ML Tower
Certificate SignedRavet, Pune 421101 |Promoter: BML Builders
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Mixed
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK, Clinic, Office space, Shop38 units in all
- Address
- Survey No. 97/1A/1A/15 Ravet Pune 412101, S. B. Patil Road, PunePIN 421101
- Designated bank account
- 85
- Developed in phases
- No
Registered transactions
9 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 16 Sep 2026 | Primary sale | — | ≈ ₹9,173 | ||
| 1 Aug 2026 | Bldg या | Primary sale | — | ≈ ₹8,577 | |
| 12 May 2026 | Bldg या | Primary sale | — | ≈ ₹8,230 | |
| 11 May 2026 | Primary sale | — | ≈ ₹9,015 | ||
| 4 Apr 2026 | Primary sale | — | ≈ ₹8,232 | ||
| 26 Mar 2026 | Primary sale | — | ≈ ₹7,967 | ||
| 22 Mar 2026 | Primary sale | — | ≈ ₹8,539 | ||
| 16 Mar 2026 | Primary sale | — | ≈ ₹8,788 | ||
| 3 Feb 2026 | Primary sale | — | ≈ ₹8,410 |
ML Tower in numbers
Registered deals, summarised
Deedo has 9 registered documents at ML Tower, from Feb 2026 to Sep 2026: 9 sales. The median registered sale works out to about ₹8,400 per sq ft, at a median of ₹44 L a deal; 0% of sales were resales.
- What is the price per sq ft at ML Tower?
- The median registered sale works out to about ₹8,400 per sq ft, at a median of ₹44 L a deal; 0% of sales were resales.
- How many properties have been sold at ML Tower?
- 9 sales are registered at ML Tower.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at ML Tower by Deedo, last updated with deals registered in Sep 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 27 Oct 2023
- Promised
- 13 Jan 2027
- Revised
- 13 May 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100053327 | 27 Oct 2023 | 13 Jan 2027 | 13 May 2027 | BML Builders | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Building | 10 | 38 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
14 of 38 units booked (37%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 73.03 sq m · 786 sq ft | 2 | 2 |
| 2BHK | 79.45 sq m · 855 sq ft | 2 | 0 |
| 3BHK | 34.05 sq m · 367 sq ft | 1 | 0 |
| 3BHK | 99.98 sq m · 1,076 sq ft | 2 | 0 |
| 3BHK | 102.47 sq m · 1,103 sq ft | 2 | 1 |
| Clinic | 83.43 sq m · 898 sq ft | 1 | 0 |
| Clinic | 83.45 sq m · 898 sq ft | 1 | 0 |
| Clinic | 139.32 sq m · 1,500 sq ft | 1 | 0 |
Show all 32 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Clinic | 145.12 sq m · 1,562 sq ft | 1 | 0 |
| Office space | 24.37 sq m · 262 sq ft | 2 | 2 |
| Office space | 30.92 sq m · 333 sq ft | 1 | 1 |
| Office space | 33 sq m · 355 sq ft | 1 | 1 |
| Office space | 33.55 sq m · 361 sq ft | 1 | 0 |
| Office space | 35.63 sq m · 384 sq ft | 1 | 0 |
| Office space | 36.47 sq m · 393 sq ft | 1 | 0 |
| Office space | 37.95 sq m · 408 sq ft | 1 | 1 |
| Office space | 40.63 sq m · 437 sq ft | 1 | 0 |
| Office space | 43.19 sq m · 465 sq ft | 1 | 1 |
| Office space | 45.48 sq m · 490 sq ft | 1 | 0 |
| Office space | 45.48 sq m · 490 sq ft | 1 | 0 |
| Office space | 52.72 sq m · 567 sq ft | 1 | 0 |
| Office space | 55.06 sq m · 593 sq ft | 1 | 0 |
| Office space | 85.03 sq m · 915 sq ft | 2 | 0 |
| Shop | 21 sq m · 226 sq ft | 1 | 1 |
| Shop | 31.1 sq m · 335 sq ft | 1 | 1 |
| Shop | 32.33 sq m · 348 sq ft | 1 | 0 |
| Shop | 32.77 sq m · 353 sq ft | 1 | 0 |
| Shop | 35.74 sq m · 385 sq ft | 1 | 1 |
| Shop | 36.35 sq m · 391 sq ft | 1 | 1 |
| Shop | 36.5 sq m · 393 sq ft | 1 | 0 |
| Shop | 51.93 sq m · 559 sq ft | 1 | 0 |
| Shop | 54.55 sq m · 587 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 129 filings listed on MahaRERA's project page
Finance
- PAN CardBML BUILDERS Pancard .pdf · uploaded 25 Aug 2023Source
Legal
Migrated
- 1 PAN CardBML BUILDERS Pancard .pdf · uploaded 25 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to Legal - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to Legal - ML Tower.pdf · uploaded 25 Aug 2023Source
Show all 131 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Plan 01.pdf · uploaded 25 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)Plan 02.pdf · uploaded 25 Aug 2023Source
- 3 Copy of Layout Approval (in case of layout)Plan 03.pdf · uploaded 25 Aug 2023Source
- 4 Copy of Layout Approval (in case of layout)Plan 04.pdf · uploaded 25 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 01.pdf · uploaded 25 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 02.pdf · uploaded 25 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 03.pdf · uploaded 25 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 04.pdf · uploaded 25 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 25 Aug 2023Source
- 1 Declaration about Commencement CertificateForm D - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 Declaration in FORM BBML Affidavit.pdf · uploaded 25 Aug 2023Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 25 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 Proforma of Allotment letterAllotment Letter - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account Declaration - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation of Allotment Letter - ML Tower.pdf · uploaded 25 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation for AFS - ML Tower.pdf · uploaded 25 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to Finance - ML Tower.pdf · uploaded 9 Oct 2023Source
- 3 a Details of encumbrances concerned to FinanceDetails of encumbrances concerned to Legal - ML Tower.pdf · uploaded 9 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to Finance - ML Tower.pdf · uploaded 9 Oct 2023Source
- 3 b Details of encumbrances concerned to LegalDetails of encumbrances concerned to Legal - ML Tower.pdf · uploaded 9 Oct 2023Source
- 1 Proforma of Agreement for saleAgreement for sale- BML Builders (Shailesh sir).pdf · uploaded 9 Oct 2023Source
- 1 Other – TechnicalCC confirmation.pdf · uploaded 9 Oct 2023Source
- 1 Copy of the legal title reportTitle Report_1 (3 files merged).pdf · uploaded 20 Oct 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA-BML Buildernew (1).pdf · uploaded 20 Oct 2023Source
- 2 Proforma of Agreement for saleRERA AGREEMENT kiran sir 03102023.pdf · uploaded 15 Dec 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Revised Sheet-1.pdf · uploaded 24 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Revised Sheet-2.pdf · uploaded 24 Mar 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Revised Sheet-3.pdf · uploaded 24 Mar 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Revised Sheet-4.pdf · uploaded 24 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised_CC.pdf · uploaded 24 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)29-4-24 Architect Certificate_compressed.pdf · uploaded 11 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)12-9-24 Architect Certificate .pdf · uploaded 11 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 (3).pdf · uploaded 11 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)16-5-24 CA Certificate-compressed.pdf · uploaded 11 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)15-5-24 Engineer Certificate.pdf · uploaded 11 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)12-9-24 Engineer Certificate .pdf · uploaded 11 Oct 2024Source
- 2 Commencement Certificates / NA Order for plotted development9-9-24 बांधकाम परवानगी 4th-compressed.pdf · uploaded 11 Oct 2024Source
- 2 Other – Technical15-4-23 Plinth checking Certificate.pdf · uploaded 11 Oct 2024Source
- 3 Other – Technicalwork in progress Certificate .pdf · uploaded 11 Oct 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samenew Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 21 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf · uploaded 18 Nov 2024Source
- 7 Copy of Layout Approval (in case of layout)9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf · uploaded 18 Nov 2024Source
- 1 Proforma of Agreement for salerera bml.pdf · uploaded 16 Dec 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A ordern n0 34 2022.pdf · uploaded 21 Dec 2024Source
- 2 Proforma of Agreement for saleRERA AGREEMENT kiran.pdf · uploaded 30 Dec 2024Source
- 2 Copy of Layout Approval (in case of layout)HPSC0725_11zon.pdf · uploaded 21 Jan 2025Source
- 3 Copy of Layout Approval (in case of layout)HPSC0726_11zon.pdf · uploaded 21 Jan 2025Source
- 4 Copy of Layout Approval (in case of layout)HPSC0727_11zon.pdf · uploaded 21 Jan 2025Source
- 5 Copy of Layout Approval (in case of layout)HPSC0728_11zon.pdf · uploaded 21 Jan 2025Source
- 6 Copy of Layout Approval (in case of layout)HPSC0729_11zon.pdf · uploaded 21 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)HPSC0724_11zon.pdf · uploaded 21 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted development20250120095555_11zon.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)4th Architect Certificate 10-02-2025-output.pdf · uploaded 13 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)4th CA Certificate 07-02-25_11zon.pdf · uploaded 13 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 Feb 2025Source
- 1 Other – Technical4th Work Progress Certificate 10-02-2025.pdf · uploaded 13 Feb 2025Source
- 1 Proforma of Agreement for saleFinal Draft for RERA BML BUILDERS 17-03-2025.pdf · uploaded 17 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)1st Revised Sanction Plan_11zon.pdf · uploaded 31 Mar 2025Source
- 1 Proforma of Agreement for saleFinal Draft - Narayani 31-03-2025 Submitted to RERA_compressed.pdf · uploaded 31 Mar 2025Source
- Form 1June form 1.pdf · uploaded 10 Jul 2026Source
- Form 1June form 1.pdf · uploaded 10 Jul 2026Source
- Form 1Sept form 1.pdf · uploaded 10 Jul 2026Source
- Form 1Dec form 1.pdf · uploaded 10 Jul 2026Source
- Form 1march form 1.pdf · uploaded 10 Jul 2026Source
- Form 2June form 2.pdf · uploaded 10 Jul 2026Source
- Form 2June form 2.pdf · uploaded 10 Jul 2026Source
- Form 2Sept form 2.pdf · uploaded 10 Jul 2026Source
- Form 2Dec form 2.pdf · uploaded 10 Jul 2026Source
- Form 2March form 2.pdf · uploaded 10 Jul 2026Source
- Form 3June form 3.pdf · uploaded 10 Jul 2026Source
- Form 3June form 3.pdf · uploaded 10 Jul 2026Source
- Form 3Sept form 3.pdf · uploaded 10 Jul 2026Source
- Form 3Dec form 3.pdf · uploaded 10 Jul 2026Source
- Form 3march form 3.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryJune sold booked inventory Data.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryJune form 3.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventorySept Sold Booked Inventory data.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryDec sold booked inventory Data.pdf · uploaded 10 Jul 2026Source
- Disclosure of Sold and Booked InventoryMarch sold booked Inventory Data.pdf · uploaded 10 Jul 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 12 Jul 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 12 Jul 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 12 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 12 Jul 2026Source
Technical
- DocumentPlan 01.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 02.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 03.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 04.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 01.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 02.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 03.pdf · uploaded 25 Aug 2023Source
- DocumentPlan 04.pdf · uploaded 25 Aug 2023Source
- Other – TechnicalCC confirmation.pdf · uploaded 9 Oct 2023Source
- DocumentBuilding Plan_Revised Sheet-1.pdf · uploaded 24 Mar 2024Source
- DocumentBuilding Plan_Revised Sheet-2.pdf · uploaded 24 Mar 2024Source
- DocumentBuilding Plan_Revised Sheet-3.pdf · uploaded 24 Mar 2024Source
- DocumentBuilding Plan_Revised Sheet-4.pdf · uploaded 24 Mar 2024Source
- Other – Technical15-4-23 Plinth checking Certificate.pdf · uploaded 11 Oct 2024Source
- Other – Technicalwork in progress Certificate .pdf · uploaded 11 Oct 2024Source
- Document9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf · uploaded 18 Nov 2024Source
- Document9-9-24 बांधकाम परवानगी 4th (1)-pages-compressed.pdf · uploaded 18 Nov 2024Source
- DocumentHPSC0724_11zon.pdf · uploaded 21 Jan 2025Source
- DocumentHPSC0725_11zon.pdf · uploaded 21 Jan 2025Source
- DocumentHPSC0726_11zon.pdf · uploaded 21 Jan 2025Source
- DocumentHPSC0727_11zon.pdf · uploaded 21 Jan 2025Source
- DocumentHPSC0728_11zon.pdf · uploaded 21 Jan 2025Source
- DocumentHPSC0729_11zon.pdf · uploaded 21 Jan 2025Source
- Other – Technical4th Work Progress Certificate 10-02-2025.pdf · uploaded 13 Feb 2025Source
- Document1st Revised Sanction Plan_11zon.pdf · uploaded 31 Mar 2025Source
- DocumentLayout.pdf · uploaded 23 Jul 2026Source
- Documentsanction plan 2.pdf · uploaded 23 Jul 2026Source
- Documentsanction plan 3.pdf · uploaded 23 Jul 2026Source
- Documentsanction plan 4.pdf · uploaded 23 Jul 2026Source
- Documentsanction plan 5.pdf · uploaded 23 Jul 2026Source
- DocumentSanction plan 6.pdf · uploaded 23 Jul 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ravet, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Mr Dheerjlal Hiralal Bhojni Land
- South
- Out of Land of Survey No 97
- East
- Out of Land of Survey No 97
- West
- 80 Meter wide DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Integrity Arch and Associates | — |
| Architect | Shamal Kavatkar | — |
| Chartered accountant | CA Bhushan S Chhajed | — |
| Chartered accountant | Eshan Porwal | — |
| Chartered accountant | Siddhi Warik | — |
| Engineer | Govind Bhanudas Nimbalkar | — |
| Engineer | Pawan Khengare | — |
| Other | Govind Bhanudas Nimbalkar | — |
| Other | Sukhakarta Construction | — |
Source: MahaRERA project page. Contact details are not shown.