Northend Tower
Certificate SignedMoshi, Pune 412105 |Promoter: Four P Realities
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK, Office space, Shop144 units in all
- Address
- Gat no 49, 50/1, Pune - Nashik Highway, MoshiPIN 412105
- Designated bank account
- 220
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
26 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 12 Oct 2026 | Rental | ≈ ₹1.2 L | — | ||
| 9 Oct 2026 | Bldg Name | Rental | ≈ ₹30,000 | — | |
| 9 Oct 2026 | Rental | ≈ ₹3.1 L | — | ||
| 8 Oct 2026 | Bldg Name · Unit 907 | Rental | ≈ ₹30,000 | — | |
| 5 Oct 2026 | Bldg Name | Rental | ≈ ₹20,000 | — | |
| 23 Sep 2026 | Bldg Name · Unit 305 | Rental | ≈ ₹30,000 | — | |
| 8 Sep 2026 | Bldg Name · Unit 502 | Rental | ≈ ₹30,000 | — | |
| 14 Aug 2026 | Bldg Name | Rental | — | — | |
| 20 Jun 2026 | Correction | ≈ ₹10,000 | — | ||
| 15 Jun 2026 | Bldg Name | Rental | ≈ ₹20,000 | — | |
| 11 Jun 2026 | Bldg Name · Unit 501 | Rental | ≈ ₹10,000 | — | |
| 11 May 2026 | Bldg Name | Rental | ≈ ₹20,000 | — | |
| 27 Apr 2026 | Bldg Name | Rental | ≈ ₹40,000 | — | |
| 20 Apr 2026 | Primary sale | ≈ ₹10,000 | — | ||
| 16 Apr 2026 | Bldg Name · Unit Flat | Rental | ≈ ₹30,000 | — | |
| 6 Apr 2026 | Bldg Name · Unit 706 | Rental | ≈ ₹20,000 | — | |
| 12 Mar 2026 | Bldg Name · Unit 909 | Rental | ≈ ₹30,000 | — | |
| 8 Mar 2026 | Bldg Name | Rental | ≈ ₹30,000 | — | |
| 5 Mar 2026 | Correction | ≈ ₹10,000 | — | ||
| 5 Mar 2026 | Correction | ≈ ₹10,000 | — | ||
| 20 Feb 2026 | Bldg Name | Rental | ≈ ₹60,000 | — | |
| 16 Feb 2026 | Bldg Name | Rental | ≈ ₹10,000 | — | |
| 10 Feb 2026 | Primary sale | ≈ ₹10,000 | — | ||
| 6 Feb 2026 | Bldg Name · Unit 908 | Rental | ≈ ₹30,000 | — | |
| 5 Feb 2026 | Bldg Name · Unit 410 | Rental | ≈ ₹30,000 | — | |
| 19 Jan 2026 | Bldg Name | Rental | ≈ ₹30,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Dec 2023
The latest completion date on record passed 2 years and 10 months ago.
- Registered
- 16 Dec 2019
- Promised
- 30 Dec 2023
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100023464 | 16 Dec 2019 | 30 Dec 2023 | 30 Dec 2023 | Four P Realities | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building A | 13 | 144 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
82 of 144 units booked (57%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 33.04 sq m · 356 sq ft | 10 | 4 |
| 1BHK | 33.39 sq m · 359 sq ft | 1 | 0 |
| 1BHK | 33.93 sq m · 365 sq ft | 8 | 5 |
| 1BHK | 34.12 sq m · 367 sq ft | 4 | 1 |
| 1BHK | 34.74 sq m · 374 sq ft | 9 | 6 |
| 1BHK | 38.86 sq m · 418 sq ft | 9 | 4 |
| 1BHK | 39.27 sq m · 423 sq ft | 9 | 2 |
| 1BHK | 39.38 sq m · 424 sq ft | 10 | 6 |
Show all 56 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 44.12 sq m · 475 sq ft | 5 | 1 |
| 2BHK | 45.59 sq m · 491 sq ft | 9 | 6 |
| 2BHK | 47.69 sq m · 513 sq ft | 9 | 3 |
| 2BHK | 49.03 sq m · 528 sq ft | 9 | 6 |
| Office space | 11.54 sq m · 124 sq ft | 1 | 1 |
| Office space | 14.19 sq m · 153 sq ft | 1 | 0 |
| Office space | 14.46 sq m · 156 sq ft | 5 | 3 |
| Office space | 14.51 sq m · 156 sq ft | 1 | 1 |
| Office space | 14.7 sq m · 158 sq ft | 1 | 1 |
| Office space | 15.2 sq m · 164 sq ft | 1 | 0 |
| Office space | 17.95 sq m · 193 sq ft | 1 | 1 |
| Office space | 18.5 sq m · 199 sq ft | 1 | 0 |
| Office space | 18.81 sq m · 202 sq ft | 2 | 0 |
| Office space | 19.02 sq m · 205 sq ft | 1 | 1 |
| Office space | 19.8 sq m · 213 sq ft | 1 | 0 |
| Office space | 19.86 sq m · 214 sq ft | 1 | 0 |
| Shop | 15.06 sq m · 162 sq ft | 1 | 1 |
| Shop | 15.42 sq m · 166 sq ft | 1 | 1 |
| Shop | 16.66 sq m · 179 sq ft | 1 | 1 |
| Shop | 17.86 sq m · 192 sq ft | 1 | 0 |
| Shop | 18.12 sq m · 195 sq ft | 1 | 1 |
| Shop | 18.66 sq m · 201 sq ft | 1 | 1 |
| Shop | 19.12 sq m · 206 sq ft | 1 | 0 |
| Shop | 20.8 sq m · 224 sq ft | 1 | 1 |
| Shop | 21.08 sq m · 227 sq ft | 1 | 1 |
| Shop | 21.42 sq m · 231 sq ft | 1 | 1 |
| Shop | 23.6 sq m · 254 sq ft | 1 | 0 |
| Shop | 26.01 sq m · 280 sq ft | 1 | 1 |
| Shop | 26.09 sq m · 281 sq ft | 1 | 1 |
| Shop | 29.27 sq m · 315 sq ft | 1 | 1 |
| Shop | 29.43 sq m · 317 sq ft | 2 | 2 |
| Shop | 29.46 sq m · 317 sq ft | 1 | 1 |
| Shop | 30.55 sq m · 329 sq ft | 1 | 1 |
| Shop | 31.8 sq m · 342 sq ft | 1 | 1 |
| Shop | 32.42 sq m · 349 sq ft | 1 | 1 |
| Shop | 32.49 sq m · 350 sq ft | 1 | 1 |
| Shop | 33.77 sq m · 363 sq ft | 1 | 1 |
| Shop | 33.82 sq m · 364 sq ft | 1 | 1 |
| Shop | 33.96 sq m · 366 sq ft | 1 | 0 |
| Shop | 35.28 sq m · 380 sq ft | 1 | 1 |
| Shop | 38.43 sq m · 414 sq ft | 1 | 1 |
| Shop | 38.91 sq m · 419 sq ft | 3 | 3 |
| Shop | 39.4 sq m · 424 sq ft | 1 | 1 |
| Shop | 39.66 sq m · 427 sq ft | 1 | 1 |
| Shop | 40.13 sq m · 432 sq ft | 1 | 1 |
| Shop | 42.17 sq m · 454 sq ft | 1 | 1 |
| Shop | 51.15 sq m · 551 sq ft | 1 | 0 |
| Shop | 123.43 sq m · 1,329 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 93 filings listed on MahaRERA's project page
Finance
- PAN CardPancard fourprealities.pdf · uploaded 13 Oct 2019Source
Legal
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 6 Oct 2019Source
- 1 PAN CardPancard fourprealities.pdf · uploaded 13 Oct 2019Source
- 1 Details of encumbrancesEncumbrances letter pdf.pdf · uploaded 13 Oct 2019Source
- 1 Copy of Layout Approval (in case of layout)Sanctioned layout plan.pdf · uploaded 13 Oct 2019Source
Show all 94 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted development9 Sanctioned layout plan.pdf · uploaded 13 Oct 2019Source
- 2 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 13 Oct 2019Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Oct 2019Source
- 4 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Oct 2019Source
- 5 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 13 Oct 2019Source
- 6 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 13 Oct 2019Source
- 7 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 13 Oct 2019Source
- 8 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 13 Oct 2019Source
- 9 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 13 Oct 2019Source
- 10 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 13 Oct 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 13 Oct 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 13 Oct 2019Source
- 1 Proforma of Allotment letterAgreement to Sale.pdf · uploaded 13 Oct 2019Source
- 1 Copy of the legal title reportSearch Report Copy 1mb.pdf · uploaded 25 Oct 2019Source
- 1 Declaration in FORM BFORM B 1MB.pdf · uploaded 25 Oct 2019Source
- 2 Proforma of Allotment letterAllotment letter.pdf · uploaded 9 Nov 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FPR.pdf · uploaded 12 Dec 2019Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A - (Page1).pdf · uploaded 23 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryDiscolsure of sold_compressed.pdf · uploaded 23 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Copy of CA Audit Certificate 2019-20 northern tower.pdf · uploaded 23 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 28 Jun 2021Source
- 2 Copy of Layout Approval (in case of layout)Lay out 1.pdf · uploaded 6 Aug 2021Source
- 3 Copy of Layout Approval (in case of layout)Lay Out 2.pdf · uploaded 6 Aug 2021Source
- 11 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 6 Aug 2021Source
- 12 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 6 Aug 2021Source
- 13 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 6 Aug 2021Source
- 14 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 6 Aug 2021Source
- 15 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 6 Aug 2021Source
- 16 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 6 Aug 2021Source
- 17 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 6 Aug 2021Source
- 18 Building Plan Approval / NA Order for plotted development10.pdf · uploaded 6 Aug 2021Source
- 19 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 6 Aug 2021Source
- 1 Declaration about Commencement CertificateNorthend Tower Change in Village Name 2.pdf · uploaded 8 Sep 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31032022.pdf · uploaded 8 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31122022.pdf · uploaded 8 Apr 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 8 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31032022.pdf · uploaded 8 Apr 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31122022.pdf · uploaded 8 Apr 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 8 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31032021.pdf · uploaded 8 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31122022.pdf · uploaded 8 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)form 5 2120-21.pdf · uploaded 8 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-22.pdf · uploaded 8 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FOUR P-Q4-ARCH LETTER 2023.pdf · uploaded 15 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)NORTHEND TOWER.pdf · uploaded 15 Sep 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Northend Tower Form 3 31032023.pdf · uploaded 15 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 15 Sep 2023Source
- 2 Disclosure of sold/ booked inventoryNorthend 05-10-2023.pdf · uploaded 5 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FOUR 1.pdf · uploaded 13 Jan 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Jan 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 13 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30062023.pdf · uploaded 13 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 3 31122023.pdf · uploaded 13 Jan 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31122023.pdf · uploaded 22 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31032024.pdf · uploaded 24 Jul 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 N E T 06.pdf · uploaded 24 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 03.pdf · uploaded 24 Jul 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 - 30-06-2024 NET.pdf · uploaded 24 Jul 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 24 Jul 2024Source
Technical
- DocumentSanctioned layout plan.pdf · uploaded 13 Oct 2019Source
- Document9 Sanctioned layout plan.pdf · uploaded 13 Oct 2019Source
- Document1.pdf · uploaded 13 Oct 2019Source
- Document3.pdf · uploaded 13 Oct 2019Source
- Document3.pdf · uploaded 13 Oct 2019Source
- Document4.pdf · uploaded 13 Oct 2019Source
- Document5.pdf · uploaded 13 Oct 2019Source
- Document6.pdf · uploaded 13 Oct 2019Source
- Document7.pdf · uploaded 13 Oct 2019Source
- Document8.pdf · uploaded 13 Oct 2019Source
- Document10.pdf · uploaded 13 Oct 2019Source
- DocumentLay out 1.pdf · uploaded 6 Aug 2021Source
- DocumentLay Out 2.pdf · uploaded 6 Aug 2021Source
- Document1.pdf · uploaded 6 Aug 2021Source
- Document2.pdf · uploaded 6 Aug 2021Source
- Document3.pdf · uploaded 6 Aug 2021Source
- Document5.pdf · uploaded 6 Aug 2021Source
- Document6.pdf · uploaded 6 Aug 2021Source
- Document8.pdf · uploaded 6 Aug 2021Source
- Document9.pdf · uploaded 6 Aug 2021Source
- Document10.pdf · uploaded 6 Aug 2021Source
- Document11.pdf · uploaded 6 Aug 2021Source
Technical (Architect)
- DocumentFORM 1 N E T 06.pdf · uploaded 24 Jul 2024Source
Technical (Engineer)
- DocumentForm 2 03.pdf · uploaded 24 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Moshi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Compound wall
- South
- Compound wall
- East
- 9 Mtr Proposed road
- West
- 60 DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sachin Ladkat and Associates | — |
| Chartered accountant | CA Akashay Baheti and Co | — |
| Chartered accountant | CA Ganesh Sunil Mandlecha | — |
| Engineer | Vikas Pote | — |
| Other | Advocate P N Jadhav | — |
| Other | Apex Consultants | — |
| Other | Deltacom structural consultants | — |
| Other | Mangesh Alhat | — |
| Other | RCC contractor Shilpkar realty | — |
Source: MahaRERA project page. Contact details are not shown.