Shivratna
Certificate SignedRavet, Pune 412101 |Promoter: Mr Rajan Vishram Palekar
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK20 units in all
- Address
- Sr No 215, CTS No 244/1/15, Plot No 6, Ravet, RavetPIN 412101
- Designated bank account
- 119
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
6 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 23 Sep 2026 | 6 | Family transfer | — | — | |
| 22 Sep 2026 | Loan closure | — | — | ||
| 13 Aug 2026 | Bldg सी · Unit 18 | Resale | — | ≈ ₹9,777 | |
| 26 May 2026 | Bldg C · Unit C | Resale | — | ≈ ₹8,414 | |
| 5 Feb 2026 | Other | — | — | ||
| 9 Jan 2026 | Mortgage | — | — |
Shivratna in numbers
Registered deals, summarised
Deedo has 6 registered documents at Shivratna, from Jan 2026 to Sep 2026: 2 sales, 1 mortgage.
- How many properties have been sold at Shivratna?
- 2 sales are registered at Shivratna, 2 of them resales.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Shivratna by Deedo, last updated with deals registered in Sep 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jul 2026
The latest completion date on record passed 3 months ago.
- Registered
- 11 Mar 2024
- Promised
- 30 Jul 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055201 | 11 Mar 2024 | 30 Jul 2026 | 30 Jul 2026 | Mr Rajan Vishram Palekar | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| B Wing | 6 | 20 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
1 of 20 units booked (5%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 46.46 sq m · 500 sq ft | 5 | 0 |
| 2BHK | 49.9 sq m · 537 sq ft | 5 | 0 |
| 2BHK | 52.4 sq m · 564 sq ft | 5 | 0 |
| 2BHK | 60.12 sq m · 647 sq ft | 5 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 149 filings listed on MahaRERA's project page
Finance
- PAN CardPROPRIETOR- PAN.pdf · uploaded 23 Jan 2024Source
Legal
- Other – LegalKHAREDI KHAT 215_compressed-1-22_compressed.pdf · uploaded 23 Jan 2024Source
- Other – LegalKHAREDI KHAT 215_compressed-23-45.pdf · uploaded 23 Jan 2024Source
- Legal Title report1 Copy of the legal title report (18) (1).pdf · uploaded 23 Jan 2024Source
- Declaration Form BMahakal developers .pdf · uploaded 23 Jan 2024Source
- Other – LegalOreder 50-Mahakal.pdf · uploaded 5 Feb 2024Source
Show all 151 documentsShow fewer documents
Migrated
- 1 PAN CardPROPRIETOR- PAN.pdf · uploaded 23 Jan 2024Source
- 1 Copy of the legal title report1 Copy of the legal title report (18) (1).pdf · uploaded 23 Jan 2024Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCES.pdf · uploaded 23 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCES.pdf · uploaded 23 Jan 2024Source
- 1 Copy of Layout Approval (in case of layout)5 (2)_compressed.pdf · uploaded 23 Jan 2024Source
- 1 Building Plan Approval / NA Order for plotted development6 (1)_compressed.pdf · uploaded 23 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted development7 (1)_compressed.pdf · uploaded 23 Jan 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTFICATE.pdf · uploaded 23 Jan 2024Source
- 1 Declaration about Commencement CertificateDECLARATION OF COMMENCEMENT-FORMAT D.pdf · uploaded 23 Jan 2024Source
- 1 Declaration in FORM BMahakal developers .pdf · uploaded 23 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Jan 2024Source
- 1 CERSAI detailsDECLARATION CERSAI.pdf · uploaded 23 Jan 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 (2)_compressed.pdf · uploaded 23 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST.pdf · uploaded 23 Jan 2024Source
- 1 Proforma of Allotment letterMODEL FORM OF ALLOTMENT LETTER.pdf · uploaded 23 Jan 2024Source
- 1 Proforma of Agreement for saleAFS-Mahakal.pdf · uploaded 23 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT-A.pdf · uploaded 23 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterDEVIATION REPORT OF ALLOTMENT LETTER.pdf · uploaded 23 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT-AGREEMENT TO SALE.pdf · uploaded 23 Jan 2024Source
- 1 Other – LegalKHAREDI KHAT 215_compressed-1-22_compressed.pdf · uploaded 23 Jan 2024Source
- 2 Other – LegalKHAREDI KHAT 215_compressed-23-45.pdf · uploaded 23 Jan 2024Source
- 1 Other – TechnicalDeclaratn.pdf · uploaded 23 Jan 2024Source
- 2 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (8) (1).pdf · uploaded 5 Feb 2024Source
- 2 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (8) (1).pdf · uploaded 5 Feb 2024Source
- 3 Other – LegalOreder 50-Mahakal.pdf · uploaded 5 Feb 2024Source
- 2 Other – TechnicalEmail Shivratna.pdf · uploaded 27 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 17 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FINAL.pdf · uploaded 17 Apr 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD DETAILS.pdf · uploaded 17 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FINAL_compressed.pdf · uploaded 17 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 13 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MAHAKAL.pdf · uploaded 13 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A MAHAKAL.pdf · uploaded 13 Jul 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD MAHAKAL.pdf · uploaded 13 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MAHAKAL_compressed.pdf · uploaded 13 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 10 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 (1)_compressed.pdf · uploaded 10 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 10 Nov 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD MAHAKAL.pdf · uploaded 10 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-23-24-Q4.pdf · uploaded 26 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q1.pdf · uploaded 26 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q2.pdf · uploaded 26 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q3.pdf · uploaded 26 Apr 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q4.pdf · uploaded 26 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-23-24-Q4.pdf · uploaded 26 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-24-25-Q1.pdf · uploaded 26 Apr 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-24-25-Q2.pdf · uploaded 26 Apr 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-24-25-Q3.pdf · uploaded 26 Apr 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-24-25-Q4.pdf · uploaded 26 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-FY 23-24(Q4).pdf · uploaded 26 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-24-25(Q1).pdf · uploaded 26 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-24-25(Q2).pdf · uploaded 26 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-24-25(Q3).pdf · uploaded 26 Apr 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-24-25(Q4).pdf · uploaded 26 Apr 2025Source
- Form 1F1-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 2F2-FY 23-24(Q4).pdf · uploaded 15 May 2025Source
- Form 3F3-23-24-Q4.pdf · uploaded 15 May 2025Source
- Disclosure of Sold and Booked InventorySU-MARCH-24.pdf · uploaded 15 May 2025Source
- Form 1SU-MARCH-24.pdf · uploaded 15 May 2025Source
- Form 2F1-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 3F3-23-24-Q4.pdf · uploaded 15 May 2025Source
- Disclosure of Sold and Booked InventoryF2-FY 23-24(Q4).pdf · uploaded 15 May 2025Source
- Form 1SU-MARCH-24.pdf · uploaded 15 May 2025Source
- Form 2F3-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 3F1-23-24-Q4.pdf · uploaded 15 May 2025Source
- Disclosure of Sold and Booked InventoryF2-FY 23-24(Q4).pdf · uploaded 15 May 2025Source
- Form 1SU-MARCH-24.pdf · uploaded 15 May 2025Source
- Form 2F3-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 3F1-23-24-Q4.pdf · uploaded 15 May 2025Source
- Disclosure of Sold and Booked InventoryF2-FY 23-24(Q4).pdf · uploaded 15 May 2025Source
- Form 1SU-MARCH-24.pdf · uploaded 15 May 2025Source
- Form 2F3-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 3F2-FY 23-24(Q4).pdf · uploaded 15 May 2025Source
- Disclosure of Sold and Booked InventoryF1-23-24-Q4.pdf · uploaded 15 May 2025Source
- Form 5 (FY 2023-2024)FY 23-24.pdf · uploaded 15 May 2025Source
- Form 5 (FY 2024-2025)FY 24-25.pdf · uploaded 15 May 2025Source
- Form 2A (FY 2023-2024)FORM-2A-23-24.pdf · uploaded 23 Jun 2025Source
- Form 2A (FY 2024-2025)FORM-2A-24-25.pdf · uploaded 23 Jun 2025Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE (2).pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE (2).pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 3Form 3 (2)_compressed.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 3Form 3 (2)_compressed.pdf · uploaded 16 Jul 2025Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE (2).pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 3Form 3 (2)_compressed.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 1ARCHITECT CERTIFICATE (2).pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 3Form 3 (2)_compressed.pdf · uploaded 2 Sep 2025Source
- Withdrawal Update Form 1F1-FINAL.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3F3-FINAL.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1F1-FINAL.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 2Form- 2.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 3F3-FINAL.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 1F1-Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2F2-Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3F3-Q3.pdf · uploaded 20 Jan 2026Source
- Occupational CertificateCC.pdf · uploaded 6 Mar 2026Source
- Occupational CertificateFORM-4.pdf · uploaded 6 Mar 2026Source
- Occupational CertificateCC MAIL.pdf · uploaded 6 Mar 2026Source
- Withdrawal Update Form 1F1-Q4.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 2F2-Q4.pdf · uploaded 23 Apr 2026Source
- Withdrawal Update Form 3F3-Q4 (2).pdf · uploaded 23 Apr 2026Source
- Form 2A (FY 2025-2026)2A-FY 25-26.pdf · uploaded 6 Jun 2026Source
- Form 5 (FY 2025-2026)Shivratna Form 5 FY 25-26 (1).pdf · uploaded 6 Jun 2026Source
Technical
- Document5 (2)_compressed.pdf · uploaded 23 Jan 2024Source
- Document6 (1)_compressed.pdf · uploaded 23 Jan 2024Source
- Document7 (1)_compressed.pdf · uploaded 23 Jan 2024Source
- Other – TechnicalDeclaratn.pdf · uploaded 23 Jan 2024Source
- Other – TechnicalEmail Shivratna.pdf · uploaded 27 Feb 2024Source
- DocumentHPSC0286_compressed.pdf · uploaded 23 Jun 2025Source
- DocumentHPSC0287_compressed.pdf · uploaded 23 Jun 2025Source
- DocumentHPSC0288_compressed.pdf · uploaded 23 Jun 2025Source
- DocumentHPSC0287_merged_11zon.pdf · uploaded 24 Jun 2025Source
- DocumentHPSC0287_merged_11zon.pdf · uploaded 16 Jul 2025Source
Technical (Architect)
- DocumentF1.pdf · uploaded 10 Nov 2024Source
- DocumentARCHITECT CERTIFICATE.pdf · uploaded 20 Jan 2025Source
- DocumentF1.pdf · uploaded 20 Apr 2025Source
- DocumentF1-23-24-Q4.pdf · uploaded 26 Apr 2025Source
- DocumentF1-24-25-Q1.pdf · uploaded 26 Apr 2025Source
- DocumentF1-24-25-Q2.pdf · uploaded 26 Apr 2025Source
- DocumentF1-24-25-Q3.pdf · uploaded 26 Apr 2025Source
- DocumentF1-24-25-Q4.pdf · uploaded 26 Apr 2025Source
- DocumentF1-Q4.pdf · uploaded 23 Apr 2026Source
Technical (Engineer)
- DocumentFORM-2.pdf · uploaded 10 Nov 2024Source
- DocumentFORM 2.pdf · uploaded 20 Jan 2025Source
- DocumentForm 2.pdf · uploaded 20 Apr 2025Source
- DocumentF2-FY 23-24(Q4).pdf · uploaded 26 Apr 2025Source
- DocumentF2-24-25(Q1).pdf · uploaded 26 Apr 2025Source
- DocumentF2-24-25(Q2).pdf · uploaded 26 Apr 2025Source
- DocumentF2-24-25(Q3).pdf · uploaded 26 Apr 2025Source
- DocumentF2-24-25(Q4).pdf · uploaded 26 Apr 2025Source
- DocumentF2-Q4.pdf · uploaded 23 Apr 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ravet, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Property of Mistry Space Society
- South
- BRT Road
- East
- Property of Madhukar Nathu Bhondve
- West
- Internal Road of Sr No 215
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shekhar Kokane | — |
| Chartered accountant | Pravin Eknath Pise | — |
| Chartered accountant | Vaibhav S Bhise | — |
| Engineer | Vaibhav Desai | — |
Source: MahaRERA project page. Contact details are not shown.