Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 2BHK, 2BHK Landowner unit, 2BHK Landowner units, 3BHK, 3BHK Landowner unit, 3BHK Landowner units, 4BHK, Duplex1, Duplex2, Duplex L.O, Landowner units, 4BHK Landowner units, Duplex 1, Duplex 3, Shop 1, Shop 2 L.O, Shop 3 L.O, Shop 4, Shop 5, Shop 6, Shop 7, Shop 8284 units in all
- Address
- 172 1 B Part and 172 1 C, Shankar Kalate Marg, WakadPIN 411057
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2026
The latest completion date on record passed 4 months ago.
- Registered
- 11 Apr 2022
- Promised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100034523 | 11 Apr 2022 | 30 Jun 2026 | 30 Jun 2026 | Vilas Javdekar Lifestyle Developers Pvt. Ltd. | Project page |
3 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building A | 28 | 151 |
| Building B | 28 | 125 |
| Building Commercial | 2 | 8 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
278 of 284 units booked (98%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 2BHK | 60.08 sq m · 647 sq ft | 7 | 7 |
| Building A | 2BHK | 60.11 sq m · 647 sq ft | 15 | 15 |
| Building A | 2BHK | 60.18 sq m · 648 sq ft | 3 | 3 |
| Building A | 2BHK Landowner unit | 66.59 sq m · 717 sq ft | 1 | 1 |
| Building A | 2BHK Landowner units | 60.11 sq m · 647 sq ft | 7 | 7 |
| Building A | 2BHK Landowner units | 60.18 sq m · 648 sq ft | 2 | 2 |
| Building A | 3BHK | 81 sq m · 872 sq ft | 18 | 18 |
| Building A | 3BHK | 81.45 sq m · 877 sq ft | 1 | 1 |
Show all 53 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building A | 3BHK | 81.85 sq m · 881 sq ft | 5 | 5 |
| Building A | 3BHK | 82.31 sq m · 886 sq ft | 12 | 12 |
| Building A | 3BHK | 82.77 sq m · 891 sq ft | 1 | 1 |
| Building A | 3BHK | 83.36 sq m · 897 sq ft | 5 | 5 |
| Building A | 3BHK | 88.59 sq m · 954 sq ft | 14 | 14 |
| Building A | 3BHK | 88.93 sq m · 957 sq ft | 1 | 1 |
| Building A | 3BHK | 90.04 sq m · 969 sq ft | 1 | 1 |
| Building A | 3BHK | 90.1 sq m · 970 sq ft | 15 | 15 |
| Building A | 3BHK Landowner unit | 81 sq m · 872 sq ft | 8 | 8 |
| Building A | 3BHK Landowner units | 82.31 sq m · 886 sq ft | 6 | 6 |
| Building A | 3BHK Landowner units | 88.59 sq m · 954 sq ft | 8 | 8 |
| Building A | 3BHK Landowner units | 90.1 sq m · 970 sq ft | 7 | 7 |
| Building A | 4BHK | 143.94 sq m · 1,549 sq ft | 8 | 8 |
| Building A | Duplex1 | 119.96 sq m · 1,291 sq ft | 1 | 1 |
| Building A | Duplex2 | 120.04 sq m · 1,292 sq ft | 1 | 1 |
| Building A | Duplex L.O | 119.96 sq m · 1,291 sq ft | 1 | 1 |
| Building A | Duplex L.O | 120.04 sq m · 1,292 sq ft | 1 | 1 |
| Building A | Landowner units | 60.08 sq m · 647 sq ft | 2 | 2 |
| Building B | 2BHK | 60.11 sq m · 647 sq ft | 17 | 17 |
| Building B | 2BHK | 60.18 sq m · 648 sq ft | 12 | 12 |
| Building B | 2BHK Landowner unit | 66.6 sq m · 717 sq ft | 1 | 1 |
| Building B | 2BHK Landowner units | 60.11 sq m · 647 sq ft | 7 | 7 |
| Building B | 2BHK Landowner units | 60.18 sq m · 648 sq ft | 3 | 3 |
| Building B | 3BHK | 81 sq m · 872 sq ft | 19 | 19 |
| Building B | 3BHK | 81.45 sq m · 877 sq ft | 1 | 1 |
| Building B | 3BHK | 82.42 sq m · 887 sq ft | 16 | 16 |
| Building B | 3BHK | 82.77 sq m · 891 sq ft | 1 | 1 |
| Building B | 3BHK | 83.33 sq m · 897 sq ft | 20 | 20 |
| Building B | 3BHK | 89.04 sq m · 958 sq ft | 1 | 1 |
| Building B | 3BHK Landowner unit | 81 sq m · 872 sq ft | 7 | 7 |
| Building B | 3BHK Landowner unit | 83.33 sq m · 897 sq ft | 6 | 6 |
| Building B | 3BHK Landowner units | 82.42 sq m · 887 sq ft | 5 | 5 |
| Building B | 4BHK | 143.94 sq m · 1,549 sq ft | 3 | 3 |
| Building B | 4BHK Landowner units | 143.94 sq m · 1,549 sq ft | 2 | 2 |
| Building B | Duplex 1 | 120.14 sq m · 1,293 sq ft | 2 | 2 |
| Building B | Duplex 3 | 120.18 sq m · 1,294 sq ft | 1 | 1 |
| Building B | Duplex L.O | 120.04 sq m · 1,292 sq ft | 1 | 1 |
| Building Commercial | Shop 1 | 118.93 sq m · 1,280 sq ft | 1 | 0 |
| Building Commercial | Shop 2 L.O | 133.86 sq m · 1,441 sq ft | 1 | 1 |
| Building Commercial | Shop 3 L.O | 144.35 sq m · 1,554 sq ft | 1 | 1 |
| Building Commercial | Shop 4 | 167.56 sq m · 1,804 sq ft | 1 | 0 |
| Building Commercial | Shop 5 | 171.08 sq m · 1,841 sq ft | 1 | 0 |
| Building Commercial | Shop 6 | 173.17 sq m · 1,864 sq ft | 1 | 0 |
| Building Commercial | Shop 7 | 178.92 sq m · 1,926 sq ft | 1 | 0 |
| Building Commercial | Shop 8 | 197.02 sq m · 2,121 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 229 filings listed on MahaRERA's project page
Finance
- PAN CardVJLDPL - PAN.pdf · uploaded 1 Apr 2022Source
- OthersCERSAI Report_BHFL_25 Cr YNC 31-07-25.pdf · uploaded 16 Sep 2025Source
- OthersENCUMBERANCE LETTER YNC SIGNED.pdf · uploaded 16 Sep 2025Source
- Document4) Society Registration Certificate- YNC A Wing.pdf · uploaded 8 Aug 2026Source
- Document4) Society Registration Certificate- YNC B Wing.pdf · uploaded 8 Aug 2026Source
- DocumentSociety Registration Certificate- YNC A-B Wing.pdf · uploaded 14 Aug 2026Source
Legal
- OtherATS Confirmation_NuovoCentro.pdf · uploaded 1 Apr 2022Source
Show all 230 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardVJLDPL - PAN.pdf · uploaded 1 Apr 2022Source
- 1 Copy of the legal title reportTSR_NUOVOCENTRO_compressed.pdf · uploaded 1 Apr 2022Source
- 1 Details of encumbrancesEncumberance_NuovoCentro.pdf · uploaded 1 Apr 2022Source
- 1 Declaration about Commencement CertificateCC Declaration_NuovoCentro.pdf · uploaded 1 Apr 2022Source
- 1 Declaration in FORM BForm B_Developer_compressed.pdf · uploaded 1 Apr 2022Source
- 1 Proforma of Allotment letterATS_NuovoCentro.pdf · uploaded 1 Apr 2022Source
- 2 Proforma of Allotment letterAllotment letter_NuovoCentro.pdf · uploaded 1 Apr 2022Source
- 1 OtherATS Confirmation_NuovoCentro.pdf · uploaded 1 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)NuovoCentro_Layout_300322.pdf · uploaded 4 Apr 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentNuovoCentro_BldgPlan_1_300322.pdf · uploaded 4 Apr 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentNuvoCentro_BldgPlan_02_300322.pdf · uploaded 4 Apr 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentNuovoCentro_BldgPlan_03_300322.pdf · uploaded 4 Apr 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentNuovoCentro_Commencement_300322.pdf · uploaded 4 Apr 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Final.pdf · uploaded 4 Apr 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_cert_NC.pdf · uploaded 4 Apr 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_certificate.pdf · uploaded 4 Apr 2022Source
- 1 CERSAI detailsAsset Based Report_CERSAI_NuovoCentro.pdf · uploaded 6 Apr 2022Source
- 3 Proforma of Allotment letterRevised ATS_VJ Units_YNC_18062022.pdf · uploaded 18 Jun 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH_YNC_JUNE 2022.pdf · uploaded 1 Aug 2022Source
- 1 Disclosure of sold/ booked inventorySI_YASHWIN NUOVOCENTRO_compressed.pdf · uploaded 10 Aug 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Yashwin Nuovo centro_compressed.pdf · uploaded 24 Oct 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_NuovoCentro_Sept 2022_combined.pdf · uploaded 24 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_Cert_NuovoCentro_Sep22.pdf · uploaded 6 Nov 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArYNC_311222.pdf · uploaded 16 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cert_NuovoCentro.pdf · uploaded 17 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_NuovoCentro Combined_compressed.pdf · uploaded 17 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)01 (1).pdf · uploaded 24 Jan 2023Source
- 4 Building Plan Approval / NA Order for plotted development03 (1).pdf · uploaded 24 Jan 2023Source
- 5 Building Plan Approval / NA Order for plotted development07 (1).pdf · uploaded 24 Jan 2023Source
- 6 Building Plan Approval / NA Order for plotted development08 (1).pdf · uploaded 24 Jan 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC (1).pdf · uploaded 24 Jan 2023Source
- 3 Copy of Layout Approval (in case of layout)01_compressed.pdf · uploaded 31 Mar 2023Source
- 7 Building Plan Approval / NA Order for plotted development02_compressed.pdf · uploaded 31 Mar 2023Source
- 8 Building Plan Approval / NA Order for plotted development03_compressed.pdf · uploaded 31 Mar 2023Source
- 9 Building Plan Approval / NA Order for plotted development04_compressed.pdf · uploaded 31 Mar 2023Source
- 10 Building Plan Approval / NA Order for plotted development05_compressed.pdf · uploaded 31 Mar 2023Source
- 11 Building Plan Approval / NA Order for plotted development06_compressed.pdf · uploaded 31 Mar 2023Source
- 12 Building Plan Approval / NA Order for plotted development07_compressed.pdf · uploaded 31 Mar 2023Source
- 13 Building Plan Approval / NA Order for plotted development08_compressed.pdf · uploaded 31 Mar 2023Source
- 14 Building Plan Approval / NA Order for plotted development09_compressed.pdf · uploaded 31 Mar 2023Source
- 15 Building Plan Approval / NA Order for plotted development10_compressed.pdf · uploaded 31 Mar 2023Source
- 16 Building Plan Approval / NA Order for plotted development11_compressed.pdf · uploaded 31 Mar 2023Source
- 17 Building Plan Approval / NA Order for plotted development12_compressed.pdf · uploaded 31 Mar 2023Source
- 18 Building Plan Approval / NA Order for plotted development13_compressed.pdf · uploaded 31 Mar 2023Source
- 19 Building Plan Approval / NA Order for plotted development14_compressed.pdf · uploaded 31 Mar 2023Source
- 20 Building Plan Approval / NA Order for plotted development15_compressed.pdf · uploaded 31 Mar 2023Source
- 21 Building Plan Approval / NA Order for plotted development16_compressed.pdf · uploaded 31 Mar 2023Source
- 22 Building Plan Approval / NA Order for plotted development17_compressed.pdf · uploaded 31 Mar 2023Source
- 23 Building Plan Approval / NA Order for plotted development18_compressed.pdf · uploaded 31 Mar 2023Source
- 24 Building Plan Approval / NA Order for plotted development19_compressed.pdf · uploaded 31 Mar 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC_compressed.pdf · uploaded 31 Mar 2023Source
- 2 Declaration about Commencement CertificateYNC_Declaration_CC.pdf · uploaded 7 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_YNC.pdf · uploaded 8 Apr 2023Source
- 2 Disclosure of sold/ booked inventoryYNC_compressed.pdf · uploaded 14 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_YNC.pdf · uploaded 15 Apr 2023Source
- 2 OtherYNC.pdf · uploaded 12 May 2023Source
- 2 Details of encumbrancesREVISED_ENCUMBERANCE_WITH_CERSAI.pdf · uploaded 23 May 2023Source
- 2 CERSAI detailsYNC_Bajaj CERSAI.pdf · uploaded 23 May 2023Source
- 1 Proforma of Agreement for saleRevised ATS draft with Mortgage Clause_YNC.pdf · uploaded 25 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)YNC_June23.pdf · uploaded 12 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryYNC Sold unsold_compressed.pdf · uploaded 14 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)YNC_compressed.pdf · uploaded 12 Aug 2023Source
- 4 Disclosure of sold/ booked inventoryYNC_Report_Revised_compressed.pdf · uploaded 4 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)VJLDPL RERA NUMBER P52100034523_YNC.pdf · uploaded 16 Sep 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_YNC_Sept 2023_signed.pdf · uploaded 7 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_YNC.pdf · uploaded 10 Oct 2023Source
- 5 Disclosure of sold/ booked inventorysold unsold_YNC_compressed.pdf · uploaded 10 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA- YNC_compressed.pdf · uploaded 11 Oct 2023Source
- 3 OtherYNC.pdf · uploaded 20 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect_YNC_31122023_signed.pdf · uploaded 13 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer Certificate_YNC_signed.pdf · uploaded 13 Jan 2024Source
- 6 Disclosure of sold/ booked inventory1 Sold Unsold_YNC_31122023_signed.pdf · uploaded 13 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate_YNC_Combined_signed_compressed.pdf · uploaded 13 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)5_Architect_YNC_31032024_signed.pdf · uploaded 15 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)5_Engineer Certificate_YNC_signed.pdf · uploaded 15 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)5_Form 2A_YNC_31032024.pdf · uploaded 15 Apr 2024Source
- 7 Disclosure of sold/ booked inventoryYNC_Inventory_31032024_signed.pdf · uploaded 15 Apr 2024Source
- 8 Disclosure of sold/ booked inventory5_Inventory_YNC_31032024_signed.pdf · uploaded 15 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)5_CA Certificate_YNC Combined for RERA_signed.pdf · uploaded 15 Apr 2024Source
- 4 Commencement Certificates / NA Order for plotted development20-CC_10052024.pdf · uploaded 27 May 2024Source
- 3 Declaration about Commencement CertificateYashWin Nuovo Centro commencement certificate 10052024_signed.pdf · uploaded 29 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_certificate_YNC_signed.pdf · uploaded 12 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer_certificate_yashwin_nouvo_centro_signed.pdf · uploaded 13 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate YNC Updated_signed.pdf · uploaded 13 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)5_Form 2A_YNC_31032024.pdf · uploaded 15 Jul 2024Source
- 9 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY YNC_signed.pdf · uploaded 15 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_YNC Combined_signed (1).pdf · uploaded 17 Jul 2024Source
- 10 Disclosure of sold/ booked inventorypdf24_merged YASHWIN NUOVO CENTRO.pdf · uploaded 19 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)19_Form 5 yashwin Nuovocentro Final_signed.pdf · uploaded 15 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER NUOVOCENTRO_signed.pdf · uploaded 22 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY YNC-signed.pdf · uploaded 22 Oct 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)YNC A- LETTER FOR NAME RESERVATION and ACCOUNT OPENING.pdf · uploaded 2 Dec 2024Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)YNC B- LETTER FOR NAME RES ERVATION and ACCOUNT OPENING.pdf · uploaded 2 Dec 2024Source
- 1 Details of encumbrancesEncumbrance letter YNC_signed.pdf · uploaded 4 Dec 2024Source
- 1 CERSAI detailsCERSAI_YNC_closure.pdf · uploaded 4 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_YNC Combined_signed_compressed.pdf · uploaded 27 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate - Yashwin NuovoCentro_signed.pdf · uploaded 10 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold inventory YNC_signed.pdf · uploaded 11 Jan 2025Source
- 1 Declaration about Commencement CertificateDeclaration about cc YNC 12072024_signed.pdf · uploaded 16 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
- 2 Copy of Layout Approval (in case of layout)01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC Dated -12072024_compressed.pdf · uploaded 22 Jan 2025Source
- 13 Building Plan Approval / NA Order for plotted development14- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 15 Building Plan Approval / NA Order for plotted development03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
- 16 Building Plan Approval / NA Order for plotted development04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
- 17 Building Plan Approval / NA Order for plotted development05- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 18 Building Plan Approval / NA Order for plotted development06- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 19 Building Plan Approval / NA Order for plotted development07- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 20 Building Plan Approval / NA Order for plotted development08- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 21 Building Plan Approval / NA Order for plotted development09- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 22 Building Plan Approval / NA Order for plotted development10- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 23 Building Plan Approval / NA Order for plotted development11- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 24 Building Plan Approval / NA Order for plotted development12- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 25 Building Plan Approval / NA Order for plotted development13- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 26 Building Plan Approval / NA Order for plotted development14- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- 12 Building Plan Approval / NA Order for plotted development13- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted development02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted development03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted development04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
- 4 Building Plan Approval / NA Order for plotted development05- Wing A_B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 5 Building Plan Approval / NA Order for plotted development06- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 6 Building Plan Approval / NA Order for plotted development07- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 7 Building Plan Approval / NA Order for plotted development08- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- 8 Building Plan Approval / NA Order for plotted development09- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 9 Building Plan Approval / NA Order for plotted development10- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 10 Building Plan Approval / NA Order for plotted development11- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 11 Building Plan Approval / NA Order for plotted development12- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- 14 Building Plan Approval / NA Order for plotted development02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Nuovo Centro combined_signed.pdf · uploaded 20 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)YNC_Architect_31032025_Signed.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)YNC_Engineer_31032025_Signed.pdf · uploaded 22 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryYNC_Sold Inventory_31032025_Signed.pdf · uploaded 22 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)YNC_Form2A_31032025_Signed.pdf · uploaded 26 Apr 2025Source
- Form 1YNC_Architect_31032025_Signed.pdf · uploaded 6 May 2025Source
- Form 2YNC_Engineer_31032025_Signed.pdf · uploaded 6 May 2025Source
- Form 3CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf · uploaded 6 May 2025Source
- Disclosure of Sold and Booked InventoryYNC_Sold Inventory_31032025_Signed.pdf · uploaded 6 May 2025Source
- OthersYNC_Form2A_31032025_Signed.pdf · uploaded 6 May 2025Source
- Form 2A (FY 2024-2025)YNC_Form2A_31032025_Signed.pdf · uploaded 26 Jun 2025Source
- Withdrawal Update Form 1Architech Certificate YNC 30-06-25.pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 2Engineer Certificate YNC 2 30-06-25.pdf · uploaded 18 Aug 2025Source
- Withdrawal Update Form 3YNC CA Certificate signed Updated.pdf · uploaded 18 Aug 2025Source
- Form 5 (FY 2024-2025)VJLDPL_Form 5_P52100034523_YNC.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1Architect certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2Engineer certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3CA certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
- Occupational CertificateYNC_Part Completion Certificate_ A & B Wing_Dated- 09102025.pdf · uploaded 29 Oct 2025Source
- Occupational CertificateYNC_Completion Certificate_ Shops & IHP_Dated- 29082025.pdf · uploaded 29 Oct 2025Source
- Form 5 (FY 2025-2026)Form 5_ YNC P52100034523.pdf · uploaded 21 Sep 2026Source
Technical
- DocumentNuovoCentro_Layout_300322.pdf · uploaded 4 Apr 2022Source
- DocumentNuovoCentro_BldgPlan_1_300322.pdf · uploaded 4 Apr 2022Source
- DocumentNuvoCentro_BldgPlan_02_300322.pdf · uploaded 4 Apr 2022Source
- DocumentNuovoCentro_BldgPlan_03_300322.pdf · uploaded 4 Apr 2022Source
- Document01 (1).pdf · uploaded 24 Jan 2023Source
- Document03 (1).pdf · uploaded 24 Jan 2023Source
- Document07 (1).pdf · uploaded 24 Jan 2023Source
- Document08 (1).pdf · uploaded 24 Jan 2023Source
- Document01_compressed.pdf · uploaded 31 Mar 2023Source
- Document02_compressed.pdf · uploaded 31 Mar 2023Source
- Document03_compressed.pdf · uploaded 31 Mar 2023Source
- Document04_compressed.pdf · uploaded 31 Mar 2023Source
- Document05_compressed.pdf · uploaded 31 Mar 2023Source
- Document06_compressed.pdf · uploaded 31 Mar 2023Source
- Document07_compressed.pdf · uploaded 31 Mar 2023Source
- Document08_compressed.pdf · uploaded 31 Mar 2023Source
- Document09_compressed.pdf · uploaded 31 Mar 2023Source
- Document10_compressed.pdf · uploaded 31 Mar 2023Source
- Document11_compressed.pdf · uploaded 31 Mar 2023Source
- Document12_compressed.pdf · uploaded 31 Mar 2023Source
- Document13_compressed.pdf · uploaded 31 Mar 2023Source
- Document14_compressed.pdf · uploaded 31 Mar 2023Source
- Document15_compressed.pdf · uploaded 31 Mar 2023Source
- Document16_compressed.pdf · uploaded 31 Mar 2023Source
- Document17_compressed.pdf · uploaded 31 Mar 2023Source
- Document18_compressed.pdf · uploaded 31 Mar 2023Source
- Document19_compressed.pdf · uploaded 31 Mar 2023Source
- Document01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
- Document01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
- Document02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
- Document03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
- Document04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
- Document05- Wing A_B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document06- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document07- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document08- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document09- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document10- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document11- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document12- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document13- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document14- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
- Document02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
- Document03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
- Document04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
- Document05- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document06- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document07- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document08- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
- Document09- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- Document10- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- Document11- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- Document12- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- Document13- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
- Document14- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
Technical (Architect)
- DocumentArchitech certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
- DocumentArchitech Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
- DocumentYNC_Architect_31032025_Signed.pdf · uploaded 22 Apr 2025Source
- DocumentArchitect certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
Technical (Engineer)
- DocumentENGINEER NUOVOCENTRO_signed.pdf · uploaded 22 Oct 2024Source
- DocumentEngineer certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
- DocumentEngineer Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
- DocumentYNC_Engineer_31032025_Signed.pdf · uploaded 22 Apr 2025Source
- DocumentEngineer certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Wakad, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- S No 128 and 132
- South
- Remaining part of S No 172 B
- East
- 24 mtr wide D P road
- West
- S No 132 and 133
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Asad Jawed Ahmed | — |
| Architect | Deepali Patidar | — |
| Architect | Prajakta yadav | — |
| Architect | Sameer Murari Valimbe | — |
| Chartered accountant | Abhijit Mundada | — |
| Chartered accountant | Sunil Shamrao Nimbalkar | — |
| Engineer | Sagar Kale | — |