Arihant Greens
Certificate SignedPunawale, Pune 411033 |Promoter: Konark Ventures
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, Shop60 units in all
- Address
- Survey No. 21 Hissa No. 1, Punawale, PunawalePIN 411033
- Designated bank account
- 109
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 2 Feb 2022
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100032864 | 2 Feb 2022 | 31 Dec 2026 | 30 Apr 2027 | Konark Ventures | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
8 of 60 units booked (13%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Winb B | 2BHK | 51.2 sq m · 551 sq ft | 22 | 6 |
| Winb B | 3BHK | 52.71 sq m · 567 sq ft | 1 | 0 |
| Winb B | 3BHK | 58.34 sq m · 628 sq ft | 1 | 0 |
| Winb B | 3BHK | 59.64 sq m · 642 sq ft | 1 | 0 |
| Winb B | 3BHK | 62.94 sq m · 677 sq ft | 10 | 2 |
| Winb B | 3BHK | 64.24 sq m · 691 sq ft | 11 | 0 |
| Wing A | 2BHK | 51.2 sq m · 551 sq ft | 2 | 0 |
| Wing A | 2BHK | 51.8 sq m · 558 sq ft | 2 | 0 |
Show all 12 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 3BHK | 67.37 sq m · 725 sq ft | 2 | 0 |
| Wing A | 3BHK | 67.84 sq m · 730 sq ft | 2 | 0 |
| Wing A | Shop | 40.64 sq m · 437 sq ft | 1 | 0 |
| Wing A | Shop | 42.55 sq m · 458 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 221 filings listed on MahaRERA's project page
Finance
- PAN CardFirm PAN Card.pdf · uploaded 13 Jan 2022Source
Legal
Show all 222 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 13 Jan 2022Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 13 Jan 2022Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 13 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 13 Jan 2022Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 13 Jan 2022Source
- 1 Declaration in FORM BForm B - Promotes.pdf · uploaded 13 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 13 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 13 Jan 2022Source
- 1 CERSAI detailsCERSAI.pdf · uploaded 13 Jan 2022Source
- 1 Copy of the legal title reportSearch Report.pdf · uploaded 21 Jan 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 21 Jan 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER AND DRAFT AGREEMENT.pdf · uploaded 21 Jan 2022Source
- 2 Copy of the legal title reportsearch report.pdf · uploaded 16 Mar 2022Source
- 2 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 12 Dec 2023Source
- 2 Copy of Layout Approval (in case of layout)HPSC2161.pdf · uploaded 13 Dec 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC2162.pdf · uploaded 13 Dec 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC2163.pdf · uploaded 13 Dec 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSC2165.pdf · uploaded 13 Dec 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSC2166.pdf · uploaded 13 Dec 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 for Rera Certificate.pdf · uploaded 13 Dec 2023Source
- 2 Details of encumbrancesEncumbrance Finance.pdf · uploaded 8 Jan 2024Source
- 3 Details of encumbrancesEncumbrance Legal.pdf · uploaded 8 Jan 2024Source
- 4 a Details of encumbrances concerned to FinanceEncumbrance Legal.pdf · uploaded 8 Jan 2024Source
- 5 a Details of encumbrances concerned to FinanceEncumbrance Finance.pdf · uploaded 8 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Legal.pdf · uploaded 8 Jan 2024Source
- 2 b Details of encumbrances concerned to LegalEncumbrance Finance.pdf · uploaded 8 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of separate bank account.pdf · uploaded 8 Jan 2024Source
- 1 Other – TechnicalSelf Declaration.pdf · uploaded 8 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate for rera (1).pdf · uploaded 12 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer Certificate (Quality assurance).pdf · uploaded 12 Mar 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)KV (CA)Form 3.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)KV (CA)Form 5.pdf · uploaded 12 Mar 2024Source
- 2 Other – TechnicalDecleration form.pdf · uploaded 12 Mar 2024Source
- 3 Other – TechnicalDocScanner 1 Mar 2024 15-17.pdf · uploaded 14 Mar 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)00 Form 2 31-03-2022.pdf · uploaded 30 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)01 Form 2 30-06-2022.pdf · uploaded 30 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)02 Form 2 30-09-2022.pdf · uploaded 30 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)03 Form 2 31-12-2022.pdf · uploaded 30 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)04 Form 2 31-03-2023.pdf · uploaded 30 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)05 Form 2 30-06-2023.pdf · uploaded 30 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)00 Form 1 310322.pdf · uploaded 6 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)01 Form 1 300622.pdf · uploaded 6 May 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)02 Form 1 300922.pdf · uploaded 6 May 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)03 Form 1 311222.pdf · uploaded 6 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)04 Form 1 31_03_2023.pdf · uploaded 6 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)05 Form 1 30623.pdf · uploaded 6 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)06 Form 1 300923.pdf · uploaded 6 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)07 Form 1 311223.pdf · uploaded 6 May 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)08 Form 1 01_04_24.pdf · uploaded 6 May 2024Source
- 1 Disclosure of sold/ booked inventory00 Sold Unsold 310322.pdf · uploaded 6 May 2024Source
- 2 Disclosure of sold/ booked inventory01 Sold unsold 300622.pdf · uploaded 6 May 2024Source
- 3 Disclosure of sold/ booked inventory02 Sold Unsold 300922.pdf · uploaded 6 May 2024Source
- 4 Disclosure of sold/ booked inventory03 Sold Unsold 311222.pdf · uploaded 6 May 2024Source
- 5 Disclosure of sold/ booked inventory04 sold unsold 310323.pdf · uploaded 6 May 2024Source
- 6 Disclosure of sold/ booked inventory05 Sold Unsold 300623.pdf · uploaded 6 May 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)01 Mar 2022.pdf · uploaded 6 May 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)02 Jun 2022.pdf · uploaded 6 May 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)03 Sep 2022.pdf · uploaded 6 May 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)04 Dec 2022.pdf · uploaded 6 May 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)05 Mar 2023.pdf · uploaded 6 May 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)06 Jun 2023.pdf · uploaded 6 May 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)07 Form 3 Sep 2023.pdf · uploaded 6 May 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)08 Form 3 Dec 2023.pdf · uploaded 6 May 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)09 Form 3 Mar 2024.pdf · uploaded 6 May 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDOI - Bharat Solanki.pdf · uploaded 6 May 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDOI - Manish P Jain.pdf · uploaded 6 May 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDOI - Pawan Bhandari.pdf · uploaded 6 May 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsDOI - Punit Sonigara.pdf · uploaded 6 May 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report - AFS.pdf · uploaded 6 May 2024Source
- 3 Copy of Layout Approval (in case of layout)1-5_11zon.pdf · uploaded 9 May 2024Source
- 8 Building Plan Approval / NA Order for plotted development2-5_11zon.pdf · uploaded 9 May 2024Source
- 9 Building Plan Approval / NA Order for plotted development3-5.pdf · uploaded 9 May 2024Source
- 10 Building Plan Approval / NA Order for plotted development4-5_11zon.pdf · uploaded 9 May 2024Source
- 11 Building Plan Approval / NA Order for plotted development5-5.pdf · uploaded 9 May 2024Source
- 3 Declaration about Commencement CertificateDeclaration Commencement Certificate.pdf · uploaded 9 May 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)06 Form 2 03-09-2023.pdf · uploaded 9 May 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)07 Form 2 31-12-2023.pdf · uploaded 9 May 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)08 Form 2 31-03-2024.pdf · uploaded 9 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 2021-22.pdf · uploaded 9 May 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 9 May 2024Source
- 7 Disclosure of sold/ booked inventory06 Sold Unsold 300923.pdf · uploaded 9 May 2024Source
- 8 Disclosure of sold/ booked inventory07 Sold Unsold 311223.pdf · uploaded 9 May 2024Source
- 9 Disclosure of sold/ booked inventory08 Sold Unsold 310324.pdf · uploaded 9 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 9 May 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 9 May 2024Source
- 1 Proforma of Agreement for saleAgreement To Sale.pdf · uploaded 9 May 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 9 May 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDecl About Sep Bank Account.pdf · uploaded 11 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 Architect certificate Q1.pdf · uploaded 24 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 24-25.pdf · uploaded 24 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 24-25.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Q-1 Upload.pdf · uploaded 24 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q-2 Upload.pdf · uploaded 24 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Q-3 upload.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Upload.pdf · uploaded 24 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 Upload.pdf · uploaded 24 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Upload.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold Upload.pdf · uploaded 24 Jan 2025Source
- 2 Disclosure of sold/ booked inventoryDisclosure of sold Upload.pdf · uploaded 24 Jan 2025Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold Upload.pdf · uploaded 24 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Upload.pdf · uploaded 24 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)imgw-315113009_compressed.pdf · uploaded 13 May 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC (nw ).pdf · uploaded 13 May 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentimgw-315113058_compressed.pdf · uploaded 13 May 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentimgw-315113130_compressed.pdf · uploaded 13 May 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentimgw-315113201_compressed.pdf · uploaded 13 May 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentimgw-315113236_compressed.pdf · uploaded 13 May 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentimgw-315113236_compressed.pdf · uploaded 13 May 2025Source
- Form 1Form 1 Architect Certificate KV.pdf · uploaded 17 Jun 2025Source
- Form 2Form - 2 Engineer's Certificate Konark Ventures.pdf · uploaded 17 Jun 2025Source
- Form 3Konark Ventures Form - 3.pdf · uploaded 17 Jun 2025Source
- Disclosure of Sold and Booked InventorySold Circular.pdf · uploaded 17 Jun 2025Source
- Form 1Form 1 (June).pdf · uploaded 14 Oct 2025Source
- Form 2Form 2 (jun).pdf · uploaded 14 Oct 2025Source
- Form 3Form 3 Konark Ventures for upload1.pdf · uploaded 14 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Of Sold Booking Inventory Arihant Greens.pdf · uploaded 14 Oct 2025Source
- Form 1Form 1 Jun 22.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Sep 22.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Dec 22.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Mar 23.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Jun 23.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Sep 23.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Dec 23.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Mar 24.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Jun 24.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Sep 24.pdf · uploaded 10 Dec 2025Source
- Form 1Form 1 Dec 24.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Jun 22.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Sep 22.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Dec 22.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Mar 23.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Jun 23.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Sep 23.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Dec 23.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Mar 24.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Jun 24.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Sep 24.pdf · uploaded 10 Dec 2025Source
- Form 2Form 2 Dec 24.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Jun 22.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Sep 22.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Dec 22.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Mar 23.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Jun 23.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Sep 23.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Dec 23.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Mar 24.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Jun 24.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Sep 24.pdf · uploaded 10 Dec 2025Source
- Form 3Form 3 Dec 24.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Jun 22.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Sep 22.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Dec 22.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis MAr 23.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Jun 23.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Sep 23.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Dec 23.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Mar 24.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Jun 24.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Sep 24.pdf · uploaded 10 Dec 2025Source
- Disclosure of Sold and Booked InventoryDis Dec 24.pdf · uploaded 10 Dec 2025Source
- Form 5 (FY 2021-2022)Form 5 21-22.pdf · uploaded 22 Dec 2025Source
- Form 5 (FY 2022-2023)Form 5 22-23.pdf · uploaded 22 Dec 2025Source
- Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 22 Dec 2025Source
- Withdrawal Update Form 1Architect Certificate Konark Ventures.pdf · uploaded 2 Jan 2026Source
- Withdrawal Update Form 2Form 2 Konark Ventures.pdf · uploaded 2 Jan 2026Source
- Withdrawal Update Form 3Form 3 Konark Ventures_compressed.pdf · uploaded 2 Jan 2026Source
- Form 5 (FY 2024-2025)Audit Report Konark Venture 24-25.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1Form 01 Dec 25.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 2Form 2 Konark Venture Dec 25 sogned.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 3Form 3 - Konark Ventures Dec 25 signed_compressed.pdf · uploaded 29 Jan 2026Source
- Withdrawal Update Form 1Form 1 Konark Ventures.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Konark Ventures Form 2 Mar 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3 Konark-signed Mar 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1Konark Venture Form1 Jun 26.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2konark venture form 2 SIGNED.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Konark Ventures form 3 SIGNED.pdf · uploaded 20 Jul 2026Source
Technical
- Document1.pdf · uploaded 13 Jan 2022Source
- Document2.pdf · uploaded 13 Jan 2022Source
- Document3.pdf · uploaded 13 Jan 2022Source
- Document4.pdf · uploaded 13 Jan 2022Source
- DocumentHPSC2161.pdf · uploaded 13 Dec 2023Source
- DocumentHPSC2162.pdf · uploaded 13 Dec 2023Source
- DocumentHPSC2163.pdf · uploaded 13 Dec 2023Source
- DocumentHPSC2165.pdf · uploaded 13 Dec 2023Source
- DocumentHPSC2166.pdf · uploaded 13 Dec 2023Source
- Other – TechnicalSelf Declaration.pdf · uploaded 8 Jan 2024Source
- Other – TechnicalDecleration form.pdf · uploaded 12 Mar 2024Source
- Other – TechnicalDocScanner 1 Mar 2024 15-17.pdf · uploaded 14 Mar 2024Source
- Document1-5_11zon.pdf · uploaded 9 May 2024Source
- Document2-5_11zon.pdf · uploaded 9 May 2024Source
- Document3-5.pdf · uploaded 9 May 2024Source
- Document4-5_11zon.pdf · uploaded 9 May 2024Source
- Document5-5.pdf · uploaded 9 May 2024Source
- Documentimgw-315113009_compressed.pdf · uploaded 13 May 2025Source
- Documentimgw-315113058_compressed.pdf · uploaded 13 May 2025Source
- Documentimgw-315113130_compressed.pdf · uploaded 13 May 2025Source
- Documentimgw-315113201_compressed.pdf · uploaded 13 May 2025Source
- Documentimgw-315113236_compressed.pdf · uploaded 13 May 2025Source
- Documentimgw-315113236_compressed.pdf · uploaded 13 May 2025Source
- Document1.pdf · uploaded 6 Feb 2026Source
- Document2.pdf · uploaded 6 Feb 2026Source
- Document3.pdf · uploaded 6 Feb 2026Source
- Document4.pdf · uploaded 6 Feb 2026Source
- Document5.pdf · uploaded 6 Feb 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Punawale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Dp Road And Remaining Property Out Of Survey 21
- South
- Property Of Aga
- East
- Property Of Survey 21 Hissa 2
- West
- Property Of Aga
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Vaibhav Fasale | — |
| Engineer | Harshal Pramod Wani | — |
Source: MahaRERA project page. Contact details are not shown.