Skip to content

41 Estera Phase 3

Certificate Signed

Punawale, Pune 411033 |Promoter: Samarttha Trimurti Properties

Residential / Group HousingRERAP52100019322
23 Jan 2019Registered with MahaRERA
5 May 2025Promised completion
2Buildings
234Units registered147 booked (63%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
1BHK, 2BHK, 3BHK234 units in all
Address
41, Punawale Jambe Road, Near Sawata Mali MandirPIN 411033
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.51412, 73.82887
41 Estera Phase 3 is at latitude 18.51412, longitude 73.82887.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 5 May 2025

The latest completion date on record passed 1 year and 5 months ago.

Registered
23 Jan 2019
Promised
5 May 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001932223 Jan 20195 May 20255 May 2025Samarttha Trimurti PropertiesProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
D14124
E14110

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

147 of 234 units booked (63%), as the promoter reported to MahaRERA

1BHK · 70 units2BHK · 110 units3BHK · 54 units
BuildingTypeCarpet areaUnitsBooked
D1BHK39.95 sq m · 430 sq ft7021
D2BHK57.6 sq m · 620 sq ft5432
E2BHK54.16 sq m · 583 sq ft1412
E2BHK54.35 sq m · 585 sq ft2118
E2BHK55.46 sq m · 597 sq ft2120
E3BHK65.87 sq m · 709 sq ft2822
E3BHK66.52 sq m · 716 sq ft2622

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 273 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSTP PAN CARD (1) (1).pdf · uploaded 14 Jan 2019Source

Legal

  • Legal Title reportTITLE REPORT 1.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 2.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 3.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 4.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 5.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 6.pdf · uploaded 14 Jan 2019Source
Show all 274 documentsShow fewer documents

Legal

  • Legal Title reportTITLE REPORT 7.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 8.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 9.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 10.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 11.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 12.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 13.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 14.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 15.pdf · uploaded 14 Jan 2019Source
  • Legal Title reportTITLE REPORT 16.pdf · uploaded 14 Jan 2019Source
  • Declaration Form BAFFIDIVATE CUM DECLATION PROMOTER.pdf · uploaded 14 Jan 2019Source
  • Declaration Form BFORM B ESTERA_compressed.pdf · uploaded 5 Nov 2024Source

Migrated

  • 1 PAN CardSTP PAN CARD (1) (1).pdf · uploaded 14 Jan 2019Source
  • 1 Copy of the legal title reportTITLE REPORT 1.pdf · uploaded 14 Jan 2019Source
  • 2 Copy of the legal title reportTITLE REPORT 2.pdf · uploaded 14 Jan 2019Source
  • 3 Copy of the legal title reportTITLE REPORT 3.pdf · uploaded 14 Jan 2019Source
  • 4 Copy of the legal title reportTITLE REPORT 4.pdf · uploaded 14 Jan 2019Source
  • 5 Copy of the legal title reportTITLE REPORT 5.pdf · uploaded 14 Jan 2019Source
  • 6 Copy of the legal title reportTITLE REPORT 6.pdf · uploaded 14 Jan 2019Source
  • 7 Copy of the legal title reportTITLE REPORT 7.pdf · uploaded 14 Jan 2019Source
  • 8 Copy of the legal title reportTITLE REPORT 8.pdf · uploaded 14 Jan 2019Source
  • 9 Copy of the legal title reportTITLE REPORT 9.pdf · uploaded 14 Jan 2019Source
  • 10 Copy of the legal title reportTITLE REPORT 10.pdf · uploaded 14 Jan 2019Source
  • 11 Copy of the legal title reportTITLE REPORT 11.pdf · uploaded 14 Jan 2019Source
  • 12 Copy of the legal title reportTITLE REPORT 12.pdf · uploaded 14 Jan 2019Source
  • 13 Copy of the legal title reportTITLE REPORT 13.pdf · uploaded 14 Jan 2019Source
  • 14 Copy of the legal title reportTITLE REPORT 14.pdf · uploaded 14 Jan 2019Source
  • 15 Copy of the legal title reportTITLE REPORT 15.pdf · uploaded 14 Jan 2019Source
  • 16 Copy of the legal title reportTITLE REPORT 16.pdf · uploaded 14 Jan 2019Source
  • 1 Details of encumbrancesEncumbrances.pdf · uploaded 14 Jan 2019Source
  • 1 Copy of Layout Approval (in case of layout)PLAN.pdf · uploaded 14 Jan 2019Source
  • 1 Building Plan Approval (IOD)IOD PLAN.pdf · uploaded 14 Jan 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentNew Commisement.pdf · uploaded 14 Jan 2019Source
  • 1 Declaration in FORM BAFFIDIVATE CUM DECLATION PROMOTER.pdf · uploaded 14 Jan 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT FORM 1.pdf · uploaded 14 Jan 2019Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 14 Jan 2019Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 14 Jan 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Phase III.pdf · uploaded 14 Nov 2019Source
  • 2 Certificates of CA (Form 3)Form 3 Phase III.pdf · uploaded 14 Nov 2019Source
  • 3 Certificates of CA (Form 3)Form 3_STP_D and E Building _ March 2019.pdf · uploaded 14 Nov 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Rera Audit - Building D and E_March 31, 2019.pdf · uploaded 14 Nov 2019Source
  • 2 Copy of Layout Approval (in case of layout)layout.pdf · uploaded 16 Nov 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 D and E Building June 2020.pdf · uploaded 14 Aug 2020Source
  • 4 Certificates of CA (Form 3)STP__Form 3_ D and E Building _ June 2020.pdf · uploaded 14 Aug 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)STP 41 Estera D E Form 5.pdf · uploaded 9 Sep 2021Source
  • 2 Proforma of Allotment letterAllotment Estera rera.pdf · uploaded 23 Feb 2022Source
  • 3 Copy of Layout Approval (in case of layout)Layout_11zon.pdf · uploaded 8 Sep 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentRev Sanction CC.pdf · uploaded 8 Sep 2022Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Estera Archi Cert (Form-1) Bldg D and E_11zon.pdf · uploaded 8 Sep 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form-2A_Estera_D and E.pdf · uploaded 17 Sep 2022Source
  • 2 Details of encumbrancesEstera_Encumbarance_Prachay Capital PVT.pdf · uploaded 15 Oct 2022Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi Form_1_Estera Bldg_D and E March_22_11zon.pdf · uploaded 22 Dec 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 3.pdf · uploaded 22 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 3.pdf · uploaded 22 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)01 30-06-2021_0001.pdf · uploaded 8 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)02 30-09-2021_0001.pdf · uploaded 8 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)03 31-12-2021_0001.pdf · uploaded 8 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)04 31-03-2022_0001.pdf · uploaded 8 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)05 30-06-2022_0001.pdf · uploaded 8 Apr 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)06 30-09-2022_0001.pdf · uploaded 8 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)07 31-12-2022_0001.pdf · uploaded 8 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)08 31-03-2023_0001.pdf · uploaded 8 Apr 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)09 30-06-2023_0001.pdf · uploaded 8 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 30-09-2023_0001.pdf · uploaded 8 Apr 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 31-12-2023_0001.pdf · uploaded 8 Apr 2024Source
  • 5 Certificates of CA (Form 3)01 30-06-2021_0001_10_11zon.pdf · uploaded 8 Apr 2024Source
  • 6 Certificates of CA (Form 3)02 30-09-2021_0001_11_11zon.pdf · uploaded 8 Apr 2024Source
  • 7 Certificates of CA (Form 3)03 31-12-2021_0001_1_11zon.pdf · uploaded 8 Apr 2024Source
  • 8 Certificates of CA (Form 3)04 31-03-2022_0001_2_11zon.pdf · uploaded 8 Apr 2024Source
  • 9 Certificates of CA (Form 3)05 30-06-2022_0001_3_11zon.pdf · uploaded 8 Apr 2024Source
  • 10 Certificates of CA (Form 3)06 30-09-2022_0001_4_11zon.pdf · uploaded 8 Apr 2024Source
  • 11 Certificates of CA (Form 3)07 31-12-2022_0001_5_11zon.pdf · uploaded 8 Apr 2024Source
  • 12 Certificates of CA (Form 3)08 31-03-2023_0001_6_11zon.pdf · uploaded 8 Apr 2024Source
  • 13 Certificates of CA (Form 3)09 30-06-2023_0001_7_11zon.pdf · uploaded 8 Apr 2024Source
  • 14 Certificates of CA (Form 3)10 30-09-2023_0001_8_11zon.pdf · uploaded 8 Apr 2024Source
  • 15 Certificates of CA (Form 3)11 31-12-2023_0001_9_11zon.pdf · uploaded 8 Apr 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank Account_0001.pdf · uploaded 8 Apr 2024Source
  • 1 Disclosure of sold/ booked inventory01 30-06-2021.pdf · uploaded 30 Apr 2024Source
  • 2 Disclosure of sold/ booked inventory02 30-09-2021.pdf · uploaded 30 Apr 2024Source
  • 3 Disclosure of sold/ booked inventory03 31-12-2021.pdf · uploaded 30 Apr 2024Source
  • 4 Disclosure of sold/ booked inventory04 31-03-2022.pdf · uploaded 30 Apr 2024Source
  • 5 Disclosure of sold/ booked inventory05 30-06-2022.pdf · uploaded 30 Apr 2024Source
  • 6 Disclosure of sold/ booked inventory06 30-09-2022.pdf · uploaded 30 Apr 2024Source
  • 7 Disclosure of sold/ booked inventory07 31-12-2022.pdf · uploaded 30 Apr 2024Source
  • 8 Disclosure of sold/ booked inventory08 31-03-2023.pdf · uploaded 30 Apr 2024Source
  • 9 Disclosure of sold/ booked inventory09 30-06-2023.pdf · uploaded 30 Apr 2024Source
  • 10 Disclosure of sold/ booked inventory10 30-09-2023.pdf · uploaded 30 Apr 2024Source
  • 11 Disclosure of sold/ booked inventory11 31-12-2023_11zon.pdf · uploaded 30 Apr 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)41 Estera Phase 3- D and E Building.pdf · uploaded 11 May 2024Source
  • 3 a Details of encumbrances concerned to Finance41 estera legal D and E.pdf · uploaded 16 May 2024Source
  • 4 a Details of encumbrances concerned to Finance41 estera finance D and E.pdf · uploaded 16 May 2024Source
  • 1 b Details of encumbrances concerned to Legal41 estera legal D and E.pdf · uploaded 16 May 2024Source
  • 2 b Details of encumbrances concerned to Legal41 estera finance D and E.pdf · uploaded 16 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form_2A_Estera_D and E_March_20-Ok.pdf · uploaded 22 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form_2A_Estera_D and E_March_22-Qx.pdf · uploaded 22 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form_2A_Estera_D and E_March_23-Qx.pdf · uploaded 22 May 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development41 Estera_E Completion Certificate.pdf · uploaded 7 Jun 2024Source
  • 12 Disclosure of sold/ booked inventory7Estera Ph 3.pdf · uploaded 12 Jun 2024Source
  • 16 Certificates of CA (Form 3)Estera form 3 31_03_24_compressed.pdf · uploaded 15 Jun 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Estera phase 3_Apr 24.pdf · uploaded 20 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)41 Estera D E Wing -Mar 24.pdf · uploaded 20 Jun 2024Source
  • 5 Details of encumbrancesEstera Phase 3 - State Bank.pdf · uploaded 16 Jul 2024Source
  • 6 Details of encumbrancesEstera Phase 3 - Prachay.pdf · uploaded 16 Jul 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ESTERA PHASE 3 30062024.pdf · uploaded 25 Jul 2024Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)41 Estera E cerificate.pdf · uploaded 26 Jul 2024Source
  • 13 Disclosure of sold/ booked inventoryEstera DE.pdf · uploaded 27 Jul 2024Source
  • 17 Certificates of CA (Form 3)FORM 3 ESTERA PHASE 3 30062024.pdf · uploaded 29 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 ESTERA PHASE 3 2023-24.pdf · uploaded 16 Oct 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30062024.pdf · uploaded 18 Oct 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 31032024.pdf · uploaded 18 Oct 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 31122023.pdf · uploaded 18 Oct 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30092023.pdf · uploaded 18 Oct 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30062023.pdf · uploaded 18 Oct 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 31032023.pdf · uploaded 18 Oct 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 31122022.pdf · uploaded 18 Oct 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30092022.pdf · uploaded 18 Oct 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30062022.pdf · uploaded 18 Oct 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ESTERA PHASE 3 30092024.pdf · uploaded 19 Oct 2024Source
  • 2 Certificates of CA (Form 3)FORM 3 ESTERA PHASE 3 30092024 2.pdf · uploaded 23 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryFORM 3 ESTERA PHASE 3 30092024 2.pdf · uploaded 23 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2 ESTERA PHASE 3 30092024.pdf · uploaded 23 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ESTERA PHASE 3 30092024.pdf · uploaded 26 Oct 2024Source
  • 3 Disclosure of sold/ booked inventoryINVENTORY ESTERA DE 30092024.pdf · uploaded 26 Oct 2024Source
  • 1 Declaration in FORM BFORM B ESTERA_compressed.pdf · uploaded 5 Nov 2024Source
  • 1 Declaration about Commencement Certificate01 ESTERA PHASE 3 - FORMAT D.pdf · uploaded 11 Nov 2024Source
  • 2 Declaration about Commencement Certificate02 ESTERA PHASE 3 - FORMAT D.pdf · uploaded 11 Nov 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)estera form 1 dec24.pdf · uploaded 12 Feb 2025Source
  • 1 Certificates of CA (Form 3)41 estera form 3_compressed.pdf · uploaded 12 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)41 estera form 2dec 24.pdf · uploaded 12 Feb 2025Source
  • 1 Disclosure of sold/ booked inventory41 estera sold unsold dec24.pdf · uploaded 12 Feb 2025Source
  • 1 Certificates of CA (Form 3)form 3 Estera uploded.pdf · uploaded 17 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryinventory estera phase 3.pdf · uploaded 17 Apr 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 estera D.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 estera.pdf · uploaded 18 Apr 2025Source
  • Withdrawal Update Form 1estera phase 3 form 1.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 1estera phase 3 form 1.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 2form 2 estera phase 3_11zon.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 2form 2 estera phase 3_11zon.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 26 Sep 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 26 Sep 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30062022.pdf · uploaded 15 Oct 2025Source
  • Form 2Form 2 June 2022.pdf · uploaded 15 Oct 2025Source
  • Form 305 30-06-2022_0001_3_11zon.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory05 30-06-2022.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30092022.pdf · uploaded 15 Oct 2025Source
  • Form 206 30-09-2022_0001.pdf · uploaded 15 Oct 2025Source
  • Form 306 30-09-2022_0001_4_11zon.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory06 30-09-2022.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory07 31-12-2022.pdf · uploaded 15 Oct 2025Source
  • Form 207 31-12-2022_0001.pdf · uploaded 15 Oct 2025Source
  • Form 307 31-12-2022_0001_5_11zon.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31122022.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31032023.pdf · uploaded 15 Oct 2025Source
  • Form 208 31-03-2023_0001.pdf · uploaded 15 Oct 2025Source
  • Form 308 31-03-2023_0001_6_11zon.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory08 31-03-2023.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory09 30-06-2023.pdf · uploaded 15 Oct 2025Source
  • Form 309 30-06-2023_0001_7_11zon.pdf · uploaded 15 Oct 2025Source
  • Form 209 30-06-2023_0001.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30062023.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30092023.pdf · uploaded 15 Oct 2025Source
  • Form 210 30-09-2023_0001.pdf · uploaded 15 Oct 2025Source
  • Form 310 30-09-2023_0001_8_11zon.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory10 30-09-2023.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory11 31-12-2023.pdf · uploaded 15 Oct 2025Source
  • Form 311 31-12-2023_0001_9_11zon.pdf · uploaded 15 Oct 2025Source
  • Form 211 31-12-2023_0001.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31122023.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31032024.pdf · uploaded 15 Oct 2025Source
  • Form 212 31-03-2024.pdf · uploaded 15 Oct 2025Source
  • Form 312 31-03-2024_0001_11zon.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory12 31-03-2024.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30062024.pdf · uploaded 15 Oct 2025Source
  • Form 213 30-06-2024.pdf · uploaded 15 Oct 2025Source
  • Form 313 30-06-2024.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory13 30-06-2024.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory14 30-09-2024.pdf · uploaded 15 Oct 2025Source
  • Form 314 30-09-2024.pdf · uploaded 15 Oct 2025Source
  • Form 214 30-09-2024.pdf · uploaded 15 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30092024.pdf · uploaded 15 Oct 2025Source
  • Form 1estera form 1 dec24.pdf · uploaded 15 Oct 2025Source
  • Form 241 estera form 2dec 24.pdf · uploaded 15 Oct 2025Source
  • Form 341 estera form 3_compressed.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventory41 estera sold unsold dec24.pdf · uploaded 15 Oct 2025Source
  • Form 1form 1 estera D.pdf · uploaded 15 Oct 2025Source
  • Form 2form 2 estera.pdf · uploaded 15 Oct 2025Source
  • Form 3form 3 Estera uploded.pdf · uploaded 15 Oct 2025Source
  • Disclosure of Sold and Booked Inventoryinventory estera phase 3.pdf · uploaded 15 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 200 31-03-2019_0001.pdf · uploaded 28 Oct 2025Source
  • Form 301 Form 3 CA Certificate Revised 31-03-2019.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 31-03-2019.pdf · uploaded 28 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 201 30-06-2021_0001.pdf · uploaded 28 Oct 2025Source
  • Form 301 30-06-2021_0001_10_11zon.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 30-06-2021.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory02 30-09-2021.pdf · uploaded 28 Oct 2025Source
  • Form 302 30-09-2021_0001_11_11zon.pdf · uploaded 28 Oct 2025Source
  • Form 202 30-09-2021_0001.pdf · uploaded 28 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31122021.pdf · uploaded 28 Oct 2025Source
  • Form 203 31-12-2021_0001.pdf · uploaded 28 Oct 2025Source
  • Form 303 31-12-2021_0001_1_11zon.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory03 31-12-2021.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory04 31-03-2022.pdf · uploaded 28 Oct 2025Source
  • Form 304 31-03-2022_0001_2_11zon.pdf · uploaded 28 Oct 2025Source
  • Form 204 31-03-2022_0001.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31032022.pdf · uploaded 28 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 200 30-06-2019_0001.pdf · uploaded 28 Oct 2025Source
  • Form 301 Form 3 CA Certificate Revised 30-06-2019.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 30-06-2019.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 30-09-2019.pdf · uploaded 28 Oct 2025Source
  • Form 300 30-09-2019.pdf · uploaded 28 Oct 2025Source
  • Form 200 30-09-2019_0001.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30092019.pdf · uploaded 28 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 200 31-12-2019_0001.pdf · uploaded 28 Oct 2025Source
  • Form 300 31-12-2019.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 31-12-2019.pdf · uploaded 28 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 200 31-03-2020_0001.pdf · uploaded 28 Oct 2025Source
  • Form 300 31-03-2020.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 31-03-2020.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30062020.pdf · uploaded 28 Oct 2025Source
  • Form 200 30-06-2020_0001.pdf · uploaded 28 Oct 2025Source
  • Form 300 30-06-2020.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 30-06-2020.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 30-09-2020.pdf · uploaded 28 Oct 2025Source
  • Form 300 30-09-2020.pdf · uploaded 28 Oct 2025Source
  • Form 200 30-09-2020_0001.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 30092020.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31122020.pdf · uploaded 28 Oct 2025Source
  • Form 200 31-12-2020_0001.pdf · uploaded 28 Oct 2025Source
  • Form 331-12-2020.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 31-12-2020.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked Inventory01 31-03-2021.pdf · uploaded 28 Oct 2025Source
  • Form 301 31-03-2021.pdf · uploaded 28 Oct 2025Source
  • Form 200 31-03-2021_0001.pdf · uploaded 28 Oct 2025Source
  • Form 1FORM 1 ESTERA PHASE 3 31032021.pdf · uploaded 28 Oct 2025Source
  • Form 5 (FY 2023-2024)7 Form 5 FY 2023-24.pdf · uploaded 28 Oct 2025Source
  • Form 5 (FY 2024-2025)Form 5 Final.pdf · uploaded 23 Jan 2026Source
  • Occupational CertificateOC D Building.pdf · uploaded 2 May 2026Source
  • Occupational CertificateOC E Building.pdf · uploaded 2 May 2026Source
  • Occupational CertificateOC Verification Mail.pdf · uploaded 2 May 2026Source

Technical

  • DocumentPLAN.pdf · uploaded 14 Jan 2019Source
  • DocumentIOD PLAN.pdf · uploaded 14 Jan 2019Source
  • Documentlayout.pdf · uploaded 16 Nov 2019Source
  • DocumentLayout_11zon.pdf · uploaded 8 Sep 2022Source

Technical (Architect)

  • DocumentFORM 1 ESTERA PHASE 3 30062022.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 30092022.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 31122022.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 31032023.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 30062023.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 30092023.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 31122023.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 31032024.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 30062024.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1 ESTERA PHASE 3 30092024.pdf · uploaded 19 Oct 2024Source
  • Documentestera form 1 dec24.pdf · uploaded 12 Feb 2025Source
  • Documentform 1 estera D.pdf · uploaded 18 Apr 2025Source
  • Documentestera phase 3 form 1.pdf · uploaded 26 Sep 2025Source

Technical (Engineer)

  • DocumentFORM 2 ESTERA PHASE 3 30092024.pdf · uploaded 26 Oct 2024Source
  • Document41 estera form 2dec 24.pdf · uploaded 12 Feb 2025Source
  • Documentform 2 estera.pdf · uploaded 18 Apr 2025Source
  • Documentform 2 estera phase 3_11zon.pdf · uploaded 26 Sep 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Punawale, Mulshi taluka

Survey, CTS, gat or plot numbers

41

Boundaries

North
41 Estera Phase 1
South
Remaining Property Of Sr No 41
East
41 Estera Phase 2
West
12 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectVk A Architecture—
Chartered accountantNamrata Kalpesh Dhruve&Co—
Chartered accountantNatwar D Marda—
EngineerRajendra Bare—
OtherShee Sairaj Buildcon Project—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology