Nb Towers
Certificate SignedMoshi, Pune 412105 |Promoter: Shekhar Infratech
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 2BHK, Shop, 3BHK201 units in all
- Address
- Sector No 11, Plot No 148 D, Spine Road, Near Tulsi LandmarkPIN 412105
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
7 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 31 May 2026 | Primary sale | — | ≈ ₹9,399 | ||
| 20 Feb 2026 | Primary sale | — | ≈ ₹7,954 | ||
| 20 Feb 2026 | Primary sale | — | ≈ ₹7,733 | ||
| 3 Feb 2026 | Primary sale | — | ≈ ₹9,280 | ||
| 21 Jan 2026 | Primary sale | — | ≈ ₹7,733 | ||
| 9 Jan 2026 | Primary sale | — | ≈ ₹7,019 | ||
| 6 Jan 2026 | Primary sale | — | ≈ ₹7,376 |
Nb Towers in numbers
Registered deals, summarised
Deedo has 7 registered documents at Nb Towers, from Jan 2026 to May 2026: 7 sales. The median registered sale works out to about ₹7,700 per sq ft, at a median of ₹65 L a deal; 0% of sales were resales.
- What is the price per sq ft at Nb Towers?
- The median registered sale works out to about ₹7,700 per sq ft, at a median of ₹65 L a deal; 0% of sales were resales.
- How many properties have been sold at Nb Towers?
- 7 sales are registered at Nb Towers.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nb Towers by Deedo, last updated with deals registered in May 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2026
The latest completion date on record passed 4 months ago.
- Registered
- 20 Sep 2023
- Promised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100052677 | 20 Sep 2023 | 30 Jun 2026 | 30 Jun 2026 | Shekhar Infratech | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
97 of 201 units booked (48%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | 2BHK | 49.12 sq m · 529 sq ft | 10 | 9 |
| Wing A | 2BHK | 62.22 sq m · 670 sq ft | 51 | 25 |
| Wing A | 2BHK | 63.26 sq m · 681 sq ft | 17 | 14 |
| Wing A | Shop | 22.87 sq m · 246 sq ft | 1 | 0 |
| Wing A | Shop | 24 sq m · 258 sq ft | 1 | 0 |
| Wing A | Shop | 25.21 sq m · 271 sq ft | 1 | 1 |
| Wing A | Shop | 25.41 sq m · 274 sq ft | 1 | 1 |
| Wing A | Shop | 27.24 sq m · 293 sq ft | 1 | 1 |
Show all 46 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | Shop | 27.65 sq m · 298 sq ft | 4 | 4 |
| Wing A | Shop | 27.66 sq m · 298 sq ft | 1 | 1 |
| Wing A | Shop | 28.25 sq m · 304 sq ft | 1 | 0 |
| Wing A | Shop | 28.98 sq m · 312 sq ft | 1 | 1 |
| Wing A | Shop | 29.54 sq m · 318 sq ft | 1 | 1 |
| Wing A | Shop | 30.3 sq m · 326 sq ft | 1 | 1 |
| Wing A | Shop | 30.94 sq m · 333 sq ft | 1 | 1 |
| Wing A | Shop | 31.98 sq m · 344 sq ft | 3 | 2 |
| Wing A | Shop | 35.11 sq m · 378 sq ft | 1 | 1 |
| Wing A | Shop | 35.13 sq m · 378 sq ft | 1 | 1 |
| Wing A | Shop | 36.69 sq m · 395 sq ft | 1 | 1 |
| Wing A | Shop | 36.7 sq m · 395 sq ft | 1 | 1 |
| Wing A | Shop | 47.21 sq m · 508 sq ft | 1 | 0 |
| Wing B | 2BHK | 61.15 sq m · 658 sq ft | 4 | 1 |
| Wing B | 3BHK | 72.2 sq m · 777 sq ft | 1 | 0 |
| Wing B | 3BHK | 75.92 sq m · 817 sq ft | 34 | 14 |
| Wing B | 3BHK | 77.6 sq m · 835 sq ft | 19 | 7 |
| Wing B | 3BHK | 78.09 sq m · 841 sq ft | 20 | 3 |
| Wing B | Shop | 22.87 sq m · 246 sq ft | 1 | 1 |
| Wing B | Shop | 24 sq m · 258 sq ft | 1 | 1 |
| Wing B | Shop | 25.21 sq m · 271 sq ft | 1 | 0 |
| Wing B | Shop | 25.41 sq m · 274 sq ft | 1 | 1 |
| Wing B | Shop | 27.24 sq m · 293 sq ft | 1 | 0 |
| Wing B | Shop | 27.65 sq m · 298 sq ft | 1 | 0 |
| Wing B | Shop | 27.65 sq m · 298 sq ft | 1 | 0 |
| Wing B | Shop | 27.65 sq m · 298 sq ft | 1 | 0 |
| Wing B | Shop | 27.65 sq m · 298 sq ft | 1 | 0 |
| Wing B | Shop | 27.66 sq m · 298 sq ft | 1 | 0 |
| Wing B | Shop | 28.98 sq m · 312 sq ft | 1 | 2 |
| Wing B | Shop | 29.54 sq m · 318 sq ft | 1 | 0 |
| Wing B | Shop | 30.3 sq m · 326 sq ft | 1 | 0 |
| Wing B | Shop | 30.94 sq m · 333 sq ft | 1 | 0 |
| Wing B | Shop | 31.98 sq m · 344 sq ft | 3 | 0 |
| Wing B | Shop | 35.11 sq m · 378 sq ft | 1 | 0 |
| Wing B | Shop | 35.13 sq m · 378 sq ft | 1 | 0 |
| Wing B | Shop | 36.69 sq m · 395 sq ft | 1 | 0 |
| Wing B | Shop | 36.7 sq m · 395 sq ft | 1 | 0 |
| Wing B | Shop | 47.21 sq m · 508 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 108 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD SHEKHAR INFRATECH.pdf · uploaded 17 Aug 2023Source
Legal
Migrated
- 1 PAN CardPAN CARD SHEKHAR INFRATECH.pdf · uploaded 17 Aug 2023Source
- 1 a Details of encumbrances concerned to FinanceNinad Bhondve - No Encumbrances Concernd To Finance.pdf · uploaded 26 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceNinad Nandkumar Bhondve - No Encumbrances Concerned To Legal.pdf · uploaded 26 Aug 2023Source
- 1 b Details of encumbrances concerned to LegalNinad Bhondve - No Encumbrances Concernd To Finance.pdf · uploaded 26 Aug 2023Source
Show all 109 documentsShow fewer documents
Migrated
- 2 b Details of encumbrances concerned to LegalNinad Nandkumar Bhondve - No Encumbrances Concerned To Legal.pdf · uploaded 26 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)scan0000005034.pdf · uploaded 26 Aug 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentscan0000005035.pdf · uploaded 26 Aug 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentscan0000005037.pdf · uploaded 26 Aug 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentscan0000005038.pdf · uploaded 26 Aug 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentscan0000005036.pdf · uploaded 26 Aug 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentscan0000005039.pdf · uploaded 26 Aug 2023Source
- 1 Commencement Certificates / NA Order for plotted development20230824193432.pdf · uploaded 26 Aug 2023Source
- 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 26 Aug 2023Source
- 1 Declaration in FORM BFORM B AFFIDAVITE.pdf · uploaded 26 Aug 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)NB Towers Form - 1.pdf · uploaded 26 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)NB Towers Form - 2.pdf · uploaded 26 Aug 2023Source
- 1 Disclosure of sold/ booked inventoryWing AB - Inventory Disclosure.pdf · uploaded 26 Aug 2023Source
- 1 CERSAI detailsUndertaking - For Cersai Report.pdf · uploaded 26 Aug 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form - 3 NB Towers.pdf · uploaded 26 Aug 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Of Interest In Other Real Estate Organizations.pdf · uploaded 26 Aug 2023Source
- 1 Proforma of Allotment letterAL.pdf · uploaded 26 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration About Separate Bank Account For Real Estate Projects.pdf · uploaded 26 Aug 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report For Allotment Letter.pdf · uploaded 26 Aug 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report For Agreement To Sale 27-08-2023.pdf · uploaded 26 Aug 2023Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 27 Aug 2023Source
- 1 Copy of the legal title reportilovepdf_merged_compressed.pdf · uploaded 6 Sep 2023Source
- 3 a Details of encumbrances concerned to FinanceEncumbrance Details Scan.pdf · uploaded 20 Nov 2023Source
- 3 b Details of encumbrances concerned to LegalEncumbrance Details Scan.pdf · uploaded 20 Nov 2023Source
- 2 Copy of Layout Approval (in case of layout)HPSC2186.pdf · uploaded 20 Nov 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSC2187.pdf · uploaded 20 Nov 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSC2188.pdf · uploaded 20 Nov 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentHPSC2189.pdf · uploaded 20 Nov 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentHPSC2190.pdf · uploaded 20 Nov 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentHPSC2191.pdf · uploaded 20 Nov 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentdoc06116920231120170017.pdf · uploaded 20 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shekhar Infratech.pdf · uploaded 5 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shekhar Infratech.pdf · uploaded 5 Dec 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 Shekhar Infratech.pdf · uploaded 5 Dec 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 Shekhar Infratech 22-12-2023.pdf · uploaded 22 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1.pdf · uploaded 15 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31122023.pdf · uploaded 15 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31122023.pdf · uploaded 15 Jan 2024Source
- 2 Proforma of Agreement for saleFINAL Agremeent to sale N B Towers Moshi 08 Feb 2024.pdf · uploaded 9 Feb 2024Source
- 3 Copy of Layout Approval (in case of layout)1 Layout.pdf · uploaded 13 Apr 2024Source
- 11 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 13 Apr 2024Source
- 12 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Apr 2024Source
- 13 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 13 Apr 2024Source
- 14 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 13 Apr 2024Source
- 15 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 13 Apr 2024Source
- 16 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 13 Apr 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentC C.pdf · uploaded 13 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 NB Towers.PDF · uploaded 22 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shekhar Infratech.pdf · uploaded 22 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Towers Form 3.pdf · uploaded 22 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 21 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_11zon (1).pdf · uploaded 21 Jul 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)SHEKHAR INFRATECH FORM 5.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.PDF · uploaded 14 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 14 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 11 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 11 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 17 Apr 2025Source
- Form 1Form 1.pdf · uploaded 20 Jul 2025Source
- Form 2Form 2.PDF · uploaded 20 Jul 2025Source
- Form 3Form 3_compressed.pdf · uploaded 20 Jul 2025Source
- Disclosure of Sold and Booked InventorySOLD.pdf · uploaded 20 Jul 2025Source
- Form 5 (FY 2024-2025)Adobe Scan 27 Sep 2025 (1).pdf · uploaded 30 Sep 2025Source
- Form 1Form 1.pdf · uploaded 9 Oct 2025Source
- Form 2Form 2.pdf · uploaded 9 Oct 2025Source
- Form 3Form 3 Signed.pdf · uploaded 9 Oct 2025Source
- Disclosure of Sold and Booked InventorySold Unsold .pdf · uploaded 9 Oct 2025Source
- Occupational CertificateFull_Occupancy_Certificate.pdf · uploaded 10 Oct 2025Source
- Form 5 (FY 2025-2026)form5 25-26.pdf · uploaded 21 May 2026Source
Technical
- Documentscan0000005034.pdf · uploaded 26 Aug 2023Source
- Documentscan0000005035.pdf · uploaded 26 Aug 2023Source
- Documentscan0000005037.pdf · uploaded 26 Aug 2023Source
- Documentscan0000005038.pdf · uploaded 26 Aug 2023Source
- Documentscan0000005036.pdf · uploaded 26 Aug 2023Source
- Documentscan0000005039.pdf · uploaded 26 Aug 2023Source
- DocumentHPSC2186.pdf · uploaded 20 Nov 2023Source
- DocumentHPSC2187.pdf · uploaded 20 Nov 2023Source
- DocumentHPSC2188.pdf · uploaded 20 Nov 2023Source
- DocumentHPSC2189.pdf · uploaded 20 Nov 2023Source
- DocumentHPSC2190.pdf · uploaded 20 Nov 2023Source
- DocumentHPSC2191.pdf · uploaded 20 Nov 2023Source
- Document1 Layout.pdf · uploaded 13 Apr 2024Source
- Document2.pdf · uploaded 13 Apr 2024Source
- Document3.pdf · uploaded 13 Apr 2024Source
- Document5.pdf · uploaded 13 Apr 2024Source
- Document6.pdf · uploaded 13 Apr 2024Source
- Document4.pdf · uploaded 13 Apr 2024Source
- Document7.pdf · uploaded 13 Apr 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Moshi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Balance Plot Of Same Sector
- South
- 45 Meter Wide Road
- East
- Balance Plot Of Same Sector
- West
- 15 Meter Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vishal Bafana | — |
| Chartered accountant | CA Mohmedyasir A Bagwan | — |
| Chartered accountant | Vinit D Achha And Associates | — |
| Engineer | Ajinkya Lahigud | — |
Source: MahaRERA project page. Contact details are not shown.