Bhalchandra Blessings
Certificate SignedRavet, Pune 412101 |Promoter: N B Bhondave Infra
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- Shop, 2BHK138 units in all
- Address
- Survey Number 181/3 A, Ravet, Beside Bhondve Empire, ShindewastiPIN 412101
- Designated bank account
- 17
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2025
The latest completion date on record passed 10 months ago.
- Registered
- 10 Sep 2022
- Promised
- 31 Dec 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046815 | 10 Sep 2022 | 31 Dec 2025 | 31 Dec 2025 | N B Bhondave Infra | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Commercial | 6 | 8 |
| Residential | 30 | 130 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
123 of 138 units booked (89%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Commercial | Shop | 31.41 sq m · 338 sq ft | 8 | 8 |
| Residential | 2BHK | 58.03 sq m · 625 sq ft | 5 | 4 |
| Residential | 2BHK | 62 sq m · 667 sq ft | 26 | 21 |
| Residential | 2BHK | 62.09 sq m · 668 sq ft | 26 | 25 |
| Residential | 2BHK | 62.2 sq m · 670 sq ft | 26 | 25 |
| Residential | 2BHK | 62.33 sq m · 671 sq ft | 21 | 21 |
| Residential | 2BHK | 62.56 sq m · 673 sq ft | 26 | 19 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 151 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card.pdf · uploaded 18 Aug 2022Source
Legal
Migrated
- 1 PAN CardPan Card.pdf · uploaded 18 Aug 2022Source
- 1 Copy of the legal title reportLegal Search.pdf · uploaded 18 Aug 2022Source
- 1 a Details of encumbrances concerned to FinanceNo Encumbrance concerned to finance .pdf · uploaded 18 Aug 2022Source
- 1 b Details of encumbrances concerned to LegalNo Encumbrance concerned to legal.pdf · uploaded 18 Aug 2022Source
Show all 152 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Plan 010101.pdf · uploaded 18 Aug 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 03.pdf · uploaded 18 Aug 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 04.pdf · uploaded 18 Aug 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 02.pdf · uploaded 18 Aug 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 06.pdf · uploaded 18 Aug 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan 07.pdf · uploaded 18 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentC C.pdf · uploaded 18 Aug 2022Source
- 1 Declaration in FORM BForm B.pdf · uploaded 18 Aug 2022Source
- 1 CERSAI detailsCERSAI Report .pdf · uploaded 18 Aug 2022Source
- 2 CERSAI detailsCERSAI_Search_Report_.pdf · uploaded 18 Aug 2022Source
- 1 Proforma of Allotment letterANNEXURE ALLOTMENT LETTER.pdf · uploaded 18 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Report for Allotment.pdf · uploaded 18 Aug 2022Source
- 1 Declaration about Commencement CertificateDeclaration CC.pdf · uploaded 20 Aug 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-.pdf · uploaded 20 Aug 2022Source
- 1 Disclosure of sold/ booked inventoryBhalchandra blessings Inventory .pdf · uploaded 20 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 New.pdf · uploaded 20 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat 'A'.pdf · uploaded 20 Aug 2022Source
- 2 Proforma of Allotment letterATS.pdf · uploaded 29 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report 29-08-2022 FINAL_compressed.pdf · uploaded 29 Aug 2022Source
- 3 Proforma of Allotment letterDraft Agreement to Sale Model Bhalchandra Blessings Commercial.pdf · uploaded 27 Sep 2022Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same70 Bank Account 27-09-2022.pdf · uploaded 27 Sep 2022Source
- 2 Copy of Layout Approval (in case of layout)Santioned Layout.pdf · uploaded 15 Dec 2022Source
- 6 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 15 Dec 2022Source
- 7 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 15 Dec 2022Source
- 8 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 15 Dec 2022Source
- 9 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 15 Dec 2022Source
- 10 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 15 Dec 2022Source
- 11 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 15 Dec 2022Source
- 12 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 15 Dec 2022Source
- 13 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 15 Dec 2022Source
- 14 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 15 Dec 2022Source
- 15 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 15 Dec 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement certificate .pdf · uploaded 15 Dec 2022Source
- 2 Declaration about Commencement CertificateCommencement certificate .pdf · uploaded 15 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance Finance 05-01-2023.pdf · uploaded 8 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance Finance 05-01-2023.pdf · uploaded 8 Jan 2023Source
- 1 Proforma of Agreement for saleDraft Agreement to sale Residentinal.pdf · uploaded 24 Jan 2023Source
- 2 Proforma of Agreement for saleDraft Agreement to sale Commercial.pdf · uploaded 24 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1.pdf · uploaded 11 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Bhalchandra Blessings Form 2.pdf · uploaded 11 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)N B Bhondave Infra Form 3.pdf · uploaded 11 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Jun 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate.PDF · uploaded 19 Jun 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form-3.PDF · uploaded 19 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2.pdf · uploaded 21 Aug 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3.pdf · uploaded 21 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)From 5.pdf · uploaded 2 Sep 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form - 2A 22-23.pdf · uploaded 8 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Scan.pdf · uploaded 16 Oct 2023Source
- 3 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 21 Nov 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentscan0000005814.pdf · uploaded 21 Nov 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentscan0000005815.pdf · uploaded 21 Nov 2023Source
- 18 Building Plan Approval / NA Order for plotted developmentscan0000005816.pdf · uploaded 21 Nov 2023Source
- 19 Building Plan Approval / NA Order for plotted developmentscan0000005817.pdf · uploaded 21 Nov 2023Source
- 20 Building Plan Approval / NA Order for plotted developmentscan0000005818.pdf · uploaded 21 Nov 2023Source
- 21 Building Plan Approval / NA Order for plotted developmentscan0000005819.pdf · uploaded 21 Nov 2023Source
- 22 Building Plan Approval / NA Order for plotted developmentscan0000005820.pdf · uploaded 21 Nov 2023Source
- 23 Building Plan Approval / NA Order for plotted developmentscan0000005821.pdf · uploaded 21 Nov 2023Source
- 24 Building Plan Approval / NA Order for plotted developmentscan0000005822.pdf · uploaded 21 Nov 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.PDF · uploaded 15 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)BLESSINGS ( 31-12-23) Form 2.pdf · uploaded 15 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 15 Jan 2024Source
- 4 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 17 Feb 2024Source
- 25 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 17 Feb 2024Source
- 26 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 17 Feb 2024Source
- 27 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 17 Feb 2024Source
- 28 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 17 Feb 2024Source
- 29 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 17 Feb 2024Source
- 30 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 17 Feb 2024Source
- 31 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 17 Feb 2024Source
- 32 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 17 Feb 2024Source
- 33 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 17 Feb 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 17 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Blessing.PDF · uploaded 22 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Blessings.pdf · uploaded 22 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 22 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 14 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Jul 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentSR 181 FULL COMPLETION 1.pdf · uploaded 14 Aug 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4.pdf · uploaded 7 Oct 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4.pdf · uploaded 7 Oct 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentForm 4.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 11 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 5.PDF · uploaded 11 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 11 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 5.PDF · uploaded 11 Oct 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 11 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 11 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.PDF · uploaded 11 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 5.PDF · uploaded 11 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.PDF · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.PDF · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.PDF · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 New.pdf · uploaded 15 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 New.pdf · uploaded 15 Oct 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 New.pdf · uploaded 15 Oct 2024Source
Technical
- DocumentPlan 010101.pdf · uploaded 18 Aug 2022Source
- DocumentPlan 03.pdf · uploaded 18 Aug 2022Source
- DocumentPlan 04.pdf · uploaded 18 Aug 2022Source
- DocumentPlan 02.pdf · uploaded 18 Aug 2022Source
- DocumentPlan 06.pdf · uploaded 18 Aug 2022Source
- DocumentPlan 07.pdf · uploaded 18 Aug 2022Source
- DocumentSantioned Layout.pdf · uploaded 15 Dec 2022Source
- Document1.pdf · uploaded 15 Dec 2022Source
- Document2.pdf · uploaded 15 Dec 2022Source
- Document3.pdf · uploaded 15 Dec 2022Source
- Document4.pdf · uploaded 15 Dec 2022Source
- Document5.pdf · uploaded 15 Dec 2022Source
- Document6.pdf · uploaded 15 Dec 2022Source
- Document7.pdf · uploaded 15 Dec 2022Source
- Document8.pdf · uploaded 15 Dec 2022Source
- Document9.pdf · uploaded 15 Dec 2022Source
- Document10.pdf · uploaded 15 Dec 2022Source
- Documentscan0000005814.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005815.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005816.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005817.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005818.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005819.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005820.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005821.pdf · uploaded 21 Nov 2023Source
- Documentscan0000005822.pdf · uploaded 21 Nov 2023Source
- DocumentLayout.pdf · uploaded 21 Nov 2023Source
- Document8.pdf · uploaded 17 Feb 2024Source
- Document9.pdf · uploaded 17 Feb 2024Source
- Document10.pdf · uploaded 17 Feb 2024Source
- Document2.pdf · uploaded 17 Feb 2024Source
- Document3.pdf · uploaded 17 Feb 2024Source
- Document4.pdf · uploaded 17 Feb 2024Source
- Document5.pdf · uploaded 17 Feb 2024Source
- Document6.pdf · uploaded 17 Feb 2024Source
- Document7.pdf · uploaded 17 Feb 2024Source
- DocumentLayout.pdf · uploaded 17 Feb 2024Source
Technical (Architect)
- DocumentForm 1.pdf · uploaded 14 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ravet, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Remaining Part Of Survey Number 181 1a
- South
- Remaining Part Of Survey Number 181 2
- East
- M I D C Pipe Line Road
- West
- Remaining Part Of Survey Number 181 3a 1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shailendra Ghorpade And Associates | — |
| Chartered accountant | Vinit D Achha And Associates | — |
| Engineer | Avinash Hole | — |
Source: MahaRERA project page. Contact details are not shown.