Aura Blue
Certificate SignedPunawale, Pune 411033 |Promoter: Fortune Realty Group
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 1BHK LADN OWNER, 1bhl land owner, 2BHK, 2BHK LAND OWNER, 3BHK, Shop111 units in all
- Address
- CTS No 69 70 72 73 74 75 76 77 78 79, PUNAWALE, PUNAWALEPIN 411033
- Designated bank account
- 220
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Oct 2026
- Registered
- 24 Jan 2022
- Promised
- 31 Oct 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032711 | 24 Jan 2022 | 31 Oct 2026 | 31 Oct 2026 | Fortune Realty Group | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Aura Blue | 12 | 111 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
49 of 111 units booked (44%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 34.95 sq m · 376 sq ft | 7 | 7 |
| 1BHK | 40.45 sq m · 435 sq ft | 2 | 0 |
| 1BHK | 41.11 sq m · 443 sq ft | 6 | 6 |
| 1BHK LADN OWNER | 41.11 sq m · 443 sq ft | 5 | 0 |
| 1bhl land owner | 34.95 sq m · 376 sq ft | 13 | 0 |
| 2BHK | 49.68 sq m · 535 sq ft | 11 | 10 |
| 2BHK | 50.97 sq m · 549 sq ft | 7 | 6 |
| 2BHK | 52.51 sq m · 565 sq ft | 4 | 3 |
Show all 23 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 53.05 sq m · 571 sq ft | 8 | 7 |
| 2BHK LAND OWNER | 49.68 sq m · 535 sq ft | 7 | 0 |
| 2BHK LAND OWNER | 50.97 sq m · 549 sq ft | 4 | 0 |
| 2BHK LAND OWNER | 52.51 sq m · 565 sq ft | 5 | 0 |
| 2BHK LAND OWNER | 53.05 sq m · 571 sq ft | 2 | 0 |
| 3BHK | 65.36 sq m · 704 sq ft | 21 | 10 |
| 3BHK | 68.8 sq m · 741 sq ft | 1 | 0 |
| Shop | 11.21 sq m · 121 sq ft | 1 | 0 |
| Shop | 12.44 sq m · 134 sq ft | 1 | 0 |
| Shop | 13.69 sq m · 147 sq ft | 1 | 0 |
| Shop | 15.5 sq m · 167 sq ft | 1 | 0 |
| Shop | 18.53 sq m · 199 sq ft | 1 | 0 |
| Shop | 23 sq m · 248 sq ft | 1 | 0 |
| Shop | 24.45 sq m · 263 sq ft | 1 | 0 |
| Shop | 31.2 sq m · 336 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 154 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title reportFormat A - Aura blue.pdf · uploaded 4 Jan 2022Source
- Legal Title reportSearch and titel report plot 69.pdf · uploaded 4 Jan 2022Source
- Declaration Form BRevise Form B.pdf · uploaded 4 Jan 2022Source
- Legal Title reportSearch and titel report plot 79.pdf · uploaded 12 Jan 2022Source
- Declaration Form BFORM B.pdf · uploaded 27 Jul 2024Source
Show all 155 documentsShow fewer documents
Migrated
- 1 PAN CardFortune realty group pancard.pdf · uploaded 4 Jan 2022Source
- 1 Copy of the legal title reportFormat A - Aura blue.pdf · uploaded 4 Jan 2022Source
- 2 Copy of the legal title reportSearch and titel report plot 69.pdf · uploaded 4 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentpunawale dou.pdf · uploaded 4 Jan 2022Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 4 Jan 2022Source
- 1 Declaration in FORM BRevise Form B.pdf · uploaded 4 Jan 2022Source
- 1 Details of encumbrancesEncumbrance.pdf · uploaded 6 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)Layout plan (2).pdf · uploaded 6 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 6 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 6 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed (1).pdf · uploaded 6 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 6 Jan 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 6 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Revised_compressed.pdf · uploaded 7 Jan 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200227640960_For_Asset_Based_Search_07_01_2022_12_30_16_167.pdf · uploaded 7 Jan 2022Source
- 1 Proforma of Allotment letterRERA_Draft_-_Final (2).pdf · uploaded 7 Jan 2022Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 7 Jan 2022Source
- 3 Copy of the legal title reportSearch and titel report plot 79.pdf · uploaded 12 Jan 2022Source
- 2 Copy of Layout Approval (in case of layout)DWG 1-1_compressed.pdf · uploaded 10 Aug 2022Source
- 3 Copy of Layout Approval (in case of layout)DWG 1-5_compressed.pdf · uploaded 10 Aug 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentDWG 2-5_compressed.pdf · uploaded 10 Aug 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentDWG 3-5_compressed.pdf · uploaded 10 Aug 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentDWG 4-5 (1)_compressed.pdf · uploaded 10 Aug 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentDWG 5-5_compressed.pdf · uploaded 10 Aug 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Aura Blue.pdf · uploaded 10 Aug 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Aura blue _compressed.pdf · uploaded 10 Aug 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate-_Fortune_Reality_Group_compressed.pdf · uploaded 10 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Report of Allotment letter.pdf · uploaded 12 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report of Ageement to sale.pdf · uploaded 12 Aug 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCOMMECEMENT CERTIFICATE.pdf · uploaded 23 Aug 2022Source
- 2 Declaration about Commencement CertificateFormat D (4).pdf · uploaded 23 Aug 2022Source
- 1 Disclosure of sold/ booked inventorySold Unsold (4)_compressed.pdf · uploaded 23 Aug 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FINAL FORM 3- AURA BLUE_compressed.pdf · uploaded 25 Aug 2022Source
- 4 Copy of Layout Approval (in case of layout)DWG 1-5_compressed- Highlited.pdf · uploaded 30 Aug 2022Source
- 1 Proforma of Agreement for saleRERA Draft - Final.pdf · uploaded 22 Nov 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)img20230113_12155478.pdf · uploaded 16 Jan 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aura Blue.pdf · uploaded 16 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 (1) (1).pdf · uploaded 2 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Feb 2023Source
- 2 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 23 Feb 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentSKM_C364e23031511360_compressed.pdf · uploaded 7 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH-1.pdf · uploaded 7 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Form 3 Rera_compressed.pdf · uploaded 7 Apr 2023Source
- 5 Copy of Layout Approval (in case of layout)PLAN 1_compressed.pdf · uploaded 11 Apr 2023Source
- 6 Copy of Layout Approval (in case of layout)PLAN 2_compressed.pdf · uploaded 11 Apr 2023Source
- 7 Copy of Layout Approval (in case of layout)PLAN 3_compressed.pdf · uploaded 11 Apr 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentPLAN 4_compressed.pdf · uploaded 11 Apr 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentPLAN 5_compressed.pdf · uploaded 11 Apr 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentPLAN 6_compressed.pdf · uploaded 11 Apr 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentPLAN 7_compressed.pdf · uploaded 11 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate_compressed.pdf · uploaded 11 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFIACTE_compressed.pdf · uploaded 11 Apr 2023Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD LIST.pdf · uploaded 12 May 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Fortune Architech Q1.pdf · uploaded 7 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Fortune Architech Q2.pdf · uploaded 7 Dec 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Fortune Engineer Certificate Q1.pdf · uploaded 7 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Fortune Engineer Certificate Q2.pdf · uploaded 7 Dec 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE-04-12-23_compressed.pdf · uploaded 7 Dec 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE-06-12-23_compressed.pdf · uploaded 7 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Fortune Architect Certificate Q-3_compressed.pdf · uploaded 20 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Fortune Q3_compressed.pdf · uploaded 20 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Fortune Q3_compressed.pdf · uploaded 20 Jan 2024Source
- 8 Copy of Layout Approval (in case of layout)LP.PDF · uploaded 14 Mar 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentP1.PDF · uploaded 14 Mar 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentP2.PDF · uploaded 14 Mar 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentP3.PDF · uploaded 14 Mar 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentP4.PDF · uploaded 14 Mar 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentP5.PDF · uploaded 14 Mar 2024Source
- 4 Commencement Certificates / NA Order for plotted developmentCC 14032024.pdf · uploaded 14 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECH.pdf · uploaded 1 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER.pdf · uploaded 1 May 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFIACTE_compressed.pdf · uploaded 1 May 2024Source
- 2 Details of encumbrancesEncumbrance.pdf · uploaded 27 Jul 2024Source
- 2 Declaration in FORM BFORM B.pdf · uploaded 27 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)From No 2A_merged.pdf · uploaded 27 Jul 2024Source
- 4 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 27 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM NO 5 2022-23.pdf · uploaded 27 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM NO 5 2023-24.pdf · uploaded 27 Jul 2024Source
- 1 Other – FinanceEncumbrance_page-0001.pdf · uploaded 27 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Fortune Realty Group.pdf · uploaded 4 Aug 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)form-02 Engineer certifiate.pdf · uploaded 4 Aug 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Fortune Realty Group_compressed.pdf · uploaded 4 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A_compressed.pdf · uploaded 4 Aug 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Form A - Fortune Realty Group.pdf · uploaded 4 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate - Fortune Realty Group Q-2.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Fortune Realty Group Q-2_compressed.pdf · uploaded 19 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Fortune Realty Group Q-2.pdf · uploaded 19 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Fortune Realty Group Q3 FY 24-25.pdf · uploaded 19 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Fortune Realty Group Q3 FY 24-25_compressed.pdf · uploaded 19 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Fortune Realty Group Q3 FY 24-25.pdf · uploaded 19 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Fortune Realty Group Q4_compressed.pdf · uploaded 26 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Fortune Realty Group Q4_compressed.pdf · uploaded 26 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Fortune Realty Group Q4.pdf · uploaded 26 Apr 2025Source
- Withdrawal Update Form 1Architech Certificate - Fortune Realty Group Jun 25.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 1FROM-1.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2Engineer Certificate - Fortune Realty Group Jun 25.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2FROM-2.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3CA Certificate - Fortune Realty Group Jun 25.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3FROM-3.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 1Form No 1 Architech Certificate.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 2Form No 2Engineer Certificate.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 3Form No 3 CA Certificate.pdf · uploaded 24 Dec 2025Source
Technical
- DocumentLayout plan (2).pdf · uploaded 6 Jan 2022Source
- DocumentPlan 2.pdf · uploaded 6 Jan 2022Source
- DocumentPlan 1.pdf · uploaded 6 Jan 2022Source
- DocumentDWG 1-5_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 2-5_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 3-5_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 4-5 (1)_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 5-5_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 1-1_compressed.pdf · uploaded 10 Aug 2022Source
- DocumentDWG 1-5_compressed- Highlited.pdf · uploaded 30 Aug 2022Source
- DocumentPLAN 1_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 2_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 3_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 4_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 5_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 6_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentPLAN 7_compressed.pdf · uploaded 11 Apr 2023Source
- DocumentLP.PDF · uploaded 14 Mar 2024Source
- DocumentP1.PDF · uploaded 14 Mar 2024Source
- DocumentP2.PDF · uploaded 14 Mar 2024Source
- DocumentP3.PDF · uploaded 14 Mar 2024Source
- DocumentP4.PDF · uploaded 14 Mar 2024Source
- DocumentP5.PDF · uploaded 14 Mar 2024Source
- DocumentLAYOUT PLAN.pdf · uploaded 29 Oct 2025Source
- Document1ST TO 11TH FLOOR PLAN.pdf · uploaded 29 Oct 2025Source
- DocumentCC.pdf · uploaded 29 Oct 2025Source
- DocumentELEVATION.pdf · uploaded 29 Oct 2025Source
- Document7TH u0026 10TH FLOOR PLAN.pdf · uploaded 29 Oct 2025Source
- DocumentBASEMENT PARKING PLAN.pdf · uploaded 29 Oct 2025Source
- Document12TH FLOOR PLAN.pdf · uploaded 29 Oct 2025Source
- DocumentPLAN 1.pdf · uploaded 30 Oct 2025Source
- DocumentPLAN 2.pdf · uploaded 30 Oct 2025Source
- DocumentPLAN 3.pdf · uploaded 30 Oct 2025Source
- DocumentPLAN 4.pdf · uploaded 30 Oct 2025Source
- DocumentPLAN 5.pdf · uploaded 30 Oct 2025Source
- DocumentPLAN 6.pdf · uploaded 30 Oct 2025Source
- DocumentLayout Plan 10062025_compressed.pdf · uploaded 20 Dec 2025Source
Technical (Architect)
- DocumentArchitech Certificate - Fortune Realty Group Q-2.pdf · uploaded 19 Oct 2024Source
- DocumentArchitect Certificate - Fortune Realty Group Q3 FY 24-25.pdf · uploaded 19 Jan 2025Source
- DocumentArchitect Certificate - Fortune Realty Group Q4_compressed.pdf · uploaded 26 Apr 2025Source
- DocumentForm No 1 Architech Certificate.pdf · uploaded 24 Dec 2025Source
Technical (Engineer)
- DocumentEngineer Certificate - Fortune Realty Group Q-2.pdf · uploaded 19 Oct 2024Source
- DocumentEngineer Certificate - Fortune Realty Group Q3 FY 24-25.pdf · uploaded 19 Jan 2025Source
- DocumentEngineer Certificate - Fortune Realty Group Q4.pdf · uploaded 26 Apr 2025Source
- DocumentForm No 2Engineer Certificate.pdf · uploaded 24 Dec 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Punawale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By River
- South
- 18 M Wide Dp Road And Cts No 70
- East
- Cts No 80
- West
- Cts No 62 65 66 68
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Shankar Nimbalkar | — |
| Chartered accountant | Raj Kishor And Associates | — |
| Chartered accountant | Vaishali R Gole | — |
| Engineer | Akshay Babar | — |
| Engineer | Mr Sunil Shivgan | — |
| Other | Mr Bharatsing Krishnasing Rajput | — |
Source: MahaRERA project page. Contact details are not shown.