Rahatani, Pune 411017 |Promoter: Goldfinger Kataria Urban Developments

Residential / Group HousingRERAP52100013230
21 Sep 2017Registered with MahaRERA
30 Apr 2027Promised completion
30 Aug 2027Revised completionPushed back 4 months
5Buildings
303Units registered118 booked (39%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
2BHK, 3BHK, Shop, 4BHK, Office space, Toilet block303 units in all
Address
S no 48 Hissa no 4 10 Rahatani, Pimple Saudhagar, Pimpale SaudhagarPIN 411017
Designated bank account
17
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.60571, 73.78453
Tamara is at latitude 18.60571, longitude 73.78453.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
21 Sep 2017
Promised
30 Apr 2027
Revised
30 Aug 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001323021 Sep 201730 Apr 202730 Aug 2027Goldfinger Kataria Urban DevelopmentsProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A building1143
B Building1143
C Building1143
Wing D Uprise1996
Wing E Uprise2078

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

118 of 303 units booked (39%), as the promoter reported to MahaRERA

2BHK · 148 units3BHK · 95 unitsShop · 24 units4BHK · 11 unitsOffice space · 24 unitsToilet block · 1 unit
BuildingTypeCarpet areaUnitsBooked
A building2BHK64.23 sq m · 691 sq ft33
A building2BHK64.24 sq m · 691 sq ft11
A building2BHK64.26 sq m · 692 sq ft11
A building2BHK64.75 sq m · 697 sq ft2221
A building2BHK66.23 sq m · 713 sq ft1313
A building2BHK66.24 sq m · 713 sq ft22
A building2BHK66.75 sq m · 718 sq ft11
B Building2BHK62.18 sq m · 669 sq ft11
Show all 66 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B Building2BHK67.72 sq m · 729 sq ft77
B Building2BHK67.73 sq m · 729 sq ft33
B Building2BHK68.93 sq m · 742 sq ft1010
B Building2BHK69.72 sq m · 750 sq ft11
B Building3BHK64.63 sq m · 696 sq ft11
B Building3BHK84.63 sq m · 911 sq ft96
B Building3BHK84.66 sq m · 911 sq ft11
B Building3BHK91.69 sq m · 987 sq ft44
B Building3BHK91.7 sq m · 987 sq ft11
B Building3BHK91.97 sq m · 990 sq ft55
C Building2BHK59.51 sq m · 641 sq ft11
C Building2BHK66.42 sq m · 715 sq ft88
C Building2BHK66.43 sq m · 715 sq ft11
C Building3BHK75.26 sq m · 810 sq ft21
C Building3BHK81.28 sq m · 875 sq ft72
C Building3BHK84.63 sq m · 911 sq ft44
C Building3BHK90.28 sq m · 972 sq ft11
C Building3BHK90.48 sq m · 974 sq ft1515
C Building3BHK90.49 sq m · 974 sq ft22
C Building3BHK90.52 sq m · 974 sq ft21
E - Uprise CommercialShop—00
Wing D Uprise2BHK67.66 sq m · 728 sq ft130
Wing D Uprise2BHK68.35 sq m · 736 sq ft440
Wing D Uprise3BHK89.33 sq m · 962 sq ft20
Wing D Uprise3BHK100.3 sq m · 1,080 sq ft130
Wing D Uprise3BHK100.42 sq m · 1,081 sq ft120
Wing D Uprise4BHK175.21 sq m · 1,886 sq ft110
Wing D UpriseOffice space204.4 sq m · 2,200 sq ft10
Wing E Uprise2BHK68.35 sq m · 736 sq ft160
Wing E Uprise3BHK100.3 sq m · 1,080 sq ft100
Wing E Uprise3BHK102.81 sq m · 1,107 sq ft40
Wing E UpriseOffice space14.02 sq m · 151 sq ft10
Wing E UpriseOffice space16.1 sq m · 173 sq ft20
Wing E UpriseOffice space22.65 sq m · 244 sq ft10
Wing E UpriseOffice space28.27 sq m · 304 sq ft10
Wing E UpriseOffice space29.38 sq m · 316 sq ft20
Wing E UpriseOffice space29.83 sq m · 321 sq ft10
Wing E UpriseOffice space30.36 sq m · 327 sq ft10
Wing E UpriseOffice space30.87 sq m · 332 sq ft20
Wing E UpriseOffice space31.08 sq m · 335 sq ft30
Wing E UpriseOffice space32.32 sq m · 348 sq ft40
Wing E UpriseOffice space35.25 sq m · 379 sq ft30
Wing E UpriseOffice space41.08 sq m · 442 sq ft20
Wing E UpriseShop14.16 sq m · 152 sq ft10
Wing E UpriseShop16.23 sq m · 175 sq ft20
Wing E UpriseShop16.92 sq m · 182 sq ft10
Wing E UpriseShop22.78 sq m · 245 sq ft10
Wing E UpriseShop28.41 sq m · 306 sq ft10
Wing E UpriseShop29.54 sq m · 318 sq ft20
Wing E UpriseShop29.83 sq m · 321 sq ft10
Wing E UpriseShop30.5 sq m · 328 sq ft10
Wing E UpriseShop31.01 sq m · 334 sq ft20
Wing E UpriseShop31.18 sq m · 336 sq ft10
Wing E UpriseShop31.21 sq m · 336 sq ft20
Wing E UpriseShop32.46 sq m · 349 sq ft40
Wing E UpriseShop35.38 sq m · 381 sq ft30
Wing E UpriseShop41.22 sq m · 444 sq ft20
Wing E UpriseToilet block16.78 sq m · 181 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 240 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardGFKUD Pan Card.pdf · uploaded 31 Jul 2017Source

Legal

  • Legal Title reportHCK Legal title report.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportJHK Legal title report.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportViraj Constructions Legal title report.pdf · uploaded 31 Jul 2017Source
  • Legal Title reportTitle Certificate.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BAffidavit for RERA.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BPromoter form B-1.pdf · uploaded 3 Jul 2026Source
Show all 241 documentsShow fewer documents

Legal

  • Declaration Form BFormat A and Search and title Report.pdf · uploaded 13 Jul 2026Source

Migrated

  • 1 PAN CardGFKUD Pan Card.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of the legal title reportHCK Legal title report.pdf · uploaded 31 Jul 2017Source
  • 2 Copy of the legal title reportJHK Legal title report.pdf · uploaded 31 Jul 2017Source
  • 3 Copy of the legal title reportViraj Constructions Legal title report.pdf · uploaded 31 Jul 2017Source
  • 4 Copy of the legal title reportTitle Certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Details of encumbrancesSelf declaration.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)DD55 0001.pdf · uploaded 31 Jul 2017Source
  • 1 Building Plan Approval (IOD)DD55 0002.pdf · uploaded 31 Jul 2017Source
  • 2 Building Plan Approval (IOD)DD55 0003.pdf · uploaded 31 Jul 2017Source
  • 3 Building Plan Approval (IOD)DD55 0004.pdf · uploaded 31 Jul 2017Source
  • 4 Building Plan Approval (IOD)DD55 0005.pdf · uploaded 31 Jul 2017Source
  • 5 Building Plan Approval (IOD)DD55 0006.pdf · uploaded 31 Jul 2017Source
  • 6 Building Plan Approval (IOD)DD55 0007.pdf · uploaded 31 Jul 2017Source
  • 7 Building Plan Approval (IOD)DD55 0008.pdf · uploaded 31 Jul 2017Source
  • 8 Building Plan Approval (IOD)DD55 0009.pdf · uploaded 31 Jul 2017Source
  • 9 Building Plan Approval (IOD)DD55 0010.pdf · uploaded 31 Jul 2017Source
  • 10 Building Plan Approval (IOD)DD55 0011.pdf · uploaded 31 Jul 2017Source
  • 11 Building Plan Approval (IOD)DD55 0012.pdf · uploaded 31 Jul 2017Source
  • 12 Building Plan Approval (IOD)DD55 0013.pdf · uploaded 31 Jul 2017Source
  • 13 Building Plan Approval (IOD)DD55 0014.pdf · uploaded 31 Jul 2017Source
  • 14 Building Plan Approval (IOD)DD55 0015.pdf · uploaded 31 Jul 2017Source
  • 15 Building Plan Approval (IOD)DD55 0016.pdf · uploaded 31 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Declaration in FORM BAffidavit for RERA.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Cer .pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Certificat.pdf · uploaded 31 Jul 2017Source
  • 1 Proforma of Allotment letterRERA Draft Agreement and Allotment letter.pdf · uploaded 31 Jul 2017Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 1920.pdf · uploaded 7 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2021.pdf · uploaded 7 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2122.pdf · uploaded 7 Feb 2023Source
  • 2 Copy of Layout Approval (in case of layout)area statement.pdf · uploaded 10 Feb 2023Source
  • 16 Building Plan Approval (IOD)bccn037_compressed (1)_compressed.pdf · uploaded 10 Feb 2023Source
  • 17 Building Plan Approval (IOD)bccn038_compressed (2)_compressed.pdf · uploaded 10 Feb 2023Source
  • 18 Building Plan Approval (IOD)bccn039_compressed_compressed (1).pdf · uploaded 10 Feb 2023Source
  • 19 Building Plan Approval (IOD)bccn040_compressed.pdf · uploaded 10 Feb 2023Source
  • 20 Building Plan Approval (IOD)bccn041_compressed_compressed (1).pdf · uploaded 10 Feb 2023Source
  • 21 Building Plan Approval (IOD)bccn042_compressed.pdf · uploaded 10 Feb 2023Source
  • 22 Building Plan Approval (IOD)bccn043_compressed.pdf · uploaded 10 Feb 2023Source
  • 23 Building Plan Approval (IOD)bccn044_compressed.pdf · uploaded 10 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted development1-Revise Commencement.pdf · uploaded 10 Feb 2023Source
  • 1 Declaration about Commencement CertificateDeclaration Commencement (1).pdf · uploaded 10 Feb 2023Source
  • 1 Disclosure of sold/ booked inventorySold -Unsold inventory.pdf · uploaded 10 Feb 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200260111890_For_Asset_Based_Search_10_02_2023_18_06_50_182.pdf · uploaded 10 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Engineer certificate.pdf · uploaded 15 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 17-18_compressed.pdf · uploaded 20 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 18-19.pdf · uploaded 20 Feb 2023Source
  • 2 Disclosure of sold/ booked inventorySold flat list Tamara (1).pdf · uploaded 3 Mar 2023Source
  • 3 Disclosure of sold/ booked inventorySold- Unsold list Tamara_compressed.pdf · uploaded 25 Aug 2023Source
  • 1 Proforma of Agreement for saleA.pdf · uploaded 8 Jan 2024Source
  • 1 Status of ConveyanceREGISTRATION CERTIFICATE_0001.pdf · uploaded 8 Jan 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report Kataria.pdf · uploaded 8 Jan 2024Source
  • 3 Copy of Layout Approval (in case of layout)10_compressed.pdf · uploaded 5 Jun 2024Source
  • 4 Copy of Layout Approval (in case of layout)11_compressed.pdf · uploaded 5 Jun 2024Source
  • 5 Copy of Layout Approval (in case of layout)12_compressed.pdf · uploaded 5 Jun 2024Source
  • 6 Copy of Layout Approval (in case of layout)13_compressed.pdf · uploaded 5 Jun 2024Source
  • 7 Copy of Layout Approval (in case of layout)14_compressed.pdf · uploaded 5 Jun 2024Source
  • 8 Copy of Layout Approval (in case of layout)15_compressed.pdf · uploaded 5 Jun 2024Source
  • 9 Copy of Layout Approval (in case of layout)16_compressed.pdf · uploaded 5 Jun 2024Source
  • 10 Copy of Layout Approval (in case of layout)17_compressed.pdf · uploaded 5 Jun 2024Source
  • 11 Copy of Layout Approval (in case of layout)18_compressed.pdf · uploaded 5 Jun 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificate BP-Rahatani-16-24.pdf · uploaded 5 Jun 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1.pdf · uploaded 5 Jun 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2.pdf · uploaded 5 Jun 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2.pdf · uploaded 5 Jun 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)42.pdf · uploaded 5 Jun 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)43.pdf · uploaded 5 Jun 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)44.pdf · uploaded 5 Jun 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)45.pdf · uploaded 5 Jun 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)46.pdf · uploaded 5 Jun 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)47.pdf · uploaded 5 Jun 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)48.pdf · uploaded 5 Jun 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)49.pdf · uploaded 5 Jun 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)50.pdf · uploaded 5 Jun 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)51.pdf · uploaded 5 Jun 2024Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)52.pdf · uploaded 5 Jun 2024Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)53.pdf · uploaded 5 Jun 2024Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)54.pdf · uploaded 5 Jun 2024Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)55.pdf · uploaded 5 Jun 2024Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)56.pdf · uploaded 5 Jun 2024Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)57.pdf · uploaded 5 Jun 2024Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)58.pdf · uploaded 5 Jun 2024Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)59.pdf · uploaded 5 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Engineer Certificate March24.pdf · uploaded 5 Jun 2024Source
  • 2 Proforma of Agreement for saletamaradraft.pdf · uploaded 11 Jul 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- jan-Mar 2019.pdf · uploaded 9 Nov 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Apr-Jun 2019.pdf · uploaded 9 Nov 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jul-Sep 2019.pdf · uploaded 9 Nov 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Oct-Dec 2019.pdf · uploaded 9 Nov 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jan-Mar2020.pdf · uploaded 9 Nov 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Apr-Jun 2020.pdf · uploaded 9 Nov 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jul-Sep 2020.pdf · uploaded 9 Nov 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Oct-Dec 2020.pdf · uploaded 9 Nov 2024Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wng- Jan-Mar 2021.pdf · uploaded 9 Nov 2024Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Apr-jun 2021.pdf · uploaded 9 Nov 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jul-Sep 2021.pdf · uploaded 9 Nov 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Oct-Dec 2021.pdf · uploaded 9 Nov 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jan-Mar 2022.pdf · uploaded 9 Nov 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Apr-Jun 2022.pdf · uploaded 9 Nov 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Jul-Sep 2022.pdf · uploaded 9 Nov 2024Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng- Oct-Dec 2022.pdf · uploaded 9 Nov 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate April to June 2024.pdf · uploaded 21 Mar 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate July to Sep 2024.pdf · uploaded 21 Mar 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Oct to Dec2024.pdf · uploaded 21 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Jan-March 2024.pdf · uploaded 21 Mar 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Apr-June2024 Engineer Certificate_compressed.pdf · uploaded 21 Mar 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate July to Sep 24.pdf · uploaded 21 Mar 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate Oct to Dec 2024.pdf · uploaded 21 Mar 2025Source
  • Withdrawal Update Form 1Tamara QPR _Q1 _ Form 1 _2025.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 2Form 2 _Tarmara QPR 2025 Q1.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 3Tamara form 3.pdf · uploaded 10 Mar 2026Source
  • Withdrawal Update Form 1TAMARA LETTER _QPR 2 _ Spet 2025.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 2Form 2 _Tarmara QPR 2025 Q2.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 3Form 3 -july -sept 2025 -tamara.pdf · uploaded 12 Mar 2026Source
  • Withdrawal Update Form 1TAMARA LETTER.pdf · uploaded 15 Mar 2026Source
  • Withdrawal Update Form 2Engineer Certificate oct-dec25 (1).pdf · uploaded 15 Mar 2026Source
  • Withdrawal Update Form 3Form 3-Oct-Dec-2025-Tamara _compressed.pdf · uploaded 15 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 1TAMARA LETTER FORM 1 P QPR 2024.pdf · uploaded 16 Mar 2026Source
  • Form 2Form 2 _Tarmara QPR 2025 Q1.pdf · uploaded 16 Mar 2026Source
  • Form 2Form 2 _Tarmara QPR 2025 Q1.pdf · uploaded 16 Mar 2026Source
  • Form 2Form 2 _Tarmara QPR 2025 Q1.pdf · uploaded 16 Mar 2026Source
  • Form 2Tamara QPR _Q1 _ Form 1 _2025.pdf · uploaded 16 Mar 2026Source
  • Form 2Form 2 _Tarmara QPR 2025 Q1.pdf · uploaded 16 Mar 2026Source
  • Form 2Tamara QPR _Q1 _ Form 1 _2025.pdf · uploaded 16 Mar 2026Source
  • Form 2Tamara QPR _Q1 _ Form 1 _2025.pdf · uploaded 16 Mar 2026Source
  • Form 2Tamara QPR _Q1 _ Form 1 _2025.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA JAN TO MAR 2025 FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Form 3TAMARA OCT DEC 2024 QPR FORM 3.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Building Wise TAMARA.pdf · uploaded 16 Mar 2026Source
  • Withdrawal Update Form 1Q4 form 1.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 2Q 4 form 2.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 3q 4 form 3.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 1Q 1 Form 1.pdf · uploaded 7 Aug 2026Source
  • Withdrawal Update Form 2Q 1 Form 2.pdf · uploaded 7 Aug 2026Source
  • Withdrawal Update Form 3Q 1 form 3.pdf · uploaded 7 Aug 2026Source
  • Form 2A (FY 2025-2026)FORM-2A.pdf · uploaded 10 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 3 Sep 2026Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 3 Sep 2026Source

Technical

  • DocumentDD55 0001.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0003.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0004.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0005.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0006.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0007.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0008.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0002.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0009.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0010.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0011.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0012.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0013.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0014.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0015.pdf · uploaded 31 Jul 2017Source
  • DocumentDD55 0016.pdf · uploaded 31 Jul 2017Source
  • Documentarea statement.pdf · uploaded 10 Feb 2023Source
  • Documentbccn037_compressed (1)_compressed.pdf · uploaded 10 Feb 2023Source
  • Documentbccn038_compressed (2)_compressed.pdf · uploaded 10 Feb 2023Source
  • Documentbccn039_compressed_compressed (1).pdf · uploaded 10 Feb 2023Source
  • Documentbccn040_compressed.pdf · uploaded 10 Feb 2023Source
  • Documentbccn041_compressed_compressed (1).pdf · uploaded 10 Feb 2023Source
  • Documentbccn042_compressed.pdf · uploaded 10 Feb 2023Source
  • Documentbccn043_compressed.pdf · uploaded 10 Feb 2023Source
  • Documentbccn044_compressed.pdf · uploaded 10 Feb 2023Source
  • Document10_compressed.pdf · uploaded 5 Jun 2024Source
  • Document11_compressed.pdf · uploaded 5 Jun 2024Source
  • Document12_compressed.pdf · uploaded 5 Jun 2024Source
  • Document13_compressed.pdf · uploaded 5 Jun 2024Source
  • Document14_compressed.pdf · uploaded 5 Jun 2024Source
  • Document15_compressed.pdf · uploaded 5 Jun 2024Source
  • Document16_compressed.pdf · uploaded 5 Jun 2024Source
  • Document17_compressed.pdf · uploaded 5 Jun 2024Source
  • Document18_compressed.pdf · uploaded 5 Jun 2024Source
  • DocumentLayout.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing podium floor.pdf · uploaded 4 May 2026Source
  • DocumentD and E wing first floor.pdf · uploaded 4 May 2026Source
  • DocumentD wing typical E wing second floor.pdf · uploaded 4 May 2026Source
  • DocumentE wing typical floor.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing refuge floor.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing 18th floor.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing recreational floor.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing terrace floor.pdf · uploaded 4 May 2026Source
  • DocumentE wing section and elevation.pdf · uploaded 4 May 2026Source
  • DocumentD wing section and elevation.pdf · uploaded 4 May 2026Source
  • DocumentD And E wing basement and ground parking.pdf · uploaded 4 May 2026Source
  • Documentclub house.pdf · uploaded 4 May 2026Source
  • DocumentHighlighted Layout.pdf · uploaded 22 May 2026Source
  • DocumentHighlighted Layout.pdf · uploaded 3 Jul 2026Source

Technical (Architect)

  • DocumentArchitect Certificate April to June 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentArchitect Certificate July to Sep 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentArchitect Certificate Oct to Dec2024.pdf · uploaded 21 Mar 2025Source
  • DocumentQ 1 Form 1.pdf · uploaded 7 Aug 2026Source

Technical (Engineer)

  • DocumentEng- jan-Mar 2019.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Apr-Jun 2019.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jul-Sep 2019.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Oct-Dec 2019.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jan-Mar2020.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Apr-Jun 2020.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jul-Sep 2020.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Oct-Dec 2020.pdf · uploaded 9 Nov 2024Source
  • DocumentWng- Jan-Mar 2021.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Apr-jun 2021.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jul-Sep 2021.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Oct-Dec 2021.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jan-Mar 2022.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Apr-Jun 2022.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Jul-Sep 2022.pdf · uploaded 9 Nov 2024Source
  • DocumentEng- Oct-Dec 2022.pdf · uploaded 9 Nov 2024Source
  • DocumentJan-March 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentApr-June2024 Engineer Certificate_compressed.pdf · uploaded 21 Mar 2025Source
  • DocumentEngineer certificate July to Sep 24.pdf · uploaded 21 Mar 2025Source
  • DocumentEngineer certificate Oct to Dec 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentQ 1 Form 2.pdf · uploaded 7 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Rahatani, Haveli taluka

Survey, CTS, gat or plot numbers

23952396(P) of Mouje - RahataniCTS No. 2659(P)S. No 48 Hissa no 4 to 10

Boundaries

North
Property owned by Kokane and Nakate
South
18 M wide road
East
Kashitish Co operative Hsg Society
West
Rose e meher society

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjvee Bhosale—
Chartered accountantSagar B Shelvane—
EngineerG A Bhilare Consultants Private Limited—
EngineerRanjeet Kadam—
OtherAdv Rajesh Jadhav—
OtherSquare One Media Solutions Pvt. Ltd.—
Registered real estate agentChetan Sham Kumbhar—
Registered real estate agentCorazon Homes Private Limited—
Show all 17 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentEcoview Properties Private Limited—
Registered real estate agentHaider Khan—
Registered real estate agentLife Space Property Solutions Pvt Ltd—
Registered real estate agentMagicstone Spaces LLP—
Registered real estate agentNestseekers Property Management LLP—
Registered real estate agentPrabhat Kumar Birendra Kumar Singh—
Registered real estate agentPratibha Sachin Menkudale—
Registered real estate agentPropinn Ventures LLP—
Registered real estate agentVicky Liladhar Bhanushali—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology