-B-04 | 27 | 170 |
| E-B-05 | 27 | 170 |
| E-B-06 | 27 | 170 |
| E-B-07 | 27 | 170 |
Show all 11 buildingsShow fewer buildings
| Building | Sanctioned floors | Units |
|---|---|---|
| E-B-08 | 27 | 170 |
| E-B-09 | 27 | 170 |
| E-B-10 | 27 | 170 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 1,709 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Commercial | Shop | 29.33 sq m · 316 sq ft | 1 | 0 |
| Commercial | Shop | 51.27 sq m · 552 sq ft | 1 | 0 |
| Commercial | Shop | 52.67 sq m · 567 sq ft | 7 | 0 |
| E-B-01 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-01 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-02 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-02 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-03 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
Show all 23 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| E-B-03 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-04 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-04 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-05 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-05 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-06 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-06 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-07 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-07 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-08 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-08 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-09 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-09 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
| E-B-10 | 1BHK | 27.1 sq m · 292 sq ft | 10 | 0 |
| E-B-10 | 1BHK | 27.12 sq m · 292 sq ft | 160 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 127 filings listed on MahaRERA's project page
Finance
- PAN CardCIDCO PANCARD.pdf · uploaded 30 Dec 2020Source
Legal
Show all 129 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)KHARGHAR BUS DEPOT PLAN_compressed (1).pdf · uploaded 19 Jan 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentKHARGHAR BUS DEPOT PLAN_compressed (1).pdf · uploaded 19 Jan 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentKHARGHAR BUS DEPOT-CC.pdf · uploaded 19 Jan 2021Source
- 1 Proforma of Allotment letterKHARGHAR BUS DEPOT DECLARATION.pdf · uploaded 19 Jan 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot_Package II.pdf · uploaded 21 Jan 2021Source
- 1 Declaration in FORM BNOTARISED PLOT NO -39 SEC -14.pdf · uploaded 2 Feb 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Kharghar Bus Depot.pdf · uploaded 29 Jul 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 245.pdf · uploaded 30 Sep 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot Dec 21 - UP_11zon.pdf · uploaded 25 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot Mar 22_11zon.pdf · uploaded 25 Jan 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot Jun 22 (1)_11zon.pdf · uploaded 25 Jan 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kharghar Bus Depot- Dec 2021.pdf · uploaded 23 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kharghar Bus Depot- Mar 2022.pdf · uploaded 23 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kharghar Bus Depot- June 2022.pdf · uploaded 23 Mar 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kharghar Bus Depot- Sept 2022.pdf · uploaded 23 Mar 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Kharghar Bus Depot.pdf · uploaded 24 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Kharghar Bus Depot FY 2020-21.pdf · uploaded 25 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Dec 2021 Kharghar Bus Depot_11zon.pdf · uploaded 29 Mar 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2022 Kharghar Bus Depot_11zon.pdf · uploaded 29 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Jun 2022 Kharghar Bus Depot_11zon.pdf · uploaded 29 Mar 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2022 Kharghar Bus Depot_11zon.pdf · uploaded 29 Mar 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A- Kharghar bus Depot- Dec 21.pdf · uploaded 3 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Kharghar bus Depot- Mar 22.pdf · uploaded 3 Apr 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Kharghar bus Depot - Jun 22.pdf · uploaded 3 Apr 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Kharghar bus Depot- Sept 22.pdf · uploaded 3 Apr 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A- Kharghar bus Depot- Dec 22.pdf · uploaded 3 Apr 2023Source
- 1 Declaration about Commencement CertificateFormat D- Kharghar Bus Depot.pdf · uploaded 1 Jun 2023Source
- 1 Disclosure of sold/ booked inventoryCircular 29- Kharghar Bus Depot_compressed.pdf · uploaded 1 Jun 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect’s Certificate of Percentage of Completion of Work.pdf · uploaded 3 Jun 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineers Certificate on Quality Assurance.pdf · uploaded 3 Jun 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer’s Certificate on Cost Incurred on Project.pdf · uploaded 7 Jun 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer’s Certificate on Cost Incurred on Project.pdf · uploaded 7 Jun 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate.pdf · uploaded 24 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form- 2A-Plot 39 Kharghar.pdf · uploaded 13 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Kharghar Bus Depot FY 20-21.pdf · uploaded 19 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Kharghar Bus Depot FY 22-23.pdf · uploaded 19 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Kharghar Bus Depot FY 21-22.pdf · uploaded 19 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sec 14 Kharghar Bus Depot Dec 23_compressed.pdf · uploaded 3 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sec 14 Kharghar Bus Depot Sept 23_compressed.pdf · uploaded 3 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sec 14 Kharghar Bus Depot June 23_compressed.pdf · uploaded 3 May 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sec 14 Kharghar Bus Depot Mar 23_compressed.pdf · uploaded 3 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kharghar BD June 23.pdf · uploaded 3 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot Sec-14 30623.pdf · uploaded 10 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot Sec-14 30923.pdf · uploaded 10 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot Sec-14 301223.pdf · uploaded 10 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot Sec-14 30323.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2023 KHBD.pdf · uploaded 10 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Jun 2023 Form-II KHBD.pdf · uploaded 10 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 2023 Form-II KHBD.pdf · uploaded 10 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sept 2023 KHBD.pdf · uploaded 10 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)KHBD DEC2023_compressed.pdf · uploaded 13 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)KHBD SEPT2023_compressed.pdf · uploaded 13 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)KHBD JUN2023_compressed.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)KHBD MAR2023_compressed.pdf · uploaded 13 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - Sep 23.pdf · uploaded 15 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - Dec 23.pdf · uploaded 15 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - Mar 24.pdf · uploaded 15 Feb 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - June 24.pdf · uploaded 15 Feb 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - Sep 24.pdf · uploaded 15 Feb 2025Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kharghar Bus Depot - Dec 24.pdf · uploaded 15 Feb 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot as on 31-12-2024.pdf · uploaded 20 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot as on 30-09-2024.pdf · uploaded 20 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot as on 30-06-2024.pdf · uploaded 20 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot as on 31-03-2024 Final.pdf · uploaded 20 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kharghar Bus Depot as on March 2024.pdf · uploaded 20 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kharghar Bus Depot as on June 2024.pdf · uploaded 20 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kharghar Bus Depot as on Sep 2024.pdf · uploaded 20 Feb 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kharghar Bus Depot as on Dec 2024.pdf · uploaded 20 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryCircular 29 KBD_11zon.pdf · uploaded 11 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Kharghar Bus Depot as on March 2025.pdf · uploaded 16 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kharghar Bus Depot as on March 2025.pdf · uploaded 14 Jun 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 of Kharghar Bus Depot as on FY 2023-24.pdf · uploaded 19 Jun 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Kharghar Bus Depot as on 31-03-2025.pdf · uploaded 20 Jun 2025Source
- 1 Disclosure of sold/ booked inventoryKHBD.pdf · uploaded 23 Jun 2025Source
- 2 Disclosure of sold/ booked inventoryCircular 29_11zon (1).pdf · uploaded 23 Jun 2025Source
- 3 Disclosure of sold/ booked inventory3 Disclosure of sold_ booked inventory (3) (1)_11zon.pdf · uploaded 23 Jun 2025Source
- Form 1Form 1 - Kharghar Bus Depot as on June 2025 (Signed).PDF · uploaded 3 Jan 2026Source
- Form 2Form 2 - Kharghar Bus Depot as on June 2025 (Signed).PDF · uploaded 3 Jan 2026Source
- Form 3Form 3 - Kharghar Bus Depot as on June 2025 (Signed)_compressed.pdf · uploaded 3 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Kharghar Bus Depot as on Sep 2025.pdf · uploaded 3 Jan 2026Source
- Form 1Form 1 Kharghar Bus Depot as on 30-09-2025.pdf · uploaded 3 Jan 2026Source
- Form 2Form 2 - Kharghar Bus Depot as on Sep 2025.pdf · uploaded 3 Jan 2026Source
- Form 3Form 3 Kharghar Bus Depot as on 30-09-2025 Final_compressed.pdf · uploaded 3 Jan 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Kharghar Bus Depot as on Sep 2025.pdf · uploaded 3 Jan 2026Source
- Form 1Form 1 Kharghar Bus Depot as on Dec 2025.pdf · uploaded 17 Feb 2026Source
- Form 2Form 2 - Kharghar Bus Depot as on Dec 2025.pdf · uploaded 17 Feb 2026Source
- Form 3Form 3 Kharghar Bus Depot as on 31-12-2025.pdf · uploaded 17 Feb 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Kharghar Bus Depot as on Dec 2025.pdf · uploaded 17 Feb 2026Source
- Form 1Form 1 Kharghar Bus Depot as on 30-09-2025.pdf · uploaded 17 Feb 2026Source
- Form 2Form 2 - Kharghar Bus Depot as on Sep 2025.pdf · uploaded 17 Feb 2026Source
- Form 3Form 3 Kharghar Bus Depot as on 30-09-2025 Final.pdf · uploaded 17 Feb 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Kharghar Bus Depot as on Sep 2025.pdf · uploaded 17 Feb 2026Source
- Form 5 (FY 2024-2025)Final Form 5 of Kharghar Bus Depot as on 31-03-2025.pdf · uploaded 8 Jun 2026Source
- Form 1Form 1 - Kharghar Bus Depot as on March 2026.pdf · uploaded 24 Jun 2026Source
- Form 2Form 2 - Kharghar Bus Depot as on March 2026.pdf · uploaded 24 Jun 2026Source
- Form 3Form 3 Kharghar Bus Depot as on 31-12-2025.pdf · uploaded 24 Jun 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Kharghar Bus Depot as on Dec 2025.pdf · uploaded 24 Jun 2026Source
Technical
Technical (Architect)
- DocumentSec 14 Kharghar Bus Depot Mar 23_compressed.pdf · uploaded 3 May 2024Source
- DocumentKharghar Bus Depot Sec-14 30323.pdf · uploaded 10 Feb 2025Source
- DocumentKharghar Bus Depot Sec-14 30623.pdf · uploaded 10 Feb 2025Source
- DocumentKharghar Bus Depot Sec-14 30923.pdf · uploaded 10 Feb 2025Source
- DocumentKharghar Bus Depot Sec-14 301223.pdf · uploaded 10 Feb 2025Source
- DocumentKharghar Bus Depot - Sep 23.pdf · uploaded 15 Feb 2025Source
- DocumentKharghar Bus Depot - Dec 23.pdf · uploaded 15 Feb 2025Source
- DocumentKharghar Bus Depot - Mar 24.pdf · uploaded 15 Feb 2025Source
- DocumentKharghar Bus Depot - June 24.pdf · uploaded 15 Feb 2025Source
- DocumentKharghar Bus Depot - Sep 24.pdf · uploaded 15 Feb 2025Source
- DocumentKharghar Bus Depot - Dec 24.pdf · uploaded 15 Feb 2025Source
- DocumentForm 1 - Kharghar Bus Depot as on March 2025.pdf · uploaded 16 May 2025Source
Technical (Engineer)
- DocumentKharghar BD June 23.pdf · uploaded 3 May 2024Source
- DocumentDec 2023 KHBD.pdf · uploaded 10 Feb 2025Source
- DocumentJun 2023 Form-II KHBD.pdf · uploaded 10 Feb 2025Source
- DocumentMarch 2023 Form-II KHBD.pdf · uploaded 10 Feb 2025Source
- DocumentSept 2023 KHBD.pdf · uploaded 10 Feb 2025Source
- DocumentForm 2 - Kharghar Bus Depot as on March 2024.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2 - Kharghar Bus Depot as on June 2024.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2 - Kharghar Bus Depot as on Sep 2024.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2 - Kharghar Bus Depot as on Dec 2024.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2 - Kharghar Bus Depot as on March 2025.pdf · uploaded 14 Jun 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kharghar, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Muslim BG Christan BG and Other BG
- South
- Open Space
- East
- 35 MTR Wide Road
- West
- Playground and C R Plot
Source: registration certificates and MahaRERA's project page, as stated there.