Millennium Samriddhi

Certificate Signed

Punawale, Pune 411033 |Promoter: Millennium Strategic Promoters LLP

Residential / Group HousingRERAP52100076784
28 Jun 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
3Buildings
244Units registered63 booked (26%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, 3BHK, Shop244 units in all
Address
31/32/A/5, 6 & 7, Punawale Main Road, PunawalePIN 411033
Designated bank account
85
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.37439, 73.43500
Millennium Samriddhi is at latitude 18.37439, longitude 73.43500.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
28 Jun 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007678428 Jun 202431 Dec 202930 Apr 2030Millennium Strategic Promoters LLPProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A - Wing20120
B - Wing1971
C- Wing1953

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

63 of 244 units booked (26%), as the promoter reported to MahaRERA

2BHK · 87 units3BHK · 148 unitsShop · 9 units
BuildingTypeCarpet areaUnitsBooked
A - Wing2BHK63.95 sq m · 688 sq ft3528
A - Wing3BHK92.35 sq m · 994 sq ft198
A - Wing3BHK92.73 sq m · 998 sq ft3818
A - Wing3BHK92.88 sq m · 1,000 sq ft192
A - WingShop31.16 sq m · 335 sq ft11
A - WingShop32.69 sq m · 352 sq ft11
A - WingShop36.75 sq m · 396 sq ft11
A - WingShop37.24 sq m · 401 sq ft11
Show all 18 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A - WingShop38.76 sq m · 417 sq ft11
A - WingShop40.11 sq m · 432 sq ft11
A - WingShop45.28 sq m · 487 sq ft10
A - WingShop48.06 sq m · 517 sq ft10
A - WingShop60.42 sq m · 650 sq ft11
B - Wing2BHK63.42 sq m · 683 sq ft350
B - Wing3BHK81.65 sq m · 879 sq ft360
C- Wing2BHK63.09 sq m · 679 sq ft170
C- Wing3BHK91.26 sq m · 982 sq ft180
C- Wing3BHK91.41 sq m · 984 sq ft180

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 236 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPromoter PAN (1).pdf · uploaded 18 May 2024Source
  • OthersSamriddhi- Form 1.pdf · uploaded 21 Jul 2025Source
  • OthersFORM 2_Engineers Certificate SAMRIDDHI.pdf · uploaded 21 Jul 2025Source
  • OthersFinance Loan declaration.pdf · uploaded 17 Nov 2025Source
  • OthersCERSAI REPORT.pdf · uploaded 25 Nov 2025Source
  • OthersDisclosure of Secured Unsecured Finance availed.pdf · uploaded 25 Nov 2025Source

Legal

  • Declaration Form BAffidavit Cum Declaration.pdf · uploaded 19 May 2024Source
Show all 237 documentsShow fewer documents

Legal

  • Other – LegalDeclaration.pdf · uploaded 24 May 2024Source
  • Legal Title reportLegal Title Report Format-A.pdf · uploaded 24 May 2024Source
  • Legal Title reportFlow Of The Title Of The Said Land.pdf · uploaded 24 May 2024Source
  • Legal Title reportLegal Title Report Annexure_compressed.pdf · uploaded 24 May 2024Source
  • Other – Legal1 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal2 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal3 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal4 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal5 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal6 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal7 Other – legal.pdf · uploaded 31 May 2024Source
  • Other – Legal5.pdf · uploaded 31 May 2024Source
  • Other – Legal6.pdf · uploaded 31 May 2024Source
  • Other – Legal7.pdf · uploaded 31 May 2024Source

Migrated

  • 1 PAN CardPromoter PAN (1).pdf · uploaded 18 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)1 OF 20.pdf · uploaded 18 May 2024Source
  • 1 Building Plan Approval / NA Order for plotted development2 OF 20.pdf · uploaded 18 May 2024Source
  • 2 Building Plan Approval / NA Order for plotted development3 OF 20.pdf · uploaded 18 May 2024Source
  • 3 Building Plan Approval / NA Order for plotted development4 of 20.pdf · uploaded 18 May 2024Source
  • 4 Building Plan Approval / NA Order for plotted development5 of 20.pdf · uploaded 18 May 2024Source
  • 5 Building Plan Approval / NA Order for plotted development6 of 20.pdf · uploaded 18 May 2024Source
  • 6 Building Plan Approval / NA Order for plotted development7 of 20.pdf · uploaded 18 May 2024Source
  • 7 Building Plan Approval / NA Order for plotted development8 of 20.pdf · uploaded 18 May 2024Source
  • 8 Building Plan Approval / NA Order for plotted development9 of 20.pdf · uploaded 18 May 2024Source
  • 9 Building Plan Approval / NA Order for plotted development10 of 20.pdf · uploaded 18 May 2024Source
  • 10 Building Plan Approval / NA Order for plotted development11 of 20.pdf · uploaded 18 May 2024Source
  • 11 Building Plan Approval / NA Order for plotted development12 of 20.pdf · uploaded 18 May 2024Source
  • 12 Building Plan Approval / NA Order for plotted development13 of 20.pdf · uploaded 18 May 2024Source
  • 13 Building Plan Approval / NA Order for plotted development14 of 20.pdf · uploaded 18 May 2024Source
  • 14 Building Plan Approval / NA Order for plotted development15 of 20.pdf · uploaded 18 May 2024Source
  • 15 Building Plan Approval / NA Order for plotted development16 of 20.pdf · uploaded 18 May 2024Source
  • 16 Building Plan Approval / NA Order for plotted development17 of 20.pdf · uploaded 18 May 2024Source
  • 17 Building Plan Approval / NA Order for plotted development18 OF 20.pdf · uploaded 18 May 2024Source
  • 18 Building Plan Approval / NA Order for plotted development19 OF 20.pdf · uploaded 18 May 2024Source
  • 19 Building Plan Approval / NA Order for plotted development20 OF 20.pdf · uploaded 18 May 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about cc.PDF · uploaded 19 May 2024Source
  • 1 Declaration in FORM BAffidavit Cum Declaration.pdf · uploaded 19 May 2024Source
  • 1 Proforma of Agreement for saleSamriddhi ATS.pdf · uploaded 19 May 2024Source
  • 1 Proforma of Allotment letterAllotment Letter Samriddhi.pdf · uploaded 19 May 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report-Allotment Letter.PDF · uploaded 19 May 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement -BP-Punawale-44-2024_compressed (1).pdf · uploaded 20 May 2024Source
  • 1 Copy of the legal title reportLegal Title Report Format-A.pdf · uploaded 24 May 2024Source
  • 2 Copy of the legal title reportFlow Of The Title Of The Said Land.pdf · uploaded 24 May 2024Source
  • 3 Copy of the legal title reportLegal Title Report Annexure_compressed.pdf · uploaded 24 May 2024Source
  • 1 a Details of encumbrances concerned to Financeilovepdfmerged.pdf · uploaded 24 May 2024Source
  • 1 b Details of encumbrances concerned to Legalilovepdfmerged.pdf · uploaded 24 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Of ATS.pdf · uploaded 24 May 2024Source
  • 1 Other – LegalDeclaration.pdf · uploaded 24 May 2024Source
  • 1 Other – TechnicalOther SD 10758- 2024 Millennium1-30.pdf · uploaded 25 May 2024Source
  • 2 Other – TechnicalSD 10758- 2024 Millennium 31-60.pdf · uploaded 25 May 2024Source
  • 3 Other – TechnicalSD 10758- 2024 Millennium 61-84.pdf · uploaded 25 May 2024Source
  • 4 Other – TechnicalPOA -2024 Millennium 1-28.pdf · uploaded 25 May 2024Source
  • 5 Other – TechnicalPOA -2024 Millennium 29-56.pdf · uploaded 25 May 2024Source
  • 6 Other – TechnicalAnnexure A R1.pdf · uploaded 27 May 2024Source
  • 7 Other – TechnicalMilllenium Promotors Form-3 Revised Final.pdf · uploaded 27 May 2024Source
  • 1 CERSAI detailsCERSAI_Search_Report_200308377047_For_Asset_Based_Search_28_05_2024_16_13_03_526.pdf · uploaded 28 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A Form-3 Revised Final.pdf · uploaded 28 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration About Separate Bank.pdf · uploaded 28 May 2024Source
  • 2 a Details of encumbrances concerned to FinanceTo Whom So Ever It May Concern.pdf · uploaded 31 May 2024Source
  • 3 a Details of encumbrances concerned to FinanceFINANCE legal.pdf · uploaded 31 May 2024Source
  • 4 a Details of encumbrances concerned to FinanceFINANCE legal.pdf · uploaded 31 May 2024Source
  • 2 b Details of encumbrances concerned to LegalTo Whom So Ever It May Concern.pdf · uploaded 31 May 2024Source
  • 3 b Details of encumbrances concerned to LegalFINANCE legal.pdf · uploaded 31 May 2024Source
  • 4 b Details of encumbrances concerned to LegalFINANCE legal.pdf · uploaded 31 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Amit.pdf · uploaded 31 May 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Haresh.pdf · uploaded 31 May 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Neeraj.pdf · uploaded 31 May 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Rajkumar.pdf · uploaded 31 May 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Sachin.pdf · uploaded 31 May 2024Source
  • 2 Other – Legal1 Other – legal.pdf · uploaded 31 May 2024Source
  • 3 Other – Legal2 Other – legal.pdf · uploaded 31 May 2024Source
  • 4 Other – Legal3 Other – legal.pdf · uploaded 31 May 2024Source
  • 5 Other – Legal4 Other – legal.pdf · uploaded 31 May 2024Source
  • 6 Other – Legal5 Other – legal.pdf · uploaded 31 May 2024Source
  • 7 Other – Legal6 Other – legal.pdf · uploaded 31 May 2024Source
  • 8 Other – Legal7 Other – legal.pdf · uploaded 31 May 2024Source
  • 9 Other – Legal5.pdf · uploaded 31 May 2024Source
  • 10 Other – Legal6.pdf · uploaded 31 May 2024Source
  • 11 Other – Legal7.pdf · uploaded 31 May 2024Source
  • 8 Other – TechnicalMail Commencement to RERA.pdf · uploaded 4 Jun 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SAMRIDDHI.pdf · uploaded 7 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 samriddhi_compressed.pdf · uploaded 15 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 samriddhi updated.pdf · uploaded 15 Oct 2024Source
  • 1 a Details of encumbrances concerned to Financelatest no legal no finance.pdf · uploaded 28 Nov 2024Source
  • 2 a Details of encumbrances concerned to Financelatest no legal no finance.pdf · uploaded 28 Nov 2024Source
  • 3 a Details of encumbrances concerned to Financelatest no legal no finance-2.pdf · uploaded 28 Nov 2024Source
  • 4 a Details of encumbrances concerned to Financelatest no legal no finance-1.pdf · uploaded 28 Nov 2024Source
  • 1 b Details of encumbrances concerned to Legallatest no legal no finance.pdf · uploaded 28 Nov 2024Source
  • 2 b Details of encumbrances concerned to Legallatest no legal no finance.pdf · uploaded 28 Nov 2024Source
  • 3 b Details of encumbrances concerned to Legallatest no legal no finance-2.pdf · uploaded 28 Nov 2024Source
  • 4 b Details of encumbrances concerned to Legallatest no legal no finance-1.pdf · uploaded 28 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 14 Dec 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 14 Dec 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentWing A 2nd - 19th_compressed.pdf · uploaded 14 Dec 2024Source
  • Form 1PROMOTERS ARCHITECT CERTIFICATE.pdf · uploaded 24 May 2025Source
  • Form 2SAMRIDDHI ENGI CERTIFICATE.pdf · uploaded 24 May 2025Source
  • Form 3form 3 samriddhi Q4_11zon.pdf · uploaded 24 May 2025Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 23 Jul 2025Source
  • Form 1Samriddhi Form - 1 Q2( 03-10-2024.pdf · uploaded 15 Sep 2025Source
  • Form 1Samriddhi Form - 1 Q3( 02-01-2025.pdf · uploaded 15 Sep 2025Source
  • Form 1Samriddhi Form 1 - Q1.pdf · uploaded 15 Sep 2025Source
  • Form 2Q2 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Form 2Q3 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Form 2Q2 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Form 3form 3 samriddhi Q2_compressed.pdf · uploaded 15 Sep 2025Source
  • Form 3SAMRIDDHI FORM 3 Q3_compressed.pdf · uploaded 15 Sep 2025Source
  • Form 3form 3 samriddhi Q2_compressed.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure FY 2024-2025 - Q2_compressed.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure FY 2024-2025 - Q3_compressed.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure FY 2024-2025 -Q1_compressed.pdf · uploaded 15 Sep 2025Source
  • Self-declaration of Quarterly ProgressSelf declaration 24-25 Q2.pdf · uploaded 15 Sep 2025Source
  • Self-declaration of Quarterly ProgressSelf declaration 24-25 Q3.pdf · uploaded 15 Sep 2025Source
  • Self-declaration of Quarterly ProgressSelf declaration 24-25 Q1.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 1Samriddhi Form - 1 Q2( 03-10-2024.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 1Samriddhi Form 1 - Q1.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 1Samriddhi Form - 1 Q3( 02-01-2025.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 1Samriddhi Form - 1 Q4 (05-04-2025.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 2Q2 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 2Q2 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 2Q3 Eng Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 2Q4 Engg Certificate Form 2.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 3form 3 samriddhi Q2_compressed.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 3form 3 samriddhi Q2_compressed.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 3SAMRIDDHI FORM 3 Q3_compressed.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 3Q4 Form 3.pdf · uploaded 15 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - Architect Certificate_04-09-2025 Samriddhi.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 2FORM 2_Engineers Q1 25-26.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 3Q4 Form 3.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 1Form 1 Samriddhi.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Samriddhi.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Form 3 Samriddhi_compressed.pdf · uploaded 18 Oct 2025Source
  • Form 5 (FY 2024-2025)GE 329 Millennium Promoters.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 SAMRIDDHI_new.pdf · uploaded 7 Feb 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 7 Feb 2026Source
  • Withdrawal Update Form 3Form 3 Samriddhi Jan 2026_compressed (1).pdf · uploaded 7 Feb 2026Source
  • Withdrawal Update Form 1FORM 1 -Samriddhi.pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 2FORM 2- Samriddhi.pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 - Samriddhi_compressed.pdf · uploaded 14 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 19 Jul 2026Source
  • Withdrawal Update Form 3Form 3_compressed.pdf · uploaded 19 Jul 2026Source
  • Form 2A (FY 2025-2026)8) Form 2A.pdf · uploaded 18 Aug 2026Source

Technical

  • Document1 OF 20.pdf · uploaded 18 May 2024Source
  • Document2 OF 20.pdf · uploaded 18 May 2024Source
  • Document3 OF 20.pdf · uploaded 18 May 2024Source
  • Document4 of 20.pdf · uploaded 18 May 2024Source
  • Document5 of 20.pdf · uploaded 18 May 2024Source
  • Document6 of 20.pdf · uploaded 18 May 2024Source
  • Document7 of 20.pdf · uploaded 18 May 2024Source
  • Document8 of 20.pdf · uploaded 18 May 2024Source
  • Document9 of 20.pdf · uploaded 18 May 2024Source
  • Document10 of 20.pdf · uploaded 18 May 2024Source
  • Document11 of 20.pdf · uploaded 18 May 2024Source
  • Document12 of 20.pdf · uploaded 18 May 2024Source
  • Document13 of 20.pdf · uploaded 18 May 2024Source
  • Document14 of 20.pdf · uploaded 18 May 2024Source
  • Document15 of 20.pdf · uploaded 18 May 2024Source
  • Document16 of 20.pdf · uploaded 18 May 2024Source
  • Document17 of 20.pdf · uploaded 18 May 2024Source
  • Document18 OF 20.pdf · uploaded 18 May 2024Source
  • Document19 OF 20.pdf · uploaded 18 May 2024Source
  • Document20 OF 20.pdf · uploaded 18 May 2024Source
  • Other – TechnicalOther SD 10758- 2024 Millennium1-30.pdf · uploaded 25 May 2024Source
  • Other – TechnicalSD 10758- 2024 Millennium 31-60.pdf · uploaded 25 May 2024Source
  • Other – TechnicalSD 10758- 2024 Millennium 61-84.pdf · uploaded 25 May 2024Source
  • Other – TechnicalPOA -2024 Millennium 1-28.pdf · uploaded 25 May 2024Source
  • Other – TechnicalPOA -2024 Millennium 29-56.pdf · uploaded 25 May 2024Source
  • Other – TechnicalAnnexure A R1.pdf · uploaded 27 May 2024Source
  • Other – TechnicalMilllenium Promotors Form-3 Revised Final.pdf · uploaded 27 May 2024Source
  • Other – TechnicalMail Commencement to RERA.pdf · uploaded 4 Jun 2024Source
  • DocumentLayout_compressed.pdf · uploaded 14 Dec 2024Source
  • DocumentWing A 2nd - 19th_compressed.pdf · uploaded 14 Dec 2024Source
  • DocumentLayout.pdf · uploaded 9 Jun 2025Source
  • Document1st Floor Wing A B C.pdf · uploaded 9 Jun 2025Source
  • DocumentA Wing Commercial.pdf · uploaded 9 Jun 2025Source
  • DocumentBasement Parking.pdf · uploaded 9 Jun 2025Source
  • DocumentGround Parking.pdf · uploaded 9 Jun 2025Source
  • DocumentWing A & C Elevation.pdf · uploaded 9 Jun 2025Source
  • DocumentWing A Floor Plan.pdf · uploaded 9 Jun 2025Source
  • DocumentWing A Refuge Floor PLan.pdf · uploaded 9 Jun 2025Source
  • DocumentWing A Section.pdf · uploaded 9 Jun 2025Source
  • DocumentWing B 2nd Floor.pdf · uploaded 9 Jun 2025Source
  • DocumentWing B 3rd floor.pdf · uploaded 9 Jun 2025Source
  • DocumentWing B Elevation, Terrace,Section.pdf · uploaded 9 Jun 2025Source
  • DocumentWing C Floor PLan.pdf · uploaded 9 Jun 2025Source
  • DocumentWing C Refuge Plan.pdf · uploaded 9 Jun 2025Source
  • DocumentWing C Section.pdf · uploaded 9 Jun 2025Source
  • DocumentCommencement Certificate_compressed.pdf · uploaded 9 Jun 2025Source
  • DocumentLayout.pdf · uploaded 21 Jul 2025Source
  • Document1st Floor Wing A B C.pdf · uploaded 21 Jul 2025Source
  • DocumentA Wing Commercial.pdf · uploaded 21 Jul 2025Source
  • DocumentBasement Parking.pdf · uploaded 21 Jul 2025Source
  • DocumentGround Parking.pdf · uploaded 21 Jul 2025Source
  • DocumentWing A u0026 C Elevation.pdf · uploaded 21 Jul 2025Source
  • DocumentWing A Floor Plan.pdf · uploaded 21 Jul 2025Source
  • DocumentWing A Refuge Floor PLan.pdf · uploaded 21 Jul 2025Source
  • DocumentWing A Section.pdf · uploaded 21 Jul 2025Source
  • DocumentWing B 2nd Floor.pdf · uploaded 21 Jul 2025Source
  • DocumentWing B 3rd floor.pdf · uploaded 21 Jul 2025Source
  • DocumentWing B 3rd floor.pdf · uploaded 21 Jul 2025Source
  • DocumentWing B Elevation, Terrace,Section.pdf · uploaded 21 Jul 2025Source
  • DocumentWing C Floor PLan.pdf · uploaded 21 Jul 2025Source
  • DocumentWing C Refuge Plan.pdf · uploaded 21 Jul 2025Source
  • DocumentWing C Section.pdf · uploaded 21 Jul 2025Source
  • DocumentCommencement Certificate_compressed (2).pdf · uploaded 21 Jul 2025Source
  • DocumentNA Order.pdf · uploaded 21 Jul 2025Source
  • DocumentAnnexure A R1.pdf · uploaded 21 Jul 2025Source
  • OthersSamriddhi Form 1.pdf · uploaded 2 Sep 2025Source
  • OthersFORM 2_Engineers Certificate SAMRIDDHI.pdf · uploaded 2 Sep 2025Source
  • OthersForm 2A Engineers Certificate.pdf · uploaded 2 Sep 2025Source
  • DocumentSanction Plan Final.pdf · uploaded 18 Aug 2026Source
  • Document2) Basement Parking.pdf · uploaded 18 Aug 2026Source
  • Document3) Ground Parking.pdf · uploaded 18 Aug 2026Source
  • Document4) Ground Mezzanine Floor Plan A Wing (Commercial) (1).pdf · uploaded 18 Aug 2026Source
  • Document5) Building Floor Plan A Wing.pdf · uploaded 18 Aug 2026Source
  • Document6) Building Floor Plan (7 12 17) A Wing.pdf · uploaded 18 Aug 2026Source
  • Document7) Section Plan A Wing.pdf · uploaded 18 Aug 2026Source
  • Document8) Building Floor Plan B Wing.pdf · uploaded 18 Aug 2026Source
  • Document9) Building Floor Plan (7 12 17) B Wing.pdf · uploaded 18 Aug 2026Source
  • Document10) Section Elevation B Wing.pdf · uploaded 18 Aug 2026Source
  • Document11) Building Floor Plan C Wing.pdf · uploaded 18 Aug 2026Source
  • Document12) Building Floor Plan (7 12 17) C Wing.pdf · uploaded 18 Aug 2026Source
  • Document13) Section Plan C Wing.pdf · uploaded 18 Aug 2026Source
  • Document14) Elevation A C Wing.pdf · uploaded 18 Aug 2026Source
  • Document15) First Floor Plan ABC Wing Final.pdf · uploaded 18 Aug 2026Source

Technical (Architect)

  • DocumentFORM 1 SAMRIDDHI.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 1.pdf · uploaded 19 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 samriddhi updated.pdf · uploaded 15 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 19 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Punawale, Mulshi taluka

Survey, CTS, gat or plot numbers

31/32/A/531/32/A/631/32/A/7

Boundaries

North
18 Meters D P Road
South
Plot no 3 MoonStone Real Infra
East
Sr no 33 Property of Darshale
West
18 meters D P Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Yogesh Manakshe—
ArchitectAvinash Bachkar—
Chartered accountantParag S Savale—
EngineerAmit Sasne—
EngineerAvinash Bachkar—
EngineerBadhe Mahesh Patilba—
EngineerMangesh Hargude—
EngineerSalim Shaikh—
EngineerSujit Kondekar—

Source: MahaRERA project page. Contact details are not shown.