Barcode
Certificate SignedMoshi, Pune 412105 |Promoter: Rama Ventures
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Office space, Shop215 units in all
- Address
- Gat No 129 Part Plot no 1 Borhadewadi, Moshi-Borhadewadi, BorhadewadiPIN 412105
- Designated bank account
- 82
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 3 years
The latest completion date on record passed 4 months ago.
- Registered
- 21 Oct 2020
- Promised
- 30 Jun 2023
- Revised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026713 | 21 Oct 2020 | 30 Jun 2023 | 30 Jun 2026 | Rama Ventures | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Barcode | 10 | 215 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
65 of 215 units booked (30%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 16.54 sq m · 178 sq ft | 4 | 2 |
| Office space | 17.14 sq m · 184 sq ft | 1 | 0 |
| Office space | 17.61 sq m · 190 sq ft | 5 | 1 |
| Office space | 17.68 sq m · 190 sq ft | 3 | 3 |
| Office space | 18.19 sq m · 196 sq ft | 3 | 1 |
| Office space | 18.25 sq m · 196 sq ft | 1 | 1 |
| Office space | 19.22 sq m · 207 sq ft | 8 | 4 |
| Office space | 20.06 sq m · 216 sq ft | 3 | 0 |
Show all 75 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 21.03 sq m · 226 sq ft | 4 | 0 |
| Office space | 21.26 sq m · 229 sq ft | 4 | 0 |
| Office space | 21.61 sq m · 233 sq ft | 1 | 0 |
| Office space | 21.66 sq m · 233 sq ft | 4 | 1 |
| Office space | 21.73 sq m · 234 sq ft | 4 | 2 |
| Office space | 22.13 sq m · 238 sq ft | 4 | 1 |
| Office space | 22.73 sq m · 245 sq ft | 4 | 2 |
| Office space | 22.86 sq m · 246 sq ft | 4 | 0 |
| Office space | 23.59 sq m · 254 sq ft | 4 | 2 |
| Office space | 23.77 sq m · 256 sq ft | 4 | 0 |
| Office space | 23.89 sq m · 257 sq ft | 4 | 1 |
| Office space | 24.14 sq m · 260 sq ft | 1 | 0 |
| Office space | 25.19 sq m · 271 sq ft | 4 | 0 |
| Office space | 25.28 sq m · 272 sq ft | 4 | 0 |
| Office space | 25.35 sq m · 273 sq ft | 4 | 1 |
| Office space | 25.46 sq m · 274 sq ft | 4 | 2 |
| Office space | 25.73 sq m · 277 sq ft | 3 | 1 |
| Office space | 25.84 sq m · 278 sq ft | 4 | 0 |
| Office space | 26.21 sq m · 282 sq ft | 3 | 1 |
| Office space | 26.29 sq m · 283 sq ft | 1 | 1 |
| Office space | 26.31 sq m · 283 sq ft | 4 | 1 |
| Office space | 27.77 sq m · 299 sq ft | 1 | 0 |
| Office space | 28.17 sq m · 303 sq ft | 4 | 0 |
| Office space | 28.28 sq m · 304 sq ft | 4 | 2 |
| Office space | 28.36 sq m · 305 sq ft | 4 | 2 |
| Office space | 28.72 sq m · 309 sq ft | 3 | 0 |
| Office space | 30.12 sq m · 324 sq ft | 4 | 0 |
| Office space | 30.31 sq m · 326 sq ft | 4 | 1 |
| Office space | 31.26 sq m · 336 sq ft | 4 | 0 |
| Office space | 32.19 sq m · 346 sq ft | 4 | 0 |
| Office space | 32.56 sq m · 350 sq ft | 4 | 1 |
| Office space | 32.67 sq m · 352 sq ft | 4 | 0 |
| Office space | 32.92 sq m · 354 sq ft | 4 | 0 |
| Office space | 33.63 sq m · 362 sq ft | 4 | 1 |
| Office space | 34.14 sq m · 367 sq ft | 4 | 0 |
| Office space | 34.39 sq m · 370 sq ft | 4 | 1 |
| Office space | 34.73 sq m · 374 sq ft | 4 | 2 |
| Office space | 35.15 sq m · 378 sq ft | 4 | 1 |
| Office space | 36.87 sq m · 397 sq ft | 4 | 2 |
| Office space | 39.2 sq m · 422 sq ft | 3 | 1 |
| Office space | 39.28 sq m · 423 sq ft | 1 | 1 |
| Office space | 39.3 sq m · 423 sq ft | 4 | 2 |
| Office space | 46.01 sq m · 495 sq ft | 4 | 0 |
| Office space | 84.52 sq m · 910 sq ft | 3 | 1 |
| Shop | 23.73 sq m · 255 sq ft | 1 | 1 |
| Shop | 24.99 sq m · 269 sq ft | 2 | 2 |
| Shop | 28.53 sq m · 307 sq ft | 2 | 1 |
| Shop | 28.72 sq m · 309 sq ft | 2 | 1 |
| Shop | 28.87 sq m · 311 sq ft | 1 | 0 |
| Shop | 28.88 sq m · 311 sq ft | 2 | 1 |
| Shop | 29.35 sq m · 316 sq ft | 1 | 1 |
| Shop | 30.22 sq m · 325 sq ft | 2 | 2 |
| Shop | 30.97 sq m · 333 sq ft | 2 | 0 |
| Shop | 32.53 sq m · 350 sq ft | 2 | 0 |
| Shop | 33.94 sq m · 365 sq ft | 1 | 1 |
| Shop | 34.67 sq m · 373 sq ft | 2 | 2 |
| Shop | 37.05 sq m · 399 sq ft | 1 | 1 |
| Shop | 37.32 sq m · 402 sq ft | 1 | 1 |
| Shop | 37.51 sq m · 404 sq ft | 1 | 0 |
| Shop | 38.25 sq m · 412 sq ft | 1 | 1 |
| Shop | 41.39 sq m · 446 sq ft | 1 | 1 |
| Shop | 41.72 sq m · 449 sq ft | 1 | 1 |
| Shop | 41.74 sq m · 449 sq ft | 1 | 0 |
| Shop | 41.93 sq m · 451 sq ft | 1 | 1 |
| Shop | 46.97 sq m · 506 sq ft | 1 | 1 |
| Shop | 58.78 sq m · 633 sq ft | 1 | 0 |
| Shop | 67.36 sq m · 725 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 196 filings listed on MahaRERA's project page
Legal
- Legal Title reportTitle Certificate RV.pdf · uploaded 14 Oct 2020Source
- Declaration Form BDeclaration Form B.pdf · uploaded 14 Oct 2020Source
- OtherCompressed PDF MOU.pdf · uploaded 16 Oct 2020Source
- OtherForm D Rama Ventures.pdf · uploaded 17 Jun 2021Source
- OtherMOU FOR UNITS RV-EV Notary No 1337-2022 Dtd 09082022_11zon.pdf · uploaded 18 Aug 2022Source
- Declaration Form BForm B - Rama Ventures.pdf · uploaded 10 Oct 2024Source
Show all 198 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTitle Certificate RV.pdf · uploaded 14 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentsheet No 2-5 Final.pdf · uploaded 14 Oct 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentsheet No 3-5 Final.pdf · uploaded 14 Oct 2020Source
- 3 Building Plan Approval / NA Order for plotted developmentsheet No 4-5 Final.pdf · uploaded 14 Oct 2020Source
- 4 Building Plan Approval / NA Order for plotted developmentsheet No 5-5 Final.pdf · uploaded 14 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE Dtd 02 07 2020.pdf · uploaded 14 Oct 2020Source
- 1 Declaration in FORM BDeclaration Form B.pdf · uploaded 14 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Rama Ventures.pdf · uploaded 14 Oct 2020Source
- 1 Proforma of Allotment letterModel Draft Agreement.pdf · uploaded 14 Oct 2020Source
- 1 Details of encumbrancesEncumbrance RV.pdf · uploaded 16 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)sheet No 1-5 Final.pdf · uploaded 16 Oct 2020Source
- 1 OtherCompressed PDF MOU.pdf · uploaded 16 Oct 2020Source
- 2 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 15 Jan 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentFloor Plan 1.pdf · uploaded 15 Jan 2021Source
- 6 Building Plan Approval / NA Order for plotted developmentFloor Plan 2.pdf · uploaded 15 Jan 2021Source
- 7 Building Plan Approval / NA Order for plotted developmentFloor Plan 3.pdf · uploaded 15 Jan 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement 2021.pdf · uploaded 15 Jan 2021Source
- 3 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 12 Jun 2021Source
- 8 Building Plan Approval / NA Order for plotted development3 4 Floor Plan 7.pdf · uploaded 12 Jun 2021Source
- 9 Building Plan Approval / NA Order for plotted developmentFifth Floor Plan 8.pdf · uploaded 12 Jun 2021Source
- 10 Building Plan Approval / NA Order for plotted developmentFirst Floor Plan 5.pdf · uploaded 12 Jun 2021Source
- 11 Building Plan Approval / NA Order for plotted developmentFourth Basement 3.pdf · uploaded 12 Jun 2021Source
- 12 Building Plan Approval / NA Order for plotted developmentGround 4.pdf · uploaded 12 Jun 2021Source
- 13 Building Plan Approval / NA Order for plotted developmentSecond Basement 2.pdf · uploaded 12 Jun 2021Source
- 14 Building Plan Approval / NA Order for plotted developmentSecond Floor Plan 6.pdf · uploaded 12 Jun 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT Dtd 11 05 2021.pdf · uploaded 12 Jun 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate RV Barcode 12 06 2021.pdf · uploaded 12 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Rama Venture.pdf · uploaded 17 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryRAMA VENTURES - Invenory.pdf · uploaded 17 Jun 2021Source
- 2 OtherForm D Rama Ventures.pdf · uploaded 17 Jun 2021Source
- 1 Declaration about Commencement CertificateForm D Rama Ventures.pdf · uploaded 21 Jun 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)RV Form 2A Barcode Mar 2021.pdf · uploaded 21 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - Rama Ventures.pdf · uploaded 21 Jun 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RV Form 2A Barcode Mar 2021.pdf · uploaded 22 Jun 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate_Barcode RV_09082021_20210812.pdf · uploaded 13 Aug 2021Source
- 2 Disclosure of sold/ booked inventoryBARCODE RV - Inventory_compressed.pdf · uploaded 4 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate_Barcode_RV_05102021_compressed.pdf · uploaded 6 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2 BARCODE RV_compressed.pdf · uploaded 9 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode - Rama Ventures_compressed.pdf · uploaded 11 Oct 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Barcode RV Form 2A DEC-22_compressed.pdf · uploaded 10 Jan 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 BARCODE RV_20220107_compressed.pdf · uploaded 12 Jan 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT Dtd 06012022-BARCODE 11zon 1.pdf · uploaded 15 Jan 2022Source
- 2 Declaration about Commencement CertificateForm - D Barcode Rv Commencement Certificate.pdf · uploaded 15 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)BARCODE Arch Certificate from 1 DEC-21_compressed.pdf · uploaded 22 Jan 2022Source
- 3 Disclosure of sold/ booked inventoryBARCODE RV Inventory DEC-21_11zon.pdf · uploaded 27 Jan 2022Source
- 4 Disclosure of sold/ booked inventoryBARCODE RV Inventory DEC-21 150dpi_11zon.pdf · uploaded 3 Mar 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode RV_compressed.pdf · uploaded 14 Apr 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 BARCODE RV_11zon.pdf · uploaded 27 Apr 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode RV 110722_11zon.pdf · uploaded 13 Jul 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode RV_11zon 150722.pdf · uploaded 15 Jul 2022Source
- 4 Copy of Layout Approval (in case of layout)default 0001_11zon.pdf · uploaded 30 Jul 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentdefault 0004 GROUND_11zon.pdf · uploaded 30 Jul 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentdefault 0006 SECOND FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentdefault 0005 FIRST FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentdefault 0007 THIRD FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentdefault 0008 FOURTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentdefault 0009 FIFTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentdefault 0011 SEVENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentdefault 0013 NINTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentdefault 0014 TENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 3 Declaration about Commencement Certificatedefault 0015 TERRACE FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- 3 OtherMOU FOR UNITS RV-EV Notary No 1337-2022 Dtd 09082022_11zon.pdf · uploaded 18 Aug 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORMS 1 BARCODE RV_11zon.pdf · uploaded 11 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Barcode Rv GE 209 Rama Ventures_001907.pdf · uploaded 28 Oct 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Rv_11zon.pdf · uploaded 16 Jan 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode Rv DEC-22_11zon.pdf · uploaded 16 Jan 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode RV MAR-23.pdf · uploaded 18 Apr 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Barcode RV MAR-23_11zon.pdf · uploaded 5 May 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 BARCODE RV 070723_2_11zon.pdf · uploaded 20 Jul 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode RV.pdf · uploaded 8 Aug 2023Source
- 5 Disclosure of sold/ booked inventoryBARCODE RV Inventory.pdf · uploaded 12 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode Rv SEPTEMBER-23.pdf · uploaded 18 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode Rv SEPTEMBER-23.pdf · uploaded 20 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Barcode Rv SEPTEMBER-23.pdf · uploaded 20 Oct 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 BARCODE RV SEP-23_compressed.pdf · uploaded 30 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 BARCODE RV 01 APRIL 2022 TO 31 MARCH 2023.pdf · uploaded 5 Dec 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Barcode (RV).pdf · uploaded 16 Jan 2024Source
- 6 Disclosure of sold/ booked inventoryBarcode (RV).pdf · uploaded 20 Jan 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Barcode (RV).pdf · uploaded 22 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Barcode (RV).pdf · uploaded 23 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Barcode (RV).pdf · uploaded 24 Jan 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A BARCODE.pdf · uploaded 5 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (RV).pdf · uploaded 10 Apr 2024Source
- 7 Disclosure of sold/ booked inventoryBarcode (RV).pdf · uploaded 11 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (RV).pdf · uploaded 15 Apr 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (RV).pdf · uploaded 16 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (RV).pdf · uploaded 13 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A BARCODE - RV.pdf · uploaded 13 Jul 2024Source
- 8 Disclosure of sold/ booked inventoryBarcode (RV).pdf · uploaded 15 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (RV).pdf · uploaded 16 Jul 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (RV).pdf · uploaded 19 Jul 2024Source
- 1 Declaration in FORM BForm B - Rama Ventures.pdf · uploaded 10 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (RV).pdf · uploaded 18 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryBarcode (RV).pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (RV).pdf · uploaded 22 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (RV).pdf · uploaded 23 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Barcode (RV).pdf · uploaded 26 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryBarcode (RV).pdf · uploaded 10 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Barcode (RV).pdf · uploaded 14 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (RV).pdf · uploaded 16 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (RV).pdf · uploaded 17 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Barcode (RV).pdf · uploaded 14 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Barcode (RV).pdf · uploaded 19 Apr 2025Source
- 1 Other – TechnicalPart Completion Certificate BARCODE dt-02-04-2025_compressed.pdf · uploaded 26 Apr 2025Source
- Form 1Barcode (RV).pdf · uploaded 3 Jul 2025Source
- Form 2Barcode (RV).pdf · uploaded 3 Jul 2025Source
- Form 3Barcode (RV).pdf · uploaded 3 Jul 2025Source
- Disclosure of Sold and Booked InventoryBarcode (RV).pdf · uploaded 3 Jul 2025Source
- Form 2A (FY 2024-2025)Barcode (RV) - Form 2A (signed).pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 1Barcode (RV).pdf · uploaded 5 Sep 2025Source
- Withdrawal Update Form 2Barcode (RV).pdf · uploaded 5 Sep 2025Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 5 Sep 2025Source
- Form 5 (FY 2023-2024)Form 5 - F Y 2023-24 - Barcode (RV).pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 1Barcode (RV) - Form 1 (signed).pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2Barcode (RV) - Form 2 (signed).pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1Barcode (RV) - Form 1 (signed).pdf · uploaded 15 Jan 2026Source
- Withdrawal Update Form 2Barcode (RV) - Form 2 (signed).pdf · uploaded 15 Jan 2026Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 15 Jan 2026Source
- Withdrawal Update Form 1Barcode (RV) - Form 1 (signed).pdf · uploaded 18 Apr 2026Source
- Withdrawal Update Form 2Barcode (RV) - Form 2 (signed).pdf · uploaded 18 Apr 2026Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 18 Apr 2026Source
- Form 2A (FY 2025-2026)Barcode (RV) - Form 2A (signed).pdf · uploaded 29 Apr 2026Source
- Form 5 (FY 2024-2025)Form 5 - F Y 2024-25 - Barcode (RV).pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 1Barcode (RV) - Form 1 (signed).pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2Barcode (RV) - Form 2 (signed).pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 1Barcode (RV) - Form 1 (signed).pdf · uploaded 5 Oct 2026Source
- Withdrawal Update Form 2Barcode (RV) - Form 2 (signed).pdf · uploaded 5 Oct 2026Source
- Withdrawal Update Form 3Barcode (RV) - Form 3 (signed).pdf · uploaded 5 Oct 2026Source
Technical
- Documentsheet No 2-5 Final.pdf · uploaded 14 Oct 2020Source
- Documentsheet No 3-5 Final.pdf · uploaded 14 Oct 2020Source
- Documentsheet No 4-5 Final.pdf · uploaded 14 Oct 2020Source
- Documentsheet No 5-5 Final.pdf · uploaded 14 Oct 2020Source
- Documentsheet No 1-5 Final.pdf · uploaded 16 Oct 2020Source
- DocumentLayout.pdf · uploaded 15 Jan 2021Source
- DocumentFloor Plan 1.pdf · uploaded 15 Jan 2021Source
- DocumentFloor Plan 2.pdf · uploaded 15 Jan 2021Source
- DocumentFloor Plan 3.pdf · uploaded 15 Jan 2021Source
- DocumentLayout Plan.pdf · uploaded 12 Jun 2021Source
- Document3 4 Floor Plan 7.pdf · uploaded 12 Jun 2021Source
- DocumentFifth Floor Plan 8.pdf · uploaded 12 Jun 2021Source
- DocumentFirst Floor Plan 5.pdf · uploaded 12 Jun 2021Source
- DocumentFourth Basement 3.pdf · uploaded 12 Jun 2021Source
- DocumentGround 4.pdf · uploaded 12 Jun 2021Source
- DocumentSecond Basement 2.pdf · uploaded 12 Jun 2021Source
- DocumentSecond Floor Plan 6.pdf · uploaded 12 Jun 2021Source
- Documentdefault 0001_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0004 GROUND_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0006 SECOND FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0005 FIRST FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0007 THIRD FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0008 FOURTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0009 FIFTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0011 SEVENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0012 EIGHTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0013 NINTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Documentdefault 0014 TENTH FLOOR_11zon.pdf · uploaded 30 Jul 2022Source
- Other – TechnicalPart Completion Certificate BARCODE dt-02-04-2025_compressed.pdf · uploaded 26 Apr 2025Source
- Document01 Layout RV EV.pdf · uploaded 19 Jul 2026Source
- Document02 1st(EV) and 2nd (RV) Basement.pdf · uploaded 19 Jul 2026Source
- Document03 3rd(EV) and 4th (RV) Basement.pdf · uploaded 19 Jul 2026Source
- Document04 Ground 1 to 3 and 20 to 33(EV) and 4 to19(RV).pdf · uploaded 19 Jul 2026Source
- Document05 1st 101 to 103 and 119 to 133(EV) and 104 to118(RV).pdf · uploaded 19 Jul 2026Source
- Document07 3rd RV.pdf · uploaded 19 Jul 2026Source
- Document09 5th RV.pdf · uploaded 19 Jul 2026Source
- Document11 7th RV.pdf · uploaded 19 Jul 2026Source
- Document13 9th 901 to 944(RV) and 945(EV).pdf · uploaded 19 Jul 2026Source
- Document14 10th Kitchen and resturant 01(EV) and 02 and 03(RV).pdf · uploaded 19 Jul 2026Source
- Document15 Terrace and Sec CC (EV and RV).pdf · uploaded 19 Jul 2026Source
- Document16 Sec AA (EV and RV).pdf · uploaded 19 Jul 2026Source
- DocumentCC.pdf · uploaded 19 Jul 2026Source
- Documentmarked Sanction Plan.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 2 of 18 - Second Basement.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 3 of 18 - Fourth Basement.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 4 of 18 - Ground Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 5 of 18 - First Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 7 of 18 - Third Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 9 of 18 - Fifth Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 11 of 18 - Seventh Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 13 of 18 - Ninth Floor.pdf · uploaded 5 Oct 2026Source
- DocumentSheet No 14 of 18 - Tenth Floor.pdf · uploaded 5 Oct 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Moshi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat no 132 and Plot no 3
- South
- Plot no 2
- East
- Plot no 3
- West
- proposed 24 m wide DP road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Madhusudan Jhanwar | — |
| Engineer | Akshay Nigade | — |
| Engineer | Santosh S Autade | — |
Source: MahaRERA project page. Contact details are not shown.