Pranam
Certificate SignedTalegaon Dhamdhere, Pune 411021 |Promoter: Primary Housing Corporation LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1BHK, 2BHK132 units in all
- Address
- Gat no 1205/1C, Talegaon, TalegaonPIN 411021
- Designated bank account
- 171
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 5 years and 6 months
The latest completion date on record passed 1 year and 4 months ago.
- Registered
- 15 Jul 2017
- Promised
- 31 Dec 2019
- Revised
- 30 Jun 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100000382 | 15 Jul 2017 | 31 Dec 2019 | 30 Jun 2025 | Primary Housing Corporation LLP | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
67 of 132 units booked (51%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A wing | 1BHK | 34.54 sq m · 372 sq ft | 1 | 1 |
| A wing | 1BHK | 35.11 sq m · 378 sq ft | 6 | 4 |
| A wing | 1BHK | 35.92 sq m · 387 sq ft | 6 | 4 |
| A wing | 1BHK | 38.15 sq m · 411 sq ft | 1 | 1 |
| A wing | 1BHK | 38.42 sq m · 414 sq ft | 2 | 0 |
| A wing | 1BHK | 38.5 sq m · 414 sq ft | 5 | 1 |
| A wing | 1BHK | 38.53 sq m · 415 sq ft | 1 | 0 |
| A wing | 1BHK | 38.73 sq m · 417 sq ft | 1 | 1 |
Show all 39 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A wing | 1BHK | 38.74 sq m · 417 sq ft | 4 | 2 |
| A wing | 1BHK | 38.92 sq m · 419 sq ft | 2 | 1 |
| A wing | 1BHK | 39.12 sq m · 421 sq ft | 6 | 3 |
| A wing | 2BHK | 52.49 sq m · 565 sq ft | 2 | 0 |
| A wing | 2BHK | 52.5 sq m · 565 sq ft | 8 | 7 |
| A wing | 2BHK | 52.57 sq m · 566 sq ft | 5 | 2 |
| A wing | 2BHK | 52.87 sq m · 569 sq ft | 2 | 2 |
| A wing | 2BHK | 52.94 sq m · 570 sq ft | 4 | 3 |
| A wing | 2BHK | 52.99 sq m · 570 sq ft | 2 | 2 |
| A wing | 2BHK | 53.02 sq m · 571 sq ft | 2 | 1 |
| A wing | 2BHK | 53.06 sq m · 571 sq ft | 3 | 2 |
| A wing | 2BHK | 53.09 sq m · 571 sq ft | 3 | 3 |
| B Wing | 1BHK | 35.11 sq m · 378 sq ft | 6 | 4 |
| B Wing | 1BHK | 35.92 sq m · 387 sq ft | 6 | 6 |
| B Wing | 1BHK | 38.15 sq m · 411 sq ft | 2 | 1 |
| B Wing | 1BHK | 38.42 sq m · 414 sq ft | 2 | 0 |
| B Wing | 1BHK | 38.5 sq m · 414 sq ft | 5 | 2 |
| B Wing | 1BHK | 38.53 sq m · 415 sq ft | 1 | 0 |
| B Wing | 1BHK | 38.73 sq m · 417 sq ft | 1 | 0 |
| B Wing | 1BHK | 38.74 sq m · 417 sq ft | 4 | 0 |
| B Wing | 1BHK | 38.92 sq m · 419 sq ft | 2 | 0 |
| B Wing | 1BHK | 39.12 sq m · 421 sq ft | 6 | 0 |
| B Wing | 2BHK | 52.49 sq m · 565 sq ft | 2 | 1 |
| B Wing | 2BHK | 52.5 sq m · 565 sq ft | 8 | 1 |
| B Wing | 2BHK | 52.57 sq m · 566 sq ft | 5 | 1 |
| B Wing | 2BHK | 52.87 sq m · 569 sq ft | 2 | 1 |
| B Wing | 2BHK | 52.94 sq m · 570 sq ft | 4 | 3 |
| B Wing | 2BHK | 52.99 sq m · 570 sq ft | 2 | 2 |
| B Wing | 2BHK | 53.02 sq m · 571 sq ft | 2 | 2 |
| B Wing | 2BHK | 53.06 sq m · 571 sq ft | 3 | 1 |
| B Wing | 2BHK | 53.09 sq m · 571 sq ft | 3 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 218 filings listed on MahaRERA's project page
Finance
- PAN CardPHC PANCARD.pdf · uploaded 4 Jul 2017Source
Legal
- Legal Title reportTITLE CERTIFICATE.PDF · uploaded 4 Jul 2017Source
- Declaration Form BForm B PRANAM.pdf · uploaded 4 Jul 2017Source
- Legal Title reportTITLE Certificate Pranam - August 2017.pdf · uploaded 14 Dec 2017Source
- Legal Title reportTitle Certificate - New.pdf · uploaded 17 Mar 2018Source
- Declaration Form BForm B modified as per maharera comments.pdf · uploaded 17 Mar 2018Source
Show all 220 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPHC PANCARD.pdf · uploaded 4 Jul 2017Source
- 1 Copy of the legal title reportTITLE CERTIFICATE.PDF · uploaded 4 Jul 2017Source
- 1 Details of encumbrancesTITLE CERTIFICATE.PDF · uploaded 4 Jul 2017Source
- 1 Building Plan Approval (IOD)Blue print no 1.pdf · uploaded 4 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate- PRANAM.pdf · uploaded 4 Jul 2017Source
- 1 Declaration in FORM BForm B PRANAM.pdf · uploaded 4 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Blue print no 1.pdf · uploaded 10 Jul 2017Source
- 1 Certificates of CA (Form 3)Form3_CA certificate_Pranam.pdf · uploaded 10 Jul 2017Source
- 1 Proforma of Allotment letterAllotment Letter Pranam.pdf · uploaded 10 Jul 2017Source
- 2 Copy of the legal title reportTITLE Certificate Pranam - August 2017.pdf · uploaded 14 Dec 2017Source
- 2 Details of encumbrancesIndex II Pranam Mortgage.pdf · uploaded 14 Dec 2017Source
- 3 Details of encumbrancesIndex II Pranam Mortgage.pdf · uploaded 14 Dec 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Pranam December 2017_compressed.pdf · uploaded 8 Feb 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Pranam_January2018.pdf · uploaded 8 Feb 2018Source
- 2 Proforma of Allotment letterPranam Agreement for sale 10July17-min.pdf · uploaded 12 Mar 2018Source
- 3 Copy of the legal title reportTitle Certificate - New.pdf · uploaded 17 Mar 2018Source
- 2 Declaration in FORM BForm B modified as per maharera comments.pdf · uploaded 17 Mar 2018Source
- 3 Declaration in FORM BAffidavit Form B Pranam_29June2018.pdf · uploaded 1 Oct 2018Source
- 1 Certificates of CA (Form 5)Pranam Statutory Auditior Form 5.pdf · uploaded 15 Oct 2018Source
- 2 Certificates of CA (Form 5)Form 5 FY 2018-19.pdf · uploaded 25 Dec 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 FY 2018-19.pdf · uploaded 25 Dec 2019Source
- 1 Declaration about Commencement CertificatePRANAM DEC OF CC.pdf · uploaded 6 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)PRIMARY HOUSING CORPORATION LLP.pdf · uploaded 6 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryFinal Inventory.pdf · uploaded 6 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)CA certificate_Primary Hsg.pdf · uploaded 16 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Primary Housing.pdf · uploaded 1 Aug 2022Source
- 4 Declaration in FORM BForm b.pdf · uploaded 26 Jun 2023Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 MAR 2023 .pdf · uploaded 19 Jul 2023Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 MAR 2023.pdf · uploaded 19 Jul 2023Source
- 2 Certificates of CA (Form 3)Form3 MAR 2023.pdf · uploaded 19 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 4 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA Form 5.pdf · uploaded 4 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)22-23.pdf · uploaded 7 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT.PDF · uploaded 18 Aug 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentC.pdf · uploaded 18 Aug 2023Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2021.pdf · uploaded 29 Apr 2025Source
- 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2025.pdf · uploaded 29 Apr 2025Source
- 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2024.pdf · uploaded 29 Apr 2025Source
- 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2024.pdf · uploaded 29 Apr 2025Source
- 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUNE 2024.pdf · uploaded 29 Apr 2025Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2024.pdf · uploaded 29 Apr 2025Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2023.pdf · uploaded 29 Apr 2025Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2023.pdf · uploaded 29 Apr 2025Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2023.pdf · uploaded 29 Apr 2025Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2022.pdf · uploaded 29 Apr 2025Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2022.pdf · uploaded 29 Apr 2025Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2022.pdf · uploaded 29 Apr 2025Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2022.pdf · uploaded 29 Apr 2025Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2021.pdf · uploaded 29 Apr 2025Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2021.pdf · uploaded 29 Apr 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2018.pdf · uploaded 29 Apr 2025Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2020.pdf · uploaded 29 Apr 2025Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2020.pdf · uploaded 29 Apr 2025Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2020.pdf · uploaded 29 Apr 2025Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2020.pdf · uploaded 29 Apr 2025Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2019.pdf · uploaded 29 Apr 2025Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2019.pdf · uploaded 29 Apr 2025Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2019.pdf · uploaded 29 Apr 2025Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2019.pdf · uploaded 29 Apr 2025Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)SEPT 2018.pdf · uploaded 29 Apr 2025Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2018.pdf · uploaded 29 Apr 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAR 2018.pdf · uploaded 29 Apr 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)DEC 2017.pdf · uploaded 29 Apr 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)JUN 2017.pdf · uploaded 29 Apr 2025Source
- 2 Certificates of CA (Form 3)DEC 2017.pdf · uploaded 3 May 2025Source
- 1 Certificates of CA (Form 3)SEPT 2017.pdf · uploaded 3 May 2025Source
- 30 Certificates of CA (Form 3)MAR 2025.pdf · uploaded 3 May 2025Source
- 29 Certificates of CA (Form 3)DEC 2024.pdf · uploaded 3 May 2025Source
- 28 Certificates of CA (Form 3)SEPT 2024.pdf · uploaded 3 May 2025Source
- 27 Certificates of CA (Form 3)JUNE 2024.pdf · uploaded 3 May 2025Source
- 26 Certificates of CA (Form 3)MAR 2024.pdf · uploaded 3 May 2025Source
- 25 Certificates of CA (Form 3)DEC 2023.pdf · uploaded 3 May 2025Source
- 24 Certificates of CA (Form 3)SEPT 2023.pdf · uploaded 3 May 2025Source
- 23 Certificates of CA (Form 3)JUNE 2023.pdf · uploaded 3 May 2025Source
- 22 Certificates of CA (Form 3)DEC 2022.pdf · uploaded 3 May 2025Source
- 21 Certificates of CA (Form 3)SEPT 2022.pdf · uploaded 3 May 2025Source
- 20 Certificates of CA (Form 3)JUNE 2022.pdf · uploaded 3 May 2025Source
- 19 Certificates of CA (Form 3)MAR 2022.pdf · uploaded 3 May 2025Source
- 18 Certificates of CA (Form 3)SEPT 2021.pdf · uploaded 3 May 2025Source
- 17 Certificates of CA (Form 3)JUNE 2021.pdf · uploaded 3 May 2025Source
- 15 Certificates of CA (Form 3)MAR 2021.pdf · uploaded 3 May 2025Source
- 16 Certificates of CA (Form 3)MAR 2021.pdf · uploaded 3 May 2025Source
- 3 Certificates of CA (Form 3)MAR 2018.pdf · uploaded 3 May 2025Source
- 4 Certificates of CA (Form 3)JUNE 2018.pdf · uploaded 3 May 2025Source
- 5 Certificates of CA (Form 3)SEPT 2018.pdf · uploaded 3 May 2025Source
- 6 Certificates of CA (Form 3)DEC 2018.pdf · uploaded 3 May 2025Source
- 7 Certificates of CA (Form 3)MAR 2019.pdf · uploaded 3 May 2025Source
- 8 Certificates of CA (Form 3)JUN 2019.pdf · uploaded 3 May 2025Source
- 9 Certificates of CA (Form 3)SEPT 2019.pdf · uploaded 3 May 2025Source
- 10 Certificates of CA (Form 3)DEC 2019.pdf · uploaded 3 May 2025Source
- 11 Certificates of CA (Form 3)MAR 2020 .pdf · uploaded 3 May 2025Source
- 12 Certificates of CA (Form 3)JUNE 2020.pdf · uploaded 3 May 2025Source
- 13 Certificates of CA (Form 3)SEPT 2020.pdf · uploaded 3 May 2025Source
- 14 Certificates of CA (Form 3)DEC 2020.pdf · uploaded 3 May 2025Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2021.pdf · uploaded 3 May 2025Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2021.pdf · uploaded 3 May 2025Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2022.pdf · uploaded 3 May 2025Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2022.pdf · uploaded 3 May 2025Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2022.pdf · uploaded 3 May 2025Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2022.pdf · uploaded 3 May 2025Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2019.pdf · uploaded 3 May 2025Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2023.pdf · uploaded 3 May 2025Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2023.pdf · uploaded 3 May 2025Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2023.pdf · uploaded 3 May 2025Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2024.pdf · uploaded 3 May 2025Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2024.pdf · uploaded 3 May 2025Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2024.pdf · uploaded 3 May 2025Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2024.pdf · uploaded 3 May 2025Source
- 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2025.pdf · uploaded 3 May 2025Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2021.pdf · uploaded 3 May 2025Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2021.pdf · uploaded 3 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2017.pdf · uploaded 3 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2018.pdf · uploaded 3 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2018.pdf · uploaded 3 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2018.pdf · uploaded 3 May 2025Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2018.pdf · uploaded 3 May 2025Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2019.pdf · uploaded 3 May 2025Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2019.pdf · uploaded 3 May 2025Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2019.pdf · uploaded 3 May 2025Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAR 2020.pdf · uploaded 3 May 2025Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)JUNE 2020.pdf · uploaded 3 May 2025Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)SEPT 2020.pdf · uploaded 3 May 2025Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)DEC 2020.pdf · uploaded 3 May 2025Source
- 17 Disclosure of sold/ booked inventoryMARCH 2025.pdf · uploaded 3 May 2025Source
- 16 Disclosure of sold/ booked inventoryDEC 2024.pdf · uploaded 3 May 2025Source
- 3 Disclosure of sold/ booked inventorySEPT 20221.pdf · uploaded 3 May 2025Source
- 15 Disclosure of sold/ booked inventorySEPT 2024.pdf · uploaded 3 May 2025Source
- 14 Disclosure of sold/ booked inventoryJUNE 2024.pdf · uploaded 3 May 2025Source
- 13 Disclosure of sold/ booked inventoryMARCH 2024.pdf · uploaded 3 May 2025Source
- 12 Disclosure of sold/ booked inventoryDEC 2023.pdf · uploaded 3 May 2025Source
- 11 Disclosure of sold/ booked inventorySEPT 2023.pdf · uploaded 3 May 2025Source
- 10 Disclosure of sold/ booked inventoryJUNE 2023.pdf · uploaded 3 May 2025Source
- 9 Disclosure of sold/ booked inventoryMARCH 2023.pdf · uploaded 3 May 2025Source
- 8 Disclosure of sold/ booked inventoryDEC 2022.pdf · uploaded 3 May 2025Source
- 7 Disclosure of sold/ booked inventorySEPT 2022.pdf · uploaded 3 May 2025Source
- 6 Disclosure of sold/ booked inventoryJUNE 2022.pdf · uploaded 3 May 2025Source
- 5 Disclosure of sold/ booked inventoryMARCH 2022.pdf · uploaded 3 May 2025Source
- 4 Disclosure of sold/ booked inventoryDEC 2021.pdf · uploaded 3 May 2025Source
- 2 Disclosure of sold/ booked inventoryJUNE 2021.pdf · uploaded 3 May 2025Source
- 1 Disclosure of sold/ booked inventoryMARCH 2021.pdf · uploaded 3 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)23-24.pdf · uploaded 3 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 9 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2023-24.pdf · uploaded 9 May 2025Source
- 1 Declaration in FORM BFORM B Affidviat.pdf · uploaded 14 Jun 2025Source
- 1 Certificates of CA (Form 3)FINAL REVISED FORM 3 WITH SOLD UNSOLD INVENTORY DISCLOSURE (1)_compressed.pdf · uploaded 14 Jun 2025Source
- Occupational Certificatetalegaon dhamdhare o c (1).pdf · uploaded 2 Jul 2025Source
Technical
Technical (Architect)
- DocumentForm 1 MAR 2023 .pdf · uploaded 19 Jul 2023Source
- DocumentDEC 2018.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2017.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2017.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2018.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2018.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2018.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2019.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2019.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2019.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2019.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2020.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2020.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2020.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2020.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2021.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2021.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2021.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2022.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2022.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2022.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2022.pdf · uploaded 29 Apr 2025Source
- DocumentJUN 2023.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2023.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2023.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2024.pdf · uploaded 29 Apr 2025Source
- DocumentJUNE 2024.pdf · uploaded 29 Apr 2025Source
- DocumentSEPT 2024.pdf · uploaded 29 Apr 2025Source
- DocumentDEC 2024.pdf · uploaded 29 Apr 2025Source
- DocumentMAR 2025.pdf · uploaded 29 Apr 2025Source
Technical (Engineer)
- DocumentForm 2 MAR 2023.pdf · uploaded 19 Jul 2023Source
- DocumentSEPT 2017.pdf · uploaded 3 May 2025Source
- DocumentMAR 2018.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2018.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2018.pdf · uploaded 3 May 2025Source
- DocumentDEC 2018.pdf · uploaded 3 May 2025Source
- DocumentMAR 2019.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2019.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2019.pdf · uploaded 3 May 2025Source
- DocumentDEC 2019.pdf · uploaded 3 May 2025Source
- DocumentMAR 2020.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2020.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2020.pdf · uploaded 3 May 2025Source
- DocumentDEC 2020.pdf · uploaded 3 May 2025Source
- DocumentMAR 2021.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2021.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2021.pdf · uploaded 3 May 2025Source
- DocumentDEC 2021.pdf · uploaded 3 May 2025Source
- DocumentMAR 2022.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2022.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2022.pdf · uploaded 3 May 2025Source
- DocumentDEC 2022.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2023.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2023.pdf · uploaded 3 May 2025Source
- DocumentDEC 2023.pdf · uploaded 3 May 2025Source
- DocumentMAR 2024.pdf · uploaded 3 May 2025Source
- DocumentJUNE 2024.pdf · uploaded 3 May 2025Source
- DocumentSEPT 2024.pdf · uploaded 3 May 2025Source
- DocumentDEC 2024.pdf · uploaded 3 May 2025Source
- DocumentMAR 2025.pdf · uploaded 3 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Talegaon Dhamdhere, Shirur taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Talegaon Kasari Road
- South
- Gat no 1206 and 1207
- East
- Remaining area of gat no 1205
- West
- Remaining area of gat no 1205
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shripad Padhye | — |
| Engineer | Himanshu Tulpule | — |
| Other | Deepak Mandade | — |
Source: MahaRERA project page. Contact details are not shown.