Skip to content

Navyam

Certificate Signed

Ravet, Pune 412101 |Promoter: Kiwale Realty LLP

15 Feb 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
8Buildings
248Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
8
Unit types
Landowner Office, Landowner Showroom, MHADA Flats, Showroom, MHADA Unit, Landowner Units, 3BHK, 2BHK, 4BHK248 units in all
Address
Survey No. 117 P At Ravet, Ravet, RavetPIN 412101
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.65336, 73.74631
Navyam is at latitude 18.65336, longitude 73.74631.

Registered transactions

14 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
13 Oct 2026Primary sale—≈ ₹11,156
21 Sep 2026Primary sale—≈ ₹10,057
21 Sep 2026Primary sale—≈ ₹9,939
31 Aug 2026Primary sale—≈ ₹11,887
21 Aug 2026Primary sale—≈ ₹11,156
5 Aug 2026Primary sale—≈ ₹10,175
11 Jun 2026Primary sale—≈ ₹11,004
4 Jun 2026Primary sale—≈ ₹11,547
15 May 2026Primary sale—≈ ₹11,156
21 Apr 2026Primary sale—≈ ₹11,156
21 Apr 2026Primary sale—≈ ₹10,992
21 Apr 2026Primary sale—≈ ₹11,547
21 Apr 2026Primary sale—≈ ₹11,717
6 Jan 2026Primary sale—≈ ₹11,377

Navyam in numbers

Registered deals, summarised

Deedo has 14 registered documents at Navyam, from Jan 2026 to Oct 2026: 14 sales. The median registered sale works out to about ₹11,200 per sq ft, at a median of ₹68 L a deal; 0% of sales were resales.

What is the price per sq ft at Navyam?
The median registered sale works out to about ₹11,200 per sq ft, at a median of ₹68 L a deal; 0% of sales were resales.
How many properties have been sold at Navyam?
14 sales are registered at Navyam.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Navyam by Deedo, last updated with deals registered in Oct 2026.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
15 Feb 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005488815 Feb 202431 Dec 202930 Apr 2030Kiwale Realty LLPProject page

8 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing1048
B Wing51
C Wing53
D Wing51
E Wing575
F Wing1040
G-Wing1040
H-Wing1040

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 248 units booked (0%), as the promoter reported to MahaRERA

Landowner Office · 4 unitsLandowner Showroom · 2 unitsMHADA Flats · 40 unitsShowroom · 2 unitsMHADA Unit · 1 unitLandowner Units · 3 units3BHK · 65 units2BHK · 130 units4BHK · 1 unit
BuildingTypeCarpet areaUnitsBooked
A WingLandowner Office32.68 sq m · 352 sq ft20
A WingLandowner Office57.39 sq m · 618 sq ft20
A WingLandowner Showroom50.74 sq m · 546 sq ft10
A WingLandowner Showroom104.39 sq m · 1,124 sq ft10
A WingMHADA Flats24.95 sq m · 269 sq ft140
A WingMHADA Flats29.45 sq m · 317 sq ft260
A WingShowroom50.74 sq m · 546 sq ft10
A WingShowroom104.39 sq m · 1,124 sq ft10
Show all 20 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B WingMHADA Unit29.45 sq m · 317 sq ft10
C WingLandowner Units56.07 sq m · 604 sq ft30
D Wing3BHK74.65 sq m · 804 sq ft10
E Wing2BHK51.95 sq m · 559 sq ft40
E Wing2BHK56.07 sq m · 604 sq ft460
E Wing3BHK74.65 sq m · 804 sq ft240
E Wing4BHK143.59 sq m · 1,546 sq ft10
F Wing2BHK54.71 sq m · 589 sq ft200
F Wing2BHK56.63 sq m · 610 sq ft200
G-Wing2BHK54.71 sq m · 589 sq ft200
G-Wing2BHK56.63 sq m · 610 sq ft200
H-Wing3BHK78.52 sq m · 845 sq ft400

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 162 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD - Kiwale Realty LLP.pdf · uploaded 10 Jun 2022Source

Legal

  • Declaration Form BForm B Promotors compressed.pdf · uploaded 1 Feb 2024Source
  • Other – LegalNew Kiwale LLP Deed compressed.pdf · uploaded 3 Feb 2024Source
  • Other – LegalOrder 50.pdf · uploaded 6 Feb 2024Source
  • Legal Title reportdoc03942320240207210433_rotated (1).pdf · uploaded 7 Feb 2024Source
  • Other – LegalUpload Agreement _ MoU Copy (27).pdf · uploaded 9 Feb 2024Source

Migrated

  • 1 PAN CardPAN CARD - Kiwale Realty LLP.pdf · uploaded 10 Jun 2022Source
Show all 163 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCC 1.pdf · uploaded 23 Jan 2024Source
  • 1 Copy of Layout Approval (in case of layout)Sheet 1-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentSheet 2-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentSheet 3-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentSheet 4-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentSheet 5-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentSheet 6-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentSheet 7-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentSheet 8-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentSheet 9-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentSheet 10-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 10 Building Plan Approval / NA Order for plotted developmentSheet 11-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 11 Building Plan Approval / NA Order for plotted developmentSheet 12-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 12 Building Plan Approval / NA Order for plotted developmentSheet 13-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 13 Building Plan Approval / NA Order for plotted developmentSheet 14-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentSheet 15-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentSheet 16-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 16 Building Plan Approval / NA Order for plotted developmentSheet 17-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 17 Building Plan Approval / NA Order for plotted developmentSheet 18-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 18 Building Plan Approval / NA Order for plotted developmentSheet 19-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 19 Building Plan Approval / NA Order for plotted developmentSheet 20-20 compressed.pdf · uploaded 25 Jan 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Navyam compressed.pdf · uploaded 25 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Navyam Eng Cert 23-01-24.pdf · uploaded 25 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separate account real estate and project compressed.pdf · uploaded 25 Jan 2024Source
  • 1 Other – TechnicalDeclation Cum Undertaking compressed.pdf · uploaded 25 Jan 2024Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance Certificate of Finance .pdf · uploaded 29 Jan 2024Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance Certificate of Finance .pdf · uploaded 29 Jan 2024Source
  • 1 Declaration about Commencement CertificateFormat D (1).pdf · uploaded 29 Jan 2024Source
  • 1 CERSAI detailsCERSAI Undertaking.pdf · uploaded 29 Jan 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Navyam_Signed-rotated.pdf · uploaded 29 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsVijay Agarawal Disclosure.pdf · uploaded 29 Jan 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsSwapnadeep Goyal Disclosure.pdf · uploaded 29 Jan 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsNitin Mittal Disclosure.pdf · uploaded 29 Jan 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsKapil Agarwal Disclosure.pdf · uploaded 29 Jan 2024Source
  • 1 Proforma of Agreement for saleDraft Agreement Navyam.pdf · uploaded 30 Jan 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation - AGREEMENT TO SALE.pdf · uploaded 30 Jan 2024Source
  • 1 Proforma of Allotment letterAllotment Letter Navyam.pdf · uploaded 31 Jan 2024Source
  • 1 Declaration in FORM BForm B Promotors compressed.pdf · uploaded 1 Feb 2024Source
  • 2 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (25).pdf · uploaded 3 Feb 2024Source
  • 2 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (25).pdf · uploaded 3 Feb 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report with reapect to allotment letter .pdf · uploaded 3 Feb 2024Source
  • 1 Other – LegalNew Kiwale LLP Deed compressed.pdf · uploaded 3 Feb 2024Source
  • 3 a Details of encumbrances concerned to FinanceNo Encumbrance- Legal.pdf · uploaded 6 Feb 2024Source
  • 3 b Details of encumbrances concerned to LegalNo Encumbrance- Legal.pdf · uploaded 6 Feb 2024Source
  • 2 Other – LegalOrder 50.pdf · uploaded 6 Feb 2024Source
  • 1 Copy of the legal title reportdoc03942320240207210433_rotated (1).pdf · uploaded 7 Feb 2024Source
  • 3 Other – LegalUpload Agreement _ MoU Copy (27).pdf · uploaded 9 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 15 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 24.pdf · uploaded 15 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 24.pdf · uploaded 15 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Navyam as on Sep 2024.pdf · uploaded 26 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - NAvyam as on Sept 2024_compressed.pdf · uploaded 26 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Navyam as on Sept 2024.pdf · uploaded 26 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryCircular 29 - Sept 2024.pdf · uploaded 7 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24_organized.pdf · uploaded 7 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24.pdf · uploaded 10 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 Arch Dt - 31-12-2024.pdf · uploaded 17 Jan 2025Source
  • 1 Declaration about Commencement CertificateFormat - D.pdf · uploaded 17 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Navyam as on December 2024.pdf · uploaded 18 Jan 2025Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 21 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Jan 2025Source
  • 11 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 21 Jan 2025Source
  • 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 21 Jan 2025Source
  • 12 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 21 Jan 2025Source
  • 13 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 21 Jan 2025Source
  • 14 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 21 Jan 2025Source
  • 15 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 21 Jan 2025Source
  • 16 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 21 Jan 2025Source
  • 17 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 21 Jan 2025Source
  • 18 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 21 Jan 2025Source
  • 19 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 21 Jan 2025Source
  • 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 21 Jan 2025Source
  • 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 21 Jan 2025Source
  • 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 21 Jan 2025Source
  • 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 21 Jan 2025Source
  • 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 21 Jan 2025Source
  • 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 21 Jan 2025Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 21 Jan 2025Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 21 Jan 2025Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Dec 2024_11zon.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Dec 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 2, Navyam.pdf · uploaded 23 Jan 2025Source
  • Form 1Form 1 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
  • Form 2Form 2 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
  • Form 3Form 3 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on March 2025.pdf · uploaded 4 Sep 2025Source
  • Form 1Form 1 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
  • Form 1Form 1 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
  • Form 2Form 2 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
  • Form 2Form 2 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
  • Form 3Form 3 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
  • Form 3Form 3 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
  • Form 5 (FY 2024-2025)Form 5 - Navyam for FY 24-25.pdf · uploaded 9 Mar 2026Source
  • Form 5 (FY 2023-2024)Form 5 2023-2024.pdf · uploaded 11 May 2026Source
  • Form 1Form 1 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
  • Form 2Form 2 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
  • Form 3Form 3 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 1Form 1 March 24.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 1Form 1 March 24.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 2Navyam_Form2_Q1_2026-27_08-09-2026_14-37.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 2Form 2 - Navyam as on June 2025.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 3Navyam_Form3_Q1_2026-27_04-09-2026_18-25_doc1.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 3Form 3 - Navyam as on June 2025.pdf · uploaded 8 Sep 2026Source

Technical

  • DocumentSheet 1-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 2-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 3-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 4-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 5-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 6-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 7-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 8-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 9-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 10-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 11-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 12-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 13-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 14-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 15-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 16-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 17-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 18-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 19-20 compressed.pdf · uploaded 25 Jan 2024Source
  • DocumentSheet 20-20 compressed.pdf · uploaded 25 Jan 2024Source
  • Other – TechnicalDeclation Cum Undertaking compressed.pdf · uploaded 25 Jan 2024Source
  • Document1.pdf · uploaded 21 Jan 2025Source
  • Document2.pdf · uploaded 21 Jan 2025Source
  • Document3.pdf · uploaded 21 Jan 2025Source
  • Document4.pdf · uploaded 21 Jan 2025Source
  • Document5.pdf · uploaded 21 Jan 2025Source
  • Document6.pdf · uploaded 21 Jan 2025Source
  • Document7.pdf · uploaded 21 Jan 2025Source
  • Document8.pdf · uploaded 21 Jan 2025Source
  • Document9.pdf · uploaded 21 Jan 2025Source
  • Document10.pdf · uploaded 21 Jan 2025Source
  • Document11.pdf · uploaded 21 Jan 2025Source
  • Document12.pdf · uploaded 21 Jan 2025Source
  • Document13.pdf · uploaded 21 Jan 2025Source
  • Document14.pdf · uploaded 21 Jan 2025Source
  • Document15.pdf · uploaded 21 Jan 2025Source
  • Document16.pdf · uploaded 21 Jan 2025Source
  • Document17.pdf · uploaded 21 Jan 2025Source
  • Document18.pdf · uploaded 21 Jan 2025Source
  • Document19.pdf · uploaded 21 Jan 2025Source
  • Document20.pdf · uploaded 21 Jan 2025Source

Technical (Architect)

  • DocumentForm 1 March 24.pdf · uploaded 15 May 2024Source
  • DocumentForm 1 - Navyam as on Sep 2024.pdf · uploaded 26 Oct 2024Source
  • Document7 Form 1 Arch Dt - 31-12-2024.pdf · uploaded 17 Jan 2025Source
  • DocumentForm 1 - Navyam as on December 2024.pdf · uploaded 18 Jan 2025Source

Technical (Engineer)

  • DocumentForm 2 - Navyam as on Sept 2024.pdf · uploaded 26 Oct 2024Source
  • DocumentForm 2 - Dec 2024.pdf · uploaded 23 Jan 2025Source
  • DocumentForm 2 - Navyam as on June 2025.pdf · uploaded 8 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Ravet, Haveli taluka

Survey, CTS, gat or plot numbers

SURVEY NO. 117 P AT RAVET

Boundaries

North
18 Mtr Dp Road
South
Remaining Part Of Survey No 117
East
Remaining Part Of Survey No 118
West
Remaining Part Of Survey No 114

Source: registration certificates and MahaRERA's project page, as stated there.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology