28 May 2023Promised completion
1Building
74Units registered73 booked (99%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK74 units in all
Address
109/2 P, near Ravet bridge, BRT stopPIN 412101
Designated bank account
119
Developed in phases
No

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 May 2023

The latest completion date on record passed 3 years and 5 months ago.

Registered
17 Jul 2018
Promised
28 May 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001716417 Jul 201828 May 202328 May 2023Aryavedant promoters & buildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
C Wing1374

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

73 of 74 units booked (99%), as the promoter reported to MahaRERA

1BHK · 46 units2BHK · 28 units
TypeCarpet areaUnitsBooked
1BHK47 sq m · 506 sq ft3434
1BHK77 sq m · 829 sq ft1212
2BHK71 sq m · 764 sq ft44
2BHK78 sq m · 840 sq ft2423

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 188 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardAryavedant Pancard.pdf · uploaded 14 Jul 2021Source

Legal

  • Declaration Form BFORM B.pdf · uploaded 31 May 2018Source
  • OtherLETTER.pdf · uploaded 5 Jul 2018Source
  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 5 Jul 2018Source

Migrated

  • 1 Details of encumbrancesENCUMBRANCE LETTER.pdf · uploaded 31 May 2018Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 31 May 2018Source
Show all 190 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCOMMICEMENT CERT.pdf · uploaded 31 May 2018Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 31 May 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT LETTER.pdf · uploaded 31 May 2018Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 31 May 2018Source
  • 2 Proforma of Allotment letterAgreement Draft pdf.pdf · uploaded 31 May 2018Source
  • 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 5 Jul 2018Source
  • 1 Building Plan Approval (IOD)IOD.pdf · uploaded 5 Jul 2018Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 5 Jul 2018Source
  • 1 OtherLETTER.pdf · uploaded 5 Jul 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERT.pdf · uploaded 3 May 2019Source
  • 2 Certificates of CA (Form 3)CA Cert.pdf · uploaded 3 May 2019Source
  • 2 Copy of Layout Approval (in case of layout)layout revised.pdf · uploaded 11 Oct 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentpalm revised commencement.pdf · uploaded 11 Oct 2019Source
  • 3 Certificates of CA (Form 3)Form 3 CA.pdf · uploaded 11 Oct 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 03 FEB 2020.pdf · uploaded 27 Feb 2020Source
  • 3 Copy of Layout Approval (in case of layout)Temp00075 A2.pdf · uploaded 26 Dec 2020Source
  • 4 Copy of Layout Approval (in case of layout)Temp00072 A1.pdf · uploaded 26 Dec 2020Source
  • 5 Copy of Layout Approval (in case of layout)Temp00071 A1.pdf · uploaded 26 Dec 2020Source
  • 6 Copy of Layout Approval (in case of layout)Temp00070 A1.pdf · uploaded 26 Dec 2020Source
  • 7 Copy of Layout Approval (in case of layout)Temp00069 A1.pdf · uploaded 26 Dec 2020Source
  • 8 Copy of Layout Approval (in case of layout)Temp00066 A1.pdf · uploaded 26 Dec 2020Source
  • 9 Copy of Layout Approval (in case of layout)Temp00066 A1.pdf · uploaded 26 Dec 2020Source
  • 10 Copy of Layout Approval (in case of layout)A1.pdf · uploaded 26 Dec 2020Source
  • 11 Copy of Layout Approval (in case of layout)A0.pdf · uploaded 26 Dec 2020Source
  • 12 Copy of Layout Approval (in case of layout)A0.pdf · uploaded 26 Dec 2020Source
  • 13 Copy of Layout Approval (in case of layout)Temp00067 A1.pdf · uploaded 26 Dec 2020Source
  • 14 Copy of Layout Approval (in case of layout)1 A0.pdf · uploaded 26 Dec 2020Source
  • 3 Commencement Certificates / NA Order for plotted developmentRevise Commencement compressed.pdf · uploaded 26 Dec 2020Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)from1 c building palm spring dec 20.pdf · uploaded 5 Jan 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palm spring c form 2 (1).pdf · uploaded 5 Jan 2021Source
  • 1 PAN CardAryavedant Pancard.pdf · uploaded 14 Jul 2021Source
  • 1 Declaration about Commencement CertificatePALM COMMENCVEMENT DECLARATION.pdf · uploaded 14 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2a_compressed (3).pdf · uploaded 14 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a_compressed (3).pdf · uploaded 14 Jul 2021Source
  • 1 Disclosure of sold/ booked inventorysold unsold inventory for C extention_compressed.pdf · uploaded 14 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 5 3132020.pdf · uploaded 14 Jul 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_compressed (1).pdf · uploaded 10 Feb 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Palm spring C_compressed.pdf · uploaded 10 Feb 2022Source
  • 4 Certificates of CA (Form 3)Form 3 for C building_compressed.pdf · uploaded 10 Feb 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)C Buidling form 5 2020-21.pdf · uploaded 23 Mar 2022Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)c building.pdf · uploaded 16 Feb 2023Source
  • 2 Disclosure of sold/ booked inventory1 Disclosure of sold_ booked inventory (2).pdf · uploaded 16 Feb 2023Source
  • 5 Certificates of CA (Form 3)FORM-3 (PALM SPRING-C WING)_compressed.pdf · uploaded 16 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)c building.pdf · uploaded 16 Feb 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Nakhate Rera Letter C wing Form1.pdf · uploaded 20 Feb 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Palm Springs c Wing .pdf · uploaded 20 Feb 2023Source
  • 3 Disclosure of sold/ booked inventorySold Booked Inventory (1).pdf · uploaded 20 Feb 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 palm spring.pdf · uploaded 17 Mar 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate.pdf · uploaded 12 Apr 2023Source
  • 6 Certificates of CA (Form 3)RERA FORM-3 (PALM SPRING-C)_compressed.pdf · uploaded 3 Jun 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 5 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palm Springs c jun 23.pdf · uploaded 5 Jul 2023Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)F1_11zon (1).pdf · uploaded 9 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Palm C.pdf · uploaded 9 Oct 2023Source
  • 4 Disclosure of sold/ booked inventoryC Building Sold Unsold data.pdf · uploaded 11 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form C - Palmspring C Building.pdf · uploaded 14 Oct 2023Source
  • 7 Certificates of CA (Form 3)FORM -3 ( C BUILDING)_compressed.pdf · uploaded 19 Oct 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 23.pdf · uploaded 27 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 Palm Spring C.pdf · uploaded 27 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FY 22-23 Form 5 C Rera (1).pdf · uploaded 6 Mar 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)PALM SPRING-C (1)_compressed.pdf · uploaded 1 Apr 2024Source
  • 5 Disclosure of sold/ booked inventorySold Unsold Inventory C.pdf · uploaded 1 Apr 2024Source
  • 8 Certificates of CA (Form 3)PALM SPRING-C (1)_compressed.pdf · uploaded 1 Apr 2024Source
  • 1 Certificates of CA (Form 3)Form-3 C Building Q2 FY 24-25_11zon.pdf · uploaded 7 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryC Sold Unsold QTR 2 FY 24-25.pdf · uploaded 7 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)C Rera Engineer Site Supervisor Certificate Qtr 2 FY 24-25.pdf · uploaded 7 Nov 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)march 2019.pdf · uploaded 8 Nov 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)sep 2018.pdf · uploaded 8 Nov 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)sep 2022.pdf · uploaded 8 Nov 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)june 2022.pdf · uploaded 8 Nov 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)march 2022.pdf · uploaded 8 Nov 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)sep 2021.pdf · uploaded 8 Nov 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)june 2021.pdf · uploaded 8 Nov 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)march 2021.pdf · uploaded 8 Nov 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect For Sep 2020.pdf · uploaded 8 Nov 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)june 2020.pdf · uploaded 8 Nov 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)march 2020.pdf · uploaded 8 Nov 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)dec 2019.pdf · uploaded 8 Nov 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)sep 2019.pdf · uploaded 8 Nov 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)june 2019.pdf · uploaded 8 Nov 2024Source
  • 2 Certificates of CA (Form 3)Form 3 March 2024.pdf · uploaded 8 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2018.pdf · uploaded 19 Nov 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2018.pdf · uploaded 19 Nov 2024Source
  • 4 Certificates of CA (Form 3)CA June 2023.pdf · uploaded 2 Dec 2024Source
  • 6 Certificates of CA (Form 3)dec 2023_compressed.pdf · uploaded 2 Dec 2024Source
  • 5 Certificates of CA (Form 3)sep 2023_compressed.pdf · uploaded 2 Dec 2024Source
  • 3 Certificates of CA (Form 3)RERA FORM-3 MARCH-23.pdf · uploaded 2 Dec 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2022.pdf · uploaded 9 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2021 Form 2.pdf · uploaded 9 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 march 2020.pdf · uploaded 9 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2021.pdf · uploaded 9 Dec 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-09-2020 Form 2.pdf · uploaded 9 Dec 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2022.pdf · uploaded 9 Dec 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2021 Form 2.pdf · uploaded 9 Dec 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)30-06-2020.pdf · uploaded 9 Dec 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)14-09-2019.pdf · uploaded 9 Dec 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)01-07-2019.pdf · uploaded 9 Dec 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)12-01-2019.pdf · uploaded 9 Dec 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2019.pdf · uploaded 9 Dec 2024Source
  • 30 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 2-36 PM (1) (1).pdf · uploaded 12 Dec 2024Source
  • 29 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 1-00 PM (1).pdf · uploaded 12 Dec 2024Source
  • 28 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 1-01 PM (2).pdf · uploaded 12 Dec 2024Source
  • 27 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 1-01 PM (1).pdf · uploaded 12 Dec 2024Source
  • 26 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-47 PM (1).pdf · uploaded 12 Dec 2024Source
  • 25 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-49 PM (1).pdf · uploaded 12 Dec 2024Source
  • 24 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-50 PM (1).pdf · uploaded 12 Dec 2024Source
  • 23 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-51 PM (1).pdf · uploaded 12 Dec 2024Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-53 PM (1).pdf · uploaded 12 Dec 2024Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-54 PM (1).pdf · uploaded 12 Dec 2024Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-55 PM (1).pdf · uploaded 12 Dec 2024Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-56 PM(1) (1).pdf · uploaded 12 Dec 2024Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-56 PM (1).pdf · uploaded 12 Dec 2024Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-57 PM (1).pdf · uploaded 12 Dec 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-59 PM (1).pdf · uploaded 12 Dec 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 12 Dec 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 12, 2024 12-58 PM (1).pdf · uploaded 12 Dec 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)ARCHITECT CERTIFICATE 2.pdf · uploaded 16 Jan 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA B C Completion Certificate.pdf · uploaded 16 Jan 2025Source
  • 1 Other – TechnicalPALM sPRING .pdf · uploaded 27 Mar 2025Source

Technical

  • DocumentLAYOUT.pdf · uploaded 31 May 2018Source
  • DocumentIOD.pdf · uploaded 5 Jul 2018Source
  • Documentlayout revised.pdf · uploaded 11 Oct 2019Source
  • DocumentTemp00075 A2.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00072 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00071 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00070 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00069 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00066 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00066 A1.pdf · uploaded 26 Dec 2020Source
  • DocumentA1.pdf · uploaded 26 Dec 2020Source
  • DocumentA0.pdf · uploaded 26 Dec 2020Source
  • DocumentA0.pdf · uploaded 26 Dec 2020Source
  • DocumentTemp00067 A1.pdf · uploaded 26 Dec 2020Source
  • Document1 A0.pdf · uploaded 26 Dec 2020Source
  • Other – TechnicalPALM sPRING .pdf · uploaded 27 Mar 2025Source

Technical (Architect)

  • DocumentForm 1 Dec 23.pdf · uploaded 27 Dec 2023Source
  • Documentsep 2018.pdf · uploaded 8 Nov 2024Source
  • Documentmarch 2019.pdf · uploaded 8 Nov 2024Source
  • Documentjune 2019.pdf · uploaded 8 Nov 2024Source
  • Documentsep 2019.pdf · uploaded 8 Nov 2024Source
  • Documentdec 2019.pdf · uploaded 8 Nov 2024Source
  • Documentmarch 2020.pdf · uploaded 8 Nov 2024Source
  • Documentjune 2020.pdf · uploaded 8 Nov 2024Source
  • DocumentArchitect For Sep 2020.pdf · uploaded 8 Nov 2024Source
  • Documentmarch 2021.pdf · uploaded 8 Nov 2024Source
  • Documentjune 2021.pdf · uploaded 8 Nov 2024Source
  • Documentsep 2021.pdf · uploaded 8 Nov 2024Source
  • Documentmarch 2022.pdf · uploaded 8 Nov 2024Source
  • Documentjune 2022.pdf · uploaded 8 Nov 2024Source
  • Documentsep 2022.pdf · uploaded 8 Nov 2024Source

Technical (Engineer)

  • DocumentPALM SPRING-C (1)_compressed.pdf · uploaded 1 Apr 2024Source
  • Document30-09-2018.pdf · uploaded 19 Nov 2024Source
  • Document30-09-2018.pdf · uploaded 19 Nov 2024Source
  • Document31-03-2021 Form 2.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 2 march 2020.pdf · uploaded 9 Dec 2024Source
  • Document30-09-2021.pdf · uploaded 9 Dec 2024Source
  • Document30-09-2020 Form 2.pdf · uploaded 9 Dec 2024Source
  • Document30-06-2022.pdf · uploaded 9 Dec 2024Source
  • Document31-03-2022.pdf · uploaded 9 Dec 2024Source
  • Document30-06-2021 Form 2.pdf · uploaded 9 Dec 2024Source
  • Document30-06-2020.pdf · uploaded 9 Dec 2024Source
  • Document14-09-2019.pdf · uploaded 9 Dec 2024Source
  • Document01-07-2019.pdf · uploaded 9 Dec 2024Source
  • Document12-01-2019.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 2 Dec 2019.pdf · uploaded 9 Dec 2024Source
  • DocumentForm 2 June 2024.pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-59 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-58 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-57 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-56 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-56 PM(1) (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-55 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-54 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-53 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-51 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-50 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-49 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 12-47 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 1-01 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 1-01 PM (2).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 1-00 PM (1).pdf · uploaded 12 Dec 2024Source
  • DocumentDocScanner Dec 12, 2024 2-36 PM (1) (1).pdf · uploaded 12 Dec 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ravet, Haveli taluka

Survey, CTS, gat or plot numbers

109/2 P

Boundaries

North
By 18m wide road and Property of vinayak bhongle
South
By remaining property of Sr no 109 2
East
By property of ramesh bhondve
West
By property of vasant kate

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMr Sanjeev bhosale—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology