24Life Exotica
Certificate SignedPimpri Chinchawad (M Corp.), Pune 412105 |Promoter: Tatva Landmarks LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2.5BHK, 2.5 BHK Landowner, 2BHK, 2 BHK Landowner, 2BHK Landowner, 3BHK, 3 BHK Landowner, Office space, Shop, Shop Landowner, 2BHKMAHDA, 2BHKMHADA242 units in all
- Address
- 199 (P), DudulgaonPIN 412105
- Designated bank account
- 171
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Feb 2023
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049643 | 22 Feb 2023 | 31 Dec 2026 | 30 Apr 2027 | Tatva Landmarks LLP | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A Wing | 15 | 135 |
| B Wing | 15 | 107 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
106 of 242 units booked (44%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2.5BHK | 66.91 sq m · 720 sq ft | 12 | 7 |
| A Wing | 2.5 BHK Landowner | 66.91 sq m · 720 sq ft | 1 | 0 |
| A Wing | 2BHK | 55.96 sq m · 602 sq ft | 5 | 5 |
| A Wing | 2BHK | 58.61 sq m · 631 sq ft | 20 | 12 |
| A Wing | 2BHK | 58.89 sq m · 634 sq ft | 2 | 0 |
| A Wing | 2BHK | 60.66 sq m · 653 sq ft | 13 | 10 |
| A Wing | 2 BHK Landowner | 55.96 sq m · 602 sq ft | 7 | 0 |
| A Wing | 2 BHK Landowner | 60.66 sq m · 653 sq ft | 1 | 0 |
Show all 54 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 2BHK Landowner | 58.61 sq m · 631 sq ft | 2 | 0 |
| A Wing | 3BHK | 76.99 sq m · 829 sq ft | 33 | 21 |
| A Wing | 3BHK | 77.25 sq m · 832 sq ft | 2 | 2 |
| A Wing | 3 BHK Landowner | 76.99 sq m · 829 sq ft | 3 | 0 |
| A Wing | Office space | 23.65 sq m · 255 sq ft | 1 | 0 |
| A Wing | Office space | 24.38 sq m · 262 sq ft | 1 | 0 |
| A Wing | Office space | 26.1 sq m · 281 sq ft | 1 | 0 |
| A Wing | Office space | 26.74 sq m · 288 sq ft | 1 | 0 |
| A Wing | Office space | 27.62 sq m · 297 sq ft | 1 | 0 |
| A Wing | Office space | 28.4 sq m · 306 sq ft | 7 | 0 |
| A Wing | Office space | 29.81 sq m · 321 sq ft | 1 | 0 |
| A Wing | Office space | 30.93 sq m · 333 sq ft | 1 | 0 |
| A Wing | Office space | 36.56 sq m · 394 sq ft | 1 | 0 |
| A Wing | Office space | 38.57 sq m · 415 sq ft | 1 | 0 |
| A Wing | Office space | 40.4 sq m · 435 sq ft | 1 | 0 |
| A Wing | Shop | 18.02 sq m · 194 sq ft | 4 | 3 |
| A Wing | Shop | 22.84 sq m · 246 sq ft | 1 | 0 |
| A Wing | Shop | 24.38 sq m · 262 sq ft | 1 | 1 |
| A Wing | Shop | 26.08 sq m · 281 sq ft | 1 | 0 |
| A Wing | Shop | 26.67 sq m · 287 sq ft | 1 | 0 |
| A Wing | Shop | 27.26 sq m · 293 sq ft | 1 | 0 |
| A Wing | Shop | 29.81 sq m · 321 sq ft | 1 | 0 |
| A Wing | Shop | 30.93 sq m · 333 sq ft | 1 | 0 |
| A Wing | Shop | 38.57 sq m · 415 sq ft | 1 | 0 |
| A Wing | Shop | 40.15 sq m · 432 sq ft | 1 | 0 |
| A Wing | Shop Landowner | 18.02 sq m · 194 sq ft | 3 | 0 |
| A Wing | Shop Landowner | 23.28 sq m · 251 sq ft | 1 | 0 |
| B Wing | 2.5BHK | 66.91 sq m · 720 sq ft | 11 | 7 |
| B Wing | 2BHK | 55.96 sq m · 602 sq ft | 4 | 2 |
| B Wing | 2BHK | 58.61 sq m · 631 sq ft | 19 | 8 |
| B Wing | 2BHK | 60.66 sq m · 653 sq ft | 10 | 8 |
| B Wing | 2 BHK Landowner | 55.96 sq m · 602 sq ft | 7 | 0 |
| B Wing | 2 BHK Landowner | 58.61 sq m · 631 sq ft | 5 | 0 |
| B Wing | 2 BHK Landowner | 60.66 sq m · 653 sq ft | 1 | 0 |
| B Wing | 2BHKMAHDA | 49.76 sq m · 536 sq ft | 2 | 1 |
| B Wing | 2BHKMAHDA | 49.81 sq m · 536 sq ft | 1 | 0 |
| B Wing | 2BHKMAHDA | 49.84 sq m · 536 sq ft | 1 | 0 |
| B Wing | 2BHKMHADA | 46.39 sq m · 499 sq ft | 1 | 0 |
| B Wing | 2BHKMHADA | 49.13 sq m · 529 sq ft | 5 | 2 |
| B Wing | 2BHKMHADA | 49.14 sq m · 529 sq ft | 1 | 1 |
| B Wing | 2BHKMHADA | 49.2 sq m · 530 sq ft | 1 | 1 |
| B Wing | 2BHKMHADA | 49.7 sq m · 535 sq ft | 2 | 1 |
| B Wing | 3BHK | 71.47 sq m · 769 sq ft | 23 | 9 |
| B Wing | 3BHK | 76.99 sq m · 829 sq ft | 11 | 5 |
| B Wing | 3 BHK Landowner | 71.47 sq m · 769 sq ft | 1 | 0 |
| B Wing | 3 BHK Landowner | 76.99 sq m · 829 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 262 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card.pdf · uploaded 4 Feb 2023Source
- Other – FinanceTransfer of bank account declaration cum undertaking Annexure-A.pdf · uploaded 7 Jun 2023Source
- Other – FinanceSelf Declaration Reason for change in Bank Account.pdf · uploaded 7 Jun 2023Source
- OthersDeclaration Est Cost - Exotica.pdf · uploaded 2 Aug 2025Source
Show all 263 documentsShow fewer documents
Migrated
- 1 PAN CardPan Card.pdf · uploaded 4 Feb 2023Source
- 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 4 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrence Letter - Finance.pdf · uploaded 4 Feb 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrence Letter - Legal.pdf · uploaded 4 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrence Letter - Finance.pdf · uploaded 4 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrence Letter - Legal.pdf · uploaded 4 Feb 2023Source
- 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 4 Feb 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 4 Feb 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 4 Feb 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 4 Feb 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 4 Feb 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan 6.pdf · uploaded 4 Feb 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentPlan 7.pdf · uploaded 4 Feb 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentPlan 8.pdf · uploaded 4 Feb 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentPlan 9.pdf · uploaded 4 Feb 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentNA Order.pdf · uploaded 4 Feb 2023Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 4 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 4 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 4 Feb 2023Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 4 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - 24Life Exotica.pdf · uploaded 4 Feb 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 4 Feb 2023Source
- 1 Proforma of Allotment letterAllotment letter.pdf · uploaded 4 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Of Seperate Bank Account.pdf · uploaded 4 Feb 2023Source
- 1 Proforma of Agreement for saleAgreement For Sale.pdf · uploaded 5 Feb 2023Source
- 1 Deviation Report with respect to Allotment letterNo deviation WRT allotment.pdf · uploaded 6 Feb 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report of Agreement For Sale.pdf · uploaded 6 Feb 2023Source
- 2 Declaration about Commencement CertificateCommencement Certificate Revised.pdf · uploaded 14 Feb 2023Source
- 1 Other – LegalCommencement Certificate Revised.pdf · uploaded 14 Feb 2023Source
- 1 Declaration in FORM BFormat B Promoter.pdf · uploaded 15 Feb 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration Of seperate Bank Account.pdf · uploaded 9 May 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate- Q4.pdf · uploaded 18 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 - Q4.pdf · uploaded 18 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer Certificate Form 2A FY 22-23.pdf · uploaded 18 May 2023Source
- 1 Disclosure of sold/ booked inventoryPromoter Disclouser Q4.pdf · uploaded 18 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 24Life Exotica Q4.pdf · uploaded 18 May 2023Source
- 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration About Seperate Bank Account.pdf · uploaded 31 May 2023Source
- 1 Other – FinanceTransfer of bank account declaration cum undertaking Annexure-A.pdf · uploaded 7 Jun 2023Source
- 2 Other – FinanceSelf Declaration Reason for change in Bank Account.pdf · uploaded 7 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engi Certi 2A 24 Exotica.pdf · uploaded 16 Jun 2023Source
- 2 Proforma of Agreement for saleAgreement For Sale - 24Life Exotica.pdf · uploaded 19 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 Q1.pdf · uploaded 16 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 Q1.pdf · uploaded 16 Aug 2023Source
- 2 Disclosure of sold/ booked inventoryPromoter Disclosure Q1 24Life Exotica.pdf · uploaded 16 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 24Life Exotica Q1.pdf · uploaded 16 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS_CERTIFICATE_Q2.pdf · uploaded 18 Oct 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Q2_2023-Engineers_Certificate.pdf · uploaded 18 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryPromoters disclosure-Q2.pdf · uploaded 18 Oct 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3_-Q2_CA_Certificate.pdf · uploaded 18 Oct 2023Source
- 2 CERSAI details24Life Exotica CERSAI Search Report.pdf · uploaded 1 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Annual Report - 24Life Exotica FY 22-23.pdf · uploaded 28 Dec 2023Source
- 9 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 11 Jan 2024Source
- 10 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 11 Jan 2024Source
- 11 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 11 Jan 2024Source
- 12 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 11 Jan 2024Source
- 13 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 11 Jan 2024Source
- 14 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 11 Jan 2024Source
- 15 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 11 Jan 2024Source
- 16 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 11 Jan 2024Source
- 17 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 11 Jan 2024Source
- 18 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 11 Jan 2024Source
- 19 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 11 Jan 2024Source
- 20 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 11 Jan 2024Source
- 21 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 11 Jan 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentExotica revised CC Dt 9-1-24.pdf · uploaded 11 Jan 2024Source
- 3 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 16 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryPromoter Disclosure Q3 (24Life Exotica).pdf · uploaded 17 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -24Life Exotica Q3.pdf · uploaded 17 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 Q3.pdf · uploaded 20 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2 Q3.pdf · uploaded 20 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 FY 23-24 Q4 signed 20.pdf · uploaded 20 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 2024 Exotica f.pdf · uploaded 22 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryExotica Promoter Disclouser Q4 2023.pdf · uploaded 22 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 2024 Exotica.pdf · uploaded 2 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A FY 23-24 Tatva.pdf · uploaded 8 Jun 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 2024-25 Q1.pdf · uploaded 19 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryPromoter Disclosure FY 2024-25 Q1- 24 life Exotica.pdf · uploaded 19 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q1-24 Life Exotica c.pdf · uploaded 19 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2024-25 Q1 24 life Exotica.pdf · uploaded 20 Jul 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentExotica 3rd CC.pdf · uploaded 8 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 8 Oct 2024Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 8 Oct 2024Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 8 Oct 2024Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 8 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 8 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 8 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 8 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 8 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 8 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 8 Oct 2024Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 8 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentExotica 3rd CC.pdf · uploaded 8 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 8 Oct 2024Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 8 Oct 2024Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 8 Oct 2024Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 8 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 8 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 8 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 8 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 8 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 8 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 8 Oct 2024Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q-2 24 life Exotica.pdf · uploaded 22 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25 Q-2 24 life Exotica.pdf · uploaded 22 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryTatva Promoter Disclosures 30-9-24.pdf · uploaded 26 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryTatva Promoter Disclosures 30-9-24.pdf · uploaded 26 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryTatva Landmark Promotor Disclosure.pdf · uploaded 31 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryTatva Landmark Promotor Disclosure.pdf · uploaded 31 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)tatva Form 5.pdf · uploaded 29 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 Exotica.pdf · uploaded 27 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 (Exotica) Q4 FY 24-25.pdf · uploaded 27 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryPromoter Disclosure Exotica Q4.pdf · uploaded 27 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 FY 24-25 Exotica.pdf · uploaded 28 Apr 2025Source
- Form 1Form 1 Q4 FY 22-23.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q1 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q2 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q3 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q4 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q1 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q2 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q3 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 1Form 1 - Q4 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 Q4 FY 22-23.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q1 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q2 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q3 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q4 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q1 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q2 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q3 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 2Form 2 - Q4 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 Q4 FY 22-23.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q1 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q2 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q3 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q4 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q1 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q2 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q3 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 3Form 3 - Q4 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q4 FY 22-23.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q1 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q2 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q3 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q4 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q1 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q2 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q3 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Q4 FY 24-25.pdf · uploaded 27 Jul 2025Source
- Form 5 (FY 2022-2023)Form 5 FY 22-23.pdf · uploaded 27 Jul 2025Source
- Form 5 (FY 2023-2024)Form 5 FY 23-24.pdf · uploaded 27 Jul 2025Source
- Withdrawal Update Form 1Form 1 Exotica Q1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Form 1 Exotica Q1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Form 2 Exotica Q1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Form 2 Exotica Q1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Form 3 Exotica Q1 QPR.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Form 3 Exotica Q1 QPR.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Form 1 Exotica Q1.pdf · uploaded 26 Aug 2025Source
- Withdrawal Update Form 2Form 2 Exotica Q1.pdf · uploaded 26 Aug 2025Source
- Withdrawal Update Form 3Form 3 Exotica Q1.pdf · uploaded 26 Aug 2025Source
- Withdrawal Update Form 1Form 1 Exotica Q2.pdf · uploaded 5 Nov 2025Source
- Withdrawal Update Form 2Form 2 Exotica Q2.pdf · uploaded 5 Nov 2025Source
- Withdrawal Update Form 3Form 3 Exotica Q2.pdf · uploaded 5 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 Annual Report - 24Life Exotica FY 24-25.pdf · uploaded 29 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A - FY 24-25 Exotica.pdf · uploaded 1 Jan 2026Source
- Withdrawal Update Form 1From 1 Q3 Exotica.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 2From 2 Q3 Exotica.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 3Form 3 Q3 Exotica.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1From 1 Q3 Exotica.pdf · uploaded 15 Mar 2026Source
- Withdrawal Update Form 2From 2 Q3 Exotica.pdf · uploaded 15 Mar 2026Source
- Withdrawal Update Form 3Form 3 Q3 24Life Exotica.pdf · uploaded 15 Mar 2026Source
- Withdrawal Update Form 1Form 1 Q4 24Life Exotica.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 2Form 2 Q4 - 24Life Exotica.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 3Form 3 Q4 - 24Life Exotica.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 1Form 1 Q1 - 24Life Exotica.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 2Form 2 Q1 - 24Life Exotica.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 3Form 3 Q1 - 24Life Exotica.pdf · uploaded 27 Jul 2026Source
- Form 2A (FY 2022-2023)Form 2A - FY 22-23 Exotica.pdf · uploaded 1 Aug 2026Source
- Form 2A (FY 2023-2024)Form 2A - FY 23-24 Exotica.pdf · uploaded 1 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A - FY 25-26 Exotica.pdf · uploaded 1 Aug 2026Source
- Withdrawal Update Form 1Form 1 Q1 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
- Withdrawal Update Form 1Form 1 Q4 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q1 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
- Withdrawal Update Form 2Form 2 Q4 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q1 - 24Life Exotica FY 2026-27.pdf · uploaded 20 Sep 2026Source
- Withdrawal Update Form 3Form 3 Q4 - 24Life Exotica FY 2026-27.pdf · uploaded 20 Sep 2026Source
Technical
- DocumentPlan 1.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 2.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 3.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 4.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 5.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 6.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 7.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 8.pdf · uploaded 4 Feb 2023Source
- DocumentPlan 9.pdf · uploaded 4 Feb 2023Source
- Document1.pdf · uploaded 11 Jan 2024Source
- Document1.pdf · uploaded 11 Jan 2024Source
- Document2.pdf · uploaded 11 Jan 2024Source
- Document3.pdf · uploaded 11 Jan 2024Source
- Document4.pdf · uploaded 11 Jan 2024Source
- Document5.pdf · uploaded 11 Jan 2024Source
- Document6.pdf · uploaded 11 Jan 2024Source
- Document7.pdf · uploaded 11 Jan 2024Source
- Document8.pdf · uploaded 11 Jan 2024Source
- Document9.pdf · uploaded 11 Jan 2024Source
- Document10.pdf · uploaded 11 Jan 2024Source
- Document11.pdf · uploaded 11 Jan 2024Source
- Document12.pdf · uploaded 11 Jan 2024Source
- Document1.pdf · uploaded 8 Oct 2024Source
- Document2.pdf · uploaded 8 Oct 2024Source
- Document3.pdf · uploaded 8 Oct 2024Source
- Document4.pdf · uploaded 8 Oct 2024Source
- Document5.pdf · uploaded 8 Oct 2024Source
- Document6.pdf · uploaded 8 Oct 2024Source
- Document7.pdf · uploaded 8 Oct 2024Source
- Document8.pdf · uploaded 8 Oct 2024Source
- Document9.pdf · uploaded 8 Oct 2024Source
- Document10.pdf · uploaded 8 Oct 2024Source
- Document11.pdf · uploaded 8 Oct 2024Source
- Document1.pdf · uploaded 8 Oct 2024Source
- Document2.pdf · uploaded 8 Oct 2024Source
- Document3.pdf · uploaded 8 Oct 2024Source
- Document4.pdf · uploaded 8 Oct 2024Source
- Document5.pdf · uploaded 8 Oct 2024Source
- Document6.pdf · uploaded 8 Oct 2024Source
- Document7.pdf · uploaded 8 Oct 2024Source
- Document8.pdf · uploaded 8 Oct 2024Source
- Document9.pdf · uploaded 8 Oct 2024Source
- Document10.pdf · uploaded 8 Oct 2024Source
- Document11.pdf · uploaded 8 Oct 2024Source
Technical (Architect)
- DocumentForm 1 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- DocumentForm 1 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- DocumentForm 1 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- DocumentForm 1 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- DocumentForm 1 Q4 Exotica.pdf · uploaded 27 Apr 2025Source
- DocumentForm 1 Q1 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
Technical (Engineer)
- DocumentForm 2 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- DocumentForm 2 Q2 24-25 Exotica.pdf · uploaded 22 Oct 2024Source
- DocumentForm 2 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- DocumentForm 2 Q3 24-25.pdf · uploaded 31 Jan 2025Source
- DocumentForm 2 Q4 FY 24-25 Exotica.pdf · uploaded 28 Apr 2025Source
- DocumentForm 2 Q1 - 24Life Exotica.pdf · uploaded 20 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pimpri Chinchawad (M Corp.), Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- GAT No 198
- South
- PCMC DP Road
- East
- GAT No 197
- West
- GAT No 208
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Arcon Associates | — |
| Chartered accountant | Avishkar Phanse And CO | — |
| Chartered accountant | Snehal G Patil & Co | — |
| Chartered accountant | V S A P & Company | — |
| Engineer | Mahadeo Shelar | — |
| Other | Structural Designers & Consultant Engineers Spectrum Consultants | — |
| Other | Sujit Associates | — |
Source: MahaRERA project page. Contact details are not shown.