Centralvista
Certificate SignedPunepune (M Corp.), Pune 411030 |Promoter: Naiknavare Developers Pvt. Ltd.
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK, 4BHK, Office space, Shop300 units in all
- Address
- Plot A, S. No. 134 T.p.s. No. 3 F.p. No. 2b And S.no. 135(P) F.p. 28(P) Sadashiv Peth, Dandekar Bridge Pune, Near Dandekar Bridge Road, Dandekar BridgePIN 411030
- Designated bank account
- 203
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 10 Jul 2025
- Promised
- 31 Dec 2030
- Revised
- 30 Apr 2031
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100080806 | 10 Jul 2025 | 31 Dec 2030 | 30 Apr 2031 | Naiknavare Developers Pvt. Ltd. | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Central Vista | 19 | 300 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 300 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 55.14 sq m · 594 sq ft | 1 | 0 |
| 2BHK | 55.23 sq m · 594 sq ft | 7 | 0 |
| 2BHK | 55.29 sq m · 595 sq ft | 7 | 0 |
| 2BHK | 55.87 sq m · 601 sq ft | 7 | 0 |
| 2BHK | 55.94 sq m · 602 sq ft | 7 | 0 |
| 2BHK | 56.56 sq m · 609 sq ft | 13 | 0 |
| 2BHK | 56.7 sq m · 610 sq ft | 2 | 0 |
| 2BHK | 57.27 sq m · 616 sq ft | 14 | 0 |
Show all 129 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 57.48 sq m · 619 sq ft | 1 | 0 |
| 2BHK | 57.66 sq m · 621 sq ft | 2 | 0 |
| 2BHK | 57.69 sq m · 621 sq ft | 1 | 0 |
| 2BHK | 57.75 sq m · 622 sq ft | 7 | 0 |
| 2BHK | 57.83 sq m · 622 sq ft | 5 | 0 |
| 2BHK | 57.85 sq m · 623 sq ft | 1 | 0 |
| 2BHK | 57.93 sq m · 624 sq ft | 1 | 0 |
| 2BHK | 58.22 sq m · 627 sq ft | 1 | 0 |
| 2BHK | 58.6 sq m · 631 sq ft | 15 | 0 |
| 2BHK | 58.81 sq m · 633 sq ft | 15 | 0 |
| 2BHK | 62.75 sq m · 675 sq ft | 15 | 0 |
| 2BHK | 62.98 sq m · 678 sq ft | 1 | 0 |
| 2BHK | 63.02 sq m · 678 sq ft | 8 | 0 |
| 2BHK | 63.04 sq m · 679 sq ft | 15 | 0 |
| 2BHK | 63.11 sq m · 679 sq ft | 6 | 0 |
| 2BHK | 64.49 sq m · 694 sq ft | 7 | 0 |
| 2BHK | 64.87 sq m · 698 sq ft | 7 | 0 |
| 2BHK | 65.07 sq m · 700 sq ft | 1 | 0 |
| 3BHK | 85.46 sq m · 920 sq ft | 5 | 0 |
| 3BHK | 85.65 sq m · 922 sq ft | 2 | 0 |
| 3BHK | 85.68 sq m · 922 sq ft | 5 | 0 |
| 3BHK | 88.35 sq m · 951 sq ft | 3 | 0 |
| 4BHK | 112.37 sq m · 1,210 sq ft | 5 | 0 |
| 4BHK | 112.4 sq m · 1,210 sq ft | 6 | 0 |
| 4BHK | 112.43 sq m · 1,210 sq ft | 1 | 0 |
| Office space | 29.63 sq m · 319 sq ft | 1 | 0 |
| Office space | 29.82 sq m · 321 sq ft | 1 | 0 |
| Office space | 30.46 sq m · 328 sq ft | 1 | 0 |
| Office space | 30.65 sq m · 330 sq ft | 1 | 0 |
| Office space | 36.58 sq m · 394 sq ft | 1 | 0 |
| Office space | 37 sq m · 398 sq ft | 1 | 0 |
| Office space | 37.1 sq m · 399 sq ft | 1 | 0 |
| Office space | 37.29 sq m · 401 sq ft | 1 | 0 |
| Office space | 47.32 sq m · 509 sq ft | 1 | 0 |
| Office space | 47.39 sq m · 510 sq ft | 1 | 0 |
| Office space | 47.49 sq m · 511 sq ft | 1 | 0 |
| Office space | 47.76 sq m · 514 sq ft | 1 | 0 |
| Office space | 50.6 sq m · 545 sq ft | 2 | 0 |
| Office space | 57.25 sq m · 616 sq ft | 1 | 0 |
| Office space | 57.46 sq m · 618 sq ft | 1 | 0 |
| Office space | 61.01 sq m · 657 sq ft | 2 | 0 |
| Office space | 64.13 sq m · 690 sq ft | 1 | 0 |
| Office space | 64.34 sq m · 693 sq ft | 1 | 0 |
| Office space | 73.74 sq m · 794 sq ft | 1 | 0 |
| Office space | 73.9 sq m · 795 sq ft | 1 | 0 |
| Office space | 78.73 sq m · 847 sq ft | 1 | 0 |
| Office space | 78.78 sq m · 848 sq ft | 1 | 0 |
| Office space | 104.73 sq m · 1,127 sq ft | 2 | 0 |
| Office space | 116.52 sq m · 1,254 sq ft | 1 | 0 |
| Office space | 116.59 sq m · 1,255 sq ft | 1 | 0 |
| Office space | 128.45 sq m · 1,383 sq ft | 1 | 0 |
| Office space | 128.56 sq m · 1,384 sq ft | 1 | 0 |
| Office space | 136.12 sq m · 1,465 sq ft | 2 | 0 |
| Shop | 8.21 sq m · 88 sq ft | 1 | 0 |
| Shop | 8.53 sq m · 92 sq ft | 1 | 0 |
| Shop | 9.28 sq m · 100 sq ft | 1 | 0 |
| Shop | 9.45 sq m · 102 sq ft | 1 | 0 |
| Shop | 9.87 sq m · 106 sq ft | 1 | 0 |
| Shop | 10.36 sq m · 112 sq ft | 1 | 0 |
| Shop | 10.43 sq m · 112 sq ft | 1 | 0 |
| Shop | 10.5 sq m · 113 sq ft | 1 | 0 |
| Shop | 11.11 sq m · 120 sq ft | 1 | 0 |
| Shop | 11.24 sq m · 121 sq ft | 1 | 0 |
| Shop | 11.43 sq m · 123 sq ft | 1 | 0 |
| Shop | 11.67 sq m · 126 sq ft | 1 | 0 |
| Shop | 11.81 sq m · 127 sq ft | 2 | 0 |
| Shop | 11.83 sq m · 127 sq ft | 1 | 0 |
| Shop | 11.89 sq m · 128 sq ft | 1 | 0 |
| Shop | 11.95 sq m · 129 sq ft | 1 | 0 |
| Shop | 11.98 sq m · 129 sq ft | 1 | 0 |
| Shop | 12 sq m · 129 sq ft | 1 | 0 |
| Shop | 12.07 sq m · 130 sq ft | 1 | 0 |
| Shop | 12.31 sq m · 133 sq ft | 1 | 0 |
| Shop | 12.39 sq m · 133 sq ft | 2 | 0 |
| Shop | 12.4 sq m · 133 sq ft | 2 | 0 |
| Shop | 12.47 sq m · 134 sq ft | 1 | 0 |
| Shop | 12.51 sq m · 135 sq ft | 1 | 0 |
| Shop | 12.62 sq m · 136 sq ft | 1 | 0 |
| Shop | 12.84 sq m · 138 sq ft | 1 | 0 |
| Shop | 13.18 sq m · 142 sq ft | 1 | 0 |
| Shop | 13.26 sq m · 143 sq ft | 1 | 0 |
| Shop | 13.51 sq m · 145 sq ft | 1 | 0 |
| Shop | 14.21 sq m · 153 sq ft | 1 | 0 |
| Shop | 15.19 sq m · 164 sq ft | 1 | 0 |
| Shop | 15.44 sq m · 166 sq ft | 1 | 0 |
| Shop | 15.62 sq m · 168 sq ft | 1 | 0 |
| Shop | 15.64 sq m · 168 sq ft | 1 | 0 |
| Shop | 16.1 sq m · 173 sq ft | 2 | 0 |
| Shop | 16.16 sq m · 174 sq ft | 1 | 0 |
| Shop | 16.57 sq m · 178 sq ft | 1 | 0 |
| Shop | 16.6 sq m · 179 sq ft | 1 | 0 |
| Shop | 17.15 sq m · 185 sq ft | 1 | 0 |
| Shop | 17.34 sq m · 187 sq ft | 1 | 0 |
| Shop | 17.5 sq m · 188 sq ft | 1 | 0 |
| Shop | 17.53 sq m · 189 sq ft | 1 | 0 |
| Shop | 17.54 sq m · 189 sq ft | 1 | 0 |
| Shop | 17.67 sq m · 190 sq ft | 1 | 0 |
| Shop | 17.7 sq m · 191 sq ft | 1 | 0 |
| Shop | 17.76 sq m · 191 sq ft | 1 | 0 |
| Shop | 17.77 sq m · 191 sq ft | 1 | 0 |
| Shop | 17.86 sq m · 192 sq ft | 1 | 0 |
| Shop | 17.91 sq m · 193 sq ft | 1 | 0 |
| Shop | 17.97 sq m · 193 sq ft | 2 | 0 |
| Shop | 17.98 sq m · 194 sq ft | 2 | 0 |
| Shop | 18.08 sq m · 195 sq ft | 1 | 0 |
| Shop | 18.42 sq m · 198 sq ft | 1 | 0 |
| Shop | 18.45 sq m · 199 sq ft | 1 | 0 |
| Shop | 18.65 sq m · 201 sq ft | 1 | 0 |
| Shop | 20.23 sq m · 218 sq ft | 1 | 0 |
| Shop | 21.28 sq m · 229 sq ft | 1 | 0 |
| Shop | 24.94 sq m · 268 sq ft | 1 | 0 |
| Shop | 26.16 sq m · 282 sq ft | 1 | 0 |
| Shop | 26.25 sq m · 283 sq ft | 1 | 0 |
| Shop | 26.66 sq m · 287 sq ft | 1 | 0 |
| Shop | 28.46 sq m · 306 sq ft | 1 | 0 |
| Shop | 32.72 sq m · 352 sq ft | 1 | 0 |
| Shop | 33.18 sq m · 357 sq ft | 1 | 0 |
| Shop | 39.39 sq m · 424 sq ft | 1 | 0 |
| Shop | 41.22 sq m · 444 sq ft | 1 | 0 |
| Shop | 95.48 sq m · 1,028 sq ft | 1 | 0 |
| Shop | 125.38 sq m · 1,350 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 162 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
- Declaration Form BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
- Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
- Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
- Legal Title reportAnnexure A.pdf · uploaded 23 May 2025Source
Show all 163 documentsShow fewer documents
Legal
- Legal Title reportAnnexure A.pdf · uploaded 23 May 2025Source
- Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
- Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
- Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
- Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
- Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
- Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
- Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
- Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
- Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
- Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
- Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
- Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
- Legal Title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
- Legal Title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
- Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
- Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
- Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
- Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
- Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
- Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
- OthersFinal AGR Central Vista.pdf · uploaded 9 Dec 2025Source
Migrated
- 1 PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)Sanction Plan No 01.pdf · uploaded 29 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Central vista Form3.pdf · uploaded 29 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Date 28-03-2025.pdf · uploaded 29 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
- 1 CERSAI detailsNo CERSAI Undertaking Central Vista.pdf · uploaded 29 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration about Rera Designated Account.pdf · uploaded 29 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Central Vista.pdf · uploaded 29 Apr 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured unsecured Finance Availed For The Project as per Order 56.pdf · uploaded 29 Apr 2025Source
- 1 PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)Sanction Plan No 01.pdf · uploaded 29 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 29 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Central vista Form3.pdf · uploaded 29 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Date 28-03-2025.pdf · uploaded 29 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
- 1 CERSAI detailsNo CERSAI Undertaking Central Vista.pdf · uploaded 29 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration about Rera Designated Account.pdf · uploaded 29 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Central Vista.pdf · uploaded 29 Apr 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured unsecured Finance Availed For The Project as per Order 56.pdf · uploaded 29 Apr 2025Source
- 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dated 30-04-2025.pdf · uploaded 30 Apr 2025Source
- 1 Declaration about Commencement CertificateFORMAT D - Declaration about CC.pdf · uploaded 30 Apr 2025Source
- 1 Deviation Report with respect to Allotment letterDeviation report wrt Allotment Letter.pdf · uploaded 30 Apr 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 30 Apr 2025Source
- 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dated 30-04-2025.pdf · uploaded 30 Apr 2025Source
- 1 Declaration about Commencement CertificateFORMAT D - Declaration about CC.pdf · uploaded 30 Apr 2025Source
- 1 Deviation Report with respect to Allotment letterDeviation report wrt Allotment Letter.pdf · uploaded 30 Apr 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 30 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
- 2 Commencement Certificates / NA Order for plotted developmentCenter vista Dandekar PLOT - A Sanctioned soft copy - Prashant Karnik - Outlook.pdf · uploaded 22 May 2025Source
- 1 Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure - A Disclousre of Interest in other RERA Properties.pdf · uploaded 22 May 2025Source
- 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format A Decleration Central Vista (1).pdf · uploaded 22 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
- 2 Commencement Certificates / NA Order for plotted developmentCenter vista Dandekar PLOT - A Sanctioned soft copy - Prashant Karnik - Outlook.pdf · uploaded 22 May 2025Source
- 1 Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure - A Disclousre of Interest in other RERA Properties.pdf · uploaded 22 May 2025Source
- 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format A Decleration Central Vista (1).pdf · uploaded 22 May 2025Source
- 1 Copy of the legal title reportAnnexure A.pdf · uploaded 23 May 2025Source
- 1 Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
- 1 Copy of the legal title reportAnnexure A.pdf · uploaded 23 May 2025Source
- 1 Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
- 2 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration Central Vista 2.pdf · uploaded 31 May 2025Source
- 2 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration Central Vista 2.pdf · uploaded 31 May 2025Source
- 2 Copy of the legal title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
- 1 Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 12 Jun 2025Source
- 2 Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
- 7 Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
- 5 Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
- 4 Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
- 3 Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
- 6 Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
- 2 Copy of the legal title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
- 1 Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 12 Jun 2025Source
- 2 Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
- 7 Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
- 5 Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
- 4 Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
- 3 Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
- 6 Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
- 2 a Details of encumbrances concerned to FinanceNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
- 9 Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
- 8 Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
- 2 b Details of encumbrances concerned to LegalNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
- 1 Proforma of Agreement for saleCentral Vista ATS 27-06-2025.pdf · uploaded 27 Jun 2025Source
- 2 a Details of encumbrances concerned to FinanceNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
- 9 Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
- 8 Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
- 2 b Details of encumbrances concerned to LegalNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
- 1 Proforma of Agreement for saleCentral Vista ATS 27-06-2025.pdf · uploaded 27 Jun 2025Source
- 10 Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
- 10 Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION CV.pdf · uploaded 5 Jul 2025Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION CV.pdf · uploaded 5 Jul 2025Source
- Form 1Central Vista Form 1.pdf · uploaded 18 Oct 2025Source
- Form 2central vista form 2 latest.pdf · uploaded 18 Oct 2025Source
- Form 3CENTRAL VISTA FORM 3.pdf · uploaded 18 Oct 2025Source
- Disclosure of Sold and Booked InventoryCENTRAL VISTA SOLD UNSOLD_compressed.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 dated 30-04-2025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3central vista form 3 1 to 9_11zon.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Jan to Mar 26_Central Vista.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2CENTRAL VISTA FORM 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3CENTRAL VISTA MERGED_compressed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Central Vista Form 1.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 2centralvista form 2.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 3Form 3 Central Vista June 26_11zon.pdf · uploaded 17 Jul 2026Source
Technical
- DocumentSanction Plan No 01.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 01.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
- DocumentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
- Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
- Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pune (M Corp.), Pune City taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot B As Per Sanction Plan
- South
- Existing Nala
- East
- Plot C As Per Sanction Plan
- West
- 36 Meter Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Gauri Naiknavare | — |
| Chartered accountant | Shrishrimal & Associates | — |
| Engineer | Sachin Gite | — |
| Engineer | Sunil Mulik | — |
| Other | Krupali Kadam | — |
Source: MahaRERA project page. Contact details are not shown.