Bhumi Silveriio
Certificate SignedPimpri Chinchawad (M Corp.), Pune 411062 |Promoter: Bhumi Shelters (India) Pvt Ltd
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 1 bhk, 2 bhk, 2BHK, 3BHK208 units in all
- Address
- Gat No 114, 124, 125, 126, 127, 0PIN 411062
- Designated bank account
- 203
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 1 year
P52100005434The latest completion date on record passed 6 years and 10 months ago.
- Registered
- 11 Aug 2017
- Promised
- 31 Dec 2018
- Revised
- 31 Dec 2019
Completion pushed back 4 months
P52100051295- Registered
- 8 Jun 2023
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100005434 | 11 Aug 2017 | 31 Dec 2018 | 31 Dec 2019 | Bhumi Shelters (India) Pvt Ltd | Project page |
| P52100051295 | 8 Jun 2023 | 31 Dec 2026 | 30 Apr 2027 | Bhumi Shelters (India) Pvt Ltd | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Bhumi Silveriio Phase 1 | 13 | 114 |
| Wing A | 13 | 94 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
179 of 208 units booked (86%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100005434 | Bhumi Silveriio Phase 1 | 1 bhk | 35.02 sq m · 377 sq ft | 22 | 21 |
| P52100005434 | Bhumi Silveriio Phase 1 | 1 bhk | 35.16 sq m · 378 sq ft | 22 | 22 |
| P52100005434 | Bhumi Silveriio Phase 1 | 1 bhk | 45.96 sq m · 495 sq ft | 2 | 1 |
| P52100005434 | Bhumi Silveriio Phase 1 | 2 bhk | 59.08 sq m · 636 sq ft | 24 | 24 |
| P52100005434 | Bhumi Silveriio Phase 1 | 2 bhk | 60.37 sq m · 650 sq ft | 20 | 20 |
| P52100005434 | Bhumi Silveriio Phase 1 | 2 bhk | 61.48 sq m · 662 sq ft | 1 | 1 |
| P52100005434 | Bhumi Silveriio Phase 1 | 2 bhk | 61.72 sq m · 664 sq ft | 1 | 1 |
| P52100005434 | Bhumi Silveriio Phase 1 | 2 bhk | 61.77 sq m · 665 sq ft | 22 | 22 |
Show all 14 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100051295 | Wing A | 2BHK | 56.8 sq m · 611 sq ft | 12 | 9 |
| P52100051295 | Wing A | 2BHK | 59.86 sq m · 644 sq ft | 2 | 2 |
| P52100051295 | Wing A | 2BHK | 59.97 sq m · 646 sq ft | 43 | 38 |
| P52100051295 | Wing A | 2BHK | 60.55 sq m · 652 sq ft | 12 | 6 |
| P52100051295 | Wing A | 2BHK | 61.64 sq m · 663 sq ft | 2 | 0 |
| P52100051295 | Wing A | 3BHK | 75.07 sq m · 808 sq ft | 23 | 12 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 179 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 182 documentsShow fewer documents
Legal
- OtherP52100005434 · Enviornment Clearnce letter-2020_.pdf · uploaded 24 Nov 2020Source
- Declaration Form BP52100051295 · affidavit.pdf · uploaded 7 Apr 2023Source
- Declaration Form BP52100051295 · affidavit.pdf · uploaded 7 Apr 2023Source
- Legal Title reportP52100051295 · legal report.pdf · uploaded 13 May 2023Source
Migrated
- 1 PAN CardP52100005434 · BHUMI PAN.pdf · uploaded 31 Jul 2017Source
- 1 Copy of the legal title reportP52100005434 · Title search report.pdf · uploaded 31 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P52100005434 · SILVERIIO LAYOUT PLAN PROPOSED.pdf · uploaded 31 Jul 2017Source
- 1 Building Plan Approval (IOD)P52100005434 · Building Flor Plans Phase 1 C building.pdf · uploaded 31 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100005434 · commencement.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP52100005434 · FORM B SILVERIIO.pdf · uploaded 31 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100005434 · Form 1.pdf · uploaded 31 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100005434 · Engineers Certificate form.pdf · uploaded 31 Jul 2017Source
- 1 Certificates of CA (Form 3)P52100005434 · Form 3 CA Certificate_Silveriio1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP52100005434 · Silveriio_Agreement Draft.pdf · uploaded 31 Jul 2017Source
- 1 Details of encumbrancesP52100005434 · ENCUBRANCE CERT.pdf · uploaded 10 Aug 2017Source
- 1 Certificates of CA (Form 5)P52100005434 · Form 5 Silveriio.pdf · uploaded 15 Oct 2018Source
- 1 OtherP52100005434 · Completion certificate.pdf · uploaded 7 Aug 2019Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100005434 · Completion certificate.pdf · uploaded 10 Aug 2019Source
- 3 Architect’s Certificate on Completion of Project (Form 4)P52100005434 · arch certificate.pdf · uploaded 12 Nov 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100005434 · Rera Form 5.pdf · uploaded 2 Dec 2019Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100005434 · appl acknow_.pdf · uploaded 8 Feb 2020Source
- 2 Details of encumbrancesP52100005434 · EC1_compressed (1)_compressed.pdf · uploaded 24 Sep 2020Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P52100005434 · society formation_compressed.pdf · uploaded 24 Sep 2020Source
- 2 OtherP52100005434 · Enviornment Clearnce letter-2020_.pdf · uploaded 24 Nov 2020Source
- 1 PAN CardP52100051295 · Pan.pdf · uploaded 3 Apr 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100051295 · CC letter.pdf · uploaded 4 Apr 2023Source
- 1 Declaration in FORM BP52100051295 · affidavit.pdf · uploaded 7 Apr 2023Source
- 2 Declaration in FORM BP52100051295 · affidavit.pdf · uploaded 7 Apr 2023Source
- 1 Proforma of Agreement for saleP52100051295 · Proforma of agr.pdf · uploaded 17 Apr 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · Form 1-Phase 3.pdf · uploaded 18 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Bhumi Ph-3 RERA Form-2.pdf · uploaded 18 Apr 2023Source
- 1 Declaration about Commencement CertificateP52100051295 · Declaration.pdf · uploaded 29 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100051295 · annex-A_.pdf · uploaded 10 May 2023Source
- 1 Proforma of Allotment letterP52100051295 · allotment letter.pdf · uploaded 10 May 2023Source
- 1 Deviation Report with respect to Allotment letterP52100051295 · deviation report - allotment.pdf · uploaded 10 May 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100051295 · deviation report - Agr for sale.pdf · uploaded 10 May 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100051295 · encumbrances.pdf · uploaded 12 May 2023Source
- 1 b Details of encumbrances concerned to LegalP52100051295 · encumbrances.pdf · uploaded 12 May 2023Source
- 1 Copy of the legal title reportP52100051295 · legal report.pdf · uploaded 13 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · CA letter.pdf · uploaded 16 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100051295 · format A.pdf · uploaded 16 May 2023Source
- 1 CERSAI detailsP52100051295 · cersai.pdf · uploaded 19 May 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100051295 · layout.pdf · uploaded 29 May 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100051295 · 4.pdf · uploaded 29 May 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100051295 · 5.pdf · uploaded 29 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100051295 · 6.pdf · uploaded 29 May 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100051295 · 7.pdf · uploaded 29 May 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100051295 · 8.pdf · uploaded 29 May 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100051295 · 9.pdf · uploaded 29 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · New Form1.pdf · uploaded 15 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form2.pdf · uploaded 27 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryP52100051295 · sold unsold declaration.pdf · uploaded 27 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · Form3.pdf · uploaded 14 May 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · form1.pdf · uploaded 26 Jun 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · form1.pdf · uploaded 26 Jun 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form2.pdf · uploaded 26 Jun 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form2.pdf · uploaded 26 Jun 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · july to sep 23.pdf · uploaded 3 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · form1.pdf · uploaded 3 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · jan to mar 2024.pdf · uploaded 3 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · july to sept2023_compressed.pdf · uploaded 3 Jul 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · oct to dec 2023_compressed.pdf · uploaded 3 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · form1.pdf · uploaded 4 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form2.pdf · uploaded 4 Jul 2024Source
- 2 Disclosure of sold/ booked inventoryP52100051295 · sold report.pdf · uploaded 12 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · form3_compressed.pdf · uploaded 12 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · form1.pdf · uploaded 10 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · form3.pdf · uploaded 10 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form2.pdf · uploaded 10 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100051295 · Sold-unsold data.pdf · uploaded 10 Oct 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form-2.pdf · uploaded 11 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form-2.pdf · uploaded 11 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · revised form2 - as on december 2023.pdf · uploaded 11 Oct 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · form2.pdf · uploaded 12 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100051295 · form5.pdf · uploaded 12 Oct 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · 2.pdf · uploaded 16 Oct 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · 2 (3).pdf · uploaded 16 Oct 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · 2 (2).pdf · uploaded 16 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · FORM-1.pdf · uploaded 8 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · FORM-3.pdf · uploaded 8 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · FORM-2.pdf · uploaded 8 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100051295 · sold-unsold.pdf · uploaded 8 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100051295 · form2A.pdf · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · Form 1.pdf · uploaded 13 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · Form 3.pdf · uploaded 13 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form 2.pdf · uploaded 13 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form 3.pdf · uploaded 13 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form 2.pdf · uploaded 13 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100051295 · SOLD UNSODL.pdf · uploaded 13 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100051295 · Commencement cert.pdf · uploaded 16 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100051295 · 1 6_compressed (1).pdf · uploaded 16 Apr 2025Source
- 1 Proforma of Agreement for saleP52100051295 · draft agreement.pdf · uploaded 16 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100051295 · Form 1.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100051295 · Form 3.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100051295 · Form 2.pdf · uploaded 17 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100051295 · Form5.pdf · uploaded 17 Apr 2025Source
- Form 1P52100051295 · FORM 1.pdf · uploaded 16 Jul 2025Source
- Form 2P52100051295 · Form 2.pdf · uploaded 16 Jul 2025Source
- Form 3P52100051295 · FORM-3.pdf · uploaded 16 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100051295 · SOLD UNSOLD.pdf · uploaded 16 Jul 2025Source
- Form 5 (FY 2024-2025)P52100051295 · Form 5_page-0001.pdf · uploaded 20 Sep 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · f1.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 2P52100051295 · f2.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 3P52100051295 · f3.pdf · uploaded 16 Oct 2025Source
- Withdrawal Update Form 1P52100051295 · BSIPL FORM -1.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 1P52100051295 · BSIPL FORM -1.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 2P52100051295 · BSIPL FORM- 2.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 2P52100051295 · BSIPL FORM- 2.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 3P52100051295 · BSIPL FORM-3.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 3P52100051295 · BSIPL FORM-3.pdf · uploaded 8 Jan 2026Source
- Withdrawal Update Form 1P52100051295 · FORM-1 UPTO MAR-26-III.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100051295 · FORM-2 UPTO MAR-26-III.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100051295 · FORM-3 UPTO MAR-26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100051295 · FORM-1-III.pdf · uploaded 9 Jul 2026Source
- Withdrawal Update Form 2P52100051295 · FORM-2-III.pdf · uploaded 9 Jul 2026Source
- Withdrawal Update Form 3P52100051295 · FORM-3-III.pdf · uploaded 9 Jul 2026Source
Technical
- DocumentP52100005434 · Building Flor Plans Phase 1 C building.pdf · uploaded 31 Jul 2017Source
- DocumentP52100005434 · SILVERIIO LAYOUT PLAN PROPOSED.pdf · uploaded 31 Jul 2017Source
- DocumentP52100051295 · layout.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 4.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 5.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 6.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 7.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 8.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 9.pdf · uploaded 29 May 2023Source
- DocumentP52100051295 · 1 6_compressed (1).pdf · uploaded 16 Apr 2025Source
Technical (Architect)
- DocumentP52100005434 · Form 1.pdf · uploaded 31 Jul 2017Source
- DocumentP52100051295 · form1.pdf · uploaded 10 Oct 2024Source
- DocumentP52100051295 · FORM-1.pdf · uploaded 8 Jan 2025Source
- DocumentP52100051295 · Form 1.pdf · uploaded 13 Apr 2025Source
- DocumentP52100051295 · Form 1.pdf · uploaded 17 Apr 2025Source
- DocumentP52100051295 · FORM-1-III.pdf · uploaded 9 Jul 2026Source
Technical (Engineer)
- DocumentP52100005434 · Engineers Certificate form.pdf · uploaded 31 Jul 2017Source
- DocumentP52100051295 · form2.pdf · uploaded 10 Oct 2024Source
- DocumentP52100051295 · revised form2 - as on december 2023.pdf · uploaded 11 Oct 2024Source
- DocumentP52100051295 · form-2.pdf · uploaded 11 Oct 2024Source
- DocumentP52100051295 · Form-2.pdf · uploaded 11 Oct 2024Source
- DocumentP52100051295 · form2.pdf · uploaded 12 Oct 2024Source
- DocumentP52100051295 · 2 (2).pdf · uploaded 16 Oct 2024Source
- DocumentP52100051295 · 2 (3).pdf · uploaded 16 Oct 2024Source
- DocumentP52100051295 · 2.pdf · uploaded 16 Oct 2024Source
- DocumentP52100051295 · FORM-2.pdf · uploaded 8 Jan 2025Source
- DocumentP52100051295 · Form 2.pdf · uploaded 13 Apr 2025Source
- DocumentP52100051295 · Form 3.pdf · uploaded 13 Apr 2025Source
- DocumentP52100051295 · Form 2.pdf · uploaded 13 Apr 2025Source
- DocumentP52100051295 · Form 2.pdf · uploaded 17 Apr 2025Source
- DocumentP52100051295 · FORM-2-III.pdf · uploaded 9 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pimpri Chinchawad (M Corp.), Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat No 108 109 110
- South
- Gat No 146 To 151
- East
- Gat No 127
- West
- Gat No 120 121
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Avinash Nawathe Architects | — | P52100005434 |
| Architect | Avinath Nawathe | — | P52100051295 |
| Chartered accountant | Nikhil | — | P52100005434 |
| Chartered accountant | S Gautam & Associates | — | P52100051295 |
| Chartered accountant | Sumeet Suresh Kate & Co | — | P52100051295 |
| Chartered accountant | summet kate | — | P52100005434 |
| Engineer | Upendra Purandare | — | P52100005434 |
| Engineer | Upendra Purandare | — | P52100051295 |
Source: MahaRERA project page. Contact details are not shown.