Skip to content

Yashwin NuovoCentro

Certificate Signed

Wakad, Pune 411057 |Promoter: Vilas Javdekar Lifestyle Developers Pvt. Ltd.

11 Apr 2022Registered with MahaRERA
30 Jun 2026Promised completion
3Buildings
284Units registered278 booked (98%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, 2BHK Landowner unit, 2BHK Landowner units, 3BHK, 3BHK Landowner unit, 3BHK Landowner units, 4BHK, Duplex1, Duplex2, Duplex L.O, Landowner units, 4BHK Landowner units, Duplex 1, Duplex 3, Shop 1, Shop 2 L.O, Shop 3 L.O, Shop 4, Shop 5, Shop 6, Shop 7, Shop 8284 units in all
Address
172 1 B Part and 172 1 C, Shankar Kalate Marg, WakadPIN 411057
Designated bank account
76
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.60004, 73.75792
Yashwin NuovoCentro is at latitude 18.60004, longitude 73.75792.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2026

The latest completion date on record passed 4 months ago.

Registered
11 Apr 2022
Promised
30 Jun 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003452311 Apr 202230 Jun 202630 Jun 2026Vilas Javdekar Lifestyle Developers Pvt. Ltd.Project page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A28151
Building B28125
Building Commercial28

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

278 of 284 units booked (98%), as the promoter reported to MahaRERA

2BHK · 54 units2BHK Landowner unit · 2 units2BHK Landowner units · 19 units3BHK · 131 units3BHK Landowner unit · 21 units3BHK Landowner units · 26 units4BHK · 11 unitsDuplex1 · 1 unitDuplex2 · 1 unitDuplex L.O · 3 unitsLandowner units · 2 units4BHK Landowner units · 2 unitsDuplex 1 · 2 unitsDuplex 3 · 1 unitShop 1 · 1 unitShop 2 L.O · 1 unitShop 3 L.O · 1 unitShop 4 · 1 unitShop 5 · 1 unitShop 6 · 1 unitShop 7 · 1 unitShop 8 · 1 unit
BuildingTypeCarpet areaUnitsBooked
Building A2BHK60.08 sq m · 647 sq ft77
Building A2BHK60.11 sq m · 647 sq ft1515
Building A2BHK60.18 sq m · 648 sq ft33
Building A2BHK Landowner unit66.59 sq m · 717 sq ft11
Building A2BHK Landowner units60.11 sq m · 647 sq ft77
Building A2BHK Landowner units60.18 sq m · 648 sq ft22
Building A3BHK81 sq m · 872 sq ft1818
Building A3BHK81.45 sq m · 877 sq ft11
Show all 53 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building A3BHK81.85 sq m · 881 sq ft55
Building A3BHK82.31 sq m · 886 sq ft1212
Building A3BHK82.77 sq m · 891 sq ft11
Building A3BHK83.36 sq m · 897 sq ft55
Building A3BHK88.59 sq m · 954 sq ft1414
Building A3BHK88.93 sq m · 957 sq ft11
Building A3BHK90.04 sq m · 969 sq ft11
Building A3BHK90.1 sq m · 970 sq ft1515
Building A3BHK Landowner unit81 sq m · 872 sq ft88
Building A3BHK Landowner units82.31 sq m · 886 sq ft66
Building A3BHK Landowner units88.59 sq m · 954 sq ft88
Building A3BHK Landowner units90.1 sq m · 970 sq ft77
Building A4BHK143.94 sq m · 1,549 sq ft88
Building ADuplex1119.96 sq m · 1,291 sq ft11
Building ADuplex2120.04 sq m · 1,292 sq ft11
Building ADuplex L.O119.96 sq m · 1,291 sq ft11
Building ADuplex L.O120.04 sq m · 1,292 sq ft11
Building ALandowner units60.08 sq m · 647 sq ft22
Building B2BHK60.11 sq m · 647 sq ft1717
Building B2BHK60.18 sq m · 648 sq ft1212
Building B2BHK Landowner unit66.6 sq m · 717 sq ft11
Building B2BHK Landowner units60.11 sq m · 647 sq ft77
Building B2BHK Landowner units60.18 sq m · 648 sq ft33
Building B3BHK81 sq m · 872 sq ft1919
Building B3BHK81.45 sq m · 877 sq ft11
Building B3BHK82.42 sq m · 887 sq ft1616
Building B3BHK82.77 sq m · 891 sq ft11
Building B3BHK83.33 sq m · 897 sq ft2020
Building B3BHK89.04 sq m · 958 sq ft11
Building B3BHK Landowner unit81 sq m · 872 sq ft77
Building B3BHK Landowner unit83.33 sq m · 897 sq ft66
Building B3BHK Landowner units82.42 sq m · 887 sq ft55
Building B4BHK143.94 sq m · 1,549 sq ft33
Building B4BHK Landowner units143.94 sq m · 1,549 sq ft22
Building BDuplex 1120.14 sq m · 1,293 sq ft22
Building BDuplex 3120.18 sq m · 1,294 sq ft11
Building BDuplex L.O120.04 sq m · 1,292 sq ft11
Building CommercialShop 1118.93 sq m · 1,280 sq ft10
Building CommercialShop 2 L.O133.86 sq m · 1,441 sq ft11
Building CommercialShop 3 L.O144.35 sq m · 1,554 sq ft11
Building CommercialShop 4167.56 sq m · 1,804 sq ft10
Building CommercialShop 5171.08 sq m · 1,841 sq ft10
Building CommercialShop 6173.17 sq m · 1,864 sq ft10
Building CommercialShop 7178.92 sq m · 1,926 sq ft10
Building CommercialShop 8197.02 sq m · 2,121 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 229 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardVJLDPL - PAN.pdf · uploaded 1 Apr 2022Source
  • OthersCERSAI Report_BHFL_25 Cr YNC 31-07-25.pdf · uploaded 16 Sep 2025Source
  • OthersENCUMBERANCE LETTER YNC SIGNED.pdf · uploaded 16 Sep 2025Source
  • Document4) Society Registration Certificate- YNC A Wing.pdf · uploaded 8 Aug 2026Source
  • Document4) Society Registration Certificate- YNC B Wing.pdf · uploaded 8 Aug 2026Source
  • DocumentSociety Registration Certificate- YNC A-B Wing.pdf · uploaded 14 Aug 2026Source

Legal

  • OtherATS Confirmation_NuovoCentro.pdf · uploaded 1 Apr 2022Source
Show all 230 documentsShow fewer documents

Legal

  • Legal Title reportTSR_NUOVOCENTRO_compressed.pdf · uploaded 1 Apr 2022Source
  • Declaration Form BForm B_Developer_compressed.pdf · uploaded 1 Apr 2022Source
  • OtherYNC.pdf · uploaded 12 May 2023Source
  • OtherYNC.pdf · uploaded 20 Oct 2023Source

Migrated

  • 1 PAN CardVJLDPL - PAN.pdf · uploaded 1 Apr 2022Source
  • 1 Copy of the legal title reportTSR_NUOVOCENTRO_compressed.pdf · uploaded 1 Apr 2022Source
  • 1 Details of encumbrancesEncumberance_NuovoCentro.pdf · uploaded 1 Apr 2022Source
  • 1 Declaration about Commencement CertificateCC Declaration_NuovoCentro.pdf · uploaded 1 Apr 2022Source
  • 1 Declaration in FORM BForm B_Developer_compressed.pdf · uploaded 1 Apr 2022Source
  • 1 Proforma of Allotment letterATS_NuovoCentro.pdf · uploaded 1 Apr 2022Source
  • 2 Proforma of Allotment letterAllotment letter_NuovoCentro.pdf · uploaded 1 Apr 2022Source
  • 1 OtherATS Confirmation_NuovoCentro.pdf · uploaded 1 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)NuovoCentro_Layout_300322.pdf · uploaded 4 Apr 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentNuovoCentro_BldgPlan_1_300322.pdf · uploaded 4 Apr 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentNuvoCentro_BldgPlan_02_300322.pdf · uploaded 4 Apr 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentNuovoCentro_BldgPlan_03_300322.pdf · uploaded 4 Apr 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentNuovoCentro_Commencement_300322.pdf · uploaded 4 Apr 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Final.pdf · uploaded 4 Apr 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_cert_NC.pdf · uploaded 4 Apr 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_certificate.pdf · uploaded 4 Apr 2022Source
  • 1 CERSAI detailsAsset Based Report_CERSAI_NuovoCentro.pdf · uploaded 6 Apr 2022Source
  • 3 Proforma of Allotment letterRevised ATS_VJ Units_YNC_18062022.pdf · uploaded 18 Jun 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH_YNC_JUNE 2022.pdf · uploaded 1 Aug 2022Source
  • 1 Disclosure of sold/ booked inventorySI_YASHWIN NUOVOCENTRO_compressed.pdf · uploaded 10 Aug 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Yashwin Nuovo centro_compressed.pdf · uploaded 24 Oct 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_NuovoCentro_Sept 2022_combined.pdf · uploaded 24 Oct 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng_Cert_NuovoCentro_Sep22.pdf · uploaded 6 Nov 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ArYNC_311222.pdf · uploaded 16 Jan 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Cert_NuovoCentro.pdf · uploaded 17 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_NuovoCentro Combined_compressed.pdf · uploaded 17 Jan 2023Source
  • 2 Copy of Layout Approval (in case of layout)01 (1).pdf · uploaded 24 Jan 2023Source
  • 4 Building Plan Approval / NA Order for plotted development03 (1).pdf · uploaded 24 Jan 2023Source
  • 5 Building Plan Approval / NA Order for plotted development07 (1).pdf · uploaded 24 Jan 2023Source
  • 6 Building Plan Approval / NA Order for plotted development08 (1).pdf · uploaded 24 Jan 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC (1).pdf · uploaded 24 Jan 2023Source
  • 3 Copy of Layout Approval (in case of layout)01_compressed.pdf · uploaded 31 Mar 2023Source
  • 7 Building Plan Approval / NA Order for plotted development02_compressed.pdf · uploaded 31 Mar 2023Source
  • 8 Building Plan Approval / NA Order for plotted development03_compressed.pdf · uploaded 31 Mar 2023Source
  • 9 Building Plan Approval / NA Order for plotted development04_compressed.pdf · uploaded 31 Mar 2023Source
  • 10 Building Plan Approval / NA Order for plotted development05_compressed.pdf · uploaded 31 Mar 2023Source
  • 11 Building Plan Approval / NA Order for plotted development06_compressed.pdf · uploaded 31 Mar 2023Source
  • 12 Building Plan Approval / NA Order for plotted development07_compressed.pdf · uploaded 31 Mar 2023Source
  • 13 Building Plan Approval / NA Order for plotted development08_compressed.pdf · uploaded 31 Mar 2023Source
  • 14 Building Plan Approval / NA Order for plotted development09_compressed.pdf · uploaded 31 Mar 2023Source
  • 15 Building Plan Approval / NA Order for plotted development10_compressed.pdf · uploaded 31 Mar 2023Source
  • 16 Building Plan Approval / NA Order for plotted development11_compressed.pdf · uploaded 31 Mar 2023Source
  • 17 Building Plan Approval / NA Order for plotted development12_compressed.pdf · uploaded 31 Mar 2023Source
  • 18 Building Plan Approval / NA Order for plotted development13_compressed.pdf · uploaded 31 Mar 2023Source
  • 19 Building Plan Approval / NA Order for plotted development14_compressed.pdf · uploaded 31 Mar 2023Source
  • 20 Building Plan Approval / NA Order for plotted development15_compressed.pdf · uploaded 31 Mar 2023Source
  • 21 Building Plan Approval / NA Order for plotted development16_compressed.pdf · uploaded 31 Mar 2023Source
  • 22 Building Plan Approval / NA Order for plotted development17_compressed.pdf · uploaded 31 Mar 2023Source
  • 23 Building Plan Approval / NA Order for plotted development18_compressed.pdf · uploaded 31 Mar 2023Source
  • 24 Building Plan Approval / NA Order for plotted development19_compressed.pdf · uploaded 31 Mar 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC_compressed.pdf · uploaded 31 Mar 2023Source
  • 2 Declaration about Commencement CertificateYNC_Declaration_CC.pdf · uploaded 7 Apr 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_YNC.pdf · uploaded 8 Apr 2023Source
  • 2 Disclosure of sold/ booked inventoryYNC_compressed.pdf · uploaded 14 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_YNC.pdf · uploaded 15 Apr 2023Source
  • 2 OtherYNC.pdf · uploaded 12 May 2023Source
  • 2 Details of encumbrancesREVISED_ENCUMBERANCE_WITH_CERSAI.pdf · uploaded 23 May 2023Source
  • 2 CERSAI detailsYNC_Bajaj CERSAI.pdf · uploaded 23 May 2023Source
  • 1 Proforma of Agreement for saleRevised ATS draft with Mortgage Clause_YNC.pdf · uploaded 25 May 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)YNC_June23.pdf · uploaded 12 Jul 2023Source
  • 3 Disclosure of sold/ booked inventoryYNC Sold unsold_compressed.pdf · uploaded 14 Jul 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)YNC_compressed.pdf · uploaded 12 Aug 2023Source
  • 4 Disclosure of sold/ booked inventoryYNC_Report_Revised_compressed.pdf · uploaded 4 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)VJLDPL RERA NUMBER P52100034523_YNC.pdf · uploaded 16 Sep 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_YNC_Sept 2023_signed.pdf · uploaded 7 Oct 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_YNC.pdf · uploaded 10 Oct 2023Source
  • 5 Disclosure of sold/ booked inventorysold unsold_YNC_compressed.pdf · uploaded 10 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA- YNC_compressed.pdf · uploaded 11 Oct 2023Source
  • 3 OtherYNC.pdf · uploaded 20 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect_YNC_31122023_signed.pdf · uploaded 13 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer Certificate_YNC_signed.pdf · uploaded 13 Jan 2024Source
  • 6 Disclosure of sold/ booked inventory1 Sold Unsold_YNC_31122023_signed.pdf · uploaded 13 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate_YNC_Combined_signed_compressed.pdf · uploaded 13 Jan 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)5_Architect_YNC_31032024_signed.pdf · uploaded 15 Apr 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)5_Engineer Certificate_YNC_signed.pdf · uploaded 15 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)5_Form 2A_YNC_31032024.pdf · uploaded 15 Apr 2024Source
  • 7 Disclosure of sold/ booked inventoryYNC_Inventory_31032024_signed.pdf · uploaded 15 Apr 2024Source
  • 8 Disclosure of sold/ booked inventory5_Inventory_YNC_31032024_signed.pdf · uploaded 15 Apr 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)5_CA Certificate_YNC Combined for RERA_signed.pdf · uploaded 15 Apr 2024Source
  • 4 Commencement Certificates / NA Order for plotted development20-CC_10052024.pdf · uploaded 27 May 2024Source
  • 3 Declaration about Commencement CertificateYashWin Nuovo Centro commencement certificate 10052024_signed.pdf · uploaded 29 May 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_certificate_YNC_signed.pdf · uploaded 12 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer_certificate_yashwin_nouvo_centro_signed.pdf · uploaded 13 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate YNC Updated_signed.pdf · uploaded 13 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)5_Form 2A_YNC_31032024.pdf · uploaded 15 Jul 2024Source
  • 9 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY YNC_signed.pdf · uploaded 15 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_YNC Combined_signed (1).pdf · uploaded 17 Jul 2024Source
  • 10 Disclosure of sold/ booked inventorypdf24_merged YASHWIN NUOVO CENTRO.pdf · uploaded 19 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)19_Form 5 yashwin Nuovocentro Final_signed.pdf · uploaded 15 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER NUOVOCENTRO_signed.pdf · uploaded 22 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD INVENTORY YNC-signed.pdf · uploaded 22 Oct 2024Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)YNC A- LETTER FOR NAME RESERVATION and ACCOUNT OPENING.pdf · uploaded 2 Dec 2024Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)YNC B- LETTER FOR NAME RES ERVATION and ACCOUNT OPENING.pdf · uploaded 2 Dec 2024Source
  • 1 Details of encumbrancesEncumbrance letter YNC_signed.pdf · uploaded 4 Dec 2024Source
  • 1 CERSAI detailsCERSAI_YNC_closure.pdf · uploaded 4 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_YNC Combined_signed_compressed.pdf · uploaded 27 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate - Yashwin NuovoCentro_signed.pdf · uploaded 10 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold inventory YNC_signed.pdf · uploaded 11 Jan 2025Source
  • 1 Declaration about Commencement CertificateDeclaration about cc YNC 12072024_signed.pdf · uploaded 16 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
  • 2 Copy of Layout Approval (in case of layout)01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Dated -12072024_compressed.pdf · uploaded 22 Jan 2025Source
  • 13 Building Plan Approval / NA Order for plotted development14- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 15 Building Plan Approval / NA Order for plotted development03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • 16 Building Plan Approval / NA Order for plotted development04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • 17 Building Plan Approval / NA Order for plotted development05- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 18 Building Plan Approval / NA Order for plotted development06- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 19 Building Plan Approval / NA Order for plotted development07- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 20 Building Plan Approval / NA Order for plotted development08- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 21 Building Plan Approval / NA Order for plotted development09- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 22 Building Plan Approval / NA Order for plotted development10- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 23 Building Plan Approval / NA Order for plotted development11- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 24 Building Plan Approval / NA Order for plotted development12- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 25 Building Plan Approval / NA Order for plotted development13- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 26 Building Plan Approval / NA Order for plotted development14- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • 12 Building Plan Approval / NA Order for plotted development13- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Building Plan Approval / NA Order for plotted development02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
  • 2 Building Plan Approval / NA Order for plotted development03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • 3 Building Plan Approval / NA Order for plotted development04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • 4 Building Plan Approval / NA Order for plotted development05- Wing A_B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 5 Building Plan Approval / NA Order for plotted development06- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 6 Building Plan Approval / NA Order for plotted development07- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 7 Building Plan Approval / NA Order for plotted development08- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • 8 Building Plan Approval / NA Order for plotted development09- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 9 Building Plan Approval / NA Order for plotted development10- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 10 Building Plan Approval / NA Order for plotted development11- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 11 Building Plan Approval / NA Order for plotted development12- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • 14 Building Plan Approval / NA Order for plotted development02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Nuovo Centro combined_signed.pdf · uploaded 20 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)YNC_Architect_31032025_Signed.pdf · uploaded 22 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf · uploaded 22 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)YNC_Engineer_31032025_Signed.pdf · uploaded 22 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryYNC_Sold Inventory_31032025_Signed.pdf · uploaded 22 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)YNC_Form2A_31032025_Signed.pdf · uploaded 26 Apr 2025Source
  • Form 1YNC_Architect_31032025_Signed.pdf · uploaded 6 May 2025Source
  • Form 2YNC_Engineer_31032025_Signed.pdf · uploaded 6 May 2025Source
  • Form 3CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf · uploaded 6 May 2025Source
  • Disclosure of Sold and Booked InventoryYNC_Sold Inventory_31032025_Signed.pdf · uploaded 6 May 2025Source
  • OthersYNC_Form2A_31032025_Signed.pdf · uploaded 6 May 2025Source
  • Form 2A (FY 2024-2025)YNC_Form2A_31032025_Signed.pdf · uploaded 26 Jun 2025Source
  • Withdrawal Update Form 1Architech Certificate YNC 30-06-25.pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 2Engineer Certificate YNC 2 30-06-25.pdf · uploaded 18 Aug 2025Source
  • Withdrawal Update Form 3YNC CA Certificate signed Updated.pdf · uploaded 18 Aug 2025Source
  • Form 5 (FY 2024-2025)VJLDPL_Form 5_P52100034523_YNC.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Architect certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 2Engineer certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
  • Withdrawal Update Form 3CA certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source
  • Occupational CertificateYNC_Part Completion Certificate_ A & B Wing_Dated- 09102025.pdf · uploaded 29 Oct 2025Source
  • Occupational CertificateYNC_Completion Certificate_ Shops & IHP_Dated- 29082025.pdf · uploaded 29 Oct 2025Source
  • Form 5 (FY 2025-2026)Form 5_ YNC P52100034523.pdf · uploaded 21 Sep 2026Source

Technical

  • DocumentNuovoCentro_Layout_300322.pdf · uploaded 4 Apr 2022Source
  • DocumentNuovoCentro_BldgPlan_1_300322.pdf · uploaded 4 Apr 2022Source
  • DocumentNuvoCentro_BldgPlan_02_300322.pdf · uploaded 4 Apr 2022Source
  • DocumentNuovoCentro_BldgPlan_03_300322.pdf · uploaded 4 Apr 2022Source
  • Document01 (1).pdf · uploaded 24 Jan 2023Source
  • Document03 (1).pdf · uploaded 24 Jan 2023Source
  • Document07 (1).pdf · uploaded 24 Jan 2023Source
  • Document08 (1).pdf · uploaded 24 Jan 2023Source
  • Document01_compressed.pdf · uploaded 31 Mar 2023Source
  • Document02_compressed.pdf · uploaded 31 Mar 2023Source
  • Document03_compressed.pdf · uploaded 31 Mar 2023Source
  • Document04_compressed.pdf · uploaded 31 Mar 2023Source
  • Document05_compressed.pdf · uploaded 31 Mar 2023Source
  • Document06_compressed.pdf · uploaded 31 Mar 2023Source
  • Document07_compressed.pdf · uploaded 31 Mar 2023Source
  • Document08_compressed.pdf · uploaded 31 Mar 2023Source
  • Document09_compressed.pdf · uploaded 31 Mar 2023Source
  • Document10_compressed.pdf · uploaded 31 Mar 2023Source
  • Document11_compressed.pdf · uploaded 31 Mar 2023Source
  • Document12_compressed.pdf · uploaded 31 Mar 2023Source
  • Document13_compressed.pdf · uploaded 31 Mar 2023Source
  • Document14_compressed.pdf · uploaded 31 Mar 2023Source
  • Document15_compressed.pdf · uploaded 31 Mar 2023Source
  • Document16_compressed.pdf · uploaded 31 Mar 2023Source
  • Document17_compressed.pdf · uploaded 31 Mar 2023Source
  • Document18_compressed.pdf · uploaded 31 Mar 2023Source
  • Document19_compressed.pdf · uploaded 31 Mar 2023Source
  • Document01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
  • Document01- Layout_compressed.pdf · uploaded 22 Jan 2025Source
  • Document02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
  • Document03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • Document04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • Document05- Wing A_B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document06- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document07- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document08- Wing A,B_Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document09- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document10- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document11- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document12- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document13- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document14- Wing A,B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document02- Basement Plan_compressed.pdf · uploaded 22 Jan 2025Source
  • Document03- Ground Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • Document04- Mezzanine Floor_compressed.pdf · uploaded 22 Jan 2025Source
  • Document05- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document06- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document07- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document08- Wing A,B,Club House_compressed.pdf · uploaded 22 Jan 2025Source
  • Document09- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document10- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document11- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document12- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document13- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source
  • Document14- Wing A and B_compressed.pdf · uploaded 22 Jan 2025Source

Technical (Architect)

  • DocumentArchitech certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
  • DocumentArchitech Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
  • DocumentYNC_Architect_31032025_Signed.pdf · uploaded 22 Apr 2025Source
  • DocumentArchitect certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source

Technical (Engineer)

  • DocumentENGINEER NUOVOCENTRO_signed.pdf · uploaded 22 Oct 2024Source
  • DocumentEngineer certificate YNC 31-12-24_signed.pdf · uploaded 10 Jan 2025Source
  • DocumentEngineer Certificate YNC 1 18-03-25_signed.pdf · uploaded 20 Mar 2025Source
  • DocumentYNC_Engineer_31032025_Signed.pdf · uploaded 22 Apr 2025Source
  • DocumentEngineer certificate YNC 30-09-25.pdf · uploaded 11 Oct 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wakad, Mulshi taluka

Survey, CTS, gat or plot numbers

172 1 B Part172 1 C

Boundaries

North
S No 128 and 132
South
Remaining part of S No 172 B
East
24 mtr wide D P road
West
S No 132 and 133

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAsad Jawed Ahmed—
ArchitectDeepali Patidar—
ArchitectPrajakta yadav—
ArchitectSameer Murari Valimbe—
Chartered accountantAbhijit Mundada—
Chartered accountantSunil Shamrao Nimbalkar—
EngineerSagar Kale—
Registered real estate agentNibha Santosh Ojha—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology