Vijay Abode
Certificate SignedAdai, Raigarh 410206 |Promoter: Vijaybahadur Shivmurat Sharma
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 6
- Unit types
- 1BHK, 1RK, 2BHK170 units in all
- Address
- S. No 123/2 3a 123/2 3b 135/2 137/4 138/3 Adai Village Tal. Panvel Dist. Raigad, Near St. George School At Post Adai, Plot No 123 135 137 138 AdaiPIN 410206
- Designated bank account
- 51
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 5 years and 9 months
- Registered
- 7 May 2019
- Promised
- 30 Mar 2023
- Revised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000020728 | 7 May 2019 | 30 Mar 2023 | 31 Dec 2028 | Vijaybahadur Shivmurat Sharma | Project page |
6 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building 1 - Wing A | 2 | 16 |
| Building 2 - Wing A and Wing B | 4 | 32 |
| Building 3 - Wing A and Wing B | 4 | 32 |
| BUILDING 4 - Wing A and Wing B | 4 | 32 |
| BUILDING 5 - Wing A and Wing B | 4 | 32 |
| BUILDING 6 EWS - Wing A and Wing B | 4 | 26 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
80 of 170 units booked (47%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1 - Wing A | 1BHK | 26.15 sq m · 281 sq ft | 4 | 0 |
| Building 1 - Wing A | 1BHK | 28.43 sq m · 306 sq ft | 4 | 0 |
| Building 1 - Wing A | 1BHK | 28.58 sq m · 308 sq ft | 4 | 0 |
| Building 1 - Wing A | 1RK | 19.48 sq m · 210 sq ft | 4 | 0 |
| Building 2 - Wing A and Wing B | 1BHK | 29.53 sq m · 318 sq ft | 8 | 8 |
| Building 2 - Wing A and Wing B | 1BHK | 29.91 sq m · 322 sq ft | 8 | 8 |
| Building 2 - Wing A and Wing B | 2BHK | 39.55 sq m · 426 sq ft | 8 | 8 |
| Building 2 - Wing A and Wing B | 2BHK | 39.64 sq m · 427 sq ft | 8 | 8 |
Show all 27 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 3 - Wing A and Wing B | 1BHK | 28.41 sq m · 306 sq ft | 4 | 0 |
| Building 3 - Wing A and Wing B | 1BHK | 28.49 sq m · 307 sq ft | 4 | 1 |
| Building 3 - Wing A and Wing B | 1BHK | 28.53 sq m · 307 sq ft | 4 | 1 |
| Building 3 - Wing A and Wing B | 1BHK | 28.57 sq m · 308 sq ft | 4 | 1 |
| Building 3 - Wing A and Wing B | 1BHK | 28.65 sq m · 308 sq ft | 8 | 1 |
| Building 3 - Wing A and Wing B | 1BHK | 28.75 sq m · 309 sq ft | 8 | 2 |
| BUILDING 4 - Wing A and Wing B | 1BHK | 28.87 sq m · 311 sq ft | 6 | 5 |
| BUILDING 4 - Wing A and Wing B | 1BHK | 28.9 sq m · 311 sq ft | 2 | 2 |
| BUILDING 4 - Wing A and Wing B | 1BHK | 29.5 sq m · 318 sq ft | 8 | 6 |
| BUILDING 4 - Wing A and Wing B | 2BHK | 39.55 sq m · 426 sq ft | 8 | 7 |
| BUILDING 4 - Wing A and Wing B | 2BHK | 39.64 sq m · 427 sq ft | 8 | 7 |
| BUILDING 5 - Wing A and Wing B | 1BHK | 28.49 sq m · 307 sq ft | 8 | 4 |
| BUILDING 5 - Wing A and Wing B | 1BHK | 28.57 sq m · 308 sq ft | 8 | 3 |
| BUILDING 5 - Wing A and Wing B | 1BHK | 28.65 sq m · 308 sq ft | 8 | 4 |
| BUILDING 5 - Wing A and Wing B | 1BHK | 28.75 sq m · 309 sq ft | 8 | 4 |
| BUILDING 6 EWS - Wing A and Wing B | 1BHK | 30.92 sq m · 333 sq ft | 6 | 0 |
| BUILDING 6 EWS - Wing A and Wing B | 1BHK | 31.25 sq m · 336 sq ft | 7 | 0 |
| BUILDING 6 EWS - Wing A and Wing B | 1BHK | 31.53 sq m · 339 sq ft | 7 | 0 |
| BUILDING 6 EWS - Wing A and Wing B | 1BHK | 32.24 sq m · 347 sq ft | 6 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardPAN V S SHARMA.pdf · uploaded 22 Apr 2019Source
Legal
Show all 128 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Scan-00031.pdf · uploaded 22 Apr 2019Source
- 1 Copy of the legal title reportSearch and Title Report.pdf · uploaded 23 Apr 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 23 Apr 2019Source
- 1 Certificates of CA (Form 3)MOHITE.pdf · uploaded 24 Apr 2019Source
- 1 Building Plan Approval (IOD)Scan-0004_compressed.pdf · uploaded 25 Apr 2019Source
- 2 Building Plan Approval (IOD)Scan-0005_compressed.pdf · uploaded 25 Apr 2019Source
- 3 Building Plan Approval (IOD)Scan-0006_compressed.pdf · uploaded 25 Apr 2019Source
- 4 Building Plan Approval (IOD)Scan-0007_compressed.pdf · uploaded 25 Apr 2019Source
- 5 Building Plan Approval (IOD)Scan-0008_compressed.pdf · uploaded 25 Apr 2019Source
- 6 Building Plan Approval (IOD)Scan-0009_compressed.pdf · uploaded 25 Apr 2019Source
- 7 Building Plan Approval (IOD)Scan-0010_compressed.pdf · uploaded 25 Apr 2019Source
- 8 Building Plan Approval (IOD)Scan-0011_compressed.pdf · uploaded 25 Apr 2019Source
- 1 Proforma of Allotment letterALOTTMENT.pdf · uploaded 25 Apr 2019Source
- 2 Proforma of Allotment letteroUR AGREREMENT.pdf · uploaded 25 Apr 2019Source
- 1 Declaration in FORM Bdoc_compressed.pdf · uploaded 2 May 2019Source
- 1 Details of Restarting of Construction work post lockdownDetails of Restarting.pdf · uploaded 30 Jun 2020Source
- 2 Details of encumbrancesDeclaration For Encumbrances.pdf · uploaded 25 Mar 2021Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 7 Feb 2023Source
- 1 Disclosure of sold/ booked inventoryVijay Abode circuler_compressed.pdf · uploaded 7 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 2019-20.pdf · uploaded 10 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 2020-21.pdf · uploaded 10 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 2021-22.pdf · uploaded 10 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Mar 2020 - Form 2.pdf · uploaded 17 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Mar 2021 - Form 2.pdf · uploaded 17 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Dec 2021 - Form 2.pdf · uploaded 17 Mar 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Mar 2022 - Form 2.pdf · uploaded 17 Mar 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Jun 2022 - Form 2.pdf · uploaded 17 Mar 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Sept 2022 - Form 2.pdf · uploaded 17 Mar 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vijay Abode Dec 2022 - Form 2.pdf · uploaded 17 Mar 2023Source
- 2 Certificates of CA (Form 3)Form 3- Vijay Abode as on March 2020.pdf · uploaded 17 Mar 2023Source
- 3 Certificates of CA (Form 3)Form 3- Vijay Abode as on March 2021.pdf · uploaded 17 Mar 2023Source
- 4 Certificates of CA (Form 3)Form 3- Vijay Abode as on December 2021.pdf · uploaded 17 Mar 2023Source
- 5 Certificates of CA (Form 3)Form 3- Vijay Abode as on March 2022.pdf · uploaded 17 Mar 2023Source
- 6 Certificates of CA (Form 3)Form 3- Vijay Abode as on June 2022.pdf · uploaded 17 Mar 2023Source
- 7 Certificates of CA (Form 3)Form 3- Vijay Abode as on September 2022.pdf · uploaded 17 Mar 2023Source
- 8 Certificates of CA (Form 3)Form 3- Vijay Abode as on December 2022.pdf · uploaded 17 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Mar 20.pdf · uploaded 29 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Mar 21.pdf · uploaded 29 Mar 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Dec 21.pdf · uploaded 29 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Jun 22.pdf · uploaded 29 Mar 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Sept 22.pdf · uploaded 29 Mar 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 - Dec 22.pdf · uploaded 29 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Year of 19-20.pdf · uploaded 31 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Year Of 20-2021.pdf · uploaded 31 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Year Of 21-2022.pdf · uploaded 31 Mar 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Vijay Abode as on March 2023.pdf · uploaded 6 May 2023Source
- 9 Certificates of CA (Form 3)Form 3- Vijay Abode as on 31-03-2023.pdf · uploaded 6 May 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Vijay Abode as on June 2023.pdf · uploaded 3 Aug 2023Source
- 10 Certificates of CA (Form 3)Form 3- Vijay Abode as on 30-06-2023.pdf · uploaded 3 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Vijay Abode for FY 2022-23.pdf · uploaded 26 Dec 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society.pdf · uploaded 10 Jan 2024Source
- 1 Status of ConveyanceConveyance.pdf · uploaded 10 Jan 2024Source
- 2 Declaration in FORM BAffidavit cum Declaration.pdf · uploaded 14 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec.pdf · uploaded 14 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From 2A 22-23.pdf · uploaded 14 Feb 2024Source
- 1 CERSAI detailsCersai Declaration.pdf · uploaded 14 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryCircular 29_11zon.pdf · uploaded 14 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 14 Feb 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)From 5 22-23.pdf · uploaded 14 Feb 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 14 Feb 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vijay Abode as on September 2023.pdf · uploaded 16 Feb 2024Source
- 11 Certificates of CA (Form 3)Form 3 - Vijay Abode as on Sep 2023.pdf · uploaded 16 Feb 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate From 2_11zon.pdf · uploaded 19 Feb 2024Source
- 12 Certificates of CA (Form 3)From 3_11zon.pdf · uploaded 19 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 4 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Vijay Abode Form 1 As on 31st December 2023_11zon.pdf · uploaded 5 Mar 2024Source
- 3 Disclosure of sold/ booked inventoryCircular 29_11zon.pdf · uploaded 5 Mar 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Architects Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 16 May 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vijay Abode as on March 2024.pdf · uploaded 16 May 2024Source
- 13 Certificates of CA (Form 3)Form 3 - Vijay Abode as on March 2024.pdf · uploaded 16 May 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 20 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 20 Jul 2024Source
- 14 Certificates of CA (Form 3)rrrrrrrrrr.pdf · uploaded 20 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 17 Feb 2025Source
- 1 Certificates of CA (Form 3)14 Certificates of CA (Form 3).pdf · uploaded 17 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 17 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Vijay Abode FY 2023-24.pdf · uploaded 12 Mar 2025Source
- 1 Certificates of CA (Form 3)Form 3 - Vijay Abode as on June 2024.pdf · uploaded 27 Mar 2025Source
- 2 Certificates of CA (Form 3)Form 3 - Vijay Abode as on Sep 2024.pdf · uploaded 27 Mar 2025Source
- 3 Certificates of CA (Form 3)Form 3 - Vijay Abode as on Dec 2024.pdf · uploaded 27 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vijay Abode as on June 2024.pdf · uploaded 27 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vijay Abode as on Sep 2024.pdf · uploaded 27 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Vijay Abode as on Dec 2024.pdf · uploaded 27 Mar 2025Source
- Form 1Form 1 - Vijay Abode June 2026.pdf · uploaded 28 Jul 2026Source
- Form 2Form 2 - Vijay Abode June 2026.pdf · uploaded 28 Jul 2026Source
- Form 3Form 3 - Vijay Abode June 2026.pdf · uploaded 28 Jul 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Vijay Abode June 2026.pdf · uploaded 28 Jul 2026Source
- Form 1Form 1 - Vijay Abode as on June 2025.pdf · uploaded 11 Sep 2026Source
- Form 2Form 2 - Vijay Abode as on June 2025.pdf · uploaded 11 Sep 2026Source
- Form 3Form 3 - Vijay Abode as on June 2025.pdf · uploaded 11 Sep 2026Source
- Disclosure of Sold and Booked InventoryCircular-29 Vijay Abode as on Dec 2025.pdf · uploaded 11 Sep 2026Source
- Form 1Form 1 - Vijay Abode as on Sep 2025.pdf · uploaded 11 Sep 2026Source
- Form 2Form 2 - Vijay Abode as on Sep 2025.pdf · uploaded 11 Sep 2026Source
- Form 3Form 3 - Vijay Abode as on Sep 2025.pdf · uploaded 11 Sep 2026Source
- Disclosure of Sold and Booked InventoryCircular-29- Vijay Abode as on Sep 2025.pdf · uploaded 11 Sep 2026Source
- Form 1Form 1 - Vijay Abode as on Dec 2025.pdf · uploaded 11 Sep 2026Source
- Form 2Form 2 - Vijay Abode as on Dec 2025.pdf · uploaded 11 Sep 2026Source
- Form 3Form 3 - Vijay Abode as on Dec 2025.pdf · uploaded 11 Sep 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Vijay Abode as on Dec 2025.pdf · uploaded 11 Sep 2026Source
- Form 1Form 1 - Vijay Abode June 2026_compressed.pdf · uploaded 11 Sep 2026Source
- Form 2Form 2 - Vijay Abode June 2026.pdf · uploaded 11 Sep 2026Source
- Form 3Form 3 - Vijay Abode June 2026.pdf · uploaded 11 Sep 2026Source
- Disclosure of Sold and Booked InventoryCircular-29- Vijay Abode June 2026.pdf · uploaded 11 Sep 2026Source
- Form 5 (FY 2024-2025)Form 5 - Vijay Abode FY 2024-25.pdf · uploaded 18 Sep 2026Source
Technical
- DocumentScan-00031.pdf · uploaded 22 Apr 2019Source
- DocumentScan-0004_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0005_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0006_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0007_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0008_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0009_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0010_compressed.pdf · uploaded 25 Apr 2019Source
- DocumentScan-0011_compressed.pdf · uploaded 25 Apr 2019Source
Technical (Architect)
Technical (Engineer)
- Document12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 20 Jul 2024Source
- Document13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 17 Feb 2025Source
- DocumentForm 2 - Vijay Abode as on June 2024.pdf · uploaded 27 Mar 2025Source
- DocumentForm 2 - Vijay Abode as on Sep 2024.pdf · uploaded 27 Mar 2025Source
- DocumentForm 2 - Vijay Abode as on Dec 2024.pdf · uploaded 27 Mar 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Adai, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 137-2 137-1 136
- South
- 123-1 123-4
- East
- 139 138-2
- West
- 138-4 135-2 135-3
Source: registration certificates and MahaRERA's project page, as stated there.