Skip to content

Centralvista

Certificate Signed

Punepune (M Corp.), Pune 411030 |Promoter: Naiknavare Developers Pvt. Ltd.

10 Jul 2025Registered with MahaRERA
31 Dec 2030Promised completion
30 Apr 2031Revised completionPushed back 4 months
1Building
300Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK, 4BHK, Office space, Shop300 units in all
Address
Plot A, S. No. 134 T.p.s. No. 3 F.p. No. 2b And S.no. 135(P) F.p. 28(P) Sadashiv Peth, Dandekar Bridge Pune, Near Dandekar Bridge Road, Dandekar BridgePIN 411030
Designated bank account
203
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
10 Jul 2025
Promised
31 Dec 2030
Revised
30 Apr 2031

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210008080610 Jul 202531 Dec 203030 Apr 2031Naiknavare Developers Pvt. Ltd.Project page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Central Vista19300

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 300 units booked (0%), as the promoter reported to MahaRERA

2BHK · 167 units3BHK · 15 units4BHK · 12 unitsOffice space · 32 unitsShop · 74 units
TypeCarpet areaUnitsBooked
2BHK55.14 sq m · 594 sq ft10
2BHK55.23 sq m · 594 sq ft70
2BHK55.29 sq m · 595 sq ft70
2BHK55.87 sq m · 601 sq ft70
2BHK55.94 sq m · 602 sq ft70
2BHK56.56 sq m · 609 sq ft130
2BHK56.7 sq m · 610 sq ft20
2BHK57.27 sq m · 616 sq ft140
Show all 129 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK57.48 sq m · 619 sq ft10
2BHK57.66 sq m · 621 sq ft20
2BHK57.69 sq m · 621 sq ft10
2BHK57.75 sq m · 622 sq ft70
2BHK57.83 sq m · 622 sq ft50
2BHK57.85 sq m · 623 sq ft10
2BHK57.93 sq m · 624 sq ft10
2BHK58.22 sq m · 627 sq ft10
2BHK58.6 sq m · 631 sq ft150
2BHK58.81 sq m · 633 sq ft150
2BHK62.75 sq m · 675 sq ft150
2BHK62.98 sq m · 678 sq ft10
2BHK63.02 sq m · 678 sq ft80
2BHK63.04 sq m · 679 sq ft150
2BHK63.11 sq m · 679 sq ft60
2BHK64.49 sq m · 694 sq ft70
2BHK64.87 sq m · 698 sq ft70
2BHK65.07 sq m · 700 sq ft10
3BHK85.46 sq m · 920 sq ft50
3BHK85.65 sq m · 922 sq ft20
3BHK85.68 sq m · 922 sq ft50
3BHK88.35 sq m · 951 sq ft30
4BHK112.37 sq m · 1,210 sq ft50
4BHK112.4 sq m · 1,210 sq ft60
4BHK112.43 sq m · 1,210 sq ft10
Office space29.63 sq m · 319 sq ft10
Office space29.82 sq m · 321 sq ft10
Office space30.46 sq m · 328 sq ft10
Office space30.65 sq m · 330 sq ft10
Office space36.58 sq m · 394 sq ft10
Office space37 sq m · 398 sq ft10
Office space37.1 sq m · 399 sq ft10
Office space37.29 sq m · 401 sq ft10
Office space47.32 sq m · 509 sq ft10
Office space47.39 sq m · 510 sq ft10
Office space47.49 sq m · 511 sq ft10
Office space47.76 sq m · 514 sq ft10
Office space50.6 sq m · 545 sq ft20
Office space57.25 sq m · 616 sq ft10
Office space57.46 sq m · 618 sq ft10
Office space61.01 sq m · 657 sq ft20
Office space64.13 sq m · 690 sq ft10
Office space64.34 sq m · 693 sq ft10
Office space73.74 sq m · 794 sq ft10
Office space73.9 sq m · 795 sq ft10
Office space78.73 sq m · 847 sq ft10
Office space78.78 sq m · 848 sq ft10
Office space104.73 sq m · 1,127 sq ft20
Office space116.52 sq m · 1,254 sq ft10
Office space116.59 sq m · 1,255 sq ft10
Office space128.45 sq m · 1,383 sq ft10
Office space128.56 sq m · 1,384 sq ft10
Office space136.12 sq m · 1,465 sq ft20
Shop8.21 sq m · 88 sq ft10
Shop8.53 sq m · 92 sq ft10
Shop9.28 sq m · 100 sq ft10
Shop9.45 sq m · 102 sq ft10
Shop9.87 sq m · 106 sq ft10
Shop10.36 sq m · 112 sq ft10
Shop10.43 sq m · 112 sq ft10
Shop10.5 sq m · 113 sq ft10
Shop11.11 sq m · 120 sq ft10
Shop11.24 sq m · 121 sq ft10
Shop11.43 sq m · 123 sq ft10
Shop11.67 sq m · 126 sq ft10
Shop11.81 sq m · 127 sq ft20
Shop11.83 sq m · 127 sq ft10
Shop11.89 sq m · 128 sq ft10
Shop11.95 sq m · 129 sq ft10
Shop11.98 sq m · 129 sq ft10
Shop12 sq m · 129 sq ft10
Shop12.07 sq m · 130 sq ft10
Shop12.31 sq m · 133 sq ft10
Shop12.39 sq m · 133 sq ft20
Shop12.4 sq m · 133 sq ft20
Shop12.47 sq m · 134 sq ft10
Shop12.51 sq m · 135 sq ft10
Shop12.62 sq m · 136 sq ft10
Shop12.84 sq m · 138 sq ft10
Shop13.18 sq m · 142 sq ft10
Shop13.26 sq m · 143 sq ft10
Shop13.51 sq m · 145 sq ft10
Shop14.21 sq m · 153 sq ft10
Shop15.19 sq m · 164 sq ft10
Shop15.44 sq m · 166 sq ft10
Shop15.62 sq m · 168 sq ft10
Shop15.64 sq m · 168 sq ft10
Shop16.1 sq m · 173 sq ft20
Shop16.16 sq m · 174 sq ft10
Shop16.57 sq m · 178 sq ft10
Shop16.6 sq m · 179 sq ft10
Shop17.15 sq m · 185 sq ft10
Shop17.34 sq m · 187 sq ft10
Shop17.5 sq m · 188 sq ft10
Shop17.53 sq m · 189 sq ft10
Shop17.54 sq m · 189 sq ft10
Shop17.67 sq m · 190 sq ft10
Shop17.7 sq m · 191 sq ft10
Shop17.76 sq m · 191 sq ft10
Shop17.77 sq m · 191 sq ft10
Shop17.86 sq m · 192 sq ft10
Shop17.91 sq m · 193 sq ft10
Shop17.97 sq m · 193 sq ft20
Shop17.98 sq m · 194 sq ft20
Shop18.08 sq m · 195 sq ft10
Shop18.42 sq m · 198 sq ft10
Shop18.45 sq m · 199 sq ft10
Shop18.65 sq m · 201 sq ft10
Shop20.23 sq m · 218 sq ft10
Shop21.28 sq m · 229 sq ft10
Shop24.94 sq m · 268 sq ft10
Shop26.16 sq m · 282 sq ft10
Shop26.25 sq m · 283 sq ft10
Shop26.66 sq m · 287 sq ft10
Shop28.46 sq m · 306 sq ft10
Shop32.72 sq m · 352 sq ft10
Shop33.18 sq m · 357 sq ft10
Shop39.39 sq m · 424 sq ft10
Shop41.22 sq m · 444 sq ft10
Shop95.48 sq m · 1,028 sq ft10
Shop125.38 sq m · 1,350 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 162 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source
  • PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source

Legal

  • Declaration Form BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
  • Declaration Form BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
  • Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
  • Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
  • Legal Title reportAnnexure A.pdf · uploaded 23 May 2025Source
Show all 163 documentsShow fewer documents

Legal

  • Legal Title reportAnnexure A.pdf · uploaded 23 May 2025Source
  • Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
  • Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
  • Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
  • Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
  • Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
  • Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
  • Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
  • Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
  • Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
  • Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
  • Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
  • Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
  • Legal Title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
  • Legal Title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
  • Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
  • Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
  • Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
  • Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
  • Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
  • Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
  • OthersFinal AGR Central Vista.pdf · uploaded 9 Dec 2025Source

Migrated

  • 1 PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source
  • 1 a Details of encumbrances concerned to FinanceNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Plan No 01.pdf · uploaded 29 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Central vista Form3.pdf · uploaded 29 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Date 28-03-2025.pdf · uploaded 29 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
  • 1 CERSAI detailsNo CERSAI Undertaking Central Vista.pdf · uploaded 29 Apr 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration about Rera Designated Account.pdf · uploaded 29 Apr 2025Source
  • 1 b Details of encumbrances concerned to LegalNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Central Vista.pdf · uploaded 29 Apr 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured unsecured Finance Availed For The Project as per Order 56.pdf · uploaded 29 Apr 2025Source
  • 1 PAN CardPAN - NDPL.pdf · uploaded 29 Apr 2025Source
  • 1 a Details of encumbrances concerned to FinanceNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)Sanction Plan No 01.pdf · uploaded 29 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 29 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Central vista Form3.pdf · uploaded 29 Apr 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Date 28-03-2025.pdf · uploaded 29 Apr 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
  • 1 CERSAI detailsNo CERSAI Undertaking Central Vista.pdf · uploaded 29 Apr 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration about Rera Designated Account.pdf · uploaded 29 Apr 2025Source
  • 1 b Details of encumbrances concerned to LegalNon Encumbrances decleration.pdf · uploaded 29 Apr 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B - Central Vista.pdf · uploaded 29 Apr 2025Source
  • 1 Disclosure for secured/unsecured finance availed for the projectDisclosure for Secured unsecured Finance Availed For The Project as per Order 56.pdf · uploaded 29 Apr 2025Source
  • 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dated 30-04-2025.pdf · uploaded 30 Apr 2025Source
  • 1 Declaration about Commencement CertificateFORMAT D - Declaration about CC.pdf · uploaded 30 Apr 2025Source
  • 1 Deviation Report with respect to Allotment letterDeviation report wrt Allotment Letter.pdf · uploaded 30 Apr 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 30 Apr 2025Source
  • 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 30 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dated 30-04-2025.pdf · uploaded 30 Apr 2025Source
  • 1 Declaration about Commencement CertificateFORMAT D - Declaration about CC.pdf · uploaded 30 Apr 2025Source
  • 1 Deviation Report with respect to Allotment letterDeviation report wrt Allotment Letter.pdf · uploaded 30 Apr 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 30 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentCenter vista Dandekar PLOT - A Sanctioned soft copy - Prashant Karnik - Outlook.pdf · uploaded 22 May 2025Source
  • 1 Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure - A Disclousre of Interest in other RERA Properties.pdf · uploaded 22 May 2025Source
  • 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format A Decleration Central Vista (1).pdf · uploaded 22 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Central Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
  • 2 Commencement Certificates / NA Order for plotted developmentCenter vista Dandekar PLOT - A Sanctioned soft copy - Prashant Karnik - Outlook.pdf · uploaded 22 May 2025Source
  • 1 Other – LegalModel Form of Allotment Letter.pdf · uploaded 22 May 2025Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure - A Disclousre of Interest in other RERA Properties.pdf · uploaded 22 May 2025Source
  • 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format A Decleration Central Vista (1).pdf · uploaded 22 May 2025Source
  • 1 Copy of the legal title reportAnnexure A.pdf · uploaded 23 May 2025Source
  • 1 Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
  • 1 Copy of the legal title reportAnnexure A.pdf · uploaded 23 May 2025Source
  • 1 Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration Central Vista 2.pdf · uploaded 31 May 2025Source
  • 2 Declaration about all RERA Designated Bank Accounts (Format A)Format A Decleration Central Vista 2.pdf · uploaded 31 May 2025Source
  • 2 Copy of the legal title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
  • 1 Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 12 Jun 2025Source
  • 2 Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
  • 7 Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
  • 5 Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
  • 4 Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
  • 3 Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
  • 6 Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
  • 2 Copy of the legal title reportTSR RERA PDA 2025 12-06-2025 Highlighted.pdf · uploaded 12 Jun 2025Source
  • 1 Proforma of Allotment letterModel Form of Allotment Letter.pdf · uploaded 12 Jun 2025Source
  • 2 Other – LegalPRCard 28-2023.pdf · uploaded 12 Jun 2025Source
  • 7 Other – LegalF P No 28 P PMC Plot 3 D.pdf · uploaded 12 Jun 2025Source
  • 5 Other – LegalS No 134 F P No 2B Dandekar Bridge Pune 3 C order.pdf · uploaded 12 Jun 2025Source
  • 4 Other – LegalF P No 28 P PMC Plot Final 3 C.pdf · uploaded 12 Jun 2025Source
  • 3 Other – LegalS No 134 Patel Property PRCard.pdf · uploaded 12 Jun 2025Source
  • 6 Other – LegalSNo 134 F P 2 B 3 D.pdf · uploaded 12 Jun 2025Source
  • 2 a Details of encumbrances concerned to FinanceNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
  • 9 Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
  • 8 Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
  • 2 b Details of encumbrances concerned to LegalNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
  • 1 Proforma of Agreement for saleCentral Vista ATS 27-06-2025.pdf · uploaded 27 Jun 2025Source
  • 2 a Details of encumbrances concerned to FinanceNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
  • 9 Other – LegalDeclaration Survey Number Central Vista.pdf · uploaded 27 Jun 2025Source
  • 8 Other – LegalCC_subdivisiuon Dandekar.pdf · uploaded 27 Jun 2025Source
  • 2 b Details of encumbrances concerned to LegalNon Encumbrance Letter Legal dated 19-06-2025.pdf · uploaded 27 Jun 2025Source
  • 1 Proforma of Agreement for saleCentral Vista ATS 27-06-2025.pdf · uploaded 27 Jun 2025Source
  • 10 Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
  • 10 Other – LegalSURVEY NUMBER AREA COVERED BY PLOT A.pdf · uploaded 4 Jul 2025Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION CV.pdf · uploaded 5 Jul 2025Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION CV.pdf · uploaded 5 Jul 2025Source
  • Form 1Central Vista Form 1.pdf · uploaded 18 Oct 2025Source
  • Form 2central vista form 2 latest.pdf · uploaded 18 Oct 2025Source
  • Form 3CENTRAL VISTA FORM 3.pdf · uploaded 18 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCENTRAL VISTA SOLD UNSOLD_compressed.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1Central Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 dated 30-04-2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3central vista form 3 1 to 9_11zon.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Jan to Mar 26_Central Vista.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2CENTRAL VISTA FORM 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3CENTRAL VISTA MERGED_compressed.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1Central Vista Form 1.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 2centralvista form 2.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Central Vista June 26_11zon.pdf · uploaded 17 Jul 2026Source

Technical

  • DocumentSanction Plan No 01.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 01.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 02.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 03.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 04.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 05.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 06.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 07.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 08.pdf · uploaded 29 Apr 2025Source
  • DocumentSanction Plan No 09.pdf · uploaded 29 Apr 2025Source
  • Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source
  • Other – TechnicalAnnexure A.pdf · uploaded 23 May 2025Source

Technical (Architect)

  • DocumentCentral Vista - RERA Form 1 dated 15-11-2024.pdf · uploaded 29 Apr 2025Source
  • DocumentCentral Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
  • DocumentCentral Vista - RERA Form 1.pdf · uploaded 22 May 2025Source
  • DocumentCentral Vista Form 1.pdf · uploaded 17 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 dated 30-04-2025.pdf · uploaded 30 Apr 2025Source
  • Documentcentralvista form 2.pdf · uploaded 17 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pune (M Corp.), Pune City taluka

Survey, CTS, gat or plot numbers

S. NO. 134 T.P.S. NO. 3 F.P. NO. 2BS.NO. 135(P) F.P. 28(P) SADASHIV PETH

Boundaries

North
Plot B As Per Sanction Plan
South
Existing Nala
East
Plot C As Per Sanction Plan
West
36 Meter Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGauri Naiknavare—
Chartered accountantShrishrimal & Associates—
EngineerSachin Gite—
EngineerSunil Mulik—
OtherKrupali Kadam—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology