Shreehari Heights

Certificate Signed

Moshi, Pune 412105 |Promoter: M/S Ramchandra Group

10 Aug 2021Registered with MahaRERA
6 Oct 2024Promised completion
1Building
24Units registered9 booked (38%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop24 units in all
Address
Survey No 22 Cts No 151, Near Jaiganesh Lawn, MoshiPIN 412105
Designated bank account
109
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.67905, 73.85158
Shreehari Heights is at latitude 18.67905, longitude 73.85158.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 6 Oct 2024

The latest completion date on record passed 2 years ago.

Registered
10 Aug 2021
Promised
6 Oct 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003026710 Aug 20216 Oct 20246 Oct 2024M/S Ramchandra GroupProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shreehari Heights924

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

9 of 24 units booked (38%), as the promoter reported to MahaRERA

1BHK · 6 units2BHK · 10 unitsShop · 8 units
TypeCarpet areaUnitsBooked
1BHK39.4 sq m · 424 sq ft10
1BHK44.95 sq m · 484 sq ft53
2BHK55.28 sq m · 595 sq ft43
2BHK55.87 sq m · 601 sq ft63
Shop6.09 sq m · 66 sq ft10
Shop7.42 sq m · 80 sq ft10
Shop24.48 sq m · 264 sq ft10
Shop25.62 sq m · 276 sq ft10
Shop26.75 sq m · 288 sq ft10
Shop28.21 sq m · 304 sq ft30

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 137 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPANCARD FIRM.pdf · uploaded 9 Jul 2021Source

Legal

  • Declaration Form Bform B (2).pdf · uploaded 9 Jul 2021Source
  • Legal Title reportsearch tital report_compressed.pdf · uploaded 20 Jul 2021Source
  • Legal Title reportKaagaz_20210731_160533826225.pdf · uploaded 20 Jul 2021Source
  • Declaration Form BP52100030267_FileName_2.pdf · uploaded 9 Feb 2025Source
  • Declaration Form BP52100030267_FileName_2.pdf · uploaded 9 Feb 2025Source

Migrated

  • 1 PAN CardPANCARD FIRM.pdf · uploaded 9 Jul 2021Source
Show all 138 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrance.pdf · uploaded 9 Jul 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 9 Jul 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentIMG_0002.pdf · uploaded 9 Jul 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentIMG_0001 (2).pdf · uploaded 9 Jul 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate (1).pdf · uploaded 9 Jul 2021Source
  • 1 Declaration about Commencement Certificateformat D.pdf · uploaded 9 Jul 2021Source
  • 1 Declaration in FORM Bform B (2).pdf · uploaded 9 Jul 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC_CER_GAT NO22(p).pdf · uploaded 9 Jul 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_compressed.pdf · uploaded 9 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2 A.pdf · uploaded 9 Jul 2021Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 9 Jul 2021Source
  • 1 Copy of the legal title reportsearch tital report_compressed.pdf · uploaded 20 Jul 2021Source
  • 2 Copy of the legal title reportKaagaz_20210731_160533826225.pdf · uploaded 20 Jul 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentIOD GAT NO 22 _MOSHI.pdf · uploaded 20 Jul 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 20 Jul 2021Source
  • 2 Proforma of Allotment letterAGREEMENT (1).pdf · uploaded 21 Jul 2021Source
  • 3 Proforma of Allotment lettershreehari final draft.pdf · uploaded 9 Mar 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Mar 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Shree Hari Heights.pdf · uploaded 24 Mar 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed (1).pdf · uploaded 24 Mar 2022Source
  • 4 Proforma of Allotment letterFlat Agreement - Ramchandra Group- Morshwar Phulari - Vasant Borate - Sachin Bhokare - Moshi - CTS NO 151.pdf · uploaded 25 Apr 2022Source
  • 5 Proforma of Allotment letterFlat Agreement - Ramchandra Group- Morshwar Phulari -22 09 22 1.pdf · uploaded 23 Sep 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH _LETTER GT NO 22-1.pdf · uploaded 7 Dec 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cerifificate Shri Hari Height.pdf · uploaded 7 Dec 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_compressed.pdf · uploaded 21 Dec 2022Source
  • 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 23 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 23 Feb 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH LETTER.pdf · uploaded 11 Apr 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Shree hari heights.pdf · uploaded 11 Apr 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH_LETTER GAT NO 22.pdf · uploaded 30 Jun 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Shreehari hights jun23.pdf · uploaded 30 Jun 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 Architect’s Certificate.pdf · uploaded 12 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 Engineer’s Certificate.pdf · uploaded 12 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (2).pdf · uploaded 12 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (2).pdf · uploaded 12 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21) (2).pdf · uploaded 12 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 CA Certificate.pdf · uploaded 12 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shir hari hights form 1.pdf · uploaded 23 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 25 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA_gat no 22-1_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA_gat no 22-1_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)20250205-ca_11zon.pdf · uploaded 8 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)20250205-ca_11zon.pdf · uploaded 8 Feb 2025Source
  • 1 Declaration in FORM BP52100030267_FileName_2.pdf · uploaded 9 Feb 2025Source
  • 1 Declaration about Commencement CertificateP52100030267_FileName_1.pdf · uploaded 9 Feb 2025Source
  • 2 Declaration about Commencement CertificateP52100030267_FileName_0.pdf · uploaded 9 Feb 2025Source
  • 1 Declaration in FORM BP52100030267_FileName_2.pdf · uploaded 9 Feb 2025Source
  • 1 Declaration about Commencement CertificateP52100030267_FileName_1.pdf · uploaded 9 Feb 2025Source
  • 2 Declaration about Commencement CertificateP52100030267_FileName_0.pdf · uploaded 9 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ilovepdf_merged_organized (2).pdf · uploaded 15 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)organized (1)_compressed.pdf · uploaded 15 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)organized.pdf · uploaded 15 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ilovepdf_merged_organized (2).pdf · uploaded 15 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)organized (1)_compressed.pdf · uploaded 15 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)organized.pdf · uploaded 15 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - June 2024.pdf · uploaded 1 Mar 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)organized (27).pdf · uploaded 1 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Mar 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf · uploaded 11 Mar 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (2).pdf · uploaded 13 Mar 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (4).pdf · uploaded 13 Mar 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (5).pdf · uploaded 13 Mar 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (6).pdf · uploaded 13 Mar 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (7).pdf · uploaded 13 Mar 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (8).pdf · uploaded 13 Mar 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (9).pdf · uploaded 13 Mar 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (10).pdf · uploaded 13 Mar 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate (2).pdf · uploaded 13 Mar 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca.pdf · uploaded 13 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)GetUserDocumentFileContent (1) (1).pdf · uploaded 13 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 13 Mar 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 13 Mar 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 13 Mar 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1) (1).pdf · uploaded 13 Mar 2025Source
  • 1 Disclosure of sold/ booked inventory20250303-153815.pdf · uploaded 13 Mar 2025Source
  • 14 Disclosure of sold/ booked inventory10 Disclosure of sold_ booked inventory (1).pdf · uploaded 13 Mar 2025Source
  • 13 Disclosure of sold/ booked inventory4 Disclosure of sold_ booked inventory (3).pdf · uploaded 13 Mar 2025Source
  • 12 Disclosure of sold/ booked inventory4 Disclosure of sold_ booked inventory (2).pdf · uploaded 13 Mar 2025Source
  • 11 Disclosure of sold/ booked inventory4 Disclosure of sold_ booked inventory (1).pdf · uploaded 13 Mar 2025Source
  • 10 Disclosure of sold/ booked inventory20250303-153700.pdf · uploaded 13 Mar 2025Source
  • 9 Disclosure of sold/ booked inventory20250303-153433.pdf · uploaded 13 Mar 2025Source
  • 8 Disclosure of sold/ booked inventory20250303-153433.pdf · uploaded 13 Mar 2025Source
  • 7 Disclosure of sold/ booked inventory20250303-153848.pdf · uploaded 13 Mar 2025Source
  • 6 Disclosure of sold/ booked inventory20250303-153555.pdf · uploaded 13 Mar 2025Source
  • 5 Disclosure of sold/ booked inventory20250303-153742.pdf · uploaded 13 Mar 2025Source
  • 4 Disclosure of sold/ booked inventory20250303-153520.pdf · uploaded 13 Mar 2025Source
  • 3 Disclosure of sold/ booked inventory20250303-153926.pdf · uploaded 13 Mar 2025Source
  • 2 Disclosure of sold/ booked inventory20250303-153627.pdf · uploaded 13 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)20250306-101442.pdf · uploaded 13 Mar 2025Source

Technical

  • DocumentLayout.pdf · uploaded 9 Jul 2021Source
  • DocumentIMG_0002.pdf · uploaded 9 Jul 2021Source
  • DocumentIMG_0001 (2).pdf · uploaded 9 Jul 2021Source
  • DocumentIOD GAT NO 22 _MOSHI.pdf · uploaded 20 Jul 2021Source

Technical (Architect)

  • DocumentShir hari hights form 1.pdf · uploaded 23 Apr 2024Source
  • DocumentRERA_gat no 22-1_merged_organized.pdf · uploaded 6 Feb 2025Source
  • DocumentRERA_gat no 22-1_merged_organized.pdf · uploaded 6 Feb 2025Source
  • Documentilovepdf_merged_organized (2).pdf · uploaded 15 Feb 2025Source
  • Documentilovepdf_merged_organized (2).pdf · uploaded 15 Feb 2025Source
  • Document1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • Document1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • Document2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • Document2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • Document6 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • Document8 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 11 Mar 2025Source
  • Document8 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 11 Mar 2025Source
  • Document8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Mar 2025Source
  • Document9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Mar 2025Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 25 Apr 2024Source
  • Documentilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • Documentilovepdf_merged_organized.pdf · uploaded 6 Feb 2025Source
  • Documentorganized.pdf · uploaded 15 Feb 2025Source
  • Documentorganized.pdf · uploaded 15 Feb 2025Source
  • DocumentEngineer Certificate - June 2024.pdf · uploaded 1 Mar 2025Source
  • Documentorganized (27).pdf · uploaded 1 Mar 2025Source
  • Document1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 13 Mar 2025Source
  • Document1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1) (1).pdf · uploaded 13 Mar 2025Source
  • Document2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 13 Mar 2025Source
  • Document2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 13 Mar 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Moshi, Haveli taluka

Survey, CTS, gat or plot numbers

SURVEY NO 22 CTS NO 151

Boundaries

North
30 M Wide D P Road
South
6 M Wide Road
East
Cts No 152
West
Remaining Property Of Cts No 151

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSachin Ladkat And Associates—
Chartered accountantSushil Ajmera And Company—
EngineerK P Badgujar Consulants Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology