Cleveland Park

Certificate Signed

Mohammadwadi, Pune 411057 |Promoter: Vardaan Lifestyle Limited

4 Aug 2017Registered with MahaRERA
30 Sep 2026Promised completion
2Buildings
92Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
—92 units in all
Address
13/1 - 13/2 Plot B, Nibm Road, MohammadwadiPIN 411057
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.47064, 73.92181
Cleveland Park is at latitude 18.47064, longitude 73.92181.

Registered transactions

70 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

All 70 records
Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
30 Sep 2026Rental≈ ₹40,000—
13 Aug 2026Rental≈ ₹40,000—
10 Aug 2026Rental≈ ₹40,000—
7 Aug 2026Rental≈ ₹60,000—
2 Jul 2026Rental≈ ₹40,000—
30 Jun 2026
Unit 304
Rental≈ ₹30,000—
13 Jun 2026Rental≈ ₹50,000—
21 May 2026Rental≈ ₹50,000—
11 Mar 2026Rental≈ ₹50,000—
8 Jan 2026Rental≈ ₹1.2 L—
5 Jan 2026Rental≈ ₹10,000—
1 Dec 2025Rental≈ ₹50,000—
3 Oct 2025
Bldg Name · Unit B-301
Rental≈ ₹30,000—
11 Sep 2025Rental≈ ₹60,000—
30 Aug 2025Rental≈ ₹50,000—
8 Aug 2025Rental≈ ₹40,000—
4 Aug 2025Rental≈ ₹40,000—
8 May 2025Rental≈ ₹30,000—
10 Mar 2025Rental≈ ₹60,000—
6 Mar 2025Rental≈ ₹50,000—
18 Feb 2025
Bldg Name · Unit B-301
Rental≈ ₹30,000—
18 Sep 2024Rental≈ ₹60,000—
16 Aug 2024Rental≈ ₹40,000—
13 Aug 2024
Mortgage——
1 Aug 2024Rental≈ ₹40,000—
23 Jun 2024Rental≈ ₹50,000—
2 May 2024Rental≈ ₹40,000—
13 Apr 2024Rental≈ ₹50,000—
5 Apr 2024Rental≈ ₹50,000—
1 Apr 2024Rental≈ ₹30,000—
24 Mar 2024Rental≈ ₹50,000—
15 Mar 2024
Bldg Name · Unit 601
Rental≈ ₹60,000—
3 Mar 2024Rental≈ ₹50,000—
18 Feb 2024Rental≈ ₹50,000—
9 Feb 2024Rental≈ ₹30,000—
3 Nov 2023Rental≈ ₹50,000—
2 Sep 2023Rental≈ ₹40,000—
13 Jul 2023Rental≈ ₹50,000—
27 Jun 2023
Unit 303
Rental≈ ₹30,000—
21 Jun 2023Rental≈ ₹50,000—
20 Jun 2023
Unit 304
Rental≈ ₹30,000—
23 May 2023Rental≈ ₹30,000—
30 Apr 2023Rental≈ ₹40,000—
11 Apr 2023Rental≈ ₹50,000—
30 Jan 2023Rental≈ ₹30,000—
24 Jan 2023Rental≈ ₹30,000—
24 Jan 2023
Bldg Name
Rental≈ ₹50,000—
5 Dec 2022Rental≈ ₹30,000—
22 Nov 2022Rental≈ ₹40,000—
11 Nov 2022Rental≈ ₹40,000—

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2026

The latest completion date on record passed 1 month ago.

Registered
4 Aug 2017
Promised
30 Sep 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000030504 Aug 201730 Sep 202630 Sep 2026Vardaan Lifestyle LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1246
Wing B1246

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

92 units registered

— · 92 units
BuildingTypeCarpet areaUnits
Wing A——46
Wing B——46

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 225 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN card.pdf · uploaded 25 Jul 2017Source

Legal

  • Legal Title reportCleveland_Park_Title_Report.pdf · uploaded 25 Jul 2017Source
  • Declaration Form BFORM B.pdf · uploaded 28 Jul 2017Source
  • Declaration Form BAFFADAVIT PROMOTER B.pdf · uploaded 8 Sep 2017Source
  • OtherCC of Flat.pdf · uploaded 2 Aug 2019Source
  • OtherCC of Shop.pdf · uploaded 2 Aug 2019Source

Migrated

  • 1 PAN CardPAN card.pdf · uploaded 25 Jul 2017Source
Show all 226 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportCleveland_Park_Title_Report.pdf · uploaded 25 Jul 2017Source
  • 1 Details of encumbrancesENMCUBRANCES CERTIFICATE.pdf · uploaded 25 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Sactioned Project Layout.pdf · uploaded 25 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCleveland Park Commencement Certificates (2).pdf · uploaded 25 Jul 2017Source
  • 1 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 6.pdf · uploaded 28 Jul 2017Source
  • 2 Building Plan Approval (IOD)bUILDING PLAN IOD Plan 2.pdf · uploaded 28 Jul 2017Source
  • 3 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 3.pdf · uploaded 28 Jul 2017Source
  • 4 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 4.pdf · uploaded 28 Jul 2017Source
  • 5 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 5.pdf · uploaded 28 Jul 2017Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE CLEVELAND.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Cleveland park(1) engineer.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 28 Jul 2017Source
  • 1 Proforma of Allotment letterDeclaration-RIMTL.pdf · uploaded 28 Jul 2017Source
  • 2 Details of encumbrancesENCUBRANCES LETTER.pdf · uploaded 8 Sep 2017Source
  • 2 Declaration in FORM BAFFADAVIT PROMOTER B.pdf · uploaded 8 Sep 2017Source
  • 2 Proforma of Allotment letterBooking Agreement as per RERA FINAL _2_.pdf · uploaded 8 Sep 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)CP Form1-Architect Certificate updated-22-5-2018.pdf · uploaded 30 Jun 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)CP Form2-Engineers Certificate updated-22-5-2018.pdf · uploaded 30 Jun 2018Source
  • 2 Certificates of CA (Form 3)CP Form3-CA Certificate updated-31-3-2018.pdf · uploaded 21 Jul 2018Source
  • 1 Certificates of CA (Form 5)Form -5.pdf · uploaded 13 Dec 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineers Certificate as on 31032019 compressed.pdf · uploaded 2 Aug 2019Source
  • 3 Certificates of CA (Form 3)FORM 3-CA Certificate- Cleveland Park - RERA-as on 31-03-2019_compressed.pdf · uploaded 2 Aug 2019Source
  • 1 OtherCC of Flat.pdf · uploaded 2 Aug 2019Source
  • 2 OtherCC of Shop.pdf · uploaded 2 Aug 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE 69_compressed.pdf · uploaded 9 Aug 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A)FORM 2A Engineer Quality Assurance Certificate.pdf · uploaded 13 Aug 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2017 to 2018.pdf · uploaded 8 Sep 2020Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)From 5 2018-2019.pdf · uploaded 15 Sep 2020Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012195114480_30062019.pdf · uploaded 26 Oct 2020Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012194845839_30092019.pdf · uploaded 26 Oct 2020Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012195313050_31122019.pdf · uploaded 26 Oct 2020Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012194428928_31032020.pdf · uploaded 26 Oct 2020Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE_compressed.pdf · uploaded 28 Oct 2020Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 2_compressed.pdf · uploaded 28 Oct 2020Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 3_compressed.pdf · uploaded 28 Oct 2020Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 4_compressed.pdf · uploaded 28 Oct 2020Source
  • 4 Certificates of CA (Form 3)CA 3 wing A B 30 June 2019compressed.pdf · uploaded 28 Oct 2020Source
  • 5 Certificates of CA (Form 3)CA 3 wing A B 30 Sept 2019 compressed.pdf · uploaded 28 Oct 2020Source
  • 6 Certificates of CA (Form 3)CA3 wing A B 31 Dec 2019 compressed.pdf · uploaded 28 Oct 2020Source
  • 7 Certificates of CA (Form 3)CA3 wing A B 31 March 2020 compressed.pdf · uploaded 28 Oct 2020Source
  • 3 Details of encumbrancescleveland park emcubrances.pdf · uploaded 4 Sep 2021Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement.pdf · uploaded 8 Dec 2022Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate 31321.pdf · uploaded 8 Dec 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate 31322.pdf · uploaded 8 Dec 2022Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 310321.pdf · uploaded 8 Dec 2022Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 100422.pdf · uploaded 8 Dec 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A)Form 2A - 31-03-2020.pdf · uploaded 8 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 31-03-2021.pdf · uploaded 8 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 31-03-2022.pdf · uploaded 8 Dec 2022Source
  • 1 Proforma of Agreement for saleAgrement to Sale Draft.pdf · uploaded 8 Dec 2022Source
  • Withdrawal Update Form 1Form 1 as on OC Date.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 2Form 2 as on OC Date.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 3Form 3 Certified .pdf · uploaded 1 Dec 2025Source
  • Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 1 Dec 2025Source
  • Form 1Form 1 September 2017.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2017.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2017.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2017.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2017.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2017.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2017.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2017.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2018.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2018.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2018.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2018.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2018.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2018.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2018.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2018.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2018.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2018.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2018.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2018.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2018.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2018.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2018.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2018.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2019.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2019.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2019.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2019.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2019.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2019.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2019.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2019.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2019.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2019.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2019.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2019.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2019.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2019.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2019.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2019.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2020.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2020.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2020.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2020.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2020.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2020.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2020.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2020.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2020.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2020.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2020.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2020.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2020.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2020.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2020.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2020.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2021.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2021.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2021.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2021.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2021.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2021.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2021.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2021.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2021.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2021.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2021.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2021.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2021.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2021.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2021.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2021.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2022.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2022.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2022.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2022.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2022.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2022.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2022.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2022.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2022.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2022.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2022.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2022.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2022.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2022.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2022.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2022.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 March 2023.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 March 2023.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 March 2023.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on March 2023.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 June 2023.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 June 2023.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 June 2023.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on June 2023.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 September 2023.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 September 2023.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 September 2023.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on September 2023.pdf · uploaded 2 Dec 2025Source
  • Form 1Form 1 December 2023.pdf · uploaded 2 Dec 2025Source
  • Form 2Form 2 December 2023.pdf · uploaded 2 Dec 2025Source
  • Form 3Form 3 December 2023.pdf · uploaded 2 Dec 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 as on December 2023.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2017-2018)Form 2A FY 17-18.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2018-2019)Form 2A FY 18-19.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2019-2020)Form 2A FY 19-20.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2020-2021)Form 2A FY 20-21.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2021-2022)Form 2A FY 21-22.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2022-2023)Form 2A FY 22-23.pdf · uploaded 2 Dec 2025Source
  • Form 2A (FY 2023-2024)Form 2A FY 23-24.pdf · uploaded 2 Dec 2025Source
  • Form 5 (FY 2017-2018)Form 5 17-18.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2018-2019)Form 5 18-19.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2019-2020)Form 5 19-20.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2020-2021)Form 5 20-21.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2021-2022)Form 5 21-22.pdf · uploaded 4 Dec 2025Source
  • Form 5 (FY 2022-2023)Form 5 22-23.pdf · uploaded 4 Dec 2025Source
  • Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
  • Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
  • Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
  • Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
  • Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 1Form 1 as on OC Date.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 2Form 2 as on OC Date.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 3Form 3 Certified .pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 6 Jan 2026Source
  • Form 2A (FY 2024-2025)Form 2A FY 24-25.pdf · uploaded 6 Jan 2026Source
  • Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 6 Jan 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 8 Sep 2026Source
  • Form 2A (FY 2025-2026)Form 2A FY 25-26.pdf · uploaded 8 Sep 2026Source

Technical

  • DocumentSactioned Project Layout.pdf · uploaded 25 Jul 2017Source
  • DocumentBUILDING PLAN IOD Plan 6.pdf · uploaded 28 Jul 2017Source
  • DocumentbUILDING PLAN IOD Plan 2.pdf · uploaded 28 Jul 2017Source
  • DocumentBUILDING PLAN IOD Plan 3.pdf · uploaded 28 Jul 2017Source
  • DocumentBUILDING PLAN IOD Plan 4.pdf · uploaded 28 Jul 2017Source
  • DocumentBUILDING PLAN IOD Plan 5.pdf · uploaded 28 Jul 2017Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 6 Jan 2026Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 6 Jan 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mohammadwadi, Haveli taluka

Survey, CTS, gat or plot numbers

13/1 - 13/2 PLOT B

Boundaries

North
Remaining Portion Of Plot B
South
By Road And Then Amenity Space
East
18 Meter Road
West
Remaining Portion Of Plot B

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectParvej Jamadar And Associates—
Chartered accountantKrishna Kabra And Company—
EngineerG A Bhilare Consultant Pvt Ltd—
EngineerManoj Mittal—
EngineerPappuraj Saste—
OtherMittal Infrastructure Pvt Ltd—
Registered real estate agentBlack Pearl Estates LLP—
Registered real estate agentDeepakkumar Rameshlal Advani—
Show all 21 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentElara Marketing Services Private Limited—
Registered real estate agentHdfc Developers Limited—
Registered real estate agentMakaan Hunt Pvt Ltd—
Registered real estate agentParshuram Chhajulal Agarwal—
Registered real estate agentPropbuying Realtors Pvt Ltd—
Registered real estate agentProperty Chef Consulting Services—
Registered real estate agentPropozone Technologies Private Limited—
Registered real estate agentRightfeat Consulting Private Limited—
Registered real estate agentShri Sadguru Construction—
Registered real estate agentShrradhaa Daven Kakkad—
Registered real estate agentSpaceindia Nest LLP—
Registered real estate agentSumit Khatri—
Registered real estate agentVishal Parshuram Agarwal—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology