Matoshri Serenity

Certificate Signed

Moshi, Pune 412105 |Promoter: Prarambh Buildcon

27 Jun 2023Registered with MahaRERA
31 Dec 2028Promised completion
1Building
134Units registered78 booked (58%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop134 units in all
Address
Gut No 329, 330, 331, Kudale Vasti, Near Arena City Sport Club, Near Y Junction of Chaudhary Dhaba, Moshi, Pune Maharashtra 412105, Near Arena City Sport Club, Near Y Junction of Chaudhary DhabaPIN 412105
Designated bank account
51
Developed in phases
No

Registered transactions

26 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
14 Oct 2026Primary sale≈ ₹40 L≈ ₹6,230
10 Sep 2026Primary sale≈ ₹30 L≈ ₹7,442
28 Aug 2026Primary sale≈ ₹38 L≈ ₹5,918
27 Aug 2026Primary sale≈ ₹34 L≈ ₹5,725
30 Jun 2026Primary sale≈ ₹41 L≈ ₹6,904
19 Jun 2026Primary sale≈ ₹41 L≈ ₹6,904
3 Jun 2026Primary sale≈ ₹26 L≈ ₹6,450
3 Jun 2026Primary sale≈ ₹27 L≈ ₹6,698
3 Jun 2026Primary sale≈ ₹42 L≈ ₹7,073
27 May 2026Primary sale≈ ₹23 L≈ ₹5,706
7 May 2026Primary sale≈ ₹37 L≈ ₹6,231
27 Apr 2026Primary sale≈ ₹41 L≈ ₹6,904
15 Apr 2026Primary sale≈ ₹41 L≈ ₹6,358
15 Apr 2026Primary sale≈ ₹42 L≈ ₹6,541
15 Apr 2026Primary sale≈ ₹40 L≈ ₹6,736
9 Apr 2026Primary sale≈ ₹40 L≈ ₹6,736
31 Mar 2026Primary sale≈ ₹26 L≈ ₹6,450
30 Mar 2026Primary sale≈ ₹40 L≈ ₹6,736
30 Mar 2026Primary sale≈ ₹40 L≈ ₹6,203
28 Mar 2026Primary sale≈ ₹39 L≈ ₹6,567
20 Mar 2026Primary sale≈ ₹40 L≈ ₹6,736
6 Mar 2026Primary sale≈ ₹41 L≈ ₹6,358
2 Mar 2026Primary sale≈ ₹39 L≈ ₹6,567
25 Feb 2026Primary sale≈ ₹28 L≈ ₹6,946
13 Feb 2026Primary sale≈ ₹40 L≈ ₹6,736
8 Jan 2026Primary sale≈ ₹40 L≈ ₹6,203

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
27 Jun 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005173127 Jun 202331 Dec 202831 Dec 2028Prarambh BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Matoshri Serenity11134

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

78 of 134 units booked (58%), as the promoter reported to MahaRERA

1BHK · 40 units2BHK · 86 unitsShop · 8 units
TypeCarpet areaUnitsBooked
1BHK41.11 sq m · 443 sq ft4027
2BHK61.6 sq m · 663 sq ft4521
2BHK63.43 sq m · 683 sq ft3023
2BHK63.69 sq m · 686 sq ft117
Shop36.45 sq m · 392 sq ft10
Shop42.37 sq m · 456 sq ft10
Shop43.27 sq m · 466 sq ft10
Shop48.13 sq m · 518 sq ft20
Show all 11 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop50.86 sq m · 547 sq ft10
Shop70.74 sq m · 761 sq ft10
Shop72.24 sq m · 778 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 193 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPrarambh Buildcon Pan Card.pdf · uploaded 30 May 2023Source

Legal

  • Legal Title reportTitle Report_1 (3 files merged).pdf · uploaded 30 May 2023Source
  • Declaration Form BFrom B-Developers.pdf · uploaded 2 Jun 2023Source
  • Other – LegalDA Ashok Jambholkar.pdf · uploaded 9 Jun 2023Source
  • Other – LegalDA Ganesh Jambhulkar-1-22.pdf · uploaded 9 Jun 2023Source
  • Other – LegalDA Ganesh Jambhulkar-23-45.pdf · uploaded 9 Jun 2023Source
  • Other – LegalDA Pratap Jamhulkar.pdf · uploaded 9 Jun 2023Source
Show all 194 documentsShow fewer documents

Legal

  • Other – LegalDA Rajesh Jambulkar.pdf · uploaded 9 Jun 2023Source
  • Other – LegalDA Sanjjay Jambhulkar-1-27.pdf · uploaded 9 Jun 2023Source
  • Other – LegalDA Sanjjay Jambhulkar-28-54.pdf · uploaded 9 Jun 2023Source

Migrated

  • 1 PAN CardPrarambh Buildcon Pan Card.pdf · uploaded 30 May 2023Source
  • 1 Copy of the legal title reportTitle Report_1 (3 files merged).pdf · uploaded 30 May 2023Source
  • 1 a Details of encumbrances concerned to FinanceWhomsoerver it may c.pdf · uploaded 30 May 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance concerned.pdf · uploaded 30 May 2023Source
  • 1 b Details of encumbrances concerned to LegalWhomsoerver it may c.pdf · uploaded 30 May 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance concerned.pdf · uploaded 30 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)1 (1).pdf · uploaded 30 May 2023Source
  • 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 30 May 2023Source
  • 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 30 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted development1 (1).pdf · uploaded 30 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 30 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 30 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 30 May 2023Source
  • 1 Declaration about Commencement CertificateDeclaration about c c.pdf · uploaded 30 May 2023Source
  • 1 Proforma of Allotment letterModel from allotment letter (1).pdf · uploaded 30 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate Bank Account Declaration.pdf · uploaded 30 May 2023Source
  • 1 Deviation Report with respect to Allotment letterDetails of deviation of allotment letter.pdf · uploaded 30 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementTo whomsoever it may concern.pdf · uploaded 30 May 2023Source
  • 1 Declaration in FORM BFrom B-Developers.pdf · uploaded 2 Jun 2023Source
  • 1 CERSAI detailsCERSAI Report.pdf · uploaded 2 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Prarambh Buildcon_Initial.pdf · uploaded 2 Jun 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 2 Jun 2023Source
  • 1 Proforma of Agreement for saleAFS.pdf · uploaded 2 Jun 2023Source
  • 1 Other – LegalDA Ashok Jambholkar.pdf · uploaded 9 Jun 2023Source
  • 2 Other – LegalDA Ganesh Jambhulkar-1-22.pdf · uploaded 9 Jun 2023Source
  • 3 Other – LegalDA Ganesh Jambhulkar-23-45.pdf · uploaded 9 Jun 2023Source
  • 4 Other – LegalDA Pratap Jamhulkar.pdf · uploaded 9 Jun 2023Source
  • 5 Other – LegalDA Rajesh Jambulkar.pdf · uploaded 9 Jun 2023Source
  • 6 Other – LegalDA Sanjjay Jambhulkar-1-27.pdf · uploaded 9 Jun 2023Source
  • 7 Other – LegalDA Sanjjay Jambhulkar-28-54.pdf · uploaded 9 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architects certificate Q 2.pdf · uploaded 5 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Q-2_compressed.pdf · uploaded 5 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate Q3.pdf · uploaded 7 Feb 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 Q2.pdf · uploaded 7 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q3.pdf · uploaded 7 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ca Certificate Q3_compressed (1).pdf · uploaded 7 Feb 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Chenge.pdf · uploaded 7 Feb 2024Source
  • 4 Copy of Layout Approval (in case of layout)plan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
  • 5 Copy of Layout Approval (in case of layout)HPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
  • 6 Copy of Layout Approval (in case of layout)HPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
  • 7 Copy of Layout Approval (in case of layout)HPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentSsekar23120212350_ construction commencement.pdf · uploaded 24 Feb 2024Source
  • 1 Disclosure of sold/ booked inventorycertificate-3.pdf · uploaded 24 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Q4.pdf · uploaded 19 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Q4.pdf · uploaded 19 Apr 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD Q4.pdf · uploaded 19 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Q4_compressed.pdf · uploaded 19 Apr 2024Source
  • 3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same4 Project Information (1).pdf · uploaded 19 Apr 2024Source
  • 8 Copy of Layout Approval (in case of layout)HPSC0049.pdf · uploaded 20 Apr 2024Source
  • 9 Copy of Layout Approval (in case of layout)HPSC0049.pdf · uploaded 3 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-Prarambh 22-23.pdf · uploaded 3 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Prarambh.pdf · uploaded 3 May 2024Source
  • 4 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same3 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 3 May 2024Source
  • 3 Disclosure of sold/ booked inventorySold Unsold - Prarambh.pdf · uploaded 24 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sept 2023.pdf · uploaded 31 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- June 2023.pdf · uploaded 31 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf · uploaded 31 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 31 May 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- June 2023.pdf · uploaded 31 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Sept 2023.pdf · uploaded 31 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 31 May 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 31 May 2024Source
  • 4 Disclosure of sold/ booked inventorySold Unsold-Prarambh Sept 2023.pdf · uploaded 31 May 2024Source
  • 5 Disclosure of sold/ booked inventorySold Unsold - Prarambh Dec 2023.pdf · uploaded 31 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM-5 MATOSHRI.pdf · uploaded 7 Jun 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC (2).pdf · uploaded 11 Jun 2024Source
  • 1 Other – TechnicalCC (2).pdf · uploaded 11 Jun 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Prarambh Architect Certificate.pdf · uploaded 6 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2.pdf · uploaded 6 Jul 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)quality assurance certificate.pdf · uploaded 6 Jul 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)quality assurance certificate.pdf · uploaded 6 Jul 2024Source
  • 6 Disclosure of sold/ booked inventorysold-unsold.pdf · uploaded 6 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 6 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 21 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 21 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 21 Oct 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD-UNSOLD.pdf · uploaded 21 Oct 2024Source
  • 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 13 Nov 2024Source
  • 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 13 Nov 2024Source
  • 4 Copy of Layout Approval (in case of layout)4.pdf · uploaded 13 Nov 2024Source
  • 5 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
  • 6 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
  • 7 Copy of Layout Approval (in case of layout)5.pdf · uploaded 13 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 13 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT.pdf · uploaded 13 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 13 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 13 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 13 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 13 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 13 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 23 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 15 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 15 Mar 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed (1).pdf · uploaded 15 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2.pdf · uploaded 15 Mar 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD-UNSOLD Dec-24.pdf · uploaded 15 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3_compressed.pdf · uploaded 21 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-FINAL.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-FINAL.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySU.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 22 Apr 2025Source
  • Form 1F1.pdf · uploaded 2 Aug 2025Source
  • Form 1F1.pdf · uploaded 2 Aug 2025Source
  • Form 1F1.pdf · uploaded 2 Aug 2025Source
  • Form 1F1-FINAL.pdf · uploaded 2 Aug 2025Source
  • Form 1Prarambh Architect Certificate.pdf · uploaded 2 Aug 2025Source
  • Form 1Architects Q4.pdf · uploaded 2 Aug 2025Source
  • Form 2from 2.pdf · uploaded 2 Aug 2025Source
  • Form 2F2-FINAL.pdf · uploaded 2 Aug 2025Source
  • Form 2F2.pdf · uploaded 2 Aug 2025Source
  • Form 2F2-FINAL.pdf · uploaded 2 Aug 2025Source
  • Form 2F2.pdf · uploaded 2 Aug 2025Source
  • Form 2ENGINEER Q4.pdf · uploaded 2 Aug 2025Source
  • Form 3FORM-3_compressed.pdf · uploaded 2 Aug 2025Source
  • Form 3F3-FINAL.pdf · uploaded 2 Aug 2025Source
  • Form 3F3.pdf · uploaded 2 Aug 2025Source
  • Form 3F3-FINAL.pdf · uploaded 2 Aug 2025Source
  • Form 3CA Certificate.pdf · uploaded 2 Aug 2025Source
  • Form 3CA Q4_compressed.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySU.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySU.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD Dec-24.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked Inventorysold-unsold.pdf · uploaded 2 Aug 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD Q4.pdf · uploaded 2 Aug 2025Source
  • Form 1F1-FINAL.pdf · uploaded 6 Nov 2025Source
  • Form 2F2-FINAL.pdf · uploaded 6 Nov 2025Source
  • Form 3F3-FINAL.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 1F1-Q3.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 2F2-Q3.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 3F3-Q3.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 1F1-Q3.pdf · uploaded 13 May 2026Source
  • Withdrawal Update Form 2F2-Q3.pdf · uploaded 13 May 2026Source
  • Withdrawal Update Form 3F1-Q3_compressed.pdf · uploaded 13 May 2026Source
  • Withdrawal Update Form 1F1-Q4.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 2F2-Q4.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 3F3-Q4.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 1Form 1 Prarambh.pdf · uploaded 28 Aug 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 28 Aug 2026Source
  • Withdrawal Update Form 3Signed Form 3- Prarambh.pdf · uploaded 28 Aug 2026Source

Technical

  • Document2.pdf · uploaded 30 May 2023Source
  • Document3.pdf · uploaded 30 May 2023Source
  • Document1 (1).pdf · uploaded 30 May 2023Source
  • Document2.pdf · uploaded 30 May 2023Source
  • Document3.pdf · uploaded 30 May 2023Source
  • Document1 (1).pdf · uploaded 30 May 2023Source
  • Documentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0051_first flor.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0052_2 to fifth.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0053_6th floor.pdf · uploaded 24 Feb 2024Source
  • Documentplan sanction ground and basement.pdf · uploaded 24 Feb 2024Source
  • DocumentHPSC0049.pdf · uploaded 20 Apr 2024Source
  • DocumentHPSC0049.pdf · uploaded 3 May 2024Source
  • Other – TechnicalCC (2).pdf · uploaded 11 Jun 2024Source
  • Document1.pdf · uploaded 13 Nov 2024Source
  • Document2.pdf · uploaded 13 Nov 2024Source
  • Document3.pdf · uploaded 13 Nov 2024Source
  • Document4.pdf · uploaded 13 Nov 2024Source
  • Document5.pdf · uploaded 13 Nov 2024Source
  • Document5.pdf · uploaded 13 Nov 2024Source
  • Document5.pdf · uploaded 13 Nov 2024Source
  • Document1.pdf · uploaded 13 Nov 2024Source
  • Document2.pdf · uploaded 13 Nov 2024Source
  • Document3.pdf · uploaded 13 Nov 2024Source
  • Document4.pdf · uploaded 13 Nov 2024Source
  • Document5.pdf · uploaded 13 Nov 2024Source

Technical (Architect)

  • DocumentF1.pdf · uploaded 21 Oct 2024Source
  • DocumentF1.pdf · uploaded 15 Mar 2025Source
  • DocumentF1.pdf · uploaded 20 Apr 2025Source
  • DocumentForm 1 Prarambh.pdf · uploaded 28 Aug 2026Source

Technical (Engineer)

  • DocumentFORM-2.pdf · uploaded 21 Oct 2024Source
  • DocumentF2.pdf · uploaded 15 Mar 2025Source
  • DocumentF2-FINAL.pdf · uploaded 20 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 28 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Moshi, Haveli taluka

Survey, CTS, gat or plot numbers

330331Gut No 329

Boundaries

North
Existing 18 Meter Wide DP Road
South
6 Meter wide Driveway
East
6 Meter Wide Fire Driveway
West
6 Meter Wide Fire Driveway

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr. Yogesh Wakchaure—
Chartered accountantCA Pravin Pise and Associates—
EngineerR.K.Randhave Consultant—
EngineerShivaji Kadam—

Source: MahaRERA project page. Contact details are not shown.