Aishwaryam Insignia
Certificate SignedPunawale, Pune 411033 |Promoter: Viksak Vinode Infratech LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 5
- Unit types
- 1BHK, 2BHK, Shop884 units in all
- Address
- 25/6, Katewasti, PunawalePIN 411033
- Designated bank account
- 109
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Feb 2022
- Promised
- 30 Jun 2027
- Revised
- 30 Oct 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033510 | 22 Feb 2022 | 30 Jun 2027 | 30 Oct 2027 | Viksak Vinode Infratech LLP | Project page |
5 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A | 25 | 331 |
| B | 24 | 179 |
| C | 24 | 317 |
| D | 12 | 47 |
| E | 8 | 10 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
855 of 884 units booked (97%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 1BHK | 41.67 sq m · 449 sq ft | 43 | 43 |
| A | 1BHK | 43.95 sq m · 473 sq ft | 4 | 4 |
| A | 2BHK | 58.35 sq m · 628 sq ft | 2 | 2 |
| A | 2BHK | 58.37 sq m · 628 sq ft | 46 | 46 |
| A | 2BHK | 58.42 sq m · 629 sq ft | 48 | 48 |
| A | 2BHK | 58.45 sq m · 629 sq ft | 92 | 90 |
| A | 2BHK | 58.56 sq m · 630 sq ft | 96 | 95 |
| B | 1BHK | 39.79 sq m · 428 sq ft | 18 | 18 |
Show all 32 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 1BHK | 39.83 sq m · 429 sq ft | 23 | 23 |
| B | 2BHK | 59 sq m · 635 sq ft | 46 | 46 |
| B | 2BHK | 59.29 sq m · 638 sq ft | 23 | 23 |
| B | 2BHK | 59.39 sq m · 639 sq ft | 23 | 23 |
| B | 2BHK | 59.51 sq m · 641 sq ft | 23 | 23 |
| B | 2BHK | 60.78 sq m · 654 sq ft | 23 | 23 |
| C | 1BHK | 42.16 sq m · 454 sq ft | 23 | 23 |
| C | 1BHK | 42.38 sq m · 456 sq ft | 22 | 22 |
| C | 2BHK | 58.33 sq m · 628 sq ft | 23 | 23 |
| C | 2BHK | 58.35 sq m · 628 sq ft | 23 | 19 |
| C | 2BHK | 58.37 sq m · 628 sq ft | 23 | 23 |
| C | 2BHK | 58.4 sq m · 629 sq ft | 23 | 23 |
| C | 2BHK | 58.42 sq m · 629 sq ft | 46 | 46 |
| C | 2BHK | 58.46 sq m · 629 sq ft | 42 | 42 |
| C | 2BHK | 58.56 sq m · 630 sq ft | 46 | 46 |
| C | 2BHK | 58.59 sq m · 631 sq ft | 46 | 46 |
| D | 1BHK | 38.67 sq m · 416 sq ft | 47 | 35 |
| E | Shop | 23.61 sq m · 254 sq ft | 1 | 0 |
| E | Shop | 24.17 sq m · 260 sq ft | 2 | 0 |
| E | Shop | 24.19 sq m · 260 sq ft | 3 | 0 |
| E | Shop | 40.55 sq m · 436 sq ft | 1 | 0 |
| E | Shop | 41.11 sq m · 443 sq ft | 1 | 0 |
| E | Shop | 41.82 sq m · 450 sq ft | 1 | 0 |
| E | Shop | 42.46 sq m · 457 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 192 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card.pdf · uploaded 10 Feb 2022Source
- Other – FinanceVV MORGEAGE DEED 1-25.pdf · uploaded 27 Dec 2022Source
- Other – FinanceVV MORGEAGE DEED 26-42.pdf · uploaded 27 Dec 2022Source
- Other – FinanceVV MORGEAGE DEED 43-68.pdf · uploaded 27 Dec 2022Source
- Other – FinanceVV MORGEAGE DEED 69-83.pdf · uploaded 27 Dec 2022Source
- Other – FinanceVV MORGEAGE DEED 84-100.pdf · uploaded 27 Dec 2022Source
Show all 194 documentsShow fewer documents
Finance
Legal
Migrated
- 1 PAN CardPan Card.pdf · uploaded 10 Feb 2022Source
- 1 Details of encumbrancesENCUMBERANCE INSIGNIA.pdf · uploaded 10 Feb 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200229998541_For_Debtor_Based_Search_10_02_2022_18_41_56_434.pdf · uploaded 10 Feb 2022Source
- 1 Copy of the legal title reportSearch Legal title Report.pdf · uploaded 11 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction plan.pdf · uploaded 11 Feb 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT INSIGNIA.pdf · uploaded 11 Feb 2022Source
- 1 Declaration in FORM BFORMB INSIGNIA.pdf · uploaded 11 Feb 2022Source
- 1 Proforma of Allotment letterAishwaryam Insignia Draft Agreement.pdf · uploaded 11 Feb 2022Source
- 1 Copy of Layout Approval (in case of layout)IOD- Insignia.pdf · uploaded 14 Feb 2022Source
- 1 Declaration about Commencement CertificateDeclaration Certificate-Insignia.pdf · uploaded 14 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA - Insignia.pdf · uploaded 14 Feb 2022Source
- 2 Copy of Layout Approval (in case of layout)INSIGNIA LAYOUT.pdf · uploaded 26 Mar 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentINSIGNIA LAYOUT.pdf · uploaded 26 Mar 2022Source
- 3 Copy of Layout Approval (in case of layout)1-19 Layout (1).pdf · uploaded 6 Oct 2022Source
- 1 Other – FinanceVV MORGEAGE DEED 1-25.pdf · uploaded 27 Dec 2022Source
- 2 Other – FinanceVV MORGEAGE DEED 26-42.pdf · uploaded 27 Dec 2022Source
- 3 Other – FinanceVV MORGEAGE DEED 43-68.pdf · uploaded 27 Dec 2022Source
- 4 Other – FinanceVV MORGEAGE DEED 69-83.pdf · uploaded 27 Dec 2022Source
- 5 Other – FinanceVV MORGEAGE DEED 84-100.pdf · uploaded 27 Dec 2022Source
- 6 Other – FinanceVV MORGEAGE DEED 101-125.pdf · uploaded 27 Dec 2022Source
- 7 Other – FinanceVV MORGEAGE DEED 126-150.pdf · uploaded 27 Dec 2022Source
- 8 Other – FinanceVV MORGEAGE DEED 151-172.pdf · uploaded 27 Dec 2022Source
- 2 Details of encumbrancesSELF DECLARATION INSIGNIA Scan copy.pdf · uploaded 17 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)VVILLP- FORM - 3 - OCT-DEC-2022 compressed.pdf · uploaded 15 Mar 2023Source
- 1 Disclosure of sold/ booked inventoryRERA MIS Final 20-03-2023.pdf · uploaded 25 Mar 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentnew sanction.pdf · uploaded 2 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 07-06-2023.pdf · uploaded 20 Jul 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-03-2023.pdf · uploaded 20 Jul 2023Source
- 2 Disclosure of sold/ booked inventorySOLD and UNSOLD 20-06-2023 compressed.pdf · uploaded 20 Jul 2023Source
- 2 Declaration about Commencement CertificateAISHWARYAM INSIGNIA DCC.pdf · uploaded 8 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-06-2023.pdf · uploaded 8 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 31-03-2023.pdf · uploaded 8 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Apr-Jun-23 compressed.pdf · uploaded 8 Aug 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 27-09-2023.pdf · uploaded 7 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-2023.pdf · uploaded 7 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD BOOKED INVENTORY 03-10-23 COMPRESSED.pdf · uploaded 7 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 06-10-2023 compressed.pdf · uploaded 9 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 2 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30-12-2023.pdf · uploaded 19 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-12-2023.pdf · uploaded 19 Jan 2024Source
- 4 Disclosure of sold/ booked inventory01 (Q3 2023-24) DISCOLSURE OF SOLD BOOKED INVENTORY.pdf · uploaded 19 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (Q3-2023-24) compressed.pdf · uploaded 19 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (Q4-2023-24).pdf · uploaded 11 Apr 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentSanction Layout 2024 compressed.pdf · uploaded 13 Apr 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 2024.pdf · uploaded 13 Apr 2024Source
- 3 Declaration about Commencement CertificateDecleration against CC 2024.pdf · uploaded 13 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 (Q4-2023-23) Insignia.pdf · uploaded 18 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (Q4-2023-24) INSIGNIA-1-10 compressed.pdf · uploaded 20 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (Q4-2023-24) INSIGNIA compressed 11-20.pdf · uploaded 20 Apr 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 31-03-2024.pdf · uploaded 29 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD (Q1 2024-25) commpress.pdf · uploaded 10 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q1 (2024-25) Insigina.pdf · uploaded 19 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q1(2024-25) APRIL-JUNE INSIGINA compressed.pdf · uploaded 20 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (Q1 2024-25) APRIL - JUNE INSIGNIA.pdf · uploaded 20 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q2 2024-25) July- sept Insignia.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q2 2024-25) JULY - SEPT INSIGNIA.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)insignia.pdf · uploaded 19 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryinsignia.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 Insignia.pdf · uploaded 5 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q3 OCT-DEC 2024 INSIGNIA.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q3 OCT-DEC 2024 INSIGNIA compressed.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3 OCT-DEC 2024 INSIGNIA.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold booked inventory INSIGNIA compressed.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Q4 JAN-MARCH 2025 INSIGNIA.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q4 JAN-MARCH 2025 INSIGNIA.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD BOOKED INVENTORY Q4- JAN-MARCH 2025 INSIGNIA.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JAN-MARCH 2025 INSIGNIA Compressed.pdf · uploaded 20 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 31-03-2025 INSIGNIA.pdf · uploaded 21 Apr 2025Source
- Form 18 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Aug 2025Source
- Form 17 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Aug 2025Source
- Form 16 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Aug 2025Source
- Form 15 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 21 Aug 2025Source
- Form 29 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Aug 2025Source
- Form 28 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Aug 2025Source
- Form 27 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Aug 2025Source
- Form 26 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 21 Aug 2025Source
- Form 311 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 21 Aug 2025Source
- Form 310 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 21 Aug 2025Source
- Form 39 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 21 Aug 2025Source
- Form 38 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked Inventory8 Disclosure of sold_ booked inventory.pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked Inventory7 Disclosure of sold_ booked inventory.pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked Inventory6 Disclosure of sold_ booked inventory.pdf · uploaded 21 Aug 2025Source
- Disclosure of Sold and Booked Inventory5 Disclosure of sold_ booked inventory.pdf · uploaded 21 Aug 2025Source
- Withdrawal Update Form 1insignia form 1 - june 2025_organized.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 2Insignia form 2 june -25.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 3Insignia Form 3 June 25 (2)_organized.pdf · uploaded 25 Oct 2025Source
- Withdrawal Update Form 1Insignia form sep -2 5.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 2Insignia form 2 sep-25.pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 3Insignia from 3 sep-25 (1).pdf · uploaded 29 Oct 2025Source
- Withdrawal Update Form 1Insignia form sep -2 5.pdf · uploaded 15 Dec 2025Source
- Withdrawal Update Form 2Insignia form 2 sep-25.pdf · uploaded 15 Dec 2025Source
- Withdrawal Update Form 3Insignia from 3 sep-25 (1).pdf · uploaded 15 Dec 2025Source
- Form 5 (FY 2024-2025)Insignia Form 5.pdf · uploaded 22 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A Insignia 2025.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 1Insignia form 1.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2Insignia form 2.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3Insignia form 3.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1Insignia form 1 Dec.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Insignia Form 2 Dec.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Insignia Form 3 Dec.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Insignia Form 1.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 2Insignia form 2.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 3Insignia Form 3 March.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1Insignia June form 1.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2Insignia June form 2.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3Insignia June form 3.pdf · uploaded 16 Jul 2026Source
- Form 2A (FY 2025-2026)Insignia form 2A.pdf · uploaded 22 Sep 2026Source
Technical
- DocumentSanction plan.pdf · uploaded 11 Feb 2022Source
- DocumentIOD- Insignia.pdf · uploaded 14 Feb 2022Source
- DocumentINSIGNIA LAYOUT.pdf · uploaded 26 Mar 2022Source
- DocumentINSIGNIA LAYOUT.pdf · uploaded 26 Mar 2022Source
- Document1-19 Layout (1).pdf · uploaded 6 Oct 2022Source
- Documentnew sanction.pdf · uploaded 2 Jun 2023Source
- DocumentSanction Layout 2024 compressed.pdf · uploaded 13 Apr 2024Source
- Document1_11zon.pdf · uploaded 30 Oct 2025Source
- Document2_11zon.pdf · uploaded 30 Oct 2025Source
- Document3_11zon.pdf · uploaded 30 Oct 2025Source
- Document4.pdf · uploaded 30 Oct 2025Source
- Document5.pdf · uploaded 30 Oct 2025Source
- Document6.pdf · uploaded 30 Oct 2025Source
- Document7.pdf · uploaded 30 Oct 2025Source
- Document8.pdf · uploaded 30 Oct 2025Source
- Document9.pdf · uploaded 30 Oct 2025Source
- Document10.pdf · uploaded 30 Oct 2025Source
- Document11.pdf · uploaded 30 Oct 2025Source
- Document12.pdf · uploaded 30 Oct 2025Source
- Document13.pdf · uploaded 30 Oct 2025Source
- Document14.pdf · uploaded 30 Oct 2025Source
- Document15.pdf · uploaded 30 Oct 2025Source
- Document16.pdf · uploaded 30 Oct 2025Source
- Document17.pdf · uploaded 30 Oct 2025Source
- Document18.pdf · uploaded 30 Oct 2025Source
- Document19.pdf · uploaded 30 Oct 2025Source
- Document20.pdf · uploaded 30 Oct 2025Source
- Document21.pdf · uploaded 30 Oct 2025Source
- Document22.pdf · uploaded 30 Oct 2025Source
- Document23.pdf · uploaded 30 Oct 2025Source
- Document24.pdf · uploaded 30 Oct 2025Source
- Document25.pdf · uploaded 30 Oct 2025Source
- Document26.pdf · uploaded 30 Oct 2025Source
- Document27.pdf · uploaded 30 Oct 2025Source
- Document28.pdf · uploaded 30 Oct 2025Source
- Document1.pdf · uploaded 15 Dec 2025Source
- Document2.pdf · uploaded 15 Dec 2025Source
- Document3.pdf · uploaded 15 Dec 2025Source
- Document4.pdf · uploaded 15 Dec 2025Source
- Document5.pdf · uploaded 15 Dec 2025Source
- DocumentA Building.pdf · uploaded 15 Dec 2025Source
- Document7.pdf · uploaded 15 Dec 2025Source
- Document8.pdf · uploaded 15 Dec 2025Source
- Document9.pdf · uploaded 15 Dec 2025Source
- Document10.pdf · uploaded 15 Dec 2025Source
- Document11.pdf · uploaded 15 Dec 2025Source
- Document12.pdf · uploaded 15 Dec 2025Source
- DocumentB Building.pdf · uploaded 15 Dec 2025Source
- Document14.pdf · uploaded 15 Dec 2025Source
- Document15.pdf · uploaded 15 Dec 2025Source
- Document16.pdf · uploaded 15 Dec 2025Source
- DocumentC Building.pdf · uploaded 15 Dec 2025Source
- Document18.pdf · uploaded 15 Dec 2025Source
- Document19.pdf · uploaded 15 Dec 2025Source
- Document20.pdf · uploaded 15 Dec 2025Source
- Document21.pdf · uploaded 15 Dec 2025Source
- Document22.pdf · uploaded 15 Dec 2025Source
- DocumentD Building.pdf · uploaded 15 Dec 2025Source
- Document24.pdf · uploaded 15 Dec 2025Source
- DocumentE Building.pdf · uploaded 15 Dec 2025Source
- Document26.pdf · uploaded 15 Dec 2025Source
- Document27.pdf · uploaded 15 Dec 2025Source
- Document28.pdf · uploaded 15 Dec 2025Source
- DocumentLayout.pdf · uploaded 23 Dec 2025Source
- DocumentLayout Approval .pdf · uploaded 23 Dec 2025Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Punawale, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Land Belonging To Raghunath Shankar Koyte
- South
- By Land Belonging To Raghunath Shankar Koyte
- East
- By Road
- West
- By Land Belonging To Deepak Baban Koyte
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manoj Tatooskar | — |
| Chartered accountant | Akshay Oswal | — |
| Chartered accountant | Oswal Solanki | — |
| Chartered accountant | Sheetal Jindal | — |
| Engineer | Chetan V Kamate | — |
| Engineer | Shrikant Shinde | — |
| Engineer | Sneha Sawant | — |