Cleveland Park
Certificate SignedMohammadwadi, Pune 411057 |Promoter: Vardaan Lifestyle Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- —92 units in all
- Address
- 13/1 - 13/2 Plot B, Nibm Road, MohammadwadiPIN 411057
- Designated bank account
- 171
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
70 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 30 Sep 2026 | Rental | ≈ ₹40,000 | — | ||
| 13 Aug 2026 | Rental | ≈ ₹40,000 | — | ||
| 10 Aug 2026 | Rental | ≈ ₹40,000 | — | ||
| 7 Aug 2026 | Rental | ≈ ₹60,000 | — | ||
| 2 Jul 2026 | Rental | ≈ ₹40,000 | — | ||
| 30 Jun 2026 | Unit 304 | Rental | ≈ ₹30,000 | — | |
| 13 Jun 2026 | Rental | ≈ ₹50,000 | — | ||
| 21 May 2026 | Rental | ≈ ₹50,000 | — | ||
| 11 Mar 2026 | Rental | ≈ ₹50,000 | — | ||
| 8 Jan 2026 | Rental | ≈ ₹1.2 L | — | ||
| 5 Jan 2026 | Rental | ≈ ₹10,000 | — | ||
| 1 Dec 2025 | Rental | ≈ ₹50,000 | — | ||
| 3 Oct 2025 | Bldg Name · Unit B-301 | Rental | ≈ ₹30,000 | — | |
| 11 Sep 2025 | Rental | ≈ ₹60,000 | — | ||
| 30 Aug 2025 | Rental | ≈ ₹50,000 | — | ||
| 8 Aug 2025 | Rental | ≈ ₹40,000 | — | ||
| 4 Aug 2025 | Rental | ≈ ₹40,000 | — | ||
| 8 May 2025 | Rental | ≈ ₹30,000 | — | ||
| 10 Mar 2025 | Rental | ≈ ₹60,000 | — | ||
| 6 Mar 2025 | Rental | ≈ ₹50,000 | — | ||
| 18 Feb 2025 | Bldg Name · Unit B-301 | Rental | ≈ ₹30,000 | — | |
| 18 Sep 2024 | Rental | ≈ ₹60,000 | — | ||
| 16 Aug 2024 | Rental | ≈ ₹40,000 | — | ||
| 13 Aug 2024 | Mortgage | — | — | ||
| 1 Aug 2024 | Rental | ≈ ₹40,000 | — | ||
| 23 Jun 2024 | Rental | ≈ ₹50,000 | — | ||
| 2 May 2024 | Rental | ≈ ₹40,000 | — | ||
| 13 Apr 2024 | Rental | ≈ ₹50,000 | — | ||
| 5 Apr 2024 | Rental | ≈ ₹50,000 | — | ||
| 1 Apr 2024 | Rental | ≈ ₹30,000 | — | ||
| 24 Mar 2024 | Rental | ≈ ₹50,000 | — | ||
| 15 Mar 2024 | Bldg Name · Unit 601 | Rental | ≈ ₹60,000 | — | |
| 3 Mar 2024 | Rental | ≈ ₹50,000 | — | ||
| 18 Feb 2024 | Rental | ≈ ₹50,000 | — | ||
| 9 Feb 2024 | Rental | ≈ ₹30,000 | — | ||
| 3 Nov 2023 | Rental | ≈ ₹50,000 | — | ||
| 2 Sep 2023 | Rental | ≈ ₹40,000 | — | ||
| 13 Jul 2023 | Rental | ≈ ₹50,000 | — | ||
| 27 Jun 2023 | Unit 303 | Rental | ≈ ₹30,000 | — | |
| 21 Jun 2023 | Rental | ≈ ₹50,000 | — | ||
| 20 Jun 2023 | Unit 304 | Rental | ≈ ₹30,000 | — | |
| 23 May 2023 | Rental | ≈ ₹30,000 | — | ||
| 30 Apr 2023 | Rental | ≈ ₹40,000 | — | ||
| 11 Apr 2023 | Rental | ≈ ₹50,000 | — | ||
| 30 Jan 2023 | Rental | ≈ ₹30,000 | — | ||
| 24 Jan 2023 | Rental | ≈ ₹30,000 | — | ||
| 24 Jan 2023 | Bldg Name | Rental | ≈ ₹50,000 | — | |
| 5 Dec 2022 | Rental | ≈ ₹30,000 | — | ||
| 22 Nov 2022 | Rental | ≈ ₹40,000 | — | ||
| 11 Nov 2022 | Rental | ≈ ₹40,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Sep 2026
The latest completion date on record passed 1 month ago.
- Registered
- 4 Aug 2017
- Promised
- 30 Sep 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100003050 | 4 Aug 2017 | 30 Sep 2026 | 30 Sep 2026 | Vardaan Lifestyle Limited | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
92 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| Wing A | — | — | 46 |
| Wing B | — | — | 46 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 225 filings listed on MahaRERA's project page
Finance
- PAN CardPAN card.pdf · uploaded 25 Jul 2017Source
Legal
- Legal Title reportCleveland_Park_Title_Report.pdf · uploaded 25 Jul 2017Source
- Declaration Form BFORM B.pdf · uploaded 28 Jul 2017Source
- Declaration Form BAFFADAVIT PROMOTER B.pdf · uploaded 8 Sep 2017Source
- OtherCC of Flat.pdf · uploaded 2 Aug 2019Source
- OtherCC of Shop.pdf · uploaded 2 Aug 2019Source
Migrated
- 1 PAN CardPAN card.pdf · uploaded 25 Jul 2017Source
Show all 226 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportCleveland_Park_Title_Report.pdf · uploaded 25 Jul 2017Source
- 1 Details of encumbrancesENMCUBRANCES CERTIFICATE.pdf · uploaded 25 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Sactioned Project Layout.pdf · uploaded 25 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCleveland Park Commencement Certificates (2).pdf · uploaded 25 Jul 2017Source
- 1 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 6.pdf · uploaded 28 Jul 2017Source
- 2 Building Plan Approval (IOD)bUILDING PLAN IOD Plan 2.pdf · uploaded 28 Jul 2017Source
- 3 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 3.pdf · uploaded 28 Jul 2017Source
- 4 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 4.pdf · uploaded 28 Jul 2017Source
- 5 Building Plan Approval (IOD)BUILDING PLAN IOD Plan 5.pdf · uploaded 28 Jul 2017Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE CLEVELAND.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Cleveland park(1) engineer.pdf · uploaded 28 Jul 2017Source
- 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 28 Jul 2017Source
- 1 Proforma of Allotment letterDeclaration-RIMTL.pdf · uploaded 28 Jul 2017Source
- 2 Details of encumbrancesENCUBRANCES LETTER.pdf · uploaded 8 Sep 2017Source
- 2 Declaration in FORM BAFFADAVIT PROMOTER B.pdf · uploaded 8 Sep 2017Source
- 2 Proforma of Allotment letterBooking Agreement as per RERA FINAL _2_.pdf · uploaded 8 Sep 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)CP Form1-Architect Certificate updated-22-5-2018.pdf · uploaded 30 Jun 2018Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)CP Form2-Engineers Certificate updated-22-5-2018.pdf · uploaded 30 Jun 2018Source
- 2 Certificates of CA (Form 3)CP Form3-CA Certificate updated-31-3-2018.pdf · uploaded 21 Jul 2018Source
- 1 Certificates of CA (Form 5)Form -5.pdf · uploaded 13 Dec 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineers Certificate as on 31032019 compressed.pdf · uploaded 2 Aug 2019Source
- 3 Certificates of CA (Form 3)FORM 3-CA Certificate- Cleveland Park - RERA-as on 31-03-2019_compressed.pdf · uploaded 2 Aug 2019Source
- 1 OtherCC of Flat.pdf · uploaded 2 Aug 2019Source
- 2 OtherCC of Shop.pdf · uploaded 2 Aug 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 ARCHITECT CERTIFICATE 69_compressed.pdf · uploaded 9 Aug 2019Source
- 1 Engineers Certificate on Quality Assurance (Form 2A)FORM 2A Engineer Quality Assurance Certificate.pdf · uploaded 13 Aug 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 2017 to 2018.pdf · uploaded 8 Sep 2020Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)From 5 2018-2019.pdf · uploaded 15 Sep 2020Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012195114480_30062019.pdf · uploaded 26 Oct 2020Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012194845839_30092019.pdf · uploaded 26 Oct 2020Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012195313050_31122019.pdf · uploaded 26 Oct 2020Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20201012194428928_31032020.pdf · uploaded 26 Oct 2020Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE_compressed.pdf · uploaded 28 Oct 2020Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 2_compressed.pdf · uploaded 28 Oct 2020Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 3_compressed.pdf · uploaded 28 Oct 2020Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 ENGINEER CERTIFICATE 4_compressed.pdf · uploaded 28 Oct 2020Source
- 4 Certificates of CA (Form 3)CA 3 wing A B 30 June 2019compressed.pdf · uploaded 28 Oct 2020Source
- 5 Certificates of CA (Form 3)CA 3 wing A B 30 Sept 2019 compressed.pdf · uploaded 28 Oct 2020Source
- 6 Certificates of CA (Form 3)CA3 wing A B 31 Dec 2019 compressed.pdf · uploaded 28 Oct 2020Source
- 7 Certificates of CA (Form 3)CA3 wing A B 31 March 2020 compressed.pdf · uploaded 28 Oct 2020Source
- 3 Details of encumbrancescleveland park emcubrances.pdf · uploaded 4 Sep 2021Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement.pdf · uploaded 8 Dec 2022Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate 31321.pdf · uploaded 8 Dec 2022Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate 31322.pdf · uploaded 8 Dec 2022Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 310321.pdf · uploaded 8 Dec 2022Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 100422.pdf · uploaded 8 Dec 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A)Form 2A - 31-03-2020.pdf · uploaded 8 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - 31-03-2021.pdf · uploaded 8 Dec 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - 31-03-2022.pdf · uploaded 8 Dec 2022Source
- 1 Proforma of Agreement for saleAgrement to Sale Draft.pdf · uploaded 8 Dec 2022Source
- Withdrawal Update Form 1Form 1 as on OC Date.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 2Form 2 as on OC Date.pdf · uploaded 1 Dec 2025Source
- Withdrawal Update Form 3Form 3 Certified .pdf · uploaded 1 Dec 2025Source
- Form 5 (FY 2023-2024)Form 5 23-24.pdf · uploaded 1 Dec 2025Source
- Form 1Form 1 September 2017.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2017.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2017.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2017.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2017.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2017.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2017.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2017.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2018.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2018.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2018.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2018.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2018.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2018.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2018.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2018.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2018.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2018.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2018.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2018.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2018.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2018.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2018.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2018.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2019.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2019.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2019.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2019.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2019.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2019.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2019.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2019.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2019.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2019.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2019.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2019.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2019.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2019.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2019.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2019.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2020.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2020.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2020.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2020.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2020.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2020.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2020.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2020.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2020.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2020.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2020.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2020.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2020.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2020.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2020.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2020.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2021.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2021.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2021.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2021.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2021.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2021.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2021.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2021.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2021.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2021.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2021.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2021.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2021.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2021.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2021.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2021.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2022.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2022.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2022.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2022.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2022.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2022.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2022.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2022.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2022.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2022.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2022.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2022.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2022.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2022.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2022.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2022.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 March 2023.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 March 2023.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 March 2023.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on March 2023.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 June 2023.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 June 2023.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 June 2023.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on June 2023.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 September 2023.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 September 2023.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 September 2023.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on September 2023.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 December 2023.pdf · uploaded 2 Dec 2025Source
- Form 2Form 2 December 2023.pdf · uploaded 2 Dec 2025Source
- Form 3Form 3 December 2023.pdf · uploaded 2 Dec 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 as on December 2023.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2017-2018)Form 2A FY 17-18.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2018-2019)Form 2A FY 18-19.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2019-2020)Form 2A FY 19-20.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2020-2021)Form 2A FY 20-21.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2021-2022)Form 2A FY 21-22.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2022-2023)Form 2A FY 22-23.pdf · uploaded 2 Dec 2025Source
- Form 2A (FY 2023-2024)Form 2A FY 23-24.pdf · uploaded 2 Dec 2025Source
- Form 5 (FY 2017-2018)Form 5 17-18.pdf · uploaded 4 Dec 2025Source
- Form 5 (FY 2018-2019)Form 5 18-19.pdf · uploaded 4 Dec 2025Source
- Form 5 (FY 2019-2020)Form 5 19-20.pdf · uploaded 4 Dec 2025Source
- Form 5 (FY 2020-2021)Form 5 20-21.pdf · uploaded 4 Dec 2025Source
- Form 5 (FY 2021-2022)Form 5 21-22.pdf · uploaded 4 Dec 2025Source
- Form 5 (FY 2022-2023)Form 5 22-23.pdf · uploaded 4 Dec 2025Source
- Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
- Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
- Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
- Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
- Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Disclosure of Sold and Booked InventoryCIRCULAR 29.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 1Form 1 as on OC Date.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 2Form 2 as on OC Date.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 3Form 3 Certified .pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 6 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A FY 24-25.pdf · uploaded 6 Jan 2026Source
- Form 5 (FY 2024-2025)Form 5 24-25.pdf · uploaded 6 Jan 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Sep 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 8 Sep 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 25-26.pdf · uploaded 8 Sep 2026Source
Technical
- DocumentSactioned Project Layout.pdf · uploaded 25 Jul 2017Source
- DocumentBUILDING PLAN IOD Plan 6.pdf · uploaded 28 Jul 2017Source
- DocumentbUILDING PLAN IOD Plan 2.pdf · uploaded 28 Jul 2017Source
- DocumentBUILDING PLAN IOD Plan 3.pdf · uploaded 28 Jul 2017Source
- DocumentBUILDING PLAN IOD Plan 4.pdf · uploaded 28 Jul 2017Source
- DocumentBUILDING PLAN IOD Plan 5.pdf · uploaded 28 Jul 2017Source
Technical (Architect)
- DocumentForm 1.pdf · uploaded 6 Jan 2026Source
Technical (Engineer)
- DocumentForm 2.pdf · uploaded 6 Jan 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Mohammadwadi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Remaining Portion Of Plot B
- South
- By Road And Then Amenity Space
- East
- 18 Meter Road
- West
- Remaining Portion Of Plot B
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Parvej Jamadar And Associates | — |
| Chartered accountant | Krishna Kabra And Company | — |
| Engineer | G A Bhilare Consultant Pvt Ltd | — |
| Engineer | Manoj Mittal | — |
| Engineer | Pappuraj Saste | — |
| Other | Mittal Infrastructure Pvt Ltd | — |
| Registered real estate agent | Black Pearl Estates LLP | — |
| Registered real estate agent | Deepakkumar Rameshlal Advani | — |
Show all 21 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Elara Marketing Services Private Limited | — |
| Registered real estate agent | Hdfc Developers Limited | — |
| Registered real estate agent | Makaan Hunt Pvt Ltd | — |
| Registered real estate agent | Parshuram Chhajulal Agarwal | — |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — |
| Registered real estate agent | Property Chef Consulting Services | — |
| Registered real estate agent | Propozone Technologies Private Limited | — |
| Registered real estate agent | Rightfeat Consulting Private Limited | — |
| Registered real estate agent | Shri Sadguru Construction | — |
| Registered real estate agent | Shrradhaa Daven Kakkad | — |
| Registered real estate agent | Spaceindia Nest LLP | — |
| Registered real estate agent | Sumit Khatri | — |
| Registered real estate agent | Vishal Parshuram Agarwal | — |
Source: MahaRERA project page. Contact details are not shown.
