RGS Forte
Certificate SignedWakad, Pune 411057 |Promoter: RGS Realty LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, Mahada.1BHK, Mahada.2BHK, Shop185 units in all
- Address
- S No. 113/1/1, Bhumkardas Gugre Road, Bhumkar Nagar, WakadPIN 411057
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 5 Apr 2022
- Promised
- 31 Mar 2027
- Revised
- 31 Jul 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100034443 | 5 Apr 2022 | 31 Mar 2027 | 31 Jul 2027 | RGS Realty LLP | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
140 of 185 units booked (76%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower-A | 2BHK | 68.85 sq m · 741 sq ft | 4 | 2 |
| Tower-A | 3BHK | 77.68 sq m · 836 sq ft | 11 | 9 |
| Tower-A | 3BHK | 77.86 sq m · 838 sq ft | 9 | 6 |
| Tower-A | 3BHK | 82.39 sq m · 887 sq ft | 36 | 22 |
| Tower-A | 3BHK | 86.45 sq m · 931 sq ft | 12 | 3 |
| Tower-A | 3BHK | 86.82 sq m · 935 sq ft | 8 | 3 |
| Tower-A | Mahada.1BHK | 31.76 sq m · 342 sq ft | 1 | 1 |
| Tower-A | Mahada.1BHK | 35.21 sq m · 379 sq ft | 1 | 1 |
Show all 29 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower-A | Mahada.1BHK | 37.96 sq m · 409 sq ft | 1 | 0 |
| Tower-A | Mahada.1BHK | 39.79 sq m · 428 sq ft | 2 | 1 |
| Tower-A | Mahada.1BHK | 40.7 sq m · 438 sq ft | 4 | 4 |
| Tower-A | Mahada.1BHK | 41.03 sq m · 442 sq ft | 1 | 0 |
| Tower-A | Mahada.1BHK | 41.05 sq m · 442 sq ft | 1 | 1 |
| Tower-A | Mahada.2BHK | 41.53 sq m · 447 sq ft | 4 | 2 |
| Tower-A | Mahada.2BHK | 42.68 sq m · 459 sq ft | 1 | 1 |
| Tower-B | 2BHK | 67.21 sq m · 723 sq ft | 4 | 4 |
| Tower-B | 3BHK | 82.39 sq m · 887 sq ft | 16 | 15 |
| Tower-B | 3BHK | 85.24 sq m · 918 sq ft | 20 | 19 |
| Tower-B | 3BHK | 86.45 sq m · 931 sq ft | 23 | 22 |
| Tower-B | 3BHK | 86.82 sq m · 935 sq ft | 17 | 16 |
| Tower-B | Shop | 31.55 sq m · 340 sq ft | 1 | 1 |
| Tower-B | Shop | 42.11 sq m · 453 sq ft | 1 | 1 |
| Tower-B | Shop | 47.85 sq m · 515 sq ft | 1 | 1 |
| Tower-B | Shop | 49.64 sq m · 534 sq ft | 1 | 1 |
| Tower-B | Shop | 55.03 sq m · 592 sq ft | 1 | 1 |
| Tower-B | Shop | 60.89 sq m · 655 sq ft | 1 | 1 |
| Tower-B | Shop | 66.36 sq m · 714 sq ft | 1 | 1 |
| Tower-B | Shop | 72.74 sq m · 783 sq ft | 1 | 0 |
| Tower-B | Shop | 86.15 sq m · 927 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 211 filings listed on MahaRERA's project page
Finance
- PAN CardRGS REALTY LLP PAN.PDF · uploaded 24 Mar 2022Source
Legal
Migrated
- 1 Details of encumbrancesENCUMBRANCE LETTER.PDF · uploaded 15 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentffssfyu002_compressed.pdf · uploaded 15 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentffssfyu003_compressed.pdf · uploaded 15 Mar 2022Source
Show all 212 documentsShow fewer documents
Migrated
- 3 Building Plan Approval / NA Order for plotted developmentffssfyu004_compressed.pdf · uploaded 15 Mar 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentffssfyu005_compressed.pdf · uploaded 15 Mar 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentffssfyu006_compressed.pdf · uploaded 15 Mar 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentffssfyu007_compressed.pdf · uploaded 15 Mar 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentffssfyu008_compressed.pdf · uploaded 15 Mar 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentffssfyu009_compressed.pdf · uploaded 15 Mar 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentffssfyu010_compressed_compressed.pdf · uploaded 15 Mar 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentffssfyu011_compressed.pdf · uploaded 15 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 15 Mar 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200232508197_For_Asset_Based_Search_15_03_2022_17_11_16_375.pdf · uploaded 15 Mar 2022Source
- 1 Proforma of Allotment letterAgreement Draft - RGS Forte.pdf · uploaded 16 Mar 2022Source
- 2 Proforma of Allotment letterAllotment Letter - RGS FORTE.pdf · uploaded 16 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Signed-1.pdf · uploaded 17 Mar 2022Source
- 1 PAN CardRGS REALTY LLP PAN.PDF · uploaded 24 Mar 2022Source
- 1 Declaration in FORM BFORM - B_compressed.pdf · uploaded 24 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)Building Plan IOD_compressed.pdf · uploaded 25 Mar 2022Source
- 1 OtherEC.pdf · uploaded 25 Mar 2022Source
- 1 Copy of the legal title reportLegal Title As Per RERA_compressed.pdf · uploaded 29 Mar 2022Source
- 1 Declaration about Commencement CertificateFORM - D.PDF · uploaded 29 Mar 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentvggf004_compressed.pdf · uploaded 30 Apr 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentvggf005_compressed.pdf · uploaded 30 Apr 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentvggf006_compressed.pdf · uploaded 30 Apr 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentvggf007_compressed.pdf · uploaded 30 Apr 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentvggf008 (1)_compressed.pdf · uploaded 30 Apr 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentvggf009_compressed.pdf · uploaded 30 Apr 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentvggf010_compressed.pdf · uploaded 30 Apr 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentvggf011_compressed.pdf · uploaded 30 Apr 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentvggf012_compressed.pdf · uploaded 30 Apr 2022Source
- 2 Details of encumbrancesENCUMBARANCE CERTIFICATE.PDF · uploaded 6 Sep 2022Source
- 2 Copy of Layout Approval (in case of layout)n1vhyg035.pdf · uploaded 7 Feb 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentn1vhyg036.pdf · uploaded 7 Feb 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentn1vhyg037.pdf · uploaded 7 Feb 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentn1vhyg038.pdf · uploaded 7 Feb 2023Source
- 23 Building Plan Approval / NA Order for plotted developmentn1vhyg039.pdf · uploaded 7 Feb 2023Source
- 24 Building Plan Approval / NA Order for plotted developmentn1vhyg041.pdf · uploaded 7 Feb 2023Source
- 25 Building Plan Approval / NA Order for plotted developmentn1vhyg042.pdf · uploaded 7 Feb 2023Source
- 26 Building Plan Approval / NA Order for plotted developmentn1vhyg043.pdf · uploaded 7 Feb 2023Source
- 27 Building Plan Approval / NA Order for plotted developmentn1vhyg044.pdf · uploaded 7 Feb 2023Source
- 28 Building Plan Approval / NA Order for plotted developmentn1vhyg045.pdf · uploaded 7 Feb 2023Source
- 29 Building Plan Approval / NA Order for plotted developmentn1vhyg046.pdf · uploaded 7 Feb 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentn1vhyg040.pdf · uploaded 7 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRGS RERA AC.PDF · uploaded 20 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RGS Realty - Form 1_compressed.pdf · uploaded 22 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 22 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format - RGS.pdf · uploaded 22 May 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Q4.pdf · uploaded 5 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A RGS Forte.pdf · uploaded 6 Jul 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A RGS Forte.pdf · uploaded 6 Jul 2023Source
- 3 Copy of Layout Approval (in case of layout)Layout Apporval_Compressed.pdf · uploaded 11 Jul 2023Source
- 30 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1_Compressed.pdf · uploaded 11 Jul 2023Source
- 31 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2_Compressed.pdf · uploaded 11 Jul 2023Source
- 32 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3_Compressed.pdf · uploaded 11 Jul 2023Source
- 33 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4_Compressed.pdf · uploaded 11 Jul 2023Source
- 34 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5_Compressed.pdf · uploaded 11 Jul 2023Source
- 35 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6_Compressed.pdf · uploaded 11 Jul 2023Source
- 36 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7_Compressed.pdf · uploaded 11 Jul 2023Source
- 37 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8_Compressed.pdf · uploaded 11 Jul 2023Source
- 38 Building Plan Approval / NA Order for plotted developmentBuilding Plan 9_Compressed.pdf · uploaded 11 Jul 2023Source
- 39 Building Plan Approval / NA Order for plotted developmentBuilding Plan 10_Compressed.pdf · uploaded 11 Jul 2023Source
- 40 Building Plan Approval / NA Order for plotted developmentBuilding Plan 11_Compressed.pdf · uploaded 11 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format.PDF · uploaded 4 Aug 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format - RGS Signed_11zon.pdf · uploaded 9 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA-certificate RGS RELATY Signed.PDF · uploaded 9 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RGS Realty LLP Form 5.PDF · uploaded 9 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Format A on Separate bank account.PDF · uploaded 9 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate September 2023.PDF · uploaded 10 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate December 2023.PDF · uploaded 10 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate September 2023.PDF · uploaded 10 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate December 2023.PDF · uploaded 10 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory_11zon.pdf · uploaded 13 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory September 2023.PDF · uploaded 13 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Inventory December 2023.PDF · uploaded 13 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate March 2024.PDF · uploaded 29 May 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate March 2024.PDF · uploaded 29 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.PDF · uploaded 29 May 2024Source
- 5 Disclosure of sold/ booked inventoryDislosure of inventory.PDF · uploaded 29 May 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA-Certificate RGS REALTY Signed.PDF · uploaded 29 May 2024Source
- 2 Declaration about Commencement CertificateCC Declaration.PDF · uploaded 20 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.PDF · uploaded 20 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.PDF · uploaded 20 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryDisclosure of Inventory - June 2024.PDF · uploaded 20 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format - RGS -Sign.PDF · uploaded 20 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect certificate Signed.PDF · uploaded 2 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format - RGS Signed.PDF · uploaded 2 Dec 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory - September 2024 Signed.PDF · uploaded 2 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.PDF · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Dec 2024.PDF · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate New Format - RGS - Signed.PDF · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Dec 2024.PDF · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - December 2024.PDF · uploaded 24 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 18 Feb 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4.pdf · uploaded 18 Feb 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentBuilding Plan 12.pdf · uploaded 18 Feb 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentBuilding Plan 11.pdf · uploaded 18 Feb 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentBuilding Plan 10.pdf · uploaded 18 Feb 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentBuilding Plan 9.pdf · uploaded 18 Feb 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8.pdf · uploaded 18 Feb 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7.pdf · uploaded 18 Feb 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6.pdf · uploaded 18 Feb 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5.pdf · uploaded 18 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3.pdf · uploaded 18 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2.pdf · uploaded 18 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1.pdf · uploaded 18 Feb 2025Source
- 1 Declaration about Commencement CertificateCC Declaration.PDF · uploaded 18 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Form 5 RGS Forte.pdf · uploaded 26 Feb 2025Source
- Form 1Form 1 Architects Certificate March 2025.pdf · uploaded 14 Jul 2025Source
- Form 2Form 2 Engineer Certificate March 2025.PDF · uploaded 14 Jul 2025Source
- Form 3Form 3 CA Certificate - RGS March 2025 Signed.PDF · uploaded 14 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Of Inventory March 2025.PDF · uploaded 14 Jul 2025Source
- Withdrawal Update Form 1Form 1 Architects Certificate June 25.PDF · uploaded 28 Jul 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate June 25.PDF · uploaded 28 Jul 2025Source
- Withdrawal Update Form 3RGS Realty LLP Form-3 CA Certificate Q-1 Compressed.pdf · uploaded 28 Jul 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 3 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 4 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architect Certificate September 2025.PDF · uploaded 4 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 4 Nov 2025Source
- Withdrawal Update Form 2Form 2 Engineers Certificate - Sept 2025.PDF · uploaded 4 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 4 Nov 2025Source
- Withdrawal Update Form 3Form 3 CA Certificate - Sept 2025.PDF · uploaded 4 Nov 2025Source
- Form 5 (FY 2024-2025)CA Form 5_RGS_FY 2024-25_Signed.PDF · uploaded 17 Nov 2025Source
- Withdrawal Update Form 1Form 1 Architects Certificate - December 2025.pdf · uploaded 15 Jan 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate - December 2025.pdf · uploaded 15 Jan 2026Source
- Withdrawal Update Form 3Form 3 CA Certificate - December 2025.PDF · uploaded 15 Jan 2026Source
- Withdrawal Update Form 1FORM 1 RGS Forte Architects Certificate.PDF · uploaded 18 Apr 2026Source
- Withdrawal Update Form 2FORM 2RGS Forte Engineer Certificate.PDF · uploaded 18 Apr 2026Source
- Withdrawal Update Form 3FORM 3 RGS Forte CA Certificate.pdf · uploaded 18 Apr 2026Source
- Form 2A (FY 2025-2026)RGS Forte Form 2A Engineers Certificate.PDF · uploaded 25 Apr 2026Source
- Withdrawal Update Form 1Form 1 Architects Certificate June 26 Forte.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate June 26 Forte.PDF · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3Form 3 CA Certificate June 2026.pdf · uploaded 18 Jul 2026Source
Technical
- Documentffssfyu002_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu003_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu004_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu005_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu006_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu007_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu008_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu009_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu010_compressed_compressed.pdf · uploaded 15 Mar 2022Source
- Documentffssfyu011_compressed.pdf · uploaded 15 Mar 2022Source
- DocumentBuilding Plan IOD_compressed.pdf · uploaded 25 Mar 2022Source
- Documentvggf004_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf005_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf006_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf007_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf008 (1)_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf009_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf010_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf011_compressed.pdf · uploaded 30 Apr 2022Source
- Documentvggf012_compressed.pdf · uploaded 30 Apr 2022Source
- Documentn1vhyg035.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg036.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg037.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg038.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg039.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg041.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg042.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg043.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg044.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg045.pdf · uploaded 7 Feb 2023Source
- Documentn1vhyg046.pdf · uploaded 7 Feb 2023Source
- DocumentLayout Apporval_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 1_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 2_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 3_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 4_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 5_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 6_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 7_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 8_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 9_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 10_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentBuilding Plan 11_Compressed.pdf · uploaded 11 Jul 2023Source
- DocumentLayout Approval.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 1.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 2.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 3.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 4.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 5.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 6.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 7.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 8.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 9.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 10.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 11.pdf · uploaded 18 Feb 2025Source
- DocumentBuilding Plan 12.pdf · uploaded 18 Feb 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Wakad, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Survey No 112
- South
- By Survey No 113-2
- East
- By remaining Part of S No 113-1-1
- West
- By Survey No 113-1-2
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Amit Bhat | — |
| Engineer | Maheshkumar Kantilal Butala | — |
| Engineer | Sanjay Taware | — |
Source: MahaRERA project page. Contact details are not shown.