Saisha Phase - 2
Certificate SignedPunawale, Pune 411033 |Promoter: Sai Samarttha Properties
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, 1BHK63 units in all
- Address
- 43 9 1, 43 9 2, 43 18 9, 43 18 10, 43 12 1 A, Pavana Nagar, Near To Shriyans SocietyPIN 411033
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Feb 2021
- Promised
- 31 Jan 2027
- Revised
- 31 May 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100028374 | 22 Feb 2021 | 31 Jan 2027 | 31 May 2027 | Sai Samarttha Properties | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Wing - 4 To 11 Floor | 8 | 36 |
| Mhada Wing | 4 | 27 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
49 of 63 units booked (78%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing - 4 To 11 Floor | 2BHK | 42.86 sq m · 461 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 2BHK | 51.72 sq m · 557 sq ft | 1 | 0 |
| A Wing - 4 To 11 Floor | 2BHK | 52.34 sq m · 563 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 2BHK | 55.88 sq m · 601 sq ft | 3 | 1 |
| A Wing - 4 To 11 Floor | 2BHK | 56.15 sq m · 604 sq ft | 2 | 0 |
| A Wing - 4 To 11 Floor | 2BHK | 56.16 sq m · 605 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 2BHK | 57.48 sq m · 619 sq ft | 3 | 2 |
| A Wing - 4 To 11 Floor | 2BHK | 57.74 sq m · 622 sq ft | 3 | 2 |
Show all 23 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing - 4 To 11 Floor | 3BHK | 52.24 sq m · 562 sq ft | 4 | 2 |
| A Wing - 4 To 11 Floor | 3BHK | 52.31 sq m · 563 sq ft | 3 | 3 |
| A Wing - 4 To 11 Floor | 3BHK | 52.43 sq m · 564 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 3BHK | 53.97 sq m · 581 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 3BHK | 54.02 sq m · 581 sq ft | 1 | 1 |
| A Wing - 4 To 11 Floor | 3BHK | 61.59 sq m · 663 sq ft | 2 | 1 |
| A Wing - 4 To 11 Floor | 3BHK | 61.78 sq m · 665 sq ft | 2 | 1 |
| A Wing - 4 To 11 Floor | 3BHK | 63.69 sq m · 686 sq ft | 3 | 2 |
| A Wing - 4 To 11 Floor | 3BHK | 63.86 sq m · 687 sq ft | 4 | 4 |
| Mhada Wing | 1BHK | 31.46 sq m · 339 sq ft | 8 | 7 |
| Mhada Wing | 1BHK | 31.95 sq m · 344 sq ft | 8 | 7 |
| Mhada Wing | 2BHK | 50.73 sq m · 546 sq ft | 8 | 8 |
| Mhada Wing | 2BHK | 51.75 sq m · 557 sq ft | 1 | 1 |
| Mhada Wing | 2BHK | 52.02 sq m · 560 sq ft | 1 | 1 |
| Mhada Wing | 3BHK | 52.28 sq m · 563 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 160 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 25 Dec 2020Source
Legal
- OtherPLOT LAY OUT.pdf · uploaded 25 Dec 2020Source
- Declaration Form BSSP Form B.pdf · uploaded 25 Dec 2020Source
- OtherSaisha NA Order 08 01 2021.pdf · uploaded 14 Jan 2021Source
- Legal Title reportSearch 1 R final.pdf · uploaded 14 Jan 2021Source
- Legal Title reportTITLE REPORT 1 R 1.pdf · uploaded 14 Jan 2021Source
- Legal Title reportSearch 3 R final.pdf · uploaded 14 Jan 2021Source
Show all 161 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardPAN CARD.pdf · uploaded 25 Dec 2020Source
- 1 Details of encumbrancesENCUMBRANCES DETAILS.pdf · uploaded 25 Dec 2020Source
- 1 Copy of Layout Approval (in case of layout)1 Layout.pdf · uploaded 25 Dec 2020Source
- 1 Building Plan Approval / NA Order for plotted development2 A 1 and 2 floor.pdf · uploaded 25 Dec 2020Source
- 2 Building Plan Approval / NA Order for plotted development3 A 3 to 10 floor.pdf · uploaded 25 Dec 2020Source
- 3 Building Plan Approval / NA Order for plotted development4 A 11 floor.pdf · uploaded 25 Dec 2020Source
- 4 Building Plan Approval / NA Order for plotted development5 A elevation section.pdf · uploaded 25 Dec 2020Source
- 5 Building Plan Approval / NA Order for plotted development6 B 2 P and terrace.pdf · uploaded 25 Dec 2020Source
- 6 Building Plan Approval / NA Order for plotted development7 B 1 to 9 floor.pdf · uploaded 25 Dec 2020Source
- 7 Building Plan Approval / NA Order for plotted development8 B 11 floor.pdf · uploaded 25 Dec 2020Source
- 8 Building Plan Approval / NA Order for plotted development9 B elevation section.pdf · uploaded 25 Dec 2020Source
- 9 Building Plan Approval / NA Order for plotted development10 C parking and 1 floor.pdf · uploaded 25 Dec 2020Source
- 10 Building Plan Approval / NA Order for plotted development11 C 2 to 10 floor.pdf · uploaded 25 Dec 2020Source
- 11 Building Plan Approval / NA Order for plotted development12 C 8 and 11 floor.pdf · uploaded 25 Dec 2020Source
- 12 Building Plan Approval / NA Order for plotted development13 C elevation section.pdf · uploaded 25 Dec 2020Source
- 13 Building Plan Approval / NA Order for plotted development14 New MHADA 1 to 4 floor.pdf · uploaded 25 Dec 2020Source
- 14 Building Plan Approval / NA Order for plotted development15 NEW MHADA elevation section.pdf · uploaded 25 Dec 2020Source
- 15 Building Plan Approval / NA Order for plotted development16 Club House.pdf · uploaded 25 Dec 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Revised.pdf · uploaded 25 Dec 2020Source
- 1 Declaration in FORM BSSP Form B.pdf · uploaded 25 Dec 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT.pdf · uploaded 25 Dec 2020Source
- 1 OtherPLOT LAY OUT.pdf · uploaded 25 Dec 2020Source
- 1 Copy of the legal title reportSearch 1 R final.pdf · uploaded 14 Jan 2021Source
- 2 Copy of the legal title reportTITLE REPORT 1 R 1.pdf · uploaded 14 Jan 2021Source
- 3 Copy of the legal title reportSearch 3 R final.pdf · uploaded 14 Jan 2021Source
- 4 Copy of the legal title reportSearch 10 R final.pdf · uploaded 14 Jan 2021Source
- 5 Copy of the legal title reportSearch 15 R final.pdf · uploaded 14 Jan 2021Source
- 6 Copy of the legal title reportSearch 20 R final.pdf · uploaded 14 Jan 2021Source
- 7 Copy of the legal title reportSearch 38 R final.pdf · uploaded 14 Jan 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineer final.pdf · uploaded 14 Jan 2021Source
- 2 OtherSaisha NA Order 08 01 2021.pdf · uploaded 14 Jan 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA Cerificate.pdf · uploaded 10 Feb 2021Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 10 Feb 2021Source
- 2 Proforma of Allotment letterFINAL Agreementl draft Saisha.pdf · uploaded 10 Feb 2021Source
- 1 Disclosure of sold/ booked inventorySAISHA 2.pdf · uploaded 14 Jun 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)MARCH 2020.pdf · uploaded 5 Aug 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)JUNE2021_compressed.pdf · uploaded 5 Aug 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate Saisha ph2.pdf · uploaded 11 Aug 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate saisha ph2.pdf · uploaded 11 Aug 2021Source
- 1 Declaration about Commencement Certificateform d.pdf · uploaded 12 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSP Phase 2 31 March compressed.pdf · uploaded 12 Aug 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSP Phase 2 30 June 21.pdf · uploaded 12 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance 30-6-21.pdf · uploaded 13 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance 31-3-21.pdf · uploaded 13 Aug 2021Source
- 3 Proforma of Allotment letterAgreement draft - Mhada.pdf · uploaded 21 Sep 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Mhada A Bldg.pdf · uploaded 7 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Saisha Engineer's certificate.pdf · uploaded 7 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)quality assurance certificate.pdf · uploaded 7 Oct 2021Source
- 2 Disclosure of sold/ booked inventoryRERA SAISHA PH2 510 2021.pdf · uploaded 7 Oct 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3Saisha Phase 2Sept 2021F.pdf · uploaded 7 Oct 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)NAME RESERVATION LETTER_0001.pdf · uploaded 3 Dec 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)IMG_20211223_0001_compressed (1).pdf · uploaded 28 Dec 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QA Saisha 2.pdf · uploaded 28 Dec 2021Source
- 3 Disclosure of sold/ booked inventoryRERA INVENTORY CERTIFICATE SAISHA PH-2.pdf · uploaded 6 Jan 2022Source
- 4 Disclosure of sold/ booked inventoryInventory Certificate Saisha - PH - 2.pdf · uploaded 7 Apr 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Saisha Phase 2.pdf · uploaded 25 May 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Saisha Phase 2 Quailty Assurance Certificate.pdf · uploaded 25 May 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Saisha Phase 2 Quailty Assurance Certificate.pdf · uploaded 25 May 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Saisha Phase 2 Quailty Assurance Certificate.pdf · uploaded 25 May 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Saisha Ar Ph2 c.pdf · uploaded 8 Jun 2022Source
- 5 Disclosure of sold/ booked inventoryRERA INVENTORY CERTIFICATE - SAISHA PH-2.pdf · uploaded 14 Jul 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Saisha ph 2.pdf · uploaded 9 Aug 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Saisha phase 2.pdf · uploaded 9 Aug 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quilty Saisha phase 2.pdf · uploaded 9 Aug 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Saishaph 2 mar22.pdf · uploaded 30 Aug 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Saishaph2 jun22.pdf · uploaded 30 Aug 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Saishaph2 Ar.pdf · uploaded 21 Oct 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)saisha ph2 Eng.pdf · uploaded 21 Oct 2022Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Saisha ph2.pdf · uploaded 21 Oct 2022Source
- 6 Disclosure of sold/ booked inventoryRERA INVENTORY Ph2 SEPT-22.pdf · uploaded 21 Oct 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 2 Sept 22.pdf · uploaded 21 Oct 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Saisha Ph2.pdf · uploaded 5 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Saisha Ph2.pdf · uploaded 5 Feb 2023Source
- 7 Disclosure of sold/ booked inventoryBooking Saisha Ph2.pdf · uploaded 5 Feb 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Saisha Ph2.pdf · uploaded 24 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5(UT) Saisha2 20-21 signed.pdf · uploaded 27 Mar 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5(UT) Saisha2 20-21 signed.pdf · uploaded 27 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5(UT) Saisha2 21-22 signed.pdf · uploaded 27 Mar 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5(UT) Saisha2 21-22 signed.pdf · uploaded 27 Mar 2023Source
- 8 Disclosure of sold/ booked inventorySaisha Inventory certificate - PH-2.pdf · uploaded 5 May 2023Source
- 2 Details of encumbrancesRERA encumbrance - 2023.pdf · uploaded 15 May 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Saisha Ph2 April 2023.pdf · uploaded 5 Jul 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Saisha - Ph - 2.pdf · uploaded 18 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Saisha - Ph - 2.pdf · uploaded 18 Jul 2023Source
- 9 Disclosure of sold/ booked inventoryRERA - Inventory Certifiacte - June - 23 - PH - 2.pdf · uploaded 18 Jul 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Saisha Ph2 july 23.pdf · uploaded 7 Aug 2023Source
- 10 Disclosure of sold/ booked inventoryInventory Certificate Saisha 2 Sept 23.pdf · uploaded 19 Oct 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)saisha second architect certificate.pdf · uploaded 28 Nov 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate saisha phase 2 second.pdf · uploaded 28 Nov 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Saisha Ph2 CA.pdf · uploaded 28 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA Saisha ph2 FY 22-23.pdf · uploaded 3 Apr 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 13 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 13 Apr 2024Source
- 11 Disclosure of sold/ booked inventorySAISHA PROJECT - PH2 - Inventory certificate Dec-23.pdf · uploaded 22 Apr 2024Source
- 12 Disclosure of sold/ booked inventorySaisha Project - Ph-2 - Inventory certificate - March-24.pdf · uploaded 24 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR Saisha PH2 April 24 C.pdf · uploaded 13 Jun 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Saisha ph2 April 24 (2).pdf · uploaded 13 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Saisha ph2 C.pdf · uploaded 13 Jun 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar Saisha Ph2 April 2024.pdf · uploaded 21 Jun 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Saisha ph2 apri 24 enng.pdf · uploaded 21 Jun 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA SAISHA PHASE II.pdf · uploaded 21 Jun 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar saisha ph 2 july 24.pdf · uploaded 24 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar saishph2 oct24.pdf · uploaded 24 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Saisha Phase2 Jun24.pdf · uploaded 24 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Saisha 2 Sep 24.pdf · uploaded 24 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Er Saishaph2 oct24.pdf · uploaded 24 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySaisha 2 Qty 1 booking.pdf · uploaded 24 Oct 2024Source
- 2 Disclosure of sold/ booked inventorySaisha 2 Qty 2 booking.pdf · uploaded 24 Oct 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)REG CERTIFICATE.pdf · uploaded 3 Jun 2025Source
- Form 5 (FY 2024-2025)Annual Audit Form 5 FY 2024-25 Saisha II.pdf · uploaded 5 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A for FY 2024-25 Saisha Plase II final.pdf · uploaded 9 Jun 2026Source
- Form 2A (FY 2025-2026)Form 2A for FY 2025-26 Saisha Plase II final.pdf · uploaded 10 Sep 2026Source
- Form 5 (FY 2025-2026)Form 5 Shaisha II for FY 2025-26 final.pdf · uploaded 10 Sep 2026Source
- Withdrawal Update Form 1Form 1 For FY 2025-26 Q1 Final.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2Form 2 For FY 2025-26 Q2 Final.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q1 final.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Form 1 for 2025-26- Q2.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q3 saisha II final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q4 saisha II.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 1Form1 for FY 2026-27 final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 2Form 2 For FY 2025-26 Q2 Final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q3 final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q4 final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 2Form 2 for FY 2026-27 Q1 final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q2 Final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q3 Final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2025-26 Q4 Final.pdf · uploaded 16 Sep 2026Source
- Withdrawal Update Form 3Form 3 For FY 2026-27 Q1 final.pdf · uploaded 16 Sep 2026Source
Technical
- Document1 Layout.pdf · uploaded 25 Dec 2020Source
- Document2 A 1 and 2 floor.pdf · uploaded 25 Dec 2020Source
- Document3 A 3 to 10 floor.pdf · uploaded 25 Dec 2020Source
- Document4 A 11 floor.pdf · uploaded 25 Dec 2020Source
- Document5 A elevation section.pdf · uploaded 25 Dec 2020Source
- Document6 B 2 P and terrace.pdf · uploaded 25 Dec 2020Source
- Document7 B 1 to 9 floor.pdf · uploaded 25 Dec 2020Source
- Document8 B 11 floor.pdf · uploaded 25 Dec 2020Source
- Document9 B elevation section.pdf · uploaded 25 Dec 2020Source
- Document10 C parking and 1 floor.pdf · uploaded 25 Dec 2020Source
- Document11 C 2 to 10 floor.pdf · uploaded 25 Dec 2020Source
- Document12 C 8 and 11 floor.pdf · uploaded 25 Dec 2020Source
- Document13 C elevation section.pdf · uploaded 25 Dec 2020Source
- Document14 New MHADA 1 to 4 floor.pdf · uploaded 25 Dec 2020Source
- Document15 NEW MHADA elevation section.pdf · uploaded 25 Dec 2020Source
- Document16 Club House.pdf · uploaded 25 Dec 2020Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Punawale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Land Of Silveroak Reality And Bankar
- South
- Land Of Shivaji Kudale And Savata Mali Trust Land
- East
- G K Builder And Land Of Manda Kudale
- West
- Land Of Bankar Aand Boundary Of S No 41
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Unusual Spaces | — |
| Architect | Vinod Dhusia Architects | — |
| Chartered accountant | Anrk Associates LLP | — |
| Chartered accountant | Namrata Dhruve & Co | — |
| Engineer | G A Bhilare Consultants Pvt Ltd | — |
| Engineer | Satish Gagare | — |
| Other | Kshitija Kolhatkar | — |
| Other | Siddhivinayak Mep Consultants | — |
| Other | Suyash Constrotech | — |
Source: MahaRERA project page. Contact details are not shown.