Mantra Mesmer
Certificate SignedMundhawa, Pune 411036 |Promoter: Mantra Zirconia Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 4
- Phases
- 4
- Buildings
- 4
- Unit types
- 3 BHK DUPLEX, Landowners Unit, 2BHK, 3BHK, 1BHK, Shop276 units in all
- Address
- Plot B At S No 9 To 14 Hissa No 52 And 53 P Mundhawa Pune, Mundhawa, MundhawaPIN 411036
- Designated bank account
- 85
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52100031475- Registered
- 23 Oct 2021
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
Completion pushed back 4 months
P52100049679- Registered
- 22 Feb 2023
- Promised
- 31 Mar 2028
- Revised
- 31 Jul 2028
Completion pushed back 4 months
P52100052535- Registered
- 8 Sep 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
Completion pushed back 4 months
P52100053291- Registered
- 23 Oct 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
4 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100031475 | 23 Oct 2021 | 31 Dec 2026 | 30 Apr 2027 | Mantra Zirconia Private Limited | Project page |
| P52100049679 | 22 Feb 2023 | 31 Mar 2028 | 31 Jul 2028 | Mantra Zirconia Private Limited | Project page |
| P52100052535 | 8 Sep 2023 | 31 Dec 2027 | 30 Apr 2028 | Mantra Zirconia Private Limited | Project page |
| P52100053291 | 23 Oct 2023 | 31 Dec 2027 | 30 Apr 2028 | Mantra Zirconia Private Limited | Project page |
4 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building A | 21 | 44 |
| Building B | 22 | 86 |
| Building C | 22 | 86 |
| H Building | 8 | 60 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
192 of 276 units booked (70%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100052535 | Building A | 3 BHK DUPLEX | 96.57 sq m · 1,039 sq ft | 39 | 36 |
| P52100052535 | Building A | Landowners Unit | 96.57 sq m · 1,039 sq ft | 5 | 0 |
| P52100053291 | Building B | 2BHK | 63.39 sq m · 682 sq ft | 12 | 8 |
| P52100053291 | Building B | 3BHK | 80.76 sq m · 869 sq ft | 28 | 21 |
| P52100053291 | Building B | Landowners Unit | 45.53 sq m · 490 sq ft | 3 | 0 |
| P52100053291 | Building B | Landowners Unit | 63.39 sq m · 682 sq ft | 28 | 0 |
| P52100053291 | Building B | Landowners Unit | 80.76 sq m · 869 sq ft | 15 | 0 |
| P52100049679 | Building C | 2BHK | 63.39 sq m · 682 sq ft | 30 | 30 |
Show all 21 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100049679 | Building C | 3BHK | 80.76 sq m · 869 sq ft | 40 | 40 |
| P52100049679 | Building C | Landowners Unit | 45.53 sq m · 490 sq ft | 3 | 0 |
| P52100049679 | Building C | Landowners Unit | 63.39 sq m · 682 sq ft | 10 | 0 |
| P52100049679 | Building C | Landowners Unit | 80.76 sq m · 869 sq ft | 3 | 0 |
| P52100031475 | H Building | 1BHK | 38.95 sq m · 419 sq ft | 49 | 49 |
| P52100031475 | H Building | Landowners Unit | 32.14 sq m · 346 sq ft | 1 | 0 |
| P52100031475 | H Building | Landowners Unit | 40.23 sq m · 433 sq ft | 1 | 0 |
| P52100031475 | H Building | Shop | 27.13 sq m · 292 sq ft | 2 | 2 |
| P52100031475 | H Building | Shop | 32.14 sq m · 346 sq ft | 1 | 1 |
| P52100031475 | H Building | Shop | 47.66 sq m · 513 sq ft | 3 | 2 |
| P52100031475 | H Building | Shop | 50.45 sq m · 543 sq ft | 1 | 1 |
| P52100031475 | H Building | Shop | 50.54 sq m · 544 sq ft | 1 | 1 |
| P52100031475 | H Building | Shop | 81.01 sq m · 872 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
4 documents held by Deedo, 543 filings listed on MahaRERA's project page
Registration certificate (4)
Finance
Show all 547 documentsShow fewer documents
Legal
- Legal Title reportP52100031475 · KESHAVNAGAR.pdf · uploaded 8 Oct 2021Source
- Legal Title reportP52100031475 · LEGAL TITILE.pdf · uploaded 8 Oct 2021Source
- Declaration Form BP52100031475 · fORM B PROMOTOR.pdf · uploaded 12 Oct 2021Source
- Legal Title reportP52100031475 · MAHA RERA-ADDITIONAL TITLE REPORT-DATED-15-3-2022-ADV-DIPESH LAD_0001_compressed.pdf · uploaded 16 Mar 2022Source
- Declaration Form BP52100049679 · Form B Promoter.pdf · uploaded 14 Jan 2023Source
- Legal Title reportP52100049679 · LEGAL TITLE.pdf · uploaded 30 Jan 2023Source
- Declaration Form BP52100052535 · Form B Promoter.pdf · uploaded 25 Jul 2023Source
- Legal Title reportP52100052535 · LEGAL TITLE.pdf · uploaded 4 Aug 2023Source
- Declaration Form BP52100053291 · FORM B_Promoter.pdf · uploaded 4 Oct 2023Source
- Legal Title reportP52100053291 · MAHA RERA-LEGAL TITLE REPORT-DATED-04-10-2023-ADV-SANDEEP MALI_EXTREME compressed (1).pdf · uploaded 5 Oct 2023Source
Migrated
- 1 PAN CardP52100031475 · PAN Card.pdf · uploaded 8 Oct 2021Source
- 1 Copy of the legal title reportP52100031475 · KESHAVNAGAR.pdf · uploaded 8 Oct 2021Source
- 2 Copy of the legal title reportP52100031475 · LEGAL TITILE.pdf · uploaded 8 Oct 2021Source
- 1 Details of encumbrancesP52100031475 · ENCUMB.pdf · uploaded 8 Oct 2021Source
- 1 Copy of Layout Approval (in case of layout)P52100031475 · Layout Plan_compressed (2).pdf · uploaded 8 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100031475 · H_compressed.pdf · uploaded 8 Oct 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100031475 · commencement.pdf · uploaded 8 Oct 2021Source
- 1 Declaration about Commencement CertificateP52100031475 · CC Declaration.pdf · uploaded 8 Oct 2021Source
- 1 Proforma of Allotment letterP52100031475 · ATS DCLRTN.pdf · uploaded 8 Oct 2021Source
- 2 Proforma of Allotment letterP52100031475 · Letter of Allotement.pdf · uploaded 8 Oct 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · ca CERTIFICATE.pdf · uploaded 11 Oct 2021Source
- 1 Declaration in FORM BP52100031475 · fORM B PROMOTOR.pdf · uploaded 12 Oct 2021Source
- 3 Proforma of Allotment letterP52100031475 · final Draft Mantra Mesmer Phase 5 (Commercial Shops) 13-11-2021_compressed.pdf · uploaded 20 Nov 2021Source
- 2 Copy of Layout Approval (in case of layout)P52100031475 · Layout Plan-01_compressed.pdf · uploaded 3 Jan 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100031475 · Wing H- Mhada-10_compressed.pdf · uploaded 3 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100031475 · Wing H- Mhada-11_compressed.pdf · uploaded 3 Jan 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100031475 · Podium Parking 0compressed.pdf · uploaded 3 Jan 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · architect ph 5.pdf · uploaded 15 Jan 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · ENG_H BUIL PH5.pdf · uploaded 15 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryP52100031475 · SOLD UNSOLD PH5.pdf · uploaded 15 Jan 2022Source
- 1 CERSAI detailsP52100031475 · Simply Cersai - village MANTRA MESMER PHASE 5.pdf · uploaded 15 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA PH 5_compressed (1).pdf · uploaded 15 Jan 2022Source
- 3 Copy of the legal title reportP52100031475 · MAHA RERA-ADDITIONAL TITLE REPORT-DATED-15-3-2022-ADV-DIPESH LAD_0001_compressed.pdf · uploaded 16 Mar 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · FORM 1_ARC CERT_PH5_H COMM.pdf · uploaded 7 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Form 2_ENG CERT_Phase 5_compressed.pdf · uploaded 7 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100031475 · Form 2A_ENG CERT_Phase 5_H Wing, Comm.pdf · uploaded 7 Apr 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 7 Jul 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert_Ph 5.pdf · uploaded 18 Oct 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert_Ph 5.pdf · uploaded 18 Oct 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · Ca Cert_Ph 5.pdf · uploaded 20 Oct 2022Source
- 1 PAN CardP52100049679 · Mantra ZIrconia Pvt Ltd.pdf · uploaded 10 Jan 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100049679 · legal encumb.pdf · uploaded 10 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalP52100049679 · legal encumb.pdf · uploaded 10 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100049679 · Layout Plan_compressed.pdf · uploaded 10 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100049679 · Wing C_compressed.pdf · uploaded 10 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100049679 · Parking Plan_compressed.pdf · uploaded 10 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100049679 · CC_compressed (2).pdf · uploaded 10 Jan 2023Source
- 1 Declaration about Commencement CertificateP52100049679 · cc declaration.pdf · uploaded 10 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA certificate.pdf · uploaded 10 Jan 2023Source
- 1 Proforma of Agreement for saleP52100049679 · ATS_compressed (1).pdf · uploaded 10 Jan 2023Source
- 1 Proforma of Allotment letterP52100049679 · ALLOTMENT LETTER.pdf · uploaded 10 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100049679 · bank account declaration.pdf · uploaded 10 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterP52100049679 · Deviation allotment letter.pdf · uploaded 10 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100049679 · Deviation Agreement.pdf · uploaded 10 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100031475 · legal encumb.pdf · uploaded 10 Jan 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100031475 · FINANACE ENCUMB.pdf · uploaded 10 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalP52100031475 · legal encumb.pdf · uploaded 10 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalP52100031475 · FINANACE ENCUMB.pdf · uploaded 10 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100031475 · Form 2A_ENG CERT_Phase 5_H Wing Commercial.pdf · uploaded 10 Jan 2023Source
- 2 Disclosure of sold/ booked inventoryP52100031475 · SOLD UNSOLD.pdf · uploaded 10 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100031475 · Rajan Gupta_Signed.pdf · uploaded 10 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100031475 · Rohit Gupta Director Declaration.pdf · uploaded 10 Jan 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP52100031475 · SIDDHARTH JAIN.pdf · uploaded 10 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)P52100031475 · form 5 letter.pdf · uploaded 10 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100031475 · form 5 letter.pdf · uploaded 10 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100031475 · form 5 letter.pdf · uploaded 10 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100031475 · form 5 letter.pdf · uploaded 10 Jan 2023Source
- 1 Proforma of Agreement for saleP52100031475 · ATS.pdf · uploaded 10 Jan 2023Source
- 4 Proforma of Allotment letterP52100031475 · Allotment Letter.pdf · uploaded 10 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100031475 · bank declaration.pdf · uploaded 10 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterP52100031475 · DEVIATION ALLOTMENT.pdf · uploaded 10 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100031475 · DEVIATION ATS.pdf · uploaded 10 Jan 2023Source
- 1 Declaration in FORM BP52100049679 · Form B Promoter.pdf · uploaded 14 Jan 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 19 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert Ph 5.pdf · uploaded 19 Jan 2023Source
- 3 Disclosure of sold/ booked inventoryP52100031475 · Sold unsold Ph 5.pdf · uploaded 19 Jan 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA PHASE 5.pdf · uploaded 20 Jan 2023Source
- 3 Copy of Layout Approval (in case of layout)P52100031475 · Layout Plan 01_compressed.pdf · uploaded 23 Jan 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100031475 · 10 Mhada H-Wing_compressed.pdf · uploaded 23 Jan 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100031475 · 2 Parking Plan_compressed.pdf · uploaded 23 Jan 2023Source
- 2 Declaration about Commencement CertificateP52100031475 · Zirconia_CC Decl.pdf · uploaded 23 Jan 2023Source
- 1 Other – TechnicalP52100031475 · letter_compressed.pdf · uploaded 23 Jan 2023Source
- 1 Copy of the legal title reportP52100049679 · LEGAL TITLE.pdf · uploaded 30 Jan 2023Source
- 1 CERSAI detailsP52100049679 · cersai declaration.pdf · uploaded 30 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100049679 · Rajan Gupta.pdf · uploaded 30 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100049679 · Rohit Gupta.pdf · uploaded 30 Jan 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP52100049679 · Siddharth Jain.pdf · uploaded 30 Jan 2023Source
- 1 Other – TechnicalP52100049679 · cc letter.pdf · uploaded 31 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100049679 · finance encumb DONE.pdf · uploaded 9 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalP52100049679 · finance encumb DONE.pdf · uploaded 9 Feb 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100031475 · Bank Declaration Ph 5_.pdf · uploaded 21 Mar 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 13 Apr 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 18 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert Ph 5.pdf · uploaded 19 Apr 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Arc Cert Ph 4.pdf · uploaded 20 Apr 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Eng Cert Ph 4.pdf · uploaded 20 Apr 2023Source
- 1 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 20 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA Certificate_MANTRA_MESMER_Phase_4_compressed.pdf · uploaded 20 Apr 2023Source
- 4 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 20 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Certificate_MANTRA_MESMER_Phase_5_compressed.pdf · uploaded 20 Apr 2023Source
- 2 Proforma of Agreement for saleP52100049679 · ATS.pdf · uploaded 2 May 2023Source
- 2 Deviation Report with respect to model copy of AgreementP52100049679 · Deviation Report_compressed.pdf · uploaded 3 May 2023Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100049679 · Mesmer_Bank Declaration_Signed_Phase 4.pdf · uploaded 1 Jun 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100049679 · layout_compressed.pdf · uploaded 9 Jun 2023Source
- 3 Copy of Layout Approval (in case of layout)P52100049679 · layout 2_compressed.pdf · uploaded 9 Jun 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100049679 · wing c building Plan_compressed.pdf · uploaded 9 Jun 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100049679 · cc.pdf · uploaded 9 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100049679 · Mesmer Form 2A.pdf · uploaded 12 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100049679 · Mesmer Form 2A.pdf · uploaded 12 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100049679 · Mesmer Form 2A.pdf · uploaded 12 Jul 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100049679 · Mesmer Form 2A.pdf · uploaded 12 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100049679 · Form 2A Ph 4.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)P52100049679 · Mesmer Form 5.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100049679 · Mesmer Form 5.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100049679 · Mesmer Form 5.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100049679 · Mesmer Form 5.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100049679 · Mesmer Form 5.pdf · uploaded 12 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Arc Cert Ph 4.pdf · uploaded 17 Jul 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Eng Cert Ph 4.pdf · uploaded 17 Jul 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 17 Jul 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert Ph 5.pdf · uploaded 17 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 19 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA Cert Ph 4.pdf · uploaded 19 Jul 2023Source
- 5 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 19 Jul 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5.pdf · uploaded 19 Jul 2023Source
- 1 PAN CardP52100052535 · 1 PAN Card.pdf · uploaded 24 Jul 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100052535 · PLAN -01-12_compressed.pdf · uploaded 24 Jul 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100052535 · PLAN-02-12_compressed.pdf · uploaded 24 Jul 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100052535 · PLAN-03-12_compressed.pdf · uploaded 24 Jul 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100052535 · CC_compressed.pdf · uploaded 24 Jul 2023Source
- 1 Declaration about Commencement CertificateP52100052535 · CC Declaration.pdf · uploaded 24 Jul 2023Source
- 1 CERSAI detailsP52100052535 · Cersai Declaration.pdf · uploaded 24 Jul 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100052535 · Dislosure of Interest 1.pdf · uploaded 24 Jul 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100052535 · Dislosure of Interest_compressed 2.pdf · uploaded 24 Jul 2023Source
- 1 Proforma of Agreement for saleP52100052535 · MESMER A BUILDING ATS - - 21-7-2023.pdf · uploaded 24 Jul 2023Source
- 1 Proforma of Allotment letterP52100052535 · allotment letter RERA -MANTRA MESMER A BUILDING.pdf · uploaded 24 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100052535 · Bank Account Declaration.pdf · uploaded 24 Jul 2023Source
- 1 Deviation Report with respect to Allotment letterP52100052535 · Deviation Allotment Letter.pdf · uploaded 24 Jul 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100052535 · Deviation Model Agreement.pdf · uploaded 24 Jul 2023Source
- 1 Declaration in FORM BP52100052535 · Form B Promoter.pdf · uploaded 25 Jul 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert.pdf · uploaded 25 Jul 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100052535 · Finance Encumberance.pdf · uploaded 26 Jul 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100052535 · Legal Encumberance.pdf · uploaded 26 Jul 2023Source
- 1 b Details of encumbrances concerned to LegalP52100052535 · Finance Encumberance.pdf · uploaded 26 Jul 2023Source
- 2 b Details of encumbrances concerned to LegalP52100052535 · Legal Encumberance.pdf · uploaded 26 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · Mesmer Ph 4.pdf · uploaded 27 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031475 · Form 2A Ph 5.pdf · uploaded 3 Aug 2023Source
- 1 Copy of the legal title reportP52100052535 · LEGAL TITLE.pdf · uploaded 4 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100049679 · Mesmer_FORM 5_Phase 4_Letter.pdf · uploaded 29 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100031475 · Mesmer_FORM 5_Phase 5.pdf · uploaded 29 Aug 2023Source
- 2 Copy of Layout Approval (in case of layout)P52100052535 · plan-1-13_compressed.pdf · uploaded 18 Sep 2023Source
- 3 Copy of Layout Approval (in case of layout)P52100052535 · plan-2-13_compressed.pdf · uploaded 18 Sep 2023Source
- 4 Copy of Layout Approval (in case of layout)P52100052535 · PLAN-03-13_compressed.pdf · uploaded 18 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100052535 · CC-1151-23 DT 21-08-2023.pdf · uploaded 18 Sep 2023Source
- 1 PAN CardP52100053291 · Mantra ZIrconia Pvt Ltd_PAN.pdf · uploaded 4 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100053291 · Layout Plan-1-13_compressed.pdf · uploaded 4 Oct 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053291 · Wing B-05-13_Building Plan_compressed.pdf · uploaded 4 Oct 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100053291 · Parking plan-2-13_compressed.pdf · uploaded 4 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053291 · CC-1151-23 DT 21-08-2023.pdf · uploaded 4 Oct 2023Source
- 1 Declaration about Commencement CertificateP52100053291 · Mesmer phase 7_Declearation CC.pdf · uploaded 4 Oct 2023Source
- 1 Declaration in FORM BP52100053291 · FORM B_Promoter.pdf · uploaded 4 Oct 2023Source
- 1 CERSAI detailsP52100053291 · Mesmer phase 7_Declearation Cersai.pdf · uploaded 4 Oct 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · Mesmer phase 7_CA Certificate.pdf · uploaded 4 Oct 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100053291 · Disclosure of Interest_Mr Rohit Gupta.pdf · uploaded 4 Oct 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100053291 · Mesmer phase 7_Declearation Bank account.pdf · uploaded 4 Oct 2023Source
- 1 Copy of the legal title reportP52100053291 · MAHA RERA-LEGAL TITLE REPORT-DATED-04-10-2023-ADV-SANDEEP MALI_EXTREME compressed (1).pdf · uploaded 5 Oct 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100053291 · Mesmer phase 7_Finance encumbrances.pdf · uploaded 5 Oct 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100053291 · Mesmer phase 7_Legal encumbrances.pdf · uploaded 5 Oct 2023Source
- 1 b Details of encumbrances concerned to LegalP52100053291 · Mesmer phase 7_Finance encumbrances.pdf · uploaded 5 Oct 2023Source
- 2 b Details of encumbrances concerned to LegalP52100053291 · Mesmer phase 7_Legal encumbrances.pdf · uploaded 5 Oct 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100053291 · Disclosure of Interest_Mr Siddharth Jain.pdf · uploaded 5 Oct 2023Source
- 1 Proforma of Allotment letterP52100053291 · allotment letter RERA -MANTRA MESMER B BUILDING_PDF.pdf · uploaded 5 Oct 2023Source
- 1 Proforma of Agreement for saleP52100053291 · MESMER B BUILDING ATS-03-10-2023_PDF.pdf · uploaded 5 Oct 2023Source
- 1 Deviation Report with respect to Allotment letterP52100053291 · Deviation report_Allotement letter.pdf · uploaded 5 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100053291 · Deviation report_ATS.pdf · uploaded 5 Oct 2023Source
- 1 Other – TechnicalP52100053291 · Mesmer_Phase 7_Decleartion_COI_Death Certi.pdf · uploaded 16 Oct 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Arc Cert Ph 6.pdf · uploaded 17 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100052535 · Eng Cert Ph 6.pdf · uploaded 17 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Arc Cert Ph 4.pdf · uploaded 17 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100049679 · Eng Cert Ph 4.pdf · uploaded 17 Oct 2023Source
- 3 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold pHASE 4.pdf · uploaded 17 Oct 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA Certificate_MANTRA_MESMER_Phase_4 R_compressed.pdf · uploaded 17 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 17 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100031475 · Eng Cert Ph 5.pdf · uploaded 17 Oct 2023Source
- 6 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold pHASE 5.pdf · uploaded 17 Oct 2023Source
- 7 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold pHASE 5.pdf · uploaded 17 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100031475 · Mesmer_PHASE 5_21-22.pdf · uploaded 17 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Eng Cert Ph 6.pdf · uploaded 18 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryP52100052535 · Sold Unsold pHASE 6.pdf · uploaded 18 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert Ph 6.pdf · uploaded 18 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Eng Cert Ph 4.pdf · uploaded 18 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert Ph 5.pdf · uploaded 18 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5.pdf · uploaded 18 Oct 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100052535 · Mantra Mesmer Ph 6.pdf · uploaded 21 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalP52100052535 · Mantra Mesmer Ph 6.pdf · uploaded 21 Dec 2023Source
- 3 a Details of encumbrances concerned to FinanceP52100049679 · Mantra Mesmer Ph 4.pdf · uploaded 21 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalP52100049679 · Mantra Mesmer Ph 4.pdf · uploaded 21 Dec 2023Source
- 4 a Details of encumbrances concerned to FinanceP52100031475 · Mantra Mesmer Ph 5.pdf · uploaded 21 Dec 2023Source
- 3 b Details of encumbrances concerned to LegalP52100031475 · Mantra Mesmer Ph 5.pdf · uploaded 21 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Form 2 Eng Cert Ph 6.pdf · uploaded 10 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert Ph 6.pdf · uploaded 10 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Form 2 Eng Cert Ph 4.pdf · uploaded 10 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Form 2 Eng Cert Ph 5.pdf · uploaded 10 Jan 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5.pdf · uploaded 10 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Form 2 Eng Cert Ph 6.pdf · uploaded 15 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert Ph 6.pdf · uploaded 15 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Form 2 Eng Cert Ph 4.pdf · uploaded 15 Jan 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Form 2 Eng Cert Ph 5.pdf · uploaded 15 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5.pdf · uploaded 15 Jan 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Arc Cert Ph 7.pdf · uploaded 17 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · Form 2 Eng Cert Ph 7.pdf · uploaded 17 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 17 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · CA Cert Ph 7.pdf · uploaded 17 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Arc Cert Ph 6.pdf · uploaded 17 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryP52100052535 · Sold Unsold Ph 6.pdf · uploaded 17 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Arc Cert Ph 4.pdf · uploaded 17 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 17 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · Ca Cert Ph 4.pdf · uploaded 17 Jan 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 17 Jan 2024Source
- 8 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 17 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-1-2022.pdf · uploaded 1 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-4-2022.pdf · uploaded 1 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-7-2022.pdf · uploaded 1 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-10-2022.pdf · uploaded 1 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-1-2023.pdf · uploaded 1 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-4-2023.pdf · uploaded 1 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-7-2023.pdf · uploaded 1 Feb 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Certi_FORM 1_ABCD_3-1-2024.pdf · uploaded 1 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_ABCD_15-1-2022.pdf · uploaded 1 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_Engg Certi_10-4-2022.pdf · uploaded 1 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_ABCD_15-7-2022.pdf · uploaded 1 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_ABCD_10-10-2022.pdf · uploaded 1 Feb 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_ABCD_10-1-2023.pdf · uploaded 1 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_Engg Certi_10-4-2023.pdf · uploaded 1 Feb 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_Engg Certi_10-7-2023.pdf · uploaded 1 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2_ABCD_15-1-2024.pdf · uploaded 1 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100053291 · FORM 2A_ABCD_15-4-2022.pdf · uploaded 1 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100053291 · FORM 2A_ABCD_15-4-2023.pdf · uploaded 1 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-1-2022.pdf · uploaded 1 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-4-2022.pdf · uploaded 1 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-7-2022.pdf · uploaded 1 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-10-2022.pdf · uploaded 1 Feb 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-1-2023.pdf · uploaded 1 Feb 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-4-2023.pdf · uploaded 1 Feb 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-7-2022.pdf · uploaded 1 Feb 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-10-2022.pdf · uploaded 1 Feb 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-1-2023.pdf · uploaded 1 Feb 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-4-2023.pdf · uploaded 1 Feb 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-7-2023.pdf · uploaded 1 Feb 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3_CA Certi_ABCD_10-1-2024.pdf · uploaded 1 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100053291 · Zirconia Pvt Ltd_ABCD_Phase 4_21-22.pdf · uploaded 1 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100053291 · Zirconia Pvt Ltd_ABCD_Phase 4_22-23.pdf · uploaded 1 Feb 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100053291 · Zirconia Pvt Ltd_ABCD_Phase 4_22-23.pdf · uploaded 1 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100053291 · WING B - 1 2 3 4 5 6 7 8 9_compressed.pdf · uploaded 26 Mar 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100053291 · WING B – 10 11 12 13 14 15 16 17 18_compressed.pdf · uploaded 26 Mar 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100052535 · WING A - 1 2 3 4 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 22_compressed.pdf · uploaded 26 Mar 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100052535 · WING A - 13 14_compressed.pdf · uploaded 26 Mar 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100049679 · WING C - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22_compressed.pdf · uploaded 26 Mar 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100031475 · WING H – 1 2 3 4 5 6_compressed.pdf · uploaded 26 Mar 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100031475 · WING H - 7_compressed.pdf · uploaded 26 Mar 2024Source
- 2 Copy of Layout Approval (in case of layout)P52100053291 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- 3 Copy of Layout Approval (in case of layout)P52100053291 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100053291 · CC 2484 23 DT 04012024_compressed.pdf · uploaded 27 Mar 2024Source
- 5 Copy of Layout Approval (in case of layout)P52100052535 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- 6 Copy of Layout Approval (in case of layout)P52100052535 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100052535 · CC 2484 23 DT 04012024_compressed.pdf · uploaded 27 Mar 2024Source
- 4 Copy of Layout Approval (in case of layout)P52100049679 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- 5 Copy of Layout Approval (in case of layout)P52100049679 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentP52100049679 · CC 2484 23 DT 04012024_compressed.pdf · uploaded 27 Mar 2024Source
- 4 Copy of Layout Approval (in case of layout)P52100031475 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- 5 Copy of Layout Approval (in case of layout)P52100031475 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100031475 · CC 2484 23 DT 04012024_compressed.pdf · uploaded 27 Mar 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Arc Cert Ph 7.pdf · uploaded 17 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Arc Cert Ph 6.pdf · uploaded 17 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryP52100052535 · Sold Unsold Ph 6.pdf · uploaded 17 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Arc Cert Ph 4.pdf · uploaded 17 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 17 Apr 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100031475 · Sold Unsold Ph 5.pdf · uploaded 17 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Arc Cert Ph 5.pdf · uploaded 17 Apr 2024Source
- 2 Disclosure of sold/ booked inventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 18 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · Eng Cert Ph 7.pdf · uploaded 19 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Eng Cert Ph 6.pdf · uploaded 19 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · Ca Cert Ph 6.pdf · uploaded 19 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Eng Cert Ph 4.pdf · uploaded 19 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · Ca Cert Ph 4.pdf · uploaded 19 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Cert Ph 5.pdf · uploaded 19 Apr 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · Ca Cert Ph 5.pdf · uploaded 19 Apr 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · Ca Cert Ph 7.pdf · uploaded 20 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100053291 · Form 2A Mantra Zirconia Ph-7.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100052535 · Form 2A Mantra Zirconia Ph-6.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100049679 · Form 2A Mantra Zirconia Ph-4.pdf · uploaded 17 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100031475 · Form 2A Mantra Zirconia Ph-5.pdf · uploaded 17 May 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · form 1 ph 7 mesmer.pdf · uploaded 17 Jul 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · form 1 ph 6 mesmer.pdf · uploaded 17 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · form 1 ph 4 mesmer.pdf · uploaded 17 Jul 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · form 1 ph 5 mesmer.pdf · uploaded 17 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · FORM 2 MESMER PH 7.pdf · uploaded 18 Jul 2024Source
- 3 Disclosure of sold/ booked inventoryP52100053291 · mesmer ph 7 sold unsold.pdf · uploaded 18 Jul 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · FORM 3 MESMER PH 7.pdf · uploaded 18 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · FORM 2 MESMER PH 5.pdf · uploaded 18 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · FORM 2 MESMER PH 6.pdf · uploaded 18 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryP52100052535 · mesmer ph 6 sold unsold.pdf · uploaded 18 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · FORM 3 MESMER PH 6.pdf · uploaded 18 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · FORM 2 MESMER PH 4.pdf · uploaded 18 Jul 2024Source
- 6 Disclosure of sold/ booked inventoryP52100049679 · mesmer ph 4 sold unsold.pdf · uploaded 18 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · FORM 3 MESMER PH 4.pdf · uploaded 18 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · FORM 2 MESMER PH 5.pdf · uploaded 18 Jul 2024Source
- 9 Disclosure of sold/ booked inventoryP52100031475 · mesmer ph 5 sold unsold.pdf · uploaded 18 Jul 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · FORM 3 MESMER PH 5.pdf · uploaded 18 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Architect Ph 7.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · Engi Ph 7.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 18 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Architect Ph 6.pdf · uploaded 18 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Architect Ph 4.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Engi Ph 4.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 18 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Architect Ph 5.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Engi Ph 5.pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · CA Cert Ph 7_compressed.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert Ph 6_compressed.pdf · uploaded 19 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5_compressed.pdf · uploaded 19 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100053291 · DECLARATION encumbrances Phase 7.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP52100053291 · DECLARATION encumbrances Phase 7.pdf · uploaded 11 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100052535 · DECLARATION encumbrances Phase 6.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP52100052535 · DECLARATION encumbrances Phase 6.pdf · uploaded 11 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100049679 · DECLARATION encumbrances Phase 4.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP52100049679 · DECLARATION encumbrances Phase 4.pdf · uploaded 11 Nov 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100031475 · DECLARATION encumbrances Phase 5.pdf · uploaded 11 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP52100031475 · DECLARATION encumbrances Phase 5.pdf · uploaded 11 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100053291 · mesmer ph 7.pdf · uploaded 27 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100052535 · mesmer ph 6.pdf · uploaded 27 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100049679 · mesmer ph 4.pdf · uploaded 27 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100031475 · mesmer ph 5.pdf · uploaded 27 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100053291 · LAY-OUT_compressed.pdf · uploaded 29 Nov 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100053291 · CC-2387-24, 30-10-2024_compressed.pdf · uploaded 29 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100053291 · WING B---1,2,3,5,9,15,19,21,.pdf · uploaded 29 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100053291 · WING B---4,6,7,8,10,11,12,13,14,16,17,18,20,22.pdf · uploaded 29 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Archi Ph 7.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · CA PH 7.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · Engi Ph 7.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Archi Ph 6.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA PH 6.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Engi Ph 6.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052535 · Sold Unsold Ph 6.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Archi Ph 4.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA PH 4.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Engi Ph 4.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Archi Ph 5.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA PH 5.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Engi Ph 5.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100053291 · Architect Ph 7.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100053291 · CA Cert Ph 7_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100053291 · Eng Ph 7.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 19 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100052535 · Architect Ph 6.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100052535 · CA Cert Ph 6_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100052535 · Eng Ph 6.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100052535 · Sold Unsold Ph 6.pdf · uploaded 19 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100049679 · Architect Ph 4.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100049679 · CA Cert Ph 4_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100049679 · Eng Ph 4.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 19 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100031475 · Architect Ph 5.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100031475 · CA Cert Ph 5_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100031475 · Eng Ph 5.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 19 Apr 2025Source
- Form 1P52100053291 · Architect Ph 7.pdf · uploaded 10 Jun 2025Source
- Form 2P52100053291 · Eng Ph 7.pdf · uploaded 10 Jun 2025Source
- Form 3P52100053291 · CA Cert Ph 7_compressed (2).pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100053291 · Sold Unsold Ph 7.pdf · uploaded 10 Jun 2025Source
- Self-declaration of Quarterly ProgressP52100053291 · Self Declaration Mesmer Ph 7.pdf · uploaded 10 Jun 2025Source
- Form 1P52100052535 · Architect Ph 6.pdf · uploaded 10 Jun 2025Source
- Form 2P52100052535 · Eng Ph 6.pdf · uploaded 10 Jun 2025Source
- Form 3P52100052535 · CA Cert Ph 6_compressed (2).pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100052535 · Sold Unsold Ph 6.pdf · uploaded 10 Jun 2025Source
- Self-declaration of Quarterly ProgressP52100052535 · Self Declaration Mantra Mesmer Ph 6.pdf · uploaded 10 Jun 2025Source
- Form 1P52100049679 · Architect Ph 4.pdf · uploaded 10 Jun 2025Source
- Form 2P52100049679 · Eng Ph 4.pdf · uploaded 10 Jun 2025Source
- Form 3P52100049679 · CA Cert Ph 4.pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100049679 · Sold Unsold Ph 4.pdf · uploaded 10 Jun 2025Source
- Self-declaration of Quarterly ProgressP52100049679 · Self Declaration Mesmer Ph 4.pdf · uploaded 10 Jun 2025Source
- Form 1P52100031475 · Architect Ph 5.pdf · uploaded 10 Jun 2025Source
- Form 2P52100031475 · Eng Ph 5.pdf · uploaded 10 Jun 2025Source
- Form 3P52100031475 · CA Cert Ph 5_compressed (3).pdf · uploaded 10 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100031475 · Sold Unsold Ph 5.pdf · uploaded 10 Jun 2025Source
- Self-declaration of Quarterly ProgressP52100031475 · Self Declaration Mesmer Ph 5.pdf · uploaded 10 Jun 2025Source
- Form 5 (FY 2023-2024)P52100053291 · mesmer ph 7.pdf · uploaded 10 Jul 2025Source
- Form 5 (FY 2023-2024)P52100052535 · mesmer ph 6.pdf · uploaded 10 Jul 2025Source
- Form 5 (FY 2023-2024)P52100049679 · mesmer ph 4.pdf · uploaded 10 Jul 2025Source
- Form 5 (FY 2023-2024)P52100031475 · mesmer ph 5.pdf · uploaded 10 Jul 2025Source
- Form 5 (FY 2024-2025)P52100053291 · mesmer ph 7_Uploaded.pdf · uploaded 6 Aug 2025Source
- Form 5 (FY 2024-2025)P52100052535 · mesmer ph 6_Uploaded.pdf · uploaded 6 Aug 2025Source
- Form 5 (FY 2024-2025)P52100049679 · mesmer ph 4_Uploaded.pdf · uploaded 6 Aug 2025Source
- Form 5 (FY 2024-2025)P52100031475 · mesmer ph 5_uploaded.pdf · uploaded 6 Aug 2025Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 7.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 7.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 7.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100052535 · Form 1 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100052535 · Form 2 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100052535 · Form 3 Phase 6.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100049679 · Form 1 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100049679 · Form 1 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100049679 · Form 1 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100049679 · Form 2 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100049679 · Form 2 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100049679 · Form 2 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100049679 · Form 3 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100049679 · Form 3 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100049679 · Form 3 Phase 4.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100031475 · Form 1 Phase 5.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2P52100031475 · Form 2 Phase 5.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3P52100031475 · Form 3 Phase 5.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 7.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P52100052535 · Form 1 Phase 6.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P52100052535 · Form 2 Phase 6.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P52100052535 · Form 3 Phase 6.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P52100031475 · Form 1 Phase 5.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2P52100031475 · Form 2 Phase 5.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3P52100031475 · Form 3 Phase 5.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1P52100053291 · Form 1 Phase 7.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 2P52100053291 · Form 2 Phase 7.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 3P52100053291 · Form 3 Phase 7.pdf · uploaded 7 May 2026Source
- Form 5 (FY 2025-2026)P52100053291 · Phase_7_Mesmer.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 1P52100052535 · Form 1 Phase 6.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 2P52100052535 · Form 2 Phase 6.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 3P52100052535 · Form 3 Phase 6.pdf · uploaded 7 May 2026Source
- Form 5 (FY 2025-2026)P52100052535 · Phase_6_Mesmer.pdf · uploaded 7 May 2026Source
- Form 5 (FY 2025-2026)P52100049679 · Phase_4_Mesmer.pdf · uploaded 7 May 2026Source
- Form 5 (FY 2025-2026)P52100031475 · Phase_5_Mesmer.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 1P52100049679 · Form 1 Phase 4.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 2P52100049679 · Form 2 Phase 4.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 3P52100049679 · Form 3 Phase 4.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 1P52100031475 · Form 1 Phase 5.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 2P52100031475 · Form 2 Phase 5.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 3P52100031475 · Form 3 Phase 5.pdf · uploaded 7 Jul 2026Source
- Withdrawal Update Form 1P52100053291 · Mesmer Ph 7 Form 1.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 2P52100053291 · Mesmer Ph 7 Form 2.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 3P52100053291 · Mesmer Ph 7 Form 3.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 1P52100052535 · Mesmer Ph 6 Form 1.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 2P52100052535 · Mesmer PH 6 Form 2.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 3P52100052535 · Mesmer Ph 6 Form 3.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 1P52100049679 · Mesmer Ph 4 Form 1.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 2P52100049679 · Mesmer Ph 4 Form 2.pdf · uploaded 17 Aug 2026Source
- Withdrawal Update Form 3P52100049679 · Mesmer Ph 4 Form 3.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2025-2026)P52100053291 · mesmer phase 7.pdf · uploaded 22 Sep 2026Source
- Form 2A (FY 2025-2026)P52100052535 · mesmer phase 6.pdf · uploaded 22 Sep 2026Source
- Form 2A (FY 2025-2026)P52100031475 · Form 2A Mesmer Ph 5.pdf · uploaded 23 Sep 2026Source
Technical
- DocumentP52100031475 · Layout Plan_compressed (2).pdf · uploaded 8 Oct 2021Source
- DocumentP52100031475 · H_compressed.pdf · uploaded 8 Oct 2021Source
- DocumentP52100031475 · Layout Plan-01_compressed.pdf · uploaded 3 Jan 2022Source
- DocumentP52100031475 · Wing H- Mhada-10_compressed.pdf · uploaded 3 Jan 2022Source
- DocumentP52100031475 · Wing H- Mhada-11_compressed.pdf · uploaded 3 Jan 2022Source
- DocumentP52100031475 · Podium Parking 0compressed.pdf · uploaded 3 Jan 2022Source
- DocumentP52100049679 · Layout Plan_compressed.pdf · uploaded 10 Jan 2023Source
- DocumentP52100049679 · Wing C_compressed.pdf · uploaded 10 Jan 2023Source
- DocumentP52100049679 · Parking Plan_compressed.pdf · uploaded 10 Jan 2023Source
- DocumentP52100031475 · Layout Plan 01_compressed.pdf · uploaded 23 Jan 2023Source
- DocumentP52100031475 · 10 Mhada H-Wing_compressed.pdf · uploaded 23 Jan 2023Source
- DocumentP52100031475 · 2 Parking Plan_compressed.pdf · uploaded 23 Jan 2023Source
- Other – TechnicalP52100031475 · letter_compressed.pdf · uploaded 23 Jan 2023Source
- Other – TechnicalP52100049679 · cc letter.pdf · uploaded 31 Jan 2023Source
- DocumentP52100049679 · layout_compressed.pdf · uploaded 9 Jun 2023Source
- DocumentP52100049679 · layout 2_compressed.pdf · uploaded 9 Jun 2023Source
- DocumentP52100049679 · wing c building Plan_compressed.pdf · uploaded 9 Jun 2023Source
- DocumentP52100052535 · PLAN -01-12_compressed.pdf · uploaded 24 Jul 2023Source
- DocumentP52100052535 · PLAN-02-12_compressed.pdf · uploaded 24 Jul 2023Source
- DocumentP52100052535 · PLAN-03-12_compressed.pdf · uploaded 24 Jul 2023Source
- DocumentP52100052535 · plan-1-13_compressed.pdf · uploaded 18 Sep 2023Source
- DocumentP52100052535 · plan-2-13_compressed.pdf · uploaded 18 Sep 2023Source
- DocumentP52100052535 · PLAN-03-13_compressed.pdf · uploaded 18 Sep 2023Source
- DocumentP52100053291 · Layout Plan-1-13_compressed.pdf · uploaded 4 Oct 2023Source
- DocumentP52100053291 · Wing B-05-13_Building Plan_compressed.pdf · uploaded 4 Oct 2023Source
- DocumentP52100053291 · Parking plan-2-13_compressed.pdf · uploaded 4 Oct 2023Source
- Other – TechnicalP52100053291 · Mesmer_Phase 7_Decleartion_COI_Death Certi.pdf · uploaded 16 Oct 2023Source
- DocumentP52100053291 · WING B - 1 2 3 4 5 6 7 8 9_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100053291 · WING B – 10 11 12 13 14 15 16 17 18_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100052535 · WING A - 1 2 3 4 5 6 7 8 9 10 11 12 15 16 17 18 19 20 21 22_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100052535 · WING A - 13 14_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100049679 · WING C - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100031475 · WING H – 1 2 3 4 5 6_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100031475 · WING H - 7_compressed.pdf · uploaded 26 Mar 2024Source
- DocumentP52100053291 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100053291 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100052535 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100052535 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100049679 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100049679 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100031475 · LAYOUT compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100031475 · PARKING_compressed.pdf · uploaded 27 Mar 2024Source
- DocumentP52100031475 · Sold Unsold Ph 5.pdf · uploaded 17 Apr 2024Source
- DocumentP52100053291 · LAY-OUT_compressed.pdf · uploaded 29 Nov 2024Source
- DocumentP52100053291 · WING B---1,2,3,5,9,15,19,21,.pdf · uploaded 29 Nov 2024Source
- DocumentP52100053291 · WING B---4,6,7,8,10,11,12,13,14,16,17,18,20,22.pdf · uploaded 29 Nov 2024Source
Technical (Architect)
- DocumentP52100053291 · Architect Ph 7.pdf · uploaded 18 Oct 2024Source
- DocumentP52100052535 · Architect Ph 6.pdf · uploaded 18 Oct 2024Source
- DocumentP52100049679 · Architect Ph 4.pdf · uploaded 18 Oct 2024Source
- DocumentP52100031475 · Architect Ph 5.pdf · uploaded 18 Oct 2024Source
- DocumentP52100053291 · Archi Ph 7.pdf · uploaded 20 Jan 2025Source
- DocumentP52100052535 · Archi Ph 6.pdf · uploaded 20 Jan 2025Source
- DocumentP52100049679 · Archi Ph 4.pdf · uploaded 20 Jan 2025Source
- DocumentP52100031475 · Archi Ph 5.pdf · uploaded 20 Jan 2025Source
- DocumentP52100053291 · Architect Ph 7.pdf · uploaded 19 Apr 2025Source
- DocumentP52100052535 · Architect Ph 6.pdf · uploaded 19 Apr 2025Source
- DocumentP52100049679 · Architect Ph 4.pdf · uploaded 19 Apr 2025Source
- DocumentP52100031475 · Architect Ph 5.pdf · uploaded 19 Apr 2025Source
- DocumentP52100031475 · Form 1 Phase 5.pdf · uploaded 20 Jul 2026Source
- DocumentP52100049679 · Mesmer Ph 4 Form 1.pdf · uploaded 14 Aug 2026Source
- DocumentP52100053291 · Mesmer Ph 7 Form 1.pdf · uploaded 17 Aug 2026Source
- DocumentP52100052535 · Mesmer Ph 6 Form 1.pdf · uploaded 17 Aug 2026Source
Technical (Engineer)
- DocumentP52100053291 · Engi Ph 7.pdf · uploaded 18 Oct 2024Source
- DocumentP52100049679 · Engi Ph 4.pdf · uploaded 18 Oct 2024Source
- DocumentP52100031475 · Engi Ph 5.pdf · uploaded 18 Oct 2024Source
- DocumentP52100053291 · Engi Ph 7.pdf · uploaded 20 Jan 2025Source
- DocumentP52100052535 · Engi Ph 6.pdf · uploaded 20 Jan 2025Source
- DocumentP52100049679 · Engi Ph 4.pdf · uploaded 20 Jan 2025Source
- DocumentP52100031475 · Engi Ph 5.pdf · uploaded 20 Jan 2025Source
- DocumentP52100053291 · Eng Ph 7.pdf · uploaded 19 Apr 2025Source
- DocumentP52100052535 · Eng Ph 6.pdf · uploaded 19 Apr 2025Source
- DocumentP52100049679 · Eng Ph 4.pdf · uploaded 19 Apr 2025Source
- DocumentP52100031475 · Eng Ph 5.pdf · uploaded 19 Apr 2025Source
- DocumentP52100031475 · Form 2 Phase 5.pdf · uploaded 7 Jul 2026Source
- DocumentP52100049679 · Mesmer Ph 4 Form 2.pdf · uploaded 14 Aug 2026Source
- DocumentP52100053291 · Mesmer Ph 7 Form 2.pdf · uploaded 17 Aug 2026Source
- DocumentP52100052535 · Mesmer PH 6 Form 2.pdf · uploaded 17 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Mundhawa, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 12m Wide Internal Road
- South
- Adj Hissa No 54
- East
- Amenity Space
- West
- 18 M Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Jay Aeram & Associates | — | P52100049679 |
| Architect | Jay Aeram & Associates | — | P52100031475 |
| Architect | Jay Aeram & Associates | — | P52100052535 |
| Architect | Mitesh Sidhpura& Associates | — | P52100053291 |
| Chartered accountant | CA Avtarsingh H Saini | — | P52100049679 |
| Chartered accountant | CA Avtarsingh H Saini | — | P52100031475 |
| Chartered accountant | CA Shruti Agarwal | — | P52100053291 |
| Chartered accountant | Shruti Agarwal | — | P52100052535 |
Show all 25 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | Shruti Agarwal | — | P52100049679 |
| Engineer | Anil Gawas | — | P52100031475 |
| Engineer | Anil Gawas | — | P52100049679 |
| Engineer | Anil Gawas | — | P52100052535 |
| Engineer | Anil Gawas | — | P52100053291 |
| Engineer | Rajesh Mankani | — | P52100053291 |
| Engineer | Rajesh Mankani Design Werks | — | P52100049679 |
| Engineer | Rajesh Mankani Design Werks | — | P52100031475 |
| Engineer | Rajesh Mankani Design Werks | — | P52100052535 |
| Engineer | Ravi Rawal | — | P52100053291 |
| Engineer | Ravi Rawal | — | P52100031475 |
| Engineer | Ravi Rawal | — | P52100052535 |
| Engineer | Ravi Rawal | — | P52100049679 |
| Registered real estate agent | Nagarjun Subbaya Tadikala | — | P52100053291 |
| Registered real estate agent | Nagarjun Subbaya Tadikala | — | P52100031475 |
| Registered real estate agent | Nagarjun Subbaya Tadikala | — | P52100049679 |
| Registered real estate agent | Nagarjun Subbaya Tadikala | — | P52100052535 |
Source: MahaRERA project page. Contact details are not shown.