East World
Certificate SignedManjari Bk, Pune 412307 |Promoter: Sankla-Mahadik Realty
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 3
- Phases
- 3
- Buildings
- 5
- Unit types
- —, 2BHK373 units in all
- Address
- Survey No-70B/1B/1(P), 70B/2/1 and 70B/2/2, Pune Solapur Road, Manjari BudrukPIN 412307
- Designated bank account
- 21
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52100054774- Registered
- 12 Feb 2024
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
Completion promised for 31 Dec 2027
P52100077516- Registered
- 20 Aug 2024
- Promised
- 31 Dec 2027
Completion promised for 31 Dec 2030
PR1260002601722- Registered
- 31 Aug 2026
- Promised
- 31 Dec 2030
3 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054774 | 12 Feb 2024 | 31 Dec 2028 | 30 Apr 2029 | Sankla-Mahadik Realty | Project page |
| P52100077516 | 20 Aug 2024 | 31 Dec 2027 | 31 Dec 2027 | Sankla-Mahadik Realty | Project page |
| PR1260002601722 | 31 Aug 2026 | 31 Dec 2030 | 31 Dec 2030 | Sankla-Mahadik Realty | Project page |
5 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Floors with CC | Units |
|---|---|---|---|
| Tower-5 | 13 | 16 | 51 |
| Tower- 6 | 15 | — | 58 |
| Tower No 7 | 22 | — | 88 |
| Tower No 8 | 22 | — | 88 |
| Tower No 9 | 22 | — | 88 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
31 of 373 units booked (8%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| PR1260002601722 | Tower-5 | — | — | 51 | — |
| P52100077516 | Tower- 6 | 2BHK | 58.5 sq m · 630 sq ft | 28 | 13 |
| P52100077516 | Tower- 6 | 2BHK | 59.25 sq m · 638 sq ft | 30 | 18 |
| P52100054774 | Tower No 7 | — | — | 88 | — |
| P52100054774 | Tower No 8 | — | — | 88 | — |
| P52100054774 | Tower No 9 | — | — | 88 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 257 filings listed on MahaRERA's project page
Registration certificate (3)
Finance
- PAN CardP52100054774 · S M Realty Pan Cards Pune.pdf · uploaded 31 Jan 2024Source
- PAN CardP52100054774 · S M Realty Pan cards 2.pdf · uploaded 31 Jan 2024Source
- PAN CardP52100077516 · Pan Card Firm.pdf · uploaded 15 Jun 2024Source
- Other – FinanceP52100077516 · Rera Letter (1).pdf · uploaded 9 Aug 2024Source
- Other – FinanceP52100077516 · POA COPY 100.pdf · uploaded 13 Aug 2024Source
Show all 260 documentsShow fewer documents
Finance
- Other – FinanceP52100077516 · Declaration in Form B (18).pdf · uploaded 13 Aug 2024Source
- OthersP52100077516 · EWP2 - Format A.pdf · uploaded 16 Sep 2025Source
- OthersP52100054774 · EWP1 - Format A.pdf · uploaded 16 Sep 2025Source
- PAN CardPR1260002601722 · PAN Crad.pdf · uploaded 10 Aug 2026Source
- GSTIN DocumentPR1260002601722 · GST Certidicate - SMR.pdf · uploaded 10 Aug 2026Source
- OthersPR1260002601722 · Declaration cum Undertaking for No Sale.pdf · uploaded 21 Aug 2026Source
Legal
- Legal Title reportP52100054774 · ilovepdf_merged (64).pdf · uploaded 31 Jan 2024Source
- Declaration Form BP52100054774 · Declaration Form B SM Realty.pdf · uploaded 31 Jan 2024Source
- Legal Title reportP52100077516 · Final Title Report- East World.pdf · uploaded 19 Jun 2024Source
- Declaration Form BP52100077516 · Form B- Promoter- East World II.pdf · uploaded 19 Jun 2024Source
- OthersP52100077516 · EWP2 - Format A.pdf · uploaded 16 Sep 2025Source
- OthersP52100054774 · EWP1 - Format A.pdf · uploaded 16 Sep 2025Source
- Declaration Form BPR1260002601722 · Form B Promotor.pdf · uploaded 7 Aug 2026Source
- OthersPR1260002601722 · Disclosure Of Interest.pdf · uploaded 10 Aug 2026Source
- Declaration Form BPR1260002601722 · Title Search Report Annexure.pdf · uploaded 27 Aug 2026Source
Migrated
- 1 PAN CardP52100054774 · S M Realty Pan Cards Pune.pdf · uploaded 31 Jan 2024Source
- 2 PAN CardP52100054774 · S M Realty Pan cards 2.pdf · uploaded 31 Jan 2024Source
- 1 Copy of the legal title reportP52100054774 · ilovepdf_merged (64).pdf · uploaded 31 Jan 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100054774 · No Encumbrance- Finance.pdf · uploaded 31 Jan 2024Source
- 1 b Details of encumbrances concerned to LegalP52100054774 · No Encumbrance- Finance.pdf · uploaded 31 Jan 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100054774 · commencement Certificate Manjri S No 70B Pune.pdf · uploaded 31 Jan 2024Source
- 1 Declaration about Commencement CertificateP52100054774 · Declaration about Commencement Certificate.pdf · uploaded 31 Jan 2024Source
- 1 Declaration in FORM BP52100054774 · Declaration Form B SM Realty.pdf · uploaded 31 Jan 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054774 · form no 03 sm CA_rotated-rotated_11zon.pdf · uploaded 31 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100054774 · Disclosure of interest Mr Subhash Sankla.pdf · uploaded 31 Jan 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP52100054774 · Disclosure of interest Mr Sahil Sankla.pdf · uploaded 31 Jan 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP52100054774 · Narendra Mahadik Disclosure of interest.pdf · uploaded 31 Jan 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsP52100054774 · Mr Vijay Mahadik Disclosure of Interest.pdf · uploaded 31 Jan 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsP52100054774 · Mr Virendra Mahadik Disclosure of interest.pdf · uploaded 31 Jan 2024Source
- 1 Proforma of Agreement for saleP52100054774 · Draft Agreement Tower Nos 7 8 and 9 EASTWORLD Manjri Bk Pune.pdf · uploaded 31 Jan 2024Source
- 1 Proforma of Allotment letterP52100054774 · Proforma of Allotment Letter.pdf · uploaded 31 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100054774 · FORMATE A (1).pdf · uploaded 31 Jan 2024Source
- 1 Deviation Report with respect to Allotment letterP52100054774 · Deviation Report Allotment Letter.pdf · uploaded 31 Jan 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100054774 · Deviation Report Agreement to Sell Manjri S No 70 B Pune.pdf · uploaded 31 Jan 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100054774 · Copy of Layout- Eastworld_11zon.pdf · uploaded 1 Feb 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100054774 · Page 2.pdf · uploaded 1 Feb 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4579.pdf · uploaded 1 Feb 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4580.pdf · uploaded 1 Feb 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4581.pdf · uploaded 1 Feb 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4582.pdf · uploaded 1 Feb 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4583.pdf · uploaded 1 Feb 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100054774 · HPSCANNER4584.pdf · uploaded 1 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054774 · Page 9.pdf · uploaded 1 Feb 2024Source
- 1 CERSAI detailsP52100054774 · Cersai Dec.pdf · uploaded 1 Feb 2024Source
- 2 a Details of encumbrances concerned to FinanceP52100054774 · No Encumbrance- Litigation.pdf · uploaded 5 Feb 2024Source
- 2 b Details of encumbrances concerned to LegalP52100054774 · No Encumbrance- Litigation.pdf · uploaded 5 Feb 2024Source
- 1 Other – TechnicalP52100054774 · Order 50.pdf · uploaded 5 Feb 2024Source
- 2 Other – TechnicalP52100054774 · ilovepdf_merged (63).pdf · uploaded 5 Feb 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentP52100054774 · East World CC Verification.pdf · uploaded 6 Feb 2024Source
- 3 Other – TechnicalP52100054774 · East World CC Verification.pdf · uploaded 6 Feb 2024Source
- 4 Other – TechnicalP52100054774 · FORAM D.pdf · uploaded 6 Feb 2024Source
- 1 PAN CardP52100077516 · Pan Card Firm.pdf · uploaded 15 Jun 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100077516 · 1 a Details of encumbrances concerned to Finance (40).pdf · uploaded 15 Jun 2024Source
- 2 a Details of encumbrances concerned to FinanceP52100077516 · 2 b Details of encumbrances concerned to Legal (26).pdf · uploaded 15 Jun 2024Source
- 1 b Details of encumbrances concerned to LegalP52100077516 · 1 a Details of encumbrances concerned to Finance (40).pdf · uploaded 15 Jun 2024Source
- 2 b Details of encumbrances concerned to LegalP52100077516 · 2 b Details of encumbrances concerned to Legal (26).pdf · uploaded 15 Jun 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100077516 · 1 Commencement Certificates _ NA Order for plotted development (20).pdf · uploaded 15 Jun 2024Source
- 1 Declaration about Commencement CertificateP52100077516 · 1 Declaration about Commencement Certificate (41).pdf · uploaded 15 Jun 2024Source
- 1 CERSAI detailsP52100077516 · 1 CERSAI details (46).pdf · uploaded 15 Jun 2024Source
- 1 Other – TechnicalP52100077516 · 1 Other – Technical (56).pdf · uploaded 15 Jun 2024Source
- 1 Copy of the legal title reportP52100077516 · Final Title Report- East World.pdf · uploaded 19 Jun 2024Source
- 1 Copy of Layout Approval (in case of layout)P52100077516 · HPSCANNER4569_11zon.pdf · uploaded 19 Jun 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077516 · HPSCANNER4569_11zon.pdf · uploaded 19 Jun 2024Source
- 1 Declaration in FORM BP52100077516 · Form B- Promoter- East World II.pdf · uploaded 19 Jun 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077516 · rutuja narsingh and associates.pdf · uploaded 19 Jun 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100077516 · 1 Disclosure of Interest in Other Real Estate Organizations (44).pdf · uploaded 19 Jun 2024Source
- 1 Proforma of Agreement for saleP52100077516 · Draft Agreement for Sale_East World Phase II_Ms Sankla Mahadik Realty_ 09082024.pdf · uploaded 19 Jun 2024Source
- 1 Proforma of Allotment letterP52100077516 · AL_East World Phase II_Ms Sankla Mahadik Realty_ 06082024.pdf · uploaded 19 Jun 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100077516 · 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same (36).pdf · uploaded 19 Jun 2024Source
- 1 Deviation Report with respect to Allotment letterP52100077516 · Deviation Report- East World Phase II.pdf · uploaded 19 Jun 2024Source
- 1 Deviation Report with respect to model copy of AgreementP52100077516 · 1 Deviation Report with respect to model copy of Agreement (70).pdf · uploaded 19 Jun 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100077516 · HPSCANNER4570.pdf · uploaded 6 Aug 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100077516 · 2 Building Plan Approval _ NA Order for plotted development (22).pdf · uploaded 6 Aug 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100077516 · 1 Disclosure for secured_unsecured finance availed for the project (12).pdf · uploaded 6 Aug 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100077516 · FORM B BANK.pdf · uploaded 6 Aug 2024Source
- 2 Other – TechnicalP52100077516 · Merged- Plot Area Dec.pdf · uploaded 6 Aug 2024Source
- 3 Other – TechnicalP52100077516 · 3 Other – Technical (10) (1).pdf · uploaded 6 Aug 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077516 · 1 Other – Finance (12).pdf · uploaded 9 Aug 2024Source
- 1 Other – FinanceP52100077516 · Rera Letter (1).pdf · uploaded 9 Aug 2024Source
- 2 Other – FinanceP52100077516 · POA COPY 100.pdf · uploaded 13 Aug 2024Source
- 3 Other – FinanceP52100077516 · Declaration in Form B (18).pdf · uploaded 13 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100077516 · Commencement Certificate.pdf · uploaded 6 Dec 2024Source
- 18 Building Plan Approval / NA Order for plotted developmentP52100077516 · 18 no_11zon.pdf · uploaded 6 Dec 2024Source
- 17 Building Plan Approval / NA Order for plotted developmentP52100077516 · 17 no.pdf · uploaded 6 Dec 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentP52100077516 · 14 no_11zon.pdf · uploaded 6 Dec 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentP52100077516 · 16 no_11zon.pdf · uploaded 6 Dec 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentP52100077516 · 15 no.pdf · uploaded 6 Dec 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentP52100077516 · 13 no.pdf · uploaded 6 Dec 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentP52100077516 · 12 no.pdf · uploaded 6 Dec 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentP52100077516 · 11 no.pdf · uploaded 6 Dec 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentP52100077516 · 10 no.pdf · uploaded 6 Dec 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100077516 · 09 no_11zon.pdf · uploaded 6 Dec 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100077516 · 08 no.pdf · uploaded 6 Dec 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100077516 · 7 no.pdf · uploaded 6 Dec 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100077516 · 6 no.pdf · uploaded 6 Dec 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100077516 · 05 no_11zon.pdf · uploaded 6 Dec 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100077516 · 4 no_11zon.pdf · uploaded 6 Dec 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100077516 · 3 no.pdf · uploaded 6 Dec 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100077516 · 02 no_11zon.pdf · uploaded 6 Dec 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100077516 · 01 no_11zon.pdf · uploaded 6 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054774 · Form 1 T8 T9 31 03 24.pdf · uploaded 18 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054774 · Form 1 T8 T9 30 06 24.pdf · uploaded 18 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054774 · Form 1 T8 T9 Dt 30 09 24.pdf · uploaded 18 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054774 · Form 3 March 2024.pdf · uploaded 18 Dec 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054774 · Form 3 June 2024.pdf · uploaded 18 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054774 · Form 3 Sept 24.pdf · uploaded 18 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054774 · SMR Form 2 T8 T9 Dt 31 03 24.pdf · uploaded 18 Dec 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054774 · SMR Form 2 T8 T9 Dt 30 06 24.pdf · uploaded 18 Dec 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054774 · SMR Form 2 T8 T9 Dt 30 09 24.pdf · uploaded 18 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054774 · Form 5 EW Ph1.pdf · uploaded 10 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054774 · FORM 1 SMR 1 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054774 · FORM 3 SMR 1 Dec 24.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054774 · FORM 2 SMR 1 Dec 24.pdf · uploaded 20 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077516 · SMR Ph2 Form1 31 12 2024.pdf · uploaded 27 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100077516 · SMR Ph2 Form1 30 09 2024.pdf · uploaded 27 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077516 · SMR Ph2 FORM 3 Sep 2024.pdf · uploaded 27 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100077516 · SMR Ph2 FORM 3 Dec 2024.pdf · uploaded 27 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077516 · SMR Ph2 Form 2 30 09 2024.pdf · uploaded 27 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100077516 · SMR Ph2 Form 2 31 12 2024.pdf · uploaded 27 Jan 2025Source
- Form 1P52100077516 · FORM 1 MARCH 2025.pdf · uploaded 30 Jun 2025Source
- Form 2P52100077516 · FORM 2 MARCH 2025.pdf · uploaded 30 Jun 2025Source
- Form 3P52100077516 · FORM 3 MARCH 2025.pdf · uploaded 30 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100077516 · Sold Disclosure MARCH -2025.pdf · uploaded 30 Jun 2025Source
- Form 1P52100054774 · FORM 1 MARCH -2025.pdf · uploaded 30 Jun 2025Source
- Form 2P52100054774 · FORM 2 MARCH -2025.pdf · uploaded 30 Jun 2025Source
- Form 3P52100054774 · FORM 3 MARCH - 2025.pdf · uploaded 30 Jun 2025Source
- Disclosure of Sold and Booked InventoryP52100054774 · Sold Disclosure MARCH -2025.pdf · uploaded 30 Jun 2025Source
- Withdrawal Update Form 1P52100054774 · FORM 1 MARCH -2025.pdf · uploaded 11 Aug 2025Source
- Withdrawal Update Form 1P52100054774 · FORM 1 MARCH -2025.pdf · uploaded 11 Aug 2025Source
- Withdrawal Update Form 2P52100054774 · FORM 2 SMR 1 Dec 24.pdf · uploaded 11 Aug 2025Source
- Withdrawal Update Form 2P52100054774 · FORM 2 SMR 1 Dec 24.pdf · uploaded 11 Aug 2025Source
- Withdrawal Update Form 3P52100054774 · form no 03 sm CA_rotated-rotated_11zon.pdf · uploaded 11 Aug 2025Source
- Withdrawal Update Form 3P52100054774 · form no 03 sm CA_rotated-rotated_11zon.pdf · uploaded 11 Aug 2025Source
- Form 1P52100077516 · from 1 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 1P52100077516 · from 1 dec 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100077516 · from 2 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100077516 · from 2 dec 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100077516 · form 3 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100077516 · from 3 dec 2024.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100077516 · Sep 24.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100077516 · Dec 24.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 1P52100077516 · Form 1 East world phase 2 july 2025.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 2P52100077516 · Form 2 East World phase 2 july 2025.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 3P52100077516 · FORM 3 -East World P II - June 2025 (3) (1).pdf · uploaded 14 Aug 2025Source
- Form 1P52100054774 · form 1 march 2024.pdf · uploaded 14 Aug 2025Source
- Form 1P52100054774 · form 1 june 2024.pdf · uploaded 14 Aug 2025Source
- Form 1P52100054774 · form 1 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 1P52100054774 · form 1 dec 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100054774 · form 2 march 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100054774 · form 2 june 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100054774 · form 2 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 2P52100054774 · form 2 dec 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100054774 · form 3 march 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100054774 · form 3 june 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100054774 · form 3 sep 2024.pdf · uploaded 14 Aug 2025Source
- Form 3P52100054774 · form 3 dec 2024.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100054774 · Sold Disclosure East World MAR-24.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100054774 · Sold Disclosure East World JUN-24.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100054774 · Sold Disclosure East World SEP-24.pdf · uploaded 14 Aug 2025Source
- Disclosure of Sold and Booked InventoryP52100054774 · Sold Disclosure East World DEC-24.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 1P52100054774 · Form 1 East World Phase 1 july 2025.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 2P52100054774 · Form 2 East World phase 1 july 2025.pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 3P52100054774 · FORM 3 -JUNE 2025 -SMR Phase I (2).pdf · uploaded 14 Aug 2025Source
- Withdrawal Update Form 1P52100077516 · Form 1 EW PH 2 Sep 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100077516 · Form 1 EW PH 2 Dec 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100077516 · EW PH 2 - FORM 1 - 31 MRCH 2026.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100077516 · SMR Form 2 - EW Ph2 - Sep 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100077516 · SMR Form 2 - EW Ph2 - Dec 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100077516 · EW FORM 2 - Ph 2 - MARCH 2026.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100077516 · Form 3 EW ph 2 sept 2025 Final.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100077516 · FORM 3 East World P II DEC 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100077516 · FORM 3 ph 2 East World MARCH 2026 Final.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100054774 · Form 1 EW PH 1 Sep 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100054774 · Form 1 EW PH 1 Dec 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100054774 · EW PH 1 - FORM 1 - 31 MRCH 2026.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100054774 · SMR Form 2 - EW Ph1 - Sep 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100054774 · SMR Form 2 - EW Ph1 - Dec 2025.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 2P52100054774 · EW FORM 2 - Ph 1 - MARCH 2026.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100054774 · Form 3 EW ph 1 sept 2025 Final.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100054774 · FORM 3 DEC 2025 SMR Phase I.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 3P52100054774 · FORM 3 ph 1 East world MARCH 2026 Final.pdf · uploaded 16 Jun 2026Source
- Withdrawal Update Form 1P52100077516 · EW Form 1 - Ph 2 - June 2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2P52100077516 · EW Form 2 - Ph 2 - June 2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3P52100077516 · EW Form 3 - Ph 2 Final.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1P52100054774 · EW Form 1 - Ph 1 - June 2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2P52100054774 · EW Form 2 - Ph 1 - June 2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3P52100054774 · EW Form 3 - Ph 1 - June 2026.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2025-2026)P52100054774 · form 2 A EW ph 1.pdf · uploaded 18 Aug 2026Source
- Form 5 (FY 2024-2025)P52100054774 · Form 5 - SMR PH I 24-25 SCAN COPY.pdf · uploaded 3 Sep 2026Source
Technical
- DocumentP52100054774 · Copy of Layout- Eastworld_11zon.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4583.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4584.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · Page 2.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4579.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4580.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4581.pdf · uploaded 1 Feb 2024Source
- DocumentP52100054774 · HPSCANNER4582.pdf · uploaded 1 Feb 2024Source
- Other – TechnicalP52100054774 · Order 50.pdf · uploaded 5 Feb 2024Source
- Other – TechnicalP52100054774 · ilovepdf_merged (63).pdf · uploaded 5 Feb 2024Source
- Other – TechnicalP52100054774 · FORAM D.pdf · uploaded 6 Feb 2024Source
- Other – TechnicalP52100054774 · East World CC Verification.pdf · uploaded 6 Feb 2024Source
- Other – TechnicalP52100077516 · 1 Other – Technical (56).pdf · uploaded 15 Jun 2024Source
- DocumentP52100077516 · HPSCANNER4569_11zon.pdf · uploaded 19 Jun 2024Source
- DocumentP52100077516 · HPSCANNER4569_11zon.pdf · uploaded 19 Jun 2024Source
- DocumentP52100077516 · HPSCANNER4570.pdf · uploaded 6 Aug 2024Source
- DocumentP52100077516 · 2 Building Plan Approval _ NA Order for plotted development (22).pdf · uploaded 6 Aug 2024Source
- Other – TechnicalP52100077516 · Merged- Plot Area Dec.pdf · uploaded 6 Aug 2024Source
- Other – TechnicalP52100077516 · 3 Other – Technical (10) (1).pdf · uploaded 6 Aug 2024Source
- DocumentP52100077516 · 01 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 02 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 3 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 4 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 05 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 6 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 7 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 08 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 09 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 10 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 11 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 12 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 13 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 15 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 16 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 14 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 17 no.pdf · uploaded 6 Dec 2024Source
- DocumentP52100077516 · 18 no_11zon.pdf · uploaded 6 Dec 2024Source
- DocumentPR1260002601722 · Layout.pdf · uploaded 7 Aug 2026Source
- DocumentPR1260002601722 · Plan 1.pdf · uploaded 7 Aug 2026Source
- DocumentPR1260002601722 · Plan 2.pdf · uploaded 7 Aug 2026Source
- DocumentPR1260002601722 · Plan 3.pdf · uploaded 7 Aug 2026Source
- DocumentPR1260002601722 · Annexure A.pdf · uploaded 7 Aug 2026Source
- DocumentP52100054774 · Marked Layout.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 2-20.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 14-20 - T7.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 15-20.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 16-20 - T8.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 17-20.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 18-20 - T9.pdf · uploaded 19 Aug 2026Source
- DocumentP52100054774 · 19-20.pdf · uploaded 19 Aug 2026Source
Technical (Architect)
- DocumentP52100054774 · Form 1 T8 T9 31 03 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100054774 · Form 1 T8 T9 30 06 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100054774 · Form 1 T8 T9 Dt 30 09 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100054774 · FORM 1 SMR 1 Dec 24.pdf · uploaded 20 Jan 2025Source
- DocumentP52100077516 · SMR Ph2 Form1 31 12 2024.pdf · uploaded 27 Jan 2025Source
- DocumentP52100077516 · EW Form 1 - Ph 2 - June 2026.pdf · uploaded 14 Aug 2026Source
- DocumentP52100054774 · EW Form 1 - Ph 1 - June 2026.pdf · uploaded 14 Aug 2026Source
Technical (Engineer)
- DocumentP52100054774 · SMR Form 2 T8 T9 Dt 31 03 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100054774 · SMR Form 2 T8 T9 Dt 30 06 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100054774 · SMR Form 2 T8 T9 Dt 30 09 24.pdf · uploaded 18 Dec 2024Source
- DocumentP52100077516 · SMR Ph2 Form 2 31 12 2024.pdf · uploaded 27 Jan 2025Source
- DocumentP52100077516 · EW Form 2 - Ph 2 - June 2026.pdf · uploaded 14 Aug 2026Source
- DocumentP52100054774 · EW Form 2 - Ph 1 - June 2026.pdf · uploaded 14 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In MANJARI Bk, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Portion out of project land bearing Survey No- 70B
- South
- Survey No- 70A
- East
- Survey No- 70B Hissa No 2
- West
- Survey No- 70B Hissa No 1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | A B Architects | — | P52100054774 |
| Architect | A B Architects | — | P52100077516 |
| Chartered accountant | CA Rutuja Narsingh & Associates | — | P52100077516 |
| Chartered accountant | Namrata Kalpesh Dhruve & Co | — | P52100054774 |
| Engineer | Chandrashekhar Dharmadhikari | — | P52100077516 |
| Engineer | Chandrashekhar Dharmadhikari | — | P52100054774 |
| Other | Fortune Enterprises | — | P52100054774 |
| Other | Gurukrupa Electricals | — | P52100054774 |
Show all 11 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Other | J K Constructions | — | P52100054774 |
| Other | Kuber Fire | — | P52100054774 |
| Other | Rajveer Badodaya | — | P52100054774 |
Source: MahaRERA project page. Contact details are not shown.