Navyam
Certificate SignedRavet, Pune 412101 |Promoter: Kiwale Realty LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 8
- Unit types
- Landowner Office, Landowner Showroom, MHADA Flats, Showroom, MHADA Unit, Landowner Units, 3BHK, 2BHK, 4BHK248 units in all
- Address
- Survey No. 117 P At Ravet, Ravet, RavetPIN 412101
- Designated bank account
- 171
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
14 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 13 Oct 2026 | Primary sale | — | ≈ ₹11,156 | ||
| 21 Sep 2026 | Primary sale | — | ≈ ₹10,057 | ||
| 21 Sep 2026 | Primary sale | — | ≈ ₹9,939 | ||
| 31 Aug 2026 | Primary sale | — | ≈ ₹11,887 | ||
| 21 Aug 2026 | Primary sale | — | ≈ ₹11,156 | ||
| 5 Aug 2026 | Primary sale | — | ≈ ₹10,175 | ||
| 11 Jun 2026 | Primary sale | — | ≈ ₹11,004 | ||
| 4 Jun 2026 | Primary sale | — | ≈ ₹11,547 | ||
| 15 May 2026 | Primary sale | — | ≈ ₹11,156 | ||
| 21 Apr 2026 | Primary sale | — | ≈ ₹11,156 | ||
| 21 Apr 2026 | Primary sale | — | ≈ ₹10,992 | ||
| 21 Apr 2026 | Primary sale | — | ≈ ₹11,547 | ||
| 21 Apr 2026 | Primary sale | — | ≈ ₹11,717 | ||
| 6 Jan 2026 | Primary sale | — | ≈ ₹11,377 |
Navyam in numbers
Registered deals, summarised
Deedo has 14 registered documents at Navyam, from Jan 2026 to Oct 2026: 14 sales. The median registered sale works out to about ₹11,200 per sq ft, at a median of ₹68 L a deal; 0% of sales were resales.
- What is the price per sq ft at Navyam?
- The median registered sale works out to about ₹11,200 per sq ft, at a median of ₹68 L a deal; 0% of sales were resales.
- How many properties have been sold at Navyam?
- 14 sales are registered at Navyam.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Navyam by Deedo, last updated with deals registered in Oct 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 15 Feb 2024
- Promised
- 31 Dec 2029
- Revised
- 30 Apr 2030
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054888 | 15 Feb 2024 | 31 Dec 2029 | 30 Apr 2030 | Kiwale Realty LLP | Project page |
8 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Wing | 10 | 48 |
| B Wing | 5 | 1 |
| C Wing | 5 | 3 |
| D Wing | 5 | 1 |
| E Wing | 5 | 75 |
| F Wing | 10 | 40 |
| G-Wing | 10 | 40 |
| H-Wing | 10 | 40 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 248 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | Landowner Office | 32.68 sq m · 352 sq ft | 2 | 0 |
| A Wing | Landowner Office | 57.39 sq m · 618 sq ft | 2 | 0 |
| A Wing | Landowner Showroom | 50.74 sq m · 546 sq ft | 1 | 0 |
| A Wing | Landowner Showroom | 104.39 sq m · 1,124 sq ft | 1 | 0 |
| A Wing | MHADA Flats | 24.95 sq m · 269 sq ft | 14 | 0 |
| A Wing | MHADA Flats | 29.45 sq m · 317 sq ft | 26 | 0 |
| A Wing | Showroom | 50.74 sq m · 546 sq ft | 1 | 0 |
| A Wing | Showroom | 104.39 sq m · 1,124 sq ft | 1 | 0 |
Show all 20 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B Wing | MHADA Unit | 29.45 sq m · 317 sq ft | 1 | 0 |
| C Wing | Landowner Units | 56.07 sq m · 604 sq ft | 3 | 0 |
| D Wing | 3BHK | 74.65 sq m · 804 sq ft | 1 | 0 |
| E Wing | 2BHK | 51.95 sq m · 559 sq ft | 4 | 0 |
| E Wing | 2BHK | 56.07 sq m · 604 sq ft | 46 | 0 |
| E Wing | 3BHK | 74.65 sq m · 804 sq ft | 24 | 0 |
| E Wing | 4BHK | 143.59 sq m · 1,546 sq ft | 1 | 0 |
| F Wing | 2BHK | 54.71 sq m · 589 sq ft | 20 | 0 |
| F Wing | 2BHK | 56.63 sq m · 610 sq ft | 20 | 0 |
| G-Wing | 2BHK | 54.71 sq m · 589 sq ft | 20 | 0 |
| G-Wing | 2BHK | 56.63 sq m · 610 sq ft | 20 | 0 |
| H-Wing | 3BHK | 78.52 sq m · 845 sq ft | 40 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 162 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD - Kiwale Realty LLP.pdf · uploaded 10 Jun 2022Source
Legal
- Declaration Form BForm B Promotors compressed.pdf · uploaded 1 Feb 2024Source
- Other – LegalNew Kiwale LLP Deed compressed.pdf · uploaded 3 Feb 2024Source
- Other – LegalOrder 50.pdf · uploaded 6 Feb 2024Source
- Legal Title reportdoc03942320240207210433_rotated (1).pdf · uploaded 7 Feb 2024Source
- Other – LegalUpload Agreement _ MoU Copy (27).pdf · uploaded 9 Feb 2024Source
Migrated
- 1 PAN CardPAN CARD - Kiwale Realty LLP.pdf · uploaded 10 Jun 2022Source
Show all 163 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCC 1.pdf · uploaded 23 Jan 2024Source
- 1 Copy of Layout Approval (in case of layout)Sheet 1-20 compressed.pdf · uploaded 25 Jan 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet 2-20 compressed.pdf · uploaded 25 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet 3-20 compressed.pdf · uploaded 25 Jan 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 4-20 compressed.pdf · uploaded 25 Jan 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 5-20 compressed.pdf · uploaded 25 Jan 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 6-20 compressed.pdf · uploaded 25 Jan 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet 7-20 compressed.pdf · uploaded 25 Jan 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet 8-20 compressed.pdf · uploaded 25 Jan 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet 9-20 compressed.pdf · uploaded 25 Jan 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentSheet 10-20 compressed.pdf · uploaded 25 Jan 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentSheet 11-20 compressed.pdf · uploaded 25 Jan 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentSheet 12-20 compressed.pdf · uploaded 25 Jan 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentSheet 13-20 compressed.pdf · uploaded 25 Jan 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentSheet 14-20 compressed.pdf · uploaded 25 Jan 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentSheet 15-20 compressed.pdf · uploaded 25 Jan 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentSheet 16-20 compressed.pdf · uploaded 25 Jan 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentSheet 17-20 compressed.pdf · uploaded 25 Jan 2024Source
- 17 Building Plan Approval / NA Order for plotted developmentSheet 18-20 compressed.pdf · uploaded 25 Jan 2024Source
- 18 Building Plan Approval / NA Order for plotted developmentSheet 19-20 compressed.pdf · uploaded 25 Jan 2024Source
- 19 Building Plan Approval / NA Order for plotted developmentSheet 20-20 compressed.pdf · uploaded 25 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert Navyam compressed.pdf · uploaded 25 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Navyam Eng Cert 23-01-24.pdf · uploaded 25 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about separate account real estate and project compressed.pdf · uploaded 25 Jan 2024Source
- 1 Other – TechnicalDeclation Cum Undertaking compressed.pdf · uploaded 25 Jan 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance Certificate of Finance .pdf · uploaded 29 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Certificate of Finance .pdf · uploaded 29 Jan 2024Source
- 1 Declaration about Commencement CertificateFormat D (1).pdf · uploaded 29 Jan 2024Source
- 1 CERSAI detailsCERSAI Undertaking.pdf · uploaded 29 Jan 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Navyam_Signed-rotated.pdf · uploaded 29 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsVijay Agarawal Disclosure.pdf · uploaded 29 Jan 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsSwapnadeep Goyal Disclosure.pdf · uploaded 29 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsNitin Mittal Disclosure.pdf · uploaded 29 Jan 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsKapil Agarwal Disclosure.pdf · uploaded 29 Jan 2024Source
- 1 Proforma of Agreement for saleDraft Agreement Navyam.pdf · uploaded 30 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation - AGREEMENT TO SALE.pdf · uploaded 30 Jan 2024Source
- 1 Proforma of Allotment letterAllotment Letter Navyam.pdf · uploaded 31 Jan 2024Source
- 1 Declaration in FORM BForm B Promotors compressed.pdf · uploaded 1 Feb 2024Source
- 2 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (25).pdf · uploaded 3 Feb 2024Source
- 2 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (25).pdf · uploaded 3 Feb 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with reapect to allotment letter .pdf · uploaded 3 Feb 2024Source
- 1 Other – LegalNew Kiwale LLP Deed compressed.pdf · uploaded 3 Feb 2024Source
- 3 a Details of encumbrances concerned to FinanceNo Encumbrance- Legal.pdf · uploaded 6 Feb 2024Source
- 3 b Details of encumbrances concerned to LegalNo Encumbrance- Legal.pdf · uploaded 6 Feb 2024Source
- 2 Other – LegalOrder 50.pdf · uploaded 6 Feb 2024Source
- 1 Copy of the legal title reportdoc03942320240207210433_rotated (1).pdf · uploaded 7 Feb 2024Source
- 3 Other – LegalUpload Agreement _ MoU Copy (27).pdf · uploaded 9 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 24.pdf · uploaded 15 May 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 24.pdf · uploaded 15 May 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 24.pdf · uploaded 15 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Navyam as on Sep 2024.pdf · uploaded 26 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - NAvyam as on Sept 2024_compressed.pdf · uploaded 26 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Navyam as on Sept 2024.pdf · uploaded 26 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryCircular 29 - Sept 2024.pdf · uploaded 7 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-24_organized.pdf · uploaded 7 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24.pdf · uploaded 10 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 Form 1 Arch Dt - 31-12-2024.pdf · uploaded 17 Jan 2025Source
- 1 Declaration about Commencement CertificateFormat - D.pdf · uploaded 17 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Navyam as on December 2024.pdf · uploaded 18 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 21 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Jan 2025Source
- 11 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 21 Jan 2025Source
- 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 21 Jan 2025Source
- 12 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 21 Jan 2025Source
- 13 Building Plan Approval / NA Order for plotted development14.pdf · uploaded 21 Jan 2025Source
- 14 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 21 Jan 2025Source
- 15 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 21 Jan 2025Source
- 16 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 21 Jan 2025Source
- 17 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 21 Jan 2025Source
- 18 Building Plan Approval / NA Order for plotted development19.pdf · uploaded 21 Jan 2025Source
- 19 Building Plan Approval / NA Order for plotted development20.pdf · uploaded 21 Jan 2025Source
- 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 21 Jan 2025Source
- 9 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 21 Jan 2025Source
- 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 21 Jan 2025Source
- 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 21 Jan 2025Source
- 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 21 Jan 2025Source
- 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 21 Jan 2025Source
- 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 21 Jan 2025Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 21 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 21 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Dec 2024_11zon.pdf · uploaded 23 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Dec 2024.pdf · uploaded 23 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryCircular 2, Navyam.pdf · uploaded 23 Jan 2025Source
- Form 1Form 1 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 - Navyam as on March 2025 (SIGNED).pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on March 2025.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
- Form 1Form 1 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
- Form 2Form 2 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
- Form 2Form 2 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
- Form 3Form 3 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
- Form 3Form 3 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on Sept 2025.pdf · uploaded 7 Mar 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on Dec 2025.pdf · uploaded 7 Mar 2026Source
- Form 5 (FY 2024-2025)Form 5 - Navyam for FY 24-25.pdf · uploaded 9 Mar 2026Source
- Form 5 (FY 2023-2024)Form 5 2023-2024.pdf · uploaded 11 May 2026Source
- Form 1Form 1 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
- Form 2Form 2 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
- Form 3Form 3 Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Navyam as on 31-03-2026.pdf · uploaded 15 May 2026Source
- Withdrawal Update Form 1Form 1 March 24.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 1Form 1 March 24.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 2Navyam_Form2_Q1_2026-27_08-09-2026_14-37.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 2Form 2 - Navyam as on June 2025.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 3Navyam_Form3_Q1_2026-27_04-09-2026_18-25_doc1.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 3Form 3 - Navyam as on June 2025.pdf · uploaded 8 Sep 2026Source
Technical
- DocumentSheet 1-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 2-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 3-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 4-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 5-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 6-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 7-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 8-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 9-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 10-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 11-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 12-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 13-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 14-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 15-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 16-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 17-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 18-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 19-20 compressed.pdf · uploaded 25 Jan 2024Source
- DocumentSheet 20-20 compressed.pdf · uploaded 25 Jan 2024Source
- Other – TechnicalDeclation Cum Undertaking compressed.pdf · uploaded 25 Jan 2024Source
- Document1.pdf · uploaded 21 Jan 2025Source
- Document2.pdf · uploaded 21 Jan 2025Source
- Document3.pdf · uploaded 21 Jan 2025Source
- Document4.pdf · uploaded 21 Jan 2025Source
- Document5.pdf · uploaded 21 Jan 2025Source
- Document6.pdf · uploaded 21 Jan 2025Source
- Document7.pdf · uploaded 21 Jan 2025Source
- Document8.pdf · uploaded 21 Jan 2025Source
- Document9.pdf · uploaded 21 Jan 2025Source
- Document10.pdf · uploaded 21 Jan 2025Source
- Document11.pdf · uploaded 21 Jan 2025Source
- Document12.pdf · uploaded 21 Jan 2025Source
- Document13.pdf · uploaded 21 Jan 2025Source
- Document14.pdf · uploaded 21 Jan 2025Source
- Document15.pdf · uploaded 21 Jan 2025Source
- Document16.pdf · uploaded 21 Jan 2025Source
- Document17.pdf · uploaded 21 Jan 2025Source
- Document18.pdf · uploaded 21 Jan 2025Source
- Document19.pdf · uploaded 21 Jan 2025Source
- Document20.pdf · uploaded 21 Jan 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ravet, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18 Mtr Dp Road
- South
- Remaining Part Of Survey No 117
- East
- Remaining Part Of Survey No 118
- West
- Remaining Part Of Survey No 114
Source: registration certificates and MahaRERA's project page, as stated there.