Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 3
- Phases
- 3
- Buildings
- 7
- Unit types
- 2BHK, 3BHK, —1,258 units in all
- Address
- 147, 148, 149, 150, Awhalwadi road, Manjari KhPIN 412307
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52100045848- Registered
- 15 Jun 2022
- Promised
- 30 Jun 2027
- Revised
- 30 Oct 2027
Completion pushed back 4 months
P52100047312- Registered
- 19 Oct 2022
- Promised
- 31 Mar 2028
- Revised
- 31 Jul 2028
Completion pushed back 4 months
P52100077637- Registered
- 17 Oct 2024
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
3 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100045848 | 15 Jun 2022 | 30 Jun 2027 | 30 Oct 2027 | Ashdan Developers Private Limited | Project page |
| P52100047312 | 19 Oct 2022 | 31 Mar 2028 | 31 Jul 2028 | Ashdan Developers Private Limited | Project page |
| P52100077637 | 17 Oct 2024 | 31 Dec 2028 | 30 Apr 2029 | Ashdan Developers Private Limited | Project page |
7 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Tower-10 | 30 | 180 |
| Tower 4 | 30 | 240 |
| Tower 5 | 30 | 120 |
| Tower 6 | 30 | 238 |
| Tower 7 | 30 | 120 |
| Tower 8 | 30 | 240 |
| Tower 9 | 30 | 120 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 1,258 units booked (0%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100077637 | Tower-10 | 2BHK | 80.1 sq m · 862 sq ft | 60 | 0 |
| P52100077637 | Tower-10 | 3BHK | 107.03 sq m · 1,152 sq ft | 60 | 0 |
| P52100077637 | Tower-10 | 3BHK | 114.86 sq m · 1,236 sq ft | 60 | 0 |
| P52100047312 | Tower 4 | — | — | 240 | — |
| P52100045848 | Tower 5 | — | — | 120 | — |
| P52100047312 | Tower 6 | — | — | 238 | — |
| P52100045848 | Tower 7 | — | — | 120 | — |
| P52100047312 | Tower 8 | — | — | 240 | — |
| P52100045848 | Tower 9 | — | — | 120 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 420 filings listed on MahaRERA's project page
Registration certificate (3)
Finance
- PAN CardP52100045848 · PAN Card.pdf · uploaded 2 Jun 2022Source
- PAN CardP52100047312 · PAN Card.pdf · uploaded 20 Jul 2022Source
- PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
- PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
- PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
Show all 423 documentsShow fewer documents
Legal
- Legal Title reportP52100045848 · Format A.pdf · uploaded 2 Jun 2022Source
- Declaration Form BP52100045848 · Form B- Ashdan.pdf · uploaded 3 Jun 2022Source
- Legal Title reportP52100047312 · Format A.pdf · uploaded 20 Jul 2022Source
- Declaration Form BP52100047312 · Form B Ashdan Developers_compressed.pdf · uploaded 25 Jul 2022Source
- Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- Legal Title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- Legal Title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- Legal Title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- Declaration Form BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
- Declaration Form BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
- Declaration Form BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
Migrated
- 1 PAN CardP52100045848 · PAN Card.pdf · uploaded 2 Jun 2022Source
- 1 Copy of the legal title reportP52100045848 · Format A.pdf · uploaded 2 Jun 2022Source
- 1 CERSAI detailsP52100045848 · CERSAI_02062022.pdf · uploaded 2 Jun 2022Source
- 1 Proforma of Allotment letterP52100045848 · Allotment letter.pdf · uploaded 2 Jun 2022Source
- 1 Details of encumbrancesP52100045848 · Encumbrance.pdf · uploaded 3 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100045848 · CC (2)_compressed-1-4.pdf · uploaded 3 Jun 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100045848 · CC (2)_compressed-5-8.pdf · uploaded 3 Jun 2022Source
- 1 Declaration about Commencement CertificateP52100045848 · Format D _ Signed.pdf · uploaded 3 Jun 2022Source
- 1 Declaration in FORM BP52100045848 · Form B- Ashdan.pdf · uploaded 3 Jun 2022Source
- 2 Proforma of Allotment letterP52100045848 · Agreement Tentative draft.pdf · uploaded 3 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100045848 · 01-29_compressed (1).pdf · uploaded 10 Jun 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100045848 · 01-29_compressed (1).pdf · uploaded 10 Jun 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Form 3 F-1.pdf · uploaded 10 Jun 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Form 3 F-2_compressed.pdf · uploaded 10 Jun 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Form 3 F-3_compressed.pdf · uploaded 10 Jun 2022Source
- 1 Disclosure of sold/ booked inventoryP52100045848 · Euphoria 2_compressed.pdf · uploaded 6 Jul 2022Source
- 1 PAN CardP52100047312 · PAN Card.pdf · uploaded 20 Jul 2022Source
- 1 Copy of the legal title reportP52100047312 · Format A.pdf · uploaded 20 Jul 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100047312 · CC_compressed.pdf · uploaded 20 Jul 2022Source
- 1 Declaration about Commencement CertificateP52100047312 · Format D.pdf · uploaded 20 Jul 2022Source
- 1 CERSAI detailsP52100047312 · CERSAI Report Euphoria Phase 3.pdf · uploaded 22 Jul 2022Source
- 1 Declaration in FORM BP52100047312 · Form B Ashdan Developers_compressed.pdf · uploaded 25 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100047312 · Euphoria phase 3.pdf · uploaded 27 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100047312 · Euphoria phase 3.pdf · uploaded 27 Jul 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3_Euphoria Phase 3_Awaited.pdf · uploaded 27 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · Euphoria Phase 2_compressed.pdf · uploaded 28 Jul 2022Source
- 2 CERSAI detailsP52100047312 · EUPHORIA PHASE 3_CERSAI REPORT DECLARATION.pdf · uploaded 30 Aug 2022Source
- 1 Proforma of Allotment letterP52100047312 · Agreement For Sale_VTP Euphoria Phase 3_Draft.pdf · uploaded 30 Aug 2022Source
- 2 Proforma of Allotment letterP52100047312 · VTP EUPHORIA PHASE 3 ALLOTMENT LETTER.pdf · uploaded 30 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterP52100047312 · Euphoria Phase 3_Allotment Letter_Deviation.pdf · uploaded 30 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementP52100047312 · EUPHORIA PHASE 2 ATS DEVIATION REPORT.pdf · uploaded 30 Aug 2022Source
- 1 a Details of encumbrances concerned to FinanceP52100047312 · Euphoria Ph 3 Encumbrances with Respect to Finance.pdf · uploaded 13 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalP52100047312 · ENCUMBARACES WITH RESPECT TO LEGAL EUPHORIA PHASE 3.pdf · uploaded 13 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100047312 · Separate bank account euphoria phase 3.pdf · uploaded 11 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 TOWER 5 7 9.pdf · uploaded 29 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 - Euphoria 2.pdf · uploaded 28 Jan 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 31122022_compressed.pdf · uploaded 2 Mar 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FROM 1 EUPHORIA PH 3 31122022.pdf · uploaded 9 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PH 3 31122022.pdf · uploaded 9 Mar 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · 230323 - RERA Certificate -Euphoria - Ph 2.pdf · uploaded 28 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · 230323 - RERA Certificate -Euphoria - Ph 3.pdf · uploaded 28 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 20032023.pdf · uploaded 28 Mar 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPH PH 3 1702023_compressed.pdf · uploaded 28 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPH 2 23122022.pdf · uploaded 29 Mar 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPH 2 30112022.pdf · uploaded 29 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPH 2 30092022.pdf · uploaded 17 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPH 2 30092022_compressed.pdf · uploaded 17 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPH PH 2 31032023.pdf · uploaded 29 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPH PH 3 31032023.pdf · uploaded 29 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · Form 2 - Euphoria Phase 2 - 31-03-2023.pdf · uploaded 4 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · Form 2 - Euphoria Phase 3 - March 2023.pdf · uploaded 4 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · 5 Form 3 - Euphoria Phase 2 - March 2023-1-6.pdf · uploaded 12 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · 5 Form 3 - Euphoria Phase 2 - March 2023-7-12.pdf · uploaded 12 May 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · 4 Form 3 - Euphoria Phase 3 - March 2023-1-5.pdf · uploaded 12 May 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · 4 Form 3 - Euphoria Phase 3 - March 2023-6-10.pdf · uploaded 12 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · 4 Form 3 - Euphoria Phase 3 - March 2023-11-15.pdf · uploaded 12 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · 4 Form 3 - Euphoria Phase 3 - March 2023-16-20.pdf · uploaded 12 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPH PHASE 2 30062023_compressed.pdf · uploaded 24 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 - Euphoria PH 2 - 30062023.pdf · uploaded 24 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 - Euphoria PH 2 - 30062023_compressed.pdf · uploaded 24 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPH PHASE 3 30062023_compressed.pdf · uploaded 24 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 - Euphoria PH 3 - 30062023_compressed.pdf · uploaded 24 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPH 3 30062023.pdf · uploaded 1 Aug 2023Source
- 2 Details of encumbrancesP52100045848 · FE Euphoria 2 010823.pdf · uploaded 2 Aug 2023Source
- 2 a Details of encumbrances concerned to FinanceP52100047312 · FE Euphoria 3 010823.pdf · uploaded 2 Aug 2023Source
- 2 b Details of encumbrances concerned to LegalP52100047312 · FE Euphoria 3 010823.pdf · uploaded 2 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 25082023.pdf · uploaded 29 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100045848 · FORM 2A EUPHORIA PHASE 2 31032023.pdf · uploaded 29 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 25082023.pdf · uploaded 29 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100047312 · FORM 2A EUPHORIA PHASE 3 31032023.pdf · uploaded 29 Aug 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 24082023.pdf · uploaded 5 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 25082023.pdf · uploaded 5 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 28082023.pdf · uploaded 5 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 24082023.pdf · uploaded 5 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 25082023.pdf · uploaded 5 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 28082023_compressed.pdf · uploaded 5 Sep 2023Source
- 2 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 30092022.pdf · uploaded 7 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 31122022.pdf · uploaded 7 Sep 2023Source
- 4 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 31032023.pdf · uploaded 7 Sep 2023Source
- 5 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 30062023.pdf · uploaded 7 Sep 2023Source
- 1 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PHASE 3 31122022.pdf · uploaded 7 Sep 2023Source
- 2 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PHASE 3 31032023.pdf · uploaded 7 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PHASE 3 30062023.pdf · uploaded 7 Sep 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 26092023.pdf · uploaded 7 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 14092023.pdf · uploaded 7 Oct 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 26092023.pdf · uploaded 7 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 28092023.pdf · uploaded 7 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 14092023.pdf · uploaded 9 Oct 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 14092023.pdf · uploaded 9 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 14092023.pdf · uploaded 14 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100045848 · FORM 5 EUPHORIA PHASE 2 2022-23.pdf · uploaded 28 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100047312 · FORM 5 EUPHORIA PHASE 3 2022-23.pdf · uploaded 28 Oct 2023Source
- 6 Disclosure of sold/ booked inventoryP52100045848 · INVENTORY EUPHORIA PHASE 2 30092023.pdf · uploaded 30 Oct 2023Source
- 4 Disclosure of sold/ booked inventoryP52100047312 · INVENTORY EUPHORIA PHASE 3 30092023.pdf · uploaded 30 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 30092023.pdf · uploaded 6 Nov 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 30092023.pdf · uploaded 6 Nov 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 30092023.pdf · uploaded 6 Nov 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 30092023.pdf · uploaded 6 Nov 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 06112023.pdf · uploaded 8 Nov 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 06112023.pdf · uploaded 8 Nov 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 06112023-NEW.pdf · uploaded 8 Nov 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 06112023.pdf · uploaded 8 Nov 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 06112023.pdf · uploaded 8 Nov 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 06112023 new.pdf · uploaded 8 Nov 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 24112023.pdf · uploaded 22 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 31122023.pdf · uploaded 22 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 23112023.pdf · uploaded 22 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Form 3 Euphoria PH 2 23112023.pdf · uploaded 22 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 24112023.pdf · uploaded 22 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 31122023.pdf · uploaded 22 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 23112023.pdf · uploaded 22 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 31122023.pdf · uploaded 22 Jan 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · Form 3 Euphoria PH 3 23112023.pdf · uploaded 22 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 31122023.pdf · uploaded 22 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 31122023.pdf · uploaded 30 Jan 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 31122023.pdf · uploaded 30 Jan 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 25012024.pdf · uploaded 30 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 25012024.pdf · uploaded 30 Jan 2024Source
- 7 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 31122023.pdf · uploaded 12 Mar 2024Source
- 5 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PHASE 3 31122023.pdf · uploaded 12 Mar 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 23122022.pdf · uploaded 28 Mar 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 26032024.pdf · uploaded 4 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 26032024.pdf · uploaded 4 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 31032024.pdf · uploaded 6 May 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 31032024.pdf · uploaded 6 May 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 31032024.pdf · uploaded 6 May 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 31032024.pdf · uploaded 6 May 2024Source
- 8 Disclosure of sold/ booked inventoryP52100045848 · INVENTORY EUPHORIA PHASE 2 31032024.pdf · uploaded 8 May 2024Source
- 6 Disclosure of sold/ booked inventoryP52100047312 · INVENTORY EUPHORIA PHASE 3 31032024.pdf · uploaded 8 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100045848 · FORM 2A EUPHORIA PHASE 2 31032024.pdf · uploaded 16 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100047312 · FORM 2A EUPHORIA PHASE 3 31032024.pdf · uploaded 16 May 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · Form-2-VTP EUPHORIA PHASE 2 24062024.pdf · uploaded 5 Jul 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · Form-2- VTP EUPHORIA PHASE 3 24062024.pdf · uploaded 5 Jul 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · 260624 Euphoria P 2.pdf · uploaded 6 Jul 2024Source
- 9 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PHASE 2 30062024.pdf · uploaded 6 Jul 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · 260624 Euphoria P 3.pdf · uploaded 6 Jul 2024Source
- 7 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PHASE 3 30062024.pdf · uploaded 6 Jul 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 4 24062024_compressed.pdf · uploaded 16 Jul 2024Source
- 1 PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
- 1 Copy of the legal title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 2 a Details of encumbrances concerned to FinanceP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Allotment letterP52100077637 · 1 Proforma of Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 Declaration in FORM BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077637 · 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (8).pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077637 · 1 CA Certificate on Project Cost and Fund withdrawal (Form 3) (48).pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077637 · 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 8 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100077637 · 1 Commencement Certificates _ NA Order for plotted development (42).pdf · uploaded 8 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- 1 Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about Commencement CertificateP52100077637 · 1 Declaration about Commencement Certificate (47).pdf · uploaded 8 Oct 2024Source
- 1 CERSAI detailsP52100077637 · CERSAI_Search_Report_200323886401_For_Asset_Based_Search_14_10_2024_12_03_23_692 (1).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P52100077637 · 1 Declaration about all RERA Designated Bank Accounts (Format A) (9).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterP52100077637 · 1 Deviation Report with respect to Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 2 b Details of encumbrances concerned to LegalP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- 2 Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- 3 Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100077637 · 1 Deviation Report with respect to model copy of Agreement (78).pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Agreement for saleP52100077637 · 1 Proforma of Agreement for sale (84).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100077637 · 1 Disclosure of Interest in Other Real Estate Organizations (50)_11zon.pdf · uploaded 8 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100077637 · 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (10).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100077637 · 1 Disclosure for secured_unsecured finance availed for the project (21).pdf · uploaded 8 Oct 2024Source
- 1 PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
- 1 Copy of the legal title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 2 a Details of encumbrances concerned to FinanceP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Allotment letterP52100077637 · 1 Proforma of Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 Declaration in FORM BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077637 · 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (8).pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077637 · 1 CA Certificate on Project Cost and Fund withdrawal (Form 3) (48).pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077637 · 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 8 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100077637 · 1 Commencement Certificates _ NA Order for plotted development (42).pdf · uploaded 8 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- 1 Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about Commencement CertificateP52100077637 · 1 Declaration about Commencement Certificate (47).pdf · uploaded 8 Oct 2024Source
- 1 CERSAI detailsP52100077637 · CERSAI_Search_Report_200323886401_For_Asset_Based_Search_14_10_2024_12_03_23_692 (1).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P52100077637 · 1 Declaration about all RERA Designated Bank Accounts (Format A) (9).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterP52100077637 · 1 Deviation Report with respect to Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 2 b Details of encumbrances concerned to LegalP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- 2 Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- 3 Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100077637 · 1 Deviation Report with respect to model copy of Agreement (78).pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Agreement for saleP52100077637 · 1 Proforma of Agreement for sale (84).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100077637 · 1 Disclosure of Interest in Other Real Estate Organizations (50)_11zon.pdf · uploaded 8 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100077637 · 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (10).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100077637 · 1 Disclosure for secured_unsecured finance availed for the project (21).pdf · uploaded 8 Oct 2024Source
- 1 PAN CardP52100077637 · 1 PAN Card (58).pdf · uploaded 8 Oct 2024Source
- 1 Copy of the legal title reportP52100077637 · 1 Copy of the legal title report (63).pdf · uploaded 8 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077637 · 1 a Details of encumbrances concerned to Finance (48).pdf · uploaded 8 Oct 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077637 · 2 b Details of encumbrances concerned to Legal (33).pdf · uploaded 8 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100077637 · 1 Commencement Certificates _ NA Order for plotted development (42).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about Commencement CertificateP52100077637 · 1 Declaration about Commencement Certificate (47).pdf · uploaded 8 Oct 2024Source
- 1 Declaration in FORM BP52100077637 · 1 Declaration in FORM B (26).pdf · uploaded 8 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077637 · 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (8).pdf · uploaded 8 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077637 · 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100077637 · 1 Disclosure for secured_unsecured finance availed for the project (21).pdf · uploaded 8 Oct 2024Source
- 1 CERSAI detailsP52100077637 · CERSAI_Search_Report_200323886401_For_Asset_Based_Search_14_10_2024_12_03_23_692 (1).pdf · uploaded 8 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077637 · 1 CA Certificate on Project Cost and Fund withdrawal (Form 3) (48).pdf · uploaded 8 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100077637 · 1 Disclosure of Interest in Other Real Estate Organizations (50)_11zon.pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Agreement for saleP52100077637 · 1 Proforma of Agreement for sale (84).pdf · uploaded 8 Oct 2024Source
- 1 Proforma of Allotment letterP52100077637 · 1 Proforma of Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P52100077637 · 1 Declaration about all RERA Designated Bank Accounts (Format A) (9).pdf · uploaded 8 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100077637 · 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (10).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterP52100077637 · 1 Deviation Report with respect to Allotment letter (52).pdf · uploaded 8 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100077637 · 1 Deviation Report with respect to model copy of Agreement (78).pdf · uploaded 8 Oct 2024Source
- 1 Other – LegalP52100077637 · 1 Other – Legal (25).pdf · uploaded 8 Oct 2024Source
- 1 Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- 1 Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- 1 Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1- EUPHORIA PHASE 2 09102024.pdf · uploaded 14 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3.pdf · uploaded 14 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PH2 30092024.pdf · uploaded 15 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PH3 30092024.pdf · uploaded 16 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · FORM 2 EUPHORIA PHASE 2 30092024.pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3 30092024.pdf · uploaded 18 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2 30092024.pdf · uploaded 22 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 30092024.pdf · uploaded 22 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100045848 · Form 5 Euphoria Phase 2.pdf · uploaded 22 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100047312 · Form-5 Euphoria Phase 3.pdf · uploaded 25 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Euphoria Phase 2.pdf · uploaded 3 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · Euphoria Phase 3.pdf · uploaded 3 Dec 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077637 · Euphoria phase 5.pdf · uploaded 21 Dec 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077637 · Euphoria phase 5.pdf · uploaded 21 Dec 2024Source
- 1 Details of encumbrancesP52100045848 · Euphoria phase 2.pdf · uploaded 21 Dec 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100047312 · Euphoria phase 3.pdf · uploaded 21 Dec 2024Source
- 1 b Details of encumbrances concerned to LegalP52100047312 · Euphoria phase 3.pdf · uploaded 21 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 31122024.pdf · uploaded 10 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 31122024.pdf · uploaded 10 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100045848 · FORM 3 Euphoria Ph2 22102024.pdf · uploaded 11 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 Euphoria Ph3 22102024.pdf · uploaded 11 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100045848 · EUPHORIA PH 2 31122024.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100047312 · EUPHORIA PH 3 31122024.pdf · uploaded 20 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · FORM 3 EUPHORIA PHASE 3 31122024.pdf · uploaded 21 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · FORM 3 EUPHORIA PHASE 2.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · FORM 2 EUPHORIA PHASE 3.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100045848 · FORM 1 EUPHORIA PHASE 2 31032025.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047312 · FORM 1 EUPHORIA PHASE 3 31032025.pdf · uploaded 12 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077637 · FORM 1 EUPHORIA PHASE 5 31122024.pdf · uploaded 19 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077637 · FORM 1 EUPHORIA PHASE 5 31032025.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077637 · Form 3 Euphoria Ph 5.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100045848 · Form 3 Euphoria Ph 2.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047312 · Form 3 Euphoria Ph 3.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077637 · Form 2 Euphorai Ph 5.pdf · uploaded 23 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100045848 · Form 2 Euphoria Ph 2.pdf · uploaded 23 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047312 · Form 2 Euphoria PH 3.pdf · uploaded 23 Apr 2025Source
- Form 2A (FY 2024-2025)P52100045848 · FORM 2A EUPHORIA PHASE 2.pdf · uploaded 23 Jun 2025Source
- Form 2A (FY 2024-2025)P52100047312 · FORM 2A EUPHORIA PHASE 3.pdf · uploaded 23 Jun 2025Source
- Form 1P52100045848 · FORM 1 EUPHORIA PHASE 2 31032025.pdf · uploaded 25 Jun 2025Source
- Form 2P52100045848 · Form 2 Euphoria Ph 2.pdf · uploaded 25 Jun 2025Source
- Form 3P52100045848 · Form 3 Euphoria Ph 2.pdf · uploaded 25 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100045848 · EUPHORIA PHASE2 31032025.pdf · uploaded 25 Jun 2025Source
- Form 1P52100047312 · FORM 1 EUPHORIA PHASE 3 31032025.pdf · uploaded 25 Jun 2025Source
- Form 2P52100047312 · Form 2 Euphoria PH 3.pdf · uploaded 25 Jun 2025Source
- Form 3P52100047312 · Form 3 Euphoria Ph 3.pdf · uploaded 25 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100047312 · EUPHORIA PHASE 3 31032025.pdf · uploaded 25 Jun 2025Source
- Form 2A (FY 2024-2025)P52100077637 · FORM 2A EUPHORIA PHASE 5.pdf · uploaded 30 Jun 2025Source
- Form 1P52100077637 · FORM 1 EUPHORIA PHASE 5 31032025.pdf · uploaded 30 Jul 2025Source
- Form 2P52100077637 · Form 2 Euphorai Ph 5.pdf · uploaded 30 Jul 2025Source
- Form 3P52100077637 · Form 3 Euphoria Ph 5.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52100077637 · EUPHORIA PHASE5 31032025.pdf · uploaded 30 Jul 2025Source
- Form 5 (FY 2024-2025)P52100077637 · vtp Euphoria phase 5.pdf · uploaded 24 Sep 2025Source
- Form 5 (FY 2024-2025)P52100045848 · vtp Euphoria phase 2_compressed.pdf · uploaded 24 Sep 2025Source
- Form 5 (FY 2024-2025)P52100047312 · vtp Euphoria phase 3.pdf · uploaded 24 Sep 2025Source
- Withdrawal Update Form 1P52100045848 · FORM 1 EUPHORIA PHASE 2 30092025.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2P52100045848 · FORM 2 EUPHORIA PHASE 2 30092025.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3P52100045848 · FORM 3 EUPHORIA PHASE 2 24062024_compressed (1).pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1P52100047312 · FORM 1 EUPHORIA PHASE 3.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 2P52100047312 · FORM 2 EUPHORIA PHASE 3 30092025.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 3P52100047312 · 3. FORM 3 EUPHORIA PHASE 3 24062024.pdf · uploaded 20 Oct 2025Source
- Withdrawal Update Form 1P52100045848 · FORM 1 Euphoria Phase 2 08012026.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 2P52100045848 · FORM 2 EUPHORIA PHASE 2 20122025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 3P52100045848 · FORM 3 Euphoria Phase 2 31122025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1P52100047312 · FORM 1 Euphoria Phase 3 08012026.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 2P52100047312 · FORM 2 EUPHORIA PHASE 3 20122025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 3P52100047312 · FORM 3 Euphoria Phase 3 31122025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1P52100077637 · FORM 1 Euphoria Phase 5 08012026.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1P52100077637 · FORM 1 EUPHORIA PHASE 5 30092025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1P52100077637 · FORM 1 Euphoria Phase 5 08012026.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2P52100077637 · FORM 2 EUPHORIA PAHSE 5 20122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2P52100077637 · FORM 2 Euphoria PHase 5 30092025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2P52100077637 · FORM 2 EUPHORIA PAHSE 5 20122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3P52100077637 · FORM 3 Euphoria Phase 5 31122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3P52100077637 · form 3 eup ph 5.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3P52100077637 · FORM 3 Euphoria Phase 5 31122025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1P52100077637 · FORM 1 Euph Ph 5 070142026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100077637 · Form-2 - Euphoria - Phase 5.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100077637 · FORM 3 Euph ph 5 30032026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100045848 · FORM 1 Euph Ph2 07042026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100045848 · Form-2 - Euphoria - Phase 2..pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100045848 · FORM 3 EUPH PH 2 30032026 F_11zon.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P52100047312 · FORM 1 Euph Ph 3 07042026.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P52100047312 · Form-2 - Euphoria - Phase 3..pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P52100047312 · FORM 3 Euph ph 3 30032026_11zon.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)P52100045848 · Form-2A -Euphoria - Phase-2.pdf · uploaded 18 Jun 2026Source
- Form 2A (FY 2025-2026)P52100047312 · Form-2A -Euphoria - Phase-3.pdf · uploaded 18 Jun 2026Source
- Withdrawal Update Form 1P52100045848 · FORM 1 Euph Ph 2 07072026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2P52100045848 · Form-2 -Euphoria - Phase-2.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3P52100045848 · FORM 3 EUPH PH 2 30062026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1P52100047312 · FORM 1 Euph Ph 3 07072026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2P52100047312 · Form-2 -Euphoria - Phase-3.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3P52100047312 · FORM 3 EUPH PH 3 30062026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1P52100077637 · FORM 1 Euph Ph 5 07072026.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2P52100077637 · Form-2 -Euphoria - Phase-5.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3P52100077637 · FORM 3 EUPH PH 5 30062026.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)P52100077637 · VTP Euphoria phase 5 Sign.pdf · uploaded 22 Sep 2026Source
- Form 5 (FY 2025-2026)P52100045848 · VTP Etrphoria Phase 2 Sign.pdf · uploaded 22 Sep 2026Source
- Form 5 (FY 2025-2026)P52100047312 · VTP Euphoria Phase 3 Sign.pdf · uploaded 22 Sep 2026Source
Technical
- DocumentP52100045848 · 01-29_compressed (1).pdf · uploaded 10 Jun 2022Source
- DocumentP52100045848 · 01-29_compressed (1).pdf · uploaded 10 Jun 2022Source
- DocumentP52100047312 · Euphoria phase 3.pdf · uploaded 27 Jul 2022Source
- DocumentP52100047312 · Euphoria phase 3.pdf · uploaded 27 Jul 2022Source
- DocumentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Copy of Layout Approval (in case of layout) (61).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Building Plan Approval _ NA Order for plotted development (39).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 2 Building Plan Approval _ NA Order for plotted development (27).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 3 Building Plan Approval _ NA Order for plotted development (20).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 4 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 5 Building Plan Approval _ NA Order for plotted development (15).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 6 Building Plan Approval _ NA Order for plotted development (13).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 7 Building Plan Approval _ NA Order for plotted development (14).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 8 Building Plan Approval _ NA Order for plotted development (12).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 1 Other – Technical (66).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 2 Other – Technical (33).pdf · uploaded 8 Oct 2024Source
- Other – TechnicalP52100077637 · 3 Other – Technical (11).pdf · uploaded 8 Oct 2024Source
Technical (Architect)
- DocumentP52100077637 · 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (8).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (8).pdf · uploaded 8 Oct 2024Source
- DocumentP52100045848 · FORM 1- EUPHORIA PHASE 2 09102024.pdf · uploaded 14 Oct 2024Source
- DocumentP52100047312 · FORM 1 EUPHORIA PHASE 3.pdf · uploaded 14 Oct 2024Source
- DocumentP52100045848 · FORM 1 EUPHORIA PHASE 2 31122024.pdf · uploaded 10 Jan 2025Source
- DocumentP52100047312 · FORM 1 EUPHORIA PHASE 3 31122024.pdf · uploaded 10 Jan 2025Source
- DocumentP52100045848 · FORM 1 EUPHORIA PHASE 2 31032025.pdf · uploaded 12 Apr 2025Source
- DocumentP52100047312 · FORM 1 EUPHORIA PHASE 3 31032025.pdf · uploaded 12 Apr 2025Source
- DocumentP52100077637 · FORM 1 EUPHORIA PHASE 5 31122024.pdf · uploaded 19 Apr 2025Source
- DocumentP52100077637 · FORM 1 EUPHORIA PHASE 5 31032025.pdf · uploaded 19 Apr 2025Source
- DocumentP52100077637 · FORM 1 Euph Ph 5 07072026.pdf · uploaded 16 Jul 2026Source
- DocumentP52100045848 · FORM 1 Euph Ph 2 07072026.pdf · uploaded 16 Jul 2026Source
- DocumentP52100047312 · FORM 1 Euph Ph 3 07072026.pdf · uploaded 16 Jul 2026Source
Technical (Engineer)
- DocumentP52100077637 · 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 8 Oct 2024Source
- DocumentP52100077637 · 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf · uploaded 8 Oct 2024Source
- DocumentP52100045848 · FORM 2 EUPHORIA PHASE 2 30092024.pdf · uploaded 18 Oct 2024Source
- DocumentP52100047312 · FORM 2 EUPHORIA PHASE 3 30092024.pdf · uploaded 18 Oct 2024Source
- DocumentP52100047312 · FORM 2 EUPHORIA PHASE 3.pdf · uploaded 29 Jan 2025Source
- DocumentP52100077637 · Form 2 Euphorai Ph 5.pdf · uploaded 23 Apr 2025Source
- DocumentP52100045848 · Form 2 Euphoria Ph 2.pdf · uploaded 23 Apr 2025Source
- DocumentP52100047312 · Form 2 Euphoria PH 3.pdf · uploaded 23 Apr 2025Source
- DocumentP52100045848 · Form-2 -Euphoria - Phase-2.pdf · uploaded 18 Jul 2026Source
- DocumentP52100047312 · Form-2 -Euphoria - Phase-3.pdf · uploaded 18 Jul 2026Source
- DocumentP52100077637 · Form-2 -Euphoria - Phase-5.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Manjari Kh, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 151
- South
- 146
- East
- 154
- West
- 136
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Sunil P Shah | — | P52100077637 |
| Architect | VK Arch | — | P52100045848 |
| Architect | Vk Arch | — | P52100047312 |
| Chartered accountant | SAC and Co LLP | — | P52100045848 |
| Chartered accountant | Sac And Co LLP | — | P52100047312 |
| Chartered accountant | SAC & cO LLP | — | P52100047312 |
| Chartered accountant | SAC & cO LLP | — | P52100045848 |
| Chartered accountant | S P A K & Co | — | P52100045848 |
Show all 89 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | S P A K & Co | — | P52100047312 |
| Chartered accountant | Sunil Shaha | — | P52100047312 |
| Chartered accountant | Sunil Shaha | — | P52100045848 |
| Engineer | Girish Awinashe | — | P52100047312 |
| Engineer | Girish Awinashe | — | P52100045848 |
| Engineer | Girish Awinashe | — | P52100077637 |
| Engineer | Mr Pravin Bhosale | — | P52100045848 |
| Engineer | Mr Pravin Bhosale | — | P52100047312 |
| Engineer | Pravin Bhosale | — | P52100045848 |
| Registered real estate agent | 360 Realtors LLP | — | P52100047312 |
| Registered real estate agent | 360 Realtors LLP | — | P52100045848 |
| Registered real estate agent | ANAROCK Property Consultants Pvt. Ltd. | — | P52100047312 |
| Registered real estate agent | ANAROCK Property Consultants Pvt. Ltd. | — | P52100045848 |
| Registered real estate agent | Basil Realty & Infra Solution LLP | — | P52100047312 |
| Registered real estate agent | Basil Realty & Infra Solution LLP | — | P52100045848 |
| Registered real estate agent | Bharat Shankar Tawar proprietor of Sai real estate solution | — | P52100045848 |
| Registered real estate agent | Bharat Shankar Tawar proprietor of Sai real estate solution | — | P52100047312 |
| Registered real estate agent | Brickfolio Solutions Private Limited | — | P52100045848 |
| Registered real estate agent | Brickfolio Solutions Private Limited | — | P52100047312 |
| Registered real estate agent | Bullmen Realty India Private Limited | — | P52100045848 |
| Registered real estate agent | Bullmen Realty India Private Limited | — | P52100047312 |
| Registered real estate agent | Chasing Spaces Private Limited | — | P52100047312 |
| Registered real estate agent | Chasing Spaces Private Limited | — | P52100045848 |
| Registered real estate agent | Clearspace Prop-Tech India Private Limited | — | P52100047312 |
| Registered real estate agent | Clearspace Prop-Tech India Private Limited | — | P52100045848 |
| Registered real estate agent | Firstdoor Realty LLP | — | P52100045848 |
| Registered real estate agent | Firstdoor Realty LLP | — | P52100047312 |
| Registered real estate agent | Firstkey Realtors Private Limited | — | P52100047312 |
| Registered real estate agent | Firstkey Realtors Private Limited | — | P52100045848 |
| Registered real estate agent | Hiren Natvarlal Trivedi | — | P52100047312 |
| Registered real estate agent | Hiren Natvarlal Trivedi | — | P52100045848 |
| Registered real estate agent | Homesfy Realty Limited | — | P52100045848 |
| Registered real estate agent | Homesfy Realty Limited | — | P52100047312 |
| Registered real estate agent | Investoxpert Advisors Private Limited | — | P52100047312 |
| Registered real estate agent | Investoxpert Advisors Private Limited | — | P52100045848 |
| Registered real estate agent | Kamaal Khan | — | P52100045848 |
| Registered real estate agent | Kamaal Khan | — | P52100047312 |
| Registered real estate agent | Key Mansions Private Limited | — | P52100047312 |
| Registered real estate agent | Key Mansions Private Limited | — | P52100045848 |
| Registered real estate agent | KingsFort Developers Private Limited | — | P52100047312 |
| Registered real estate agent | KingsFort Developers Private Limited | — | P52100045848 |
| Registered real estate agent | Kprbsk Realtors Private Limited | — | P52100047312 |
| Registered real estate agent | Kprbsk Realtors Private Limited | — | P52100045848 |
| Registered real estate agent | Krishna Kumar Panday | — | P52100045848 |
| Registered real estate agent | Krishna Kumar Panday | — | P52100047312 |
| Registered real estate agent | Livnest Technologies Private Limited | — | P52100047312 |
| Registered real estate agent | Livnest Technologies Private Limited | — | P52100045848 |
| Registered real estate agent | Magicstone Spaces LLP | — | P52100047312 |
| Registered real estate agent | Magicstone Spaces LLP | — | P52100045848 |
| Registered real estate agent | Paresh Sureshrao Mamidwar | — | P52100045848 |
| Registered real estate agent | Paresh Sureshrao Mamidwar | — | P52100047312 |
| Registered real estate agent | ProIndia Realty Private Limited | — | P52100045848 |
| Registered real estate agent | ProIndia Realty Private Limited | — | P52100047312 |
| Registered real estate agent | PropBiz Advisors Private Limited | — | P52100047312 |
| Registered real estate agent | PropBiz Advisors Private Limited | — | P52100045848 |
| Registered real estate agent | Propengine Realtech Private Limited | — | P52100047312 |
| Registered real estate agent | Propengine Realtech Private Limited | — | P52100045848 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100045848 |
| Registered real estate agent | Propertypistol Realty Private Limited | — | P52100047312 |
| Registered real estate agent | Propnivesh Private Limited | — | P52100045848 |
| Registered real estate agent | Propnivesh Private Limited | — | P52100047312 |
| Registered real estate agent | Rahri Services Pvt Ltd | — | P52100047312 |
| Registered real estate agent | Rahri Services Pvt Ltd | — | P52100045848 |
| Registered real estate agent | Rahul Kumar Singh | — | P52100047312 |
| Registered real estate agent | Rahul Kumar Singh | — | P52100045848 |
| Registered real estate agent | Realty Assistant Private Limited | — | P52100047312 |
| Registered real estate agent | Realty Assistant Private Limited | — | P52100045848 |
| Registered real estate agent | Rockwellroyal Homes Private Limited | — | P52100047312 |
| Registered real estate agent | Rockwellroyal Homes Private Limited | — | P52100045848 |
| Registered real estate agent | Santosh Pande | — | P52100047312 |
| Registered real estate agent | Santosh Pande | — | P52100045848 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100045848 |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — | P52100047312 |
| Registered real estate agent | Spacewalk Advisors LLP | — | P52100045848 |
| Registered real estate agent | Spacewalk Advisors LLP | — | P52100047312 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100047312 |
| Registered real estate agent | Square Yards Consulting Private Limited | — | P52100045848 |
| Registered real estate agent | Thee House Of Real Estate Solutions Private Limited | — | P52100045848 |
| Registered real estate agent | Thee House Of Real Estate Solutions Private Limited | — | P52100047312 |
| Registered real estate agent | Willow Stone Realty Private Limited | — | P52100047312 |
| Registered real estate agent | Willow Stone Realty Private Limited | — | P52100045848 |
Source: MahaRERA project page. Contact details are not shown.