Sukhwani Minerva
Certificate SignedPimpale Saudagar, Pune 411027 |Promoter: Sukhwani Ramchandani LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 4BHK, Shop, 3BHK251 units in all
- Address
- S.No. 68/1(P) and 68/2(P), 69/1(P) and 69/2(P), at Pimple Saudagar, S. No. 68/1, 68/2, 69/1, 69/2 Pimple Saudagar, Pimple SaudagarPIN 411027
- Designated bank account
- 85
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 3 Feb 2023
- Promised
- 31 Mar 2028
- Revised
- 31 Jul 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049203 | 3 Feb 2023 | 31 Mar 2028 | 31 Jul 2028 | Sukhwani Ramchandani LLP | Project page |
3 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
21 of 251 units booked (8%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | 4BHK | 116.66 sq m · 1,256 sq ft | 18 | 0 |
| A Wing | 4BHK | 117.58 sq m · 1,266 sq ft | 36 | 3 |
| A Wing | 4BHK | 117.7 sq m · 1,267 sq ft | 18 | 3 |
| A Wing | Shop | 27.31 sq m · 294 sq ft | 1 | 0 |
| A Wing | Shop | 27.77 sq m · 299 sq ft | 3 | 1 |
| A Wing | Shop | 28.66 sq m · 308 sq ft | 1 | 0 |
| A Wing | Shop | 29.58 sq m · 318 sq ft | 1 | 1 |
| A Wing | Shop | 30.02 sq m · 323 sq ft | 2 | 0 |
Show all 42 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A Wing | Shop | 30.91 sq m · 333 sq ft | 1 | 0 |
| A Wing | Shop | 31.37 sq m · 338 sq ft | 1 | 0 |
| A Wing | Shop | 32.99 sq m · 355 sq ft | 1 | 1 |
| B Wing | 3BHK | 72.82 sq m · 784 sq ft | 3 | 0 |
| B Wing | 3BHK | 86.1 sq m · 927 sq ft | 36 | 1 |
| B Wing | 3BHK | 88.46 sq m · 952 sq ft | 15 | 2 |
| B Wing | 3BHK | 89.06 sq m · 959 sq ft | 18 | 0 |
| B Wing | Shop | 17.96 sq m · 193 sq ft | 1 | 1 |
| B Wing | Shop | 18.02 sq m · 194 sq ft | 1 | 1 |
| B Wing | Shop | 24.51 sq m · 264 sq ft | 1 | 0 |
| B Wing | Shop | 28.52 sq m · 307 sq ft | 2 | 1 |
| B Wing | Shop | 30.03 sq m · 323 sq ft | 1 | 1 |
| B Wing | Shop | 31.75 sq m · 342 sq ft | 1 | 1 |
| B Wing | Shop | 32.71 sq m · 352 sq ft | 1 | 1 |
| B Wing | Shop | 32.99 sq m · 355 sq ft | 1 | 0 |
| B Wing | Shop | 38.28 sq m · 412 sq ft | 1 | 0 |
| B Wing | Shop | 41.72 sq m · 449 sq ft | 1 | 1 |
| C Wing | 3BHK | 70.75 sq m · 762 sq ft | 3 | 0 |
| C Wing | 3BHK | 86.13 sq m · 927 sq ft | 33 | 1 |
| C Wing | 3BHK | 87.55 sq m · 942 sq ft | 18 | 0 |
| C Wing | 3BHK | 88.07 sq m · 948 sq ft | 18 | 0 |
| C Wing | Shop | 15.19 sq m · 164 sq ft | 1 | 0 |
| C Wing | Shop | 19.44 sq m · 209 sq ft | 1 | 0 |
| C Wing | Shop | 20.85 sq m · 224 sq ft | 1 | 0 |
| C Wing | Shop | 21.99 sq m · 237 sq ft | 1 | 0 |
| C Wing | Shop | 24.15 sq m · 260 sq ft | 1 | 0 |
| C Wing | Shop | 25.66 sq m · 276 sq ft | 1 | 0 |
| C Wing | Shop | 26.74 sq m · 288 sq ft | 1 | 0 |
| C Wing | Shop | 27.62 sq m · 297 sq ft | 1 | 0 |
| C Wing | Shop | 27.85 sq m · 300 sq ft | 1 | 0 |
| C Wing | Shop | 33.18 sq m · 357 sq ft | 1 | 1 |
| C Wing | Shop | 42.56 sq m · 458 sq ft | 1 | 0 |
| C Wing | Shop | 44.24 sq m · 476 sq ft | 1 | 0 |
| C Wing | Shop | 44.47 sq m · 479 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 199 filings listed on MahaRERA's project page
Finance
- PAN Cardpan card sukhwani ramchandani llp.pdf · uploaded 12 Jan 2023Source
Legal
- Legal Title reportSearch Title Report Part 1_compressed.pdf · uploaded 12 Jan 2023Source
- Legal Title reportSearch Title Report Part 2_compressed.pdf · uploaded 12 Jan 2023Source
- Declaration Form Baffidavit cum declaration_compressed.pdf · uploaded 12 Jan 2023Source
- Othersanan030.pdf · uploaded 27 May 2026Source
- Othersanan028.pdf · uploaded 27 May 2026Source
- Othersanan027.pdf · uploaded 27 May 2026Source
Show all 200 documentsShow fewer documents
Legal
- Othersanan025.pdf · uploaded 27 May 2026Source
- Othersanan026.pdf · uploaded 27 May 2026Source
- Othersanan024.pdf · uploaded 27 May 2026Source
- Othersanan022.pdf · uploaded 27 May 2026Source
- Othersanan029.pdf · uploaded 27 May 2026Source
- Othersanan023.pdf · uploaded 27 May 2026Source
- Othersanan021.pdf · uploaded 27 May 2026Source
- Othersanan020.pdf · uploaded 27 May 2026Source
- Othersanan019.pdf · uploaded 27 May 2026Source
- Othersanan018.pdf · uploaded 27 May 2026Source
Migrated
- 1 PAN Cardpan card sukhwani ramchandani llp.pdf · uploaded 12 Jan 2023Source
- 1 Copy of the legal title reportSearch Title Report Part 1_compressed.pdf · uploaded 12 Jan 2023Source
- 2 Copy of the legal title reportSearch Title Report Part 2_compressed.pdf · uploaded 12 Jan 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrances Merged.pdf · uploaded 12 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrances Merged.pdf · uploaded 12 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)Layout approval_compressed.pdf · uploaded 12 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)Amalgamation Plan_compressed.pdf · uploaded 12 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1_compressed.pdf · uploaded 12 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2_compressed.pdf · uploaded 12 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3_compressed.pdf · uploaded 12 Jan 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4_compressed.pdf · uploaded 12 Jan 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5_compressed.pdf · uploaded 12 Jan 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6_compressed.pdf · uploaded 12 Jan 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7_compressed.pdf · uploaded 12 Jan 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8_compressed.pdf · uploaded 12 Jan 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentBuilding Plan 9_compressed.pdf · uploaded 12 Jan 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentBuilding Plan 10_compressed.pdf · uploaded 12 Jan 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentBuilding Plan 11_compressed.pdf · uploaded 12 Jan 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentBuilding Plan 12_compressed.pdf · uploaded 12 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 12 Jan 2023Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 12 Jan 2023Source
- 1 Declaration in FORM Baffidavit cum declaration_compressed.pdf · uploaded 12 Jan 2023Source
- 1 CERSAI detailsCersai site report_compressed.pdf · uploaded 12 Jan 2023Source
- 2 CERSAI detailsCersai Declaration.pdf · uploaded 12 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Signed.pdf · uploaded 12 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest ghanshyam sukhwani.pdf · uploaded 12 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest Sanjay Ramchandani.pdf · uploaded 12 Jan 2023Source
- 1 Proforma of Agreement for saleRERA Draft Final.pdf · uploaded 12 Jan 2023Source
- 1 Proforma of Allotment letterALLOT for a b c sukhwani minerva.pdf · uploaded 12 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration on Seperate bank account.pdf · uploaded 12 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report on allotmet letter.pdf · uploaded 12 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report on agreemnt draft.pdf · uploaded 12 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate _Form1_11zon.pdf · uploaded 15 Jun 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory_11zon.pdf · uploaded 15 Jun 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Form3.pdf · uploaded 15 Jun 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Engineer Certificate.pdf · uploaded 17 Jun 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 13 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 13 Dec 2023Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory_11zon.pdf · uploaded 13 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Signed_11zon.pdf · uploaded 13 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SUKHWNI MINERVA FORM 5 22-23.pdf · uploaded 29 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 20 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate December 2023 Signed.pdf · uploaded 20 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 7 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 7 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate December 2023 Signed_11zon.pdf · uploaded 7 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 9 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)SUKHWNI MINERVA FORM 5 22-23.pdf · uploaded 9 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)C ACERTIFICATE RAMCHANDANI LLP.pdf · uploaded 7 May 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure fo Inventory Ramchandhani LLP_compressed.pdf · uploaded 7 May 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)C ACERTIFICATE RAMCHANDANI LLP.pdf · uploaded 7 May 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)sukhwani ramchandani engineers certificate.pdf · uploaded 9 May 2024Source
- 3 Copy of Layout Approval (in case of layout)Layout approval.pdf · uploaded 8 Jun 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1.pdf · uploaded 8 Jun 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2.pdf · uploaded 8 Jun 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3.pdf · uploaded 8 Jun 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4.pdf · uploaded 8 Jun 2024Source
- 17 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5.pdf · uploaded 8 Jun 2024Source
- 18 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6.pdf · uploaded 8 Jun 2024Source
- 19 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7.pdf · uploaded 8 Jun 2024Source
- 20 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8.pdf · uploaded 8 Jun 2024Source
- 21 Building Plan Approval / NA Order for plotted developmentBuilding Plan 9.pdf · uploaded 8 Jun 2024Source
- 22 Building Plan Approval / NA Order for plotted developmentBuilding Plan 10.pdf · uploaded 8 Jun 2024Source
- 23 Building Plan Approval / NA Order for plotted developmentBuilding Plan 11.pdf · uploaded 8 Jun 2024Source
- 24 Building Plan Approval / NA Order for plotted developmentBuilding Plan 12.pdf · uploaded 8 Jun 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Jun 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 10 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate.pdf · uploaded 12 Jun 2024Source
- 2 Declaration about Commencement CertificateCC Declaration_Highlighted.pdf · uploaded 20 Jun 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 14 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 14 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 14 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate June 2024 sign _11zon.pdf · uploaded 14 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - September 2024 sign.pdf · uploaded 9 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate September 2024 - Sign.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate September 2024 - Sign.pdf · uploaded 9 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory - September 2024 sign.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 9 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate December 2024 - Signed.pdf · uploaded 9 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 9 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - December 2024.pdf · uploaded 9 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Form 5 Sukhwani Minevra.pdf · uploaded 27 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Architect Certificate SD_compressed.pdf · uploaded 22 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Supreme Developers_compressed.pdf · uploaded 22 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Supreme Developers.pdf · uploaded 22 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 22 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySupreme Developers_Sold Unsold Booked List.pdf · uploaded 22 Apr 2025Source
- 2 Disclosure of sold/ booked inventorySukhwani Ramchandani LLP_Sold Unsold Booked List_compressed.pdf · uploaded 22 Apr 2025Source
- Form 1Architech Certificate.pdf · uploaded 24 Jul 2025Source
- Form 1Form 1 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 24 Jul 2025Source
- Form 2Engineers Certificate.pdf · uploaded 24 Jul 2025Source
- Form 2Form 3 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 24 Jul 2025Source
- Form 3CA Certificate_compressed.pdf · uploaded 24 Jul 2025Source
- Form 3Form 3 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 24 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List_compressed.pdf · uploaded 24 Jul 2025Source
- Disclosure of Sold and Booked InventorySukhwani Ramchandani LLP_Sold Unsold Booked List_compressed.pdf · uploaded 24 Jul 2025Source
- Form 1Minerva_Architect Certificate.pdf · uploaded 7 Nov 2025Source
- Form 2Minerva_Engineer Certificate.pdf · uploaded 7 Nov 2025Source
- Form 3Minerva_Form 3 (1)_compressed.pdf · uploaded 7 Nov 2025Source
- Disclosure of Sold and Booked InventoryMinerva_Sold Unsold List_compressed.pdf · uploaded 7 Nov 2025Source
- Form 5 (FY 2024-2025)CA Form_Sukhwani Ramchandani _FY 2024-25_Signed.pdf · uploaded 2 Dec 2025Source
- Form 1Sukhwani Minerva Work Stage Certificate.pdf · uploaded 24 Jan 2026Source
- Form 2Engineers CertificaeSukhwani minerva.pdf · uploaded 24 Jan 2026Source
- Form 3C A Certificate Sukhwani Minerva_compressed.pdf · uploaded 24 Jan 2026Source
- Disclosure of Sold and Booked InventorySold-Booked Inventory Sukhwani Minerva_compressed.pdf · uploaded 24 Jan 2026Source
- Form 1Form 1.pdf · uploaded 24 Apr 2026Source
- Form 2Form 2.pdf · uploaded 24 Apr 2026Source
- Form 3Form 3_compressed.pdf · uploaded 24 Apr 2026Source
- Disclosure of Sold and Booked InventorySold and unsold_compressed.pdf · uploaded 24 Apr 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 3Form 3_compressed (3).pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 3Form 3_compressed (3).pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 1Form 1 Architect Certificate.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 3Form 3_compressed (3).pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 1Form1.pdf · uploaded 13 Jul 2026Source
- Withdrawal Update Form 2Form2.pdf · uploaded 13 Jul 2026Source
- Withdrawal Update Form 3Form3_compressed.pdf · uploaded 13 Jul 2026Source
Technical
- DocumentLayout approval_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentAmalgamation Plan_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 1_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 2_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 3_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 4_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 5_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 6_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 7_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 8_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 9_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 10_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 11_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentBuilding Plan 12_compressed.pdf · uploaded 12 Jan 2023Source
- DocumentLayout approval.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 1.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 2.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 3.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 4.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 5.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 6.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 7.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 8.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 9.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 10.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 11.pdf · uploaded 8 Jun 2024Source
- DocumentBuilding Plan 12.pdf · uploaded 8 Jun 2024Source
- Documentanan030.pdf · uploaded 27 May 2026Source
- Documentanan018 Building.pdf · uploaded 27 May 2026Source
- DocumentComencemnet Certificate 2026.pdf · uploaded 27 May 2026Source
- Documentanan019 Parking.pdf · uploaded 27 May 2026Source
- Documentanan020 Parking.pdf · uploaded 27 May 2026Source
- Documentanan021 Floor PlanA.pdf · uploaded 27 May 2026Source
- Documentanan022 Lift A.pdf · uploaded 27 May 2026Source
- Documentanan022 Lift A.pdf · uploaded 27 May 2026Source
- Documentanan023 Commercial B Wing.pdf · uploaded 27 May 2026Source
- Documentanan024 Floor Plan B Wing.pdf · uploaded 27 May 2026Source
- Documentanan025 Left B.pdf · uploaded 27 May 2026Source
- Documentanan026 C Wing Commercial.pdf · uploaded 27 May 2026Source
- Documentanan027 Floor Plan C Wing.pdf · uploaded 27 May 2026Source
- Documentanan028 FLoor Plan C Wing Mahada.pdf · uploaded 27 May 2026Source
- Documentanan029 Lift C Wing.pdf · uploaded 27 May 2026Source
- Documentanan030 A Wing Ground Floor.pdf · uploaded 27 May 2026Source
Technical (Architect)
- DocumentForm 1 Architect Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- DocumentForm 1 Architect Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- DocumentForm 1 Architect Certificate.pdf · uploaded 9 Jan 2025Source
- DocumentForm 1 - Architect Certificate SD_compressed.pdf · uploaded 22 Apr 2025Source
- DocumentForm 1 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 22 Apr 2025Source
- DocumentForm1.pdf · uploaded 13 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 Engineer Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- DocumentForm 2 Engineer Certificate - Sept 2024.pdf · uploaded 9 Oct 2024Source
- DocumentForm 2 Engineer Certificate.pdf · uploaded 9 Jan 2025Source
- DocumentForm 2 Supreme Developers.pdf · uploaded 22 Apr 2025Source
- DocumentForm 2 - Sukhwani Ramchandani LLP_compressed.pdf · uploaded 22 Apr 2025Source
- DocumentForm2.pdf · uploaded 13 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pimpale Saudagar, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- By Palm Breeze Society
- South
- By 18 mtrs Road
- East
- By 12 mtr road
- West
- By PCMC Garden
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kalparachna Architects | — |
| Chartered accountant | A N J K & Co LLP | — |
| Chartered accountant | RV Nevatia & Co | — |
| Engineer | Mr Santosh Dhiwar | — |
| Other | G A Bhilare Consultants | — |
Source: MahaRERA project page. Contact details are not shown.