Vision Heights

Certificate Signed

Lohgaon, Pune 411047 |Promoter: Shree Mahalaxmi Developers

Residential / Group HousingRERAP52100046992
26 Sep 2022Registered with MahaRERA
30 Jun 2025Promised completion
2Buildings
70Units registered13 booked (19%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
1BHK, 2BHK, 3BHK70 units in all
Address
Survey No. 273, Survey No 273, LohgaonPIN 411047
Designated bank account
41
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.59865, 73.92659
Vision Heights is at latitude 18.59865, longitude 73.92659.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2025

The latest completion date on record passed 1 year and 4 months ago.

Registered
26 Sep 2022
Promised
30 Jun 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004699226 Sep 202230 Jun 202530 Jun 2025Shree Mahalaxmi DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A766
Wing B34

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 of 70 units booked (19%), as the promoter reported to MahaRERA

1BHK · 39 units2BHK · 30 units3BHK · 1 unit
BuildingTypeCarpet areaUnitsBooked
Wing A1BHK38.09 sq m · 410 sq ft110
Wing A1BHK38.42 sq m · 414 sq ft60
Wing A1BHK38.52 sq m · 415 sq ft160
Wing A1BHK38.77 sq m · 417 sq ft64
Wing A2BHK50.43 sq m · 543 sq ft229
Wing A2BHK51 sq m · 549 sq ft50
Wing B2BHK50.84 sq m · 547 sq ft30
Wing B3BHK59.12 sq m · 636 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 148 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardFirm PAN.pdf · uploaded 26 Jul 2022Source
  • Other – FinanceFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source

Legal

  • Legal Title reportLegal Title Report.pdf · uploaded 26 Jul 2022Source
  • Declaration Form BForm B OK.pdf · uploaded 12 Aug 2022Source
  • Other – LegalFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source

Migrated

  • 1 PAN CardFirm PAN.pdf · uploaded 26 Jul 2022Source
  • 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 26 Jul 2022Source
Show all 149 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to FinanceEncumbrance certificate .pdf · uploaded 26 Jul 2022Source
  • 1 Copy of Layout Approval (in case of layout)SANCATION PLAN.pdf · uploaded 26 Jul 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificates NA ORDER.pdf · uploaded 26 Jul 2022Source
  • 1 Declaration about Commencement CertificateCommencement Certificate .pdf · uploaded 26 Jul 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 26 Jul 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentSANCATION PLAN.pdf · uploaded 27 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate.pdf · uploaded 27 Jul 2022Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrance certificate.pdf · uploaded 12 Aug 2022Source
  • 1 Declaration in FORM BForm B OK.pdf · uploaded 12 Aug 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 12 Aug 2022Source
  • 1 CERSAI detailsCERSAI Details Merge.pdf · uploaded 12 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameALL BANK DETAILS.pdf · uploaded 18 Aug 2022Source
  • 1 Proforma of Allotment letterAL Model form Allotment Compress.pdf · uploaded 6 Sep 2022Source
  • 1 Deviation Report with respect to Allotment letterAL Daviation Report Compress.pdf · uploaded 6 Sep 2022Source
  • 1 Deviation Report with respect to model copy of AgreementAFS Deviation Report of Mahalaxmi Dev Revised.pdf · uploaded 6 Sep 2022Source
  • 2 Proforma of Allotment letterAFS Articles of Agreement SMD_New19092022.pdf · uploaded 18 Sep 2022Source
  • 3 Proforma of Allotment letterAFS Articles of Agreement SMD Revised.pdf · uploaded 18 Oct 2022Source
  • 2 Deviation Report with respect to Allotment letterDaviation Report 02112022_compressed.pdf · uploaded 2 Nov 2022Source
  • 2 Copy of Layout Approval (in case of layout)HPSC0119 NEW.pdf · uploaded 27 Apr 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSC0118_230411_144603 NEW.pdf · uploaded 27 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentSKM_36723041116070_230411_160451.pdf · uploaded 27 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE3.pdf · uploaded 23 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE2.pdf · uploaded 23 Feb 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE13.pdf · uploaded 23 Feb 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE12.pdf · uploaded 23 Feb 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE11.pdf · uploaded 23 Feb 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE10.pdf · uploaded 23 Feb 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE9.pdf · uploaded 23 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE8.pdf · uploaded 23 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE7.pdf · uploaded 23 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE6.pdf · uploaded 23 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE5.pdf · uploaded 23 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 FILE4.pdf · uploaded 23 Feb 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE13.pdf · uploaded 23 Feb 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE12.pdf · uploaded 23 Feb 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE11.pdf · uploaded 23 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE10.pdf · uploaded 23 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE9.pdf · uploaded 23 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE7.pdf · uploaded 23 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE6.pdf · uploaded 23 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE5.pdf · uploaded 23 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE4.pdf · uploaded 23 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE3.pdf · uploaded 23 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 FILE8.pdf · uploaded 23 Feb 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE9.pdf · uploaded 23 Feb 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE13.pdf · uploaded 23 Feb 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE12.pdf · uploaded 23 Feb 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE11.pdf · uploaded 23 Feb 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE10.pdf · uploaded 23 Feb 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE8.pdf · uploaded 23 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE7.pdf · uploaded 23 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE6.pdf · uploaded 23 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE5.pdf · uploaded 23 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE4.pdf · uploaded 23 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 FILE3.pdf · uploaded 23 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC 3.pdf · uploaded 23 Feb 2025Source
  • 1 Other – LegalFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)RC.pdf · uploaded 23 Feb 2025Source
  • 1 Other – FinanceFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source
  • 1 Other – TechnicalFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A Vision Heights 30052023.pdf · uploaded 23 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A Vision Heights 30052024.pdf · uploaded 23 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 Shree Mahalaxmi Developers 2023.pdf · uploaded 27 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 Shree Mahalaxmi Developers 2024.pdf · uploaded 27 Feb 2025Source
  • Form 1FORM 1 31032023.pdf · uploaded 15 Sep 2025Source
  • Form 2FORM 2 31032023.pdf · uploaded 15 Sep 2025Source
  • Form 3FORM 3 VISION HEIGHTS 31032023.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit_310323.pdf · uploaded 15 Sep 2025Source
  • Form 1FORM 1 30062023.pdf · uploaded 15 Sep 2025Source
  • Form 2FORM 2 VISION HEIGHTS 30062023.pdf · uploaded 15 Sep 2025Source
  • Form 3FORM 3 VISION HEIGHTS 30062023.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit_300623.pdf · uploaded 15 Sep 2025Source
  • Form 1Form1 30092023.pdf · uploaded 15 Sep 2025Source
  • Form 2Form2 30092023.pdf · uploaded 15 Sep 2025Source
  • Form 3Form3 30092023.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit_300923.pdf · uploaded 15 Sep 2025Source
  • Form 1FORM 1 31122023.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 31122023.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 31122023.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 311223.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 31032024.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 VISION HEIGHTS 31032024.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 VISION HEIGHTS 31032024.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 310324.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 30062024.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 30062024.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 30062024.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 300624.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 30092024.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 30092024.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 30092024.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 300924.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 31122024.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 31122024.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 31122024.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 311224.pdf · uploaded 3 Oct 2025Source
  • Form 1Form 1 March 25.pdf · uploaded 3 Oct 2025Source
  • Form 2Form 2 March 25.pdf · uploaded 3 Oct 2025Source
  • Form 3Form 3 March 25.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit March25.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 30092022.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 30092022.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 30092022.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 30092022.pdf · uploaded 3 Oct 2025Source
  • Form 1FORM 1 31122022.pdf · uploaded 3 Oct 2025Source
  • Form 2FORM 2 31122022.pdf · uploaded 3 Oct 2025Source
  • Form 3FORM 3 31122022.pdf · uploaded 3 Oct 2025Source
  • Disclosure of Sold and Booked InventoryList of Sold Unit 31122022.pdf · uploaded 3 Oct 2025Source
  • Withdrawal Update Form 1Form1 30062025.pdf · uploaded 3 Oct 2025Source
  • Withdrawal Update Form 2Form2 30062025.pdf · uploaded 3 Oct 2025Source
  • Withdrawal Update Form 3Form3 30062025.pdf · uploaded 3 Oct 2025Source

Technical

  • DocumentSANCATION PLAN.pdf · uploaded 26 Jul 2022Source
  • DocumentSANCATION PLAN.pdf · uploaded 27 Jul 2022Source
  • DocumentHPSC0119 NEW.pdf · uploaded 27 Apr 2023Source
  • DocumentHPSC0118_230411_144603 NEW.pdf · uploaded 27 Apr 2023Source
  • Other – TechnicalFORM 4 SAMARTH DEVELOPERS.pdf · uploaded 23 Feb 2025Source

Technical (Architect)

  • DocumentFORM 1 FILE2.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE3.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE4.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE5.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE6.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE7.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE8.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE9.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE10.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE11.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE12.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 1 FILE13.pdf · uploaded 23 Feb 2025Source
  • DocumentForm1 30062025.pdf · uploaded 3 Oct 2025Source

Technical (Engineer)

  • DocumentFORM 2 FILE3.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE4.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE5.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE6.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE7.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE8.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE9.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE10.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE11.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE12.pdf · uploaded 23 Feb 2025Source
  • DocumentFORM 2 FILE13.pdf · uploaded 23 Feb 2025Source
  • DocumentForm2 30062025.pdf · uploaded 3 Oct 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Lohgaon, Haveli taluka

Survey, CTS, gat or plot numbers

SURVEY NO. 273

Boundaries

North
Survey No 274
South
Cts No 1275 1937 1938 And Ingress And Egress Road
East
Cts No 1268
West
Cts No 1957 Property Of Genu Mahadu Kadam N Other

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSagar B Karale—
Chartered accountantAshok Malipatil—
Chartered accountantCa Amol Totala—
Chartered accountantCa Yogesh Bhagat—
EngineerVikas Vasantrao Shitole—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology