Gulab Shilp
Certificate SignedWarje, Pune 411058 |Promoter: Buttepatil Properties
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK50 units in all
- Address
- 80/2/1, Dodke Park Road, AtulnagarPIN 411058
- Designated bank account
- 154
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
12 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 13 Oct 2026 | Primary sale | ≈ ₹54 L | ≈ ₹9,075 | ||
| 13 Oct 2026 | Cancellation | ≈ ₹10,000 | — | ||
| 27 Aug 2026 | Primary sale | ≈ ₹70 L | ≈ ₹10,574 | ||
| 11 Aug 2026 | Primary sale | ≈ ₹52 L | ≈ ₹11,791 | ||
| 31 Jul 2026 | Bldg Name · Unit 202 | Rental | ≈ ₹60,000 | — | |
| 10 Jul 2026 | Primary sale | ≈ ₹65 L | ≈ ₹10,449 | ||
| 5 May 2026 | Bldg Name · Unit 201 | Rental | ≈ ₹60,000 | — | |
| 7 Jan 2026 | Bldg Name · Unit 404 | Rental | ≈ ₹60,000 | — | |
| 2 Sep 2025 | Bldg Name · Unit 202 | Rental | ≈ ₹60,000 | — | |
| 25 Jul 2025 | Bldg Name · Unit 201 | Rental | ≈ ₹60,000 | — | |
| 25 Jun 2025 | Bldg Name · Unit 201 | Rental | ≈ ₹1 L | — | |
| 4 Jun 2025 | Bldg Name · Unit 202 | Rental | ≈ ₹50,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 2 Feb 2022
- Promised
- 31 Mar 2027
- Revised
- 31 Jul 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032862 | 2 Feb 2022 | 31 Mar 2027 | 31 Jul 2027 | Buttepatil Properties | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Gulab Shilp | 11 | 50 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
50 of 50 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 45.43 sq m · 489 sq ft | 10 | 10 |
| 2BHK | 57.04 sq m · 614 sq ft | 10 | 10 |
| 2BHK | 60.2 sq m · 648 sq ft | 10 | 10 |
| 2BHK | 65.4 sq m · 704 sq ft | 10 | 10 |
| 2BHK | 66.33 sq m · 714 sq ft | 10 | 10 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 123 filings listed on MahaRERA's project page
Finance
- PAN CardPROP.pdf · uploaded 18 Jan 2022Source
Legal
- Legal Title reportWarje Rera Legal Title Report.pdf · uploaded 25 Dec 2021Source
- Declaration Form Bform B.pdf · uploaded 19 Jan 2022Source
- Declaration Form BAffidavit Cum Declaration Form B EXTENSION.pdf · uploaded 15 Mar 2024Source
- Declaration Form BFORM B rera warje 19225.pdf · uploaded 19 Feb 2025Source
- Declaration Form BFORM B Warje Delaration 110425.pdf · uploaded 11 Apr 2025Source
Show all 125 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportWarje Rera Legal Title Report.pdf · uploaded 25 Dec 2021Source
- 1 Copy of Layout Approval (in case of layout)Declaration Layout.pdf · uploaded 25 Dec 2021Source
- 1 Declaration about Commencement CertificateDeclaration C C.pdf · uploaded 25 Dec 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTI WARJE.pdf · uploaded 25 Dec 2021Source
- 1 Proforma of Allotment letterAGREEMENT FOR SALE-Warje-Buttepatil.pdf · uploaded 25 Dec 2021Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 25 Dec 2021Source
- 1 CERSAI detailsCERSAI-WARJE GULAB SHILP-.pdf · uploaded 27 Dec 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentWARAJE PLAN.pdf · uploaded 3 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentWARAJE CC.pdf · uploaded 3 Jan 2022Source
- 1 PAN CardPROP.pdf · uploaded 18 Jan 2022Source
- 1 Declaration in FORM Bform B.pdf · uploaded 19 Jan 2022Source
- 1 Details of encumbrancesENCUMBRANCE WARJE.pdf · uploaded 27 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentWARJE PLAN 1.pdf · uploaded 12 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentWARJE PLAN 2.pdf · uploaded 12 Jan 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentWarje CC.pdf · uploaded 12 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)GULAB SHILP FORM 5 MAR-2022.pdf · uploaded 8 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC March 2022.pdf · uploaded 19 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC June 2022.pdf · uploaded 19 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC Sept 2022.pdf · uploaded 19 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC Dec 2022.pdf · uploaded 19 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC March 2023.pdf · uploaded 19 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC June 2023.pdf · uploaded 19 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC Sept 2023.pdf · uploaded 19 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Gulab Shilp EC Dec 2023.pdf · uploaded 19 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A QUALITY ASSU MAR 22.pdf · uploaded 19 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A QUALITY ASSU MAR 23.pdf · uploaded 19 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gulab Shilp Dec 2022 (1).pdf · uploaded 19 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gulab Shilp March 2023 (1).pdf · uploaded 19 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gulab Shilp June 2023 (1).pdf · uploaded 19 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gulab Shilp Sept 2023 (1).pdf · uploaded 19 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Gulab Shilp Dec 2023 (1).pdf · uploaded 19 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 MAR 23 GULAB SHILP.pdf · uploaded 23 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC DEC 2022 GULAB SHILP.pdf · uploaded 25 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC MAR 2023 GULAB SHILP.pdf · uploaded 25 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC JUNE 2023 GULAB SHILP.pdf · uploaded 25 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC SEP 2023 GULAB SHILP.pdf · uploaded 25 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC DEC 2023 GULAB SHILP.pdf · uploaded 25 Jan 2024Source
- 2 Declaration in FORM BAffidavit Cum Declaration Form B EXTENSION.pdf · uploaded 15 Mar 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 STAMP WARJE.pdf · uploaded 18 Mar 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A WARJE STAMP.pdf · uploaded 18 Mar 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A WARJE STAMP.pdf · uploaded 18 Mar 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold Unsold WARJE.pdf · uploaded 18 Mar 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 WARJE STAMP.pdf · uploaded 18 Mar 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGIN FORM 2.pdf · uploaded 19 Mar 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA G SHILP mar 24 C.pdf · uploaded 21 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA G SHILP june 24 C.pdf · uploaded 21 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 GULAB SHILP mar 24.pdf · uploaded 21 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTI Gulab Shilp MAR 24.pdf · uploaded 22 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Gulab Shilp ArC Sept 2024.pdf · uploaded 7 Nov 2024Source
- 1 Declaration in FORM BFORM B rera warje 19225.pdf · uploaded 19 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC SHILP DEC 24.pdf · uploaded 21 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 Q2 Gulab Shilp.pdf · uploaded 21 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Q2 gulab shilp.pdf · uploaded 22 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q3 GULAB SHILP.pdf · uploaded 22 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 Form 2 Gulab Shilp 300624.pdf · uploaded 22 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 form 2 310324.pdf · uploaded 22 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 Q3 Gulab Shilp.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest.pdf · uploaded 22 Feb 2025Source
- 1 Declaration in FORM BFORM B Warje Delaration 110425.pdf · uploaded 11 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure Of Sold Unsold WARJE 17225.pdf · uploaded 11 Apr 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentWarje Part Completion Certificate_compressed.pdf · uploaded 15 Apr 2025Source
- Form 1Gulab Shilp Form 1 Arch Mar 25 Q4.pdf · uploaded 27 May 2025Source
- Form 2Gulab Shilp Form 2 Eng Mar 25 Q4.pdf · uploaded 27 May 2025Source
- Form 3GULAB SHILP Form 3 CA Mar 25 Q4.pdf · uploaded 27 May 2025Source
- Withdrawal Update Form 1form 1 warje 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1form 1 warje 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1form 1 warje 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1form 1 warje 150725.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2warje form 2 151025 1.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2warje form 2 151025 1.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2warje form 2 151025 1.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2form 2 warje 050725.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3WARJE FORM 3 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3WARJE FORM 3 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3WARJE FORM 3 151025.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3form3 warje q1 25.pdf · uploaded 18 Oct 2025Source
- Form 5 (FY 2024-2025)FORM-5 GULAB SHILP.pdf · uploaded 7 Nov 2025Source
- Form 2A (FY 2024-2025)Gulab Shilp 2A.pdf · uploaded 10 Nov 2025Source
- Withdrawal Update Form 1Gulab Shilp Down Arc.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 2Gulab Shilp Eng cer Form 2 Q3.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 3Gulab Shilp Form 3.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 1ARC SHILP Q4.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 2EC SHILP Q4.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 3CA SHILP Q4.pdf · uploaded 7 May 2026Source
- Form 2A (FY 2021-2022)Form 2A Gulab Shilp 23 24.pdf · uploaded 30 Jul 2026Source
- Form 2A (FY 2022-2023)Form 2A Gulab Shilp 23 24.pdf · uploaded 30 Jul 2026Source
- Form 2A (FY 2023-2024)Form 2A Gulab Shilp 23 24.pdf · uploaded 30 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A Gulab Shilp 24 25.pdf · uploaded 30 Jul 2026Source
- Form 2A (FY 2026-2027)Form 2A Serenity Springs 25 26.pdf · uploaded 30 Jul 2026Source
- Withdrawal Update Form 1ARC SHILP Q4.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2EC SHILP Q4.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3CA SHILP Q4.pdf · uploaded 4 Aug 2026Source
- Occupational CertificateGULAB SHILP Completion Cer - 1.pdf · uploaded 21 Sep 2026Source
- Occupational CertificateGULAB SHILP 1st Sanation Plan.pdf · uploaded 21 Sep 2026Source
- Occupational CertificateGULAB SHILP Completion Cer - 2.pdf · uploaded 21 Sep 2026Source
- Occupational CertificateGulab Shilp 2nd Sancation Plan.pdf · uploaded 21 Sep 2026Source
- Occupational CertificateGulab Shilp Completion Cer - 3.pdf · uploaded 21 Sep 2026Source
- Occupational CertificateWarje 3rd Sanction Plan_260626_115454 - new.pdf · uploaded 21 Sep 2026Source
- Occupational Certificateemail.pdf · uploaded 21 Sep 2026Source
Technical
- DocumentDeclaration Layout.pdf · uploaded 25 Dec 2021Source
- DocumentWARAJE PLAN.pdf · uploaded 3 Jan 2022Source
- DocumentWARJE PLAN 1.pdf · uploaded 12 Jan 2023Source
- DocumentWARJE PLAN 2.pdf · uploaded 12 Jan 2023Source
- DocumentWarje 3rd Sanction PLAN 1.pdf · uploaded 1 Apr 2026Source
- DocumentWarje 3rd Sanction PLAN 2.pdf · uploaded 1 Apr 2026Source
- DocumentWarje 3rd Sanction PLAN 3.pdf · uploaded 1 Apr 2026Source
- DocumentWarje 3rd Sanction PLAN 1.pdf · uploaded 1 Apr 2026Source
- DocumentWarje 3rd Sanction PLAN 2.pdf · uploaded 1 Apr 2026Source
- DocumentWarje 3rd Sanction PLAN 3.pdf · uploaded 1 Apr 2026Source
Technical (Architect)
Technical (Engineer)
- Documentform 2 Q2 Gulab Shilp.pdf · uploaded 21 Feb 2025Source
- DocumentQ2 Form 2 Gulab Shilp 300624.pdf · uploaded 22 Feb 2025Source
- DocumentQ4 form 2 310324.pdf · uploaded 22 Feb 2025Source
- Documentform 2 Q3 Gulab Shilp.pdf · uploaded 22 Feb 2025Source
- DocumentEC SHILP Q4.pdf · uploaded 7 May 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Warje, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Road
- South
- Atulnagar
- East
- Barate Property
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Siddhart Harishchandrakar | — |
| Chartered accountant | Ambar Naik | — |
| Engineer | Kalpesh Manani | — |
| Engineer | Parag Chopda | — |
Source: MahaRERA project page. Contact details are not shown.