Indrayani Sankalp-MPMC

Certificate Signed

Lohgaon, Pune 411047 |Promoter: Bebanco Developers Ltd

Residential / Group HousingRERAP52100007861
18 Aug 2017Registered with MahaRERA
6 Feb 2024Promised completion
5 Feb 2025Revised completionPushed back 1 year
60Buildings
5,444Units registered5,025 booked (92%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
60
Unit types
3 BHK REGULAR, 3 BHK COMPACT, 2 BHK, 2 BHK REGULAR, 1 BHK, 1 RK, Shop type a, Shop type b, 3.5 BHK, 4.5 BHK5,444 units in all
Address
32 part, WADGAON SHINDE ROAD, SHINDE VASTIPIN 411047
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.61920, 73.95631
Indrayani Sankalp-MPMC is at latitude 18.61920, longitude 73.95631.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 1 year and 8 months ago.

Registered
18 Aug 2017
Promised
6 Feb 2024
Revised
5 Feb 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210000786118 Aug 20176 Feb 20245 Feb 2025Bebanco Developers LtdProject page

60 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A1-A1454
A1-B1454
A1-C1454
A1-D1454
A1-E1454
A1-F1454
A1-G1454
A1-H1454
Show all 60 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
A1-I1454
A1-J1454
A1-K1454
A1-L1454
A1-M1454
A1-N1454
A1-O1454
A1-P1454
A1-Q Sector 21454
A1-R Sector 21454
A1 Sector 214108
A1-S Sector 21454
A1-T Sector 21454
A1-U Sector 21454
A1-V Sector 21454
A2 Sector 214108
B114110
B1014110
B11 Sector 214108
B12 Sector 214108
B13 Sector 214108
B14 Sector 214108
B15 Sector 214108
B16 Sector 214108
B17 Sector 214108
B18 Sector 214108
B214110
B314110
B414110
B514110
B614110
B714110
B814110
B914110
Cd-115124
Cd-10 Sector 215122
Cd-11 Sector 215122
Cd-12 Sector 215122
Cd-13 Sector 215122
Cd-14 Sector 215122
Cd-15 Sector 215122
Cd-16 Sector 215122
Cd-215124
Cd-315124
Cd-415124
Cd-515124
Cd-615124
Cd-715124
Cd-815124
Cd-9 Sector 215122
S11454
S21454

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

5,025 of 5,444 units booked (92%), as the promoter reported to MahaRERA

3 BHK REGULAR · 1,188 units3 BHK COMPACT · 216 units2 BHK · 1,748 units2 BHK REGULAR · 216 units1 BHK · 1,700 units1 RK · 108 unitsShop type a · 96 unitsShop type b · 64 units3.5 BHK · 52 units4.5 BHK · 56 units
BuildingTypeCarpet areaUnitsBooked
A1-A3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-B3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-C3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-D3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-E3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-F3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-G3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-H3 BHK REGULAR63.28 sq m · 681 sq ft5454
Show all 110 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A1-I3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-J3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-K3 BHK REGULAR63.28 sq m · 681 sq ft5453
A1-L3 BHK REGULAR63.28 sq m · 681 sq ft5452
A1-M3 BHK REGULAR63.28 sq m · 681 sq ft5451
A1-N3 BHK REGULAR63.28 sq m · 681 sq ft5453
A1-O3 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-P3 BHK REGULAR63.28 sq m · 681 sq ft5451
A1-Q Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-R Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5442
A1 Sector 23 BHK COMPACT51.92 sq m · 559 sq ft108100
A1-S Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5438
A1-T Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5450
A1-U Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5454
A1-V Sector 23 BHK REGULAR63.28 sq m · 681 sq ft5454
A2 Sector 23 BHK COMPACT51.92 sq m · 559 sq ft108106
B12 BHK40.73 sq m · 438 sq ft110103
B102 BHK40.73 sq m · 438 sq ft110101
B11 Sector 22 BHK40.73 sq m · 438 sq ft10879
B12 Sector 22 BHK40.73 sq m · 438 sq ft108104
B13 Sector 22 BHK REGULAR40.73 sq m · 438 sq ft108106
B14 Sector 22 BHK REGULAR40.73 sq m · 438 sq ft108102
B15 Sector 22 BHK40.73 sq m · 438 sq ft108106
B16 Sector 22 BHK40.73 sq m · 438 sq ft108104
B17 Sector 22 BHK40.73 sq m · 438 sq ft108100
B18 Sector 22 BHK40.73 sq m · 438 sq ft108107
B22 BHK40.73 sq m · 438 sq ft110105
B32 BHK40.73 sq m · 438 sq ft110105
B42 BHK40.73 sq m · 438 sq ft110100
B52 BHK40.73 sq m · 438 sq ft110107
B62 BHK40.73 sq m · 438 sq ft110107
B72 BHK40.73 sq m · 438 sq ft110101
B82 BHK40.73 sq m · 438 sq ft110108
B92 BHK40.73 sq m · 438 sq ft110108
Cd-11 BHK28.49 sq m · 307 sq ft106101
Cd-11 RK20.9 sq m · 225 sq ft88
Cd-1Shop type a14.54 sq m · 157 sq ft66
Cd-1Shop type b22.45 sq m · 242 sq ft44
Cd-10 Sector 21 BHK28.49 sq m · 307 sq ft10499
Cd-10 Sector 21 RK20.9 sq m · 225 sq ft88
Cd-10 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-10 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-11 Sector 21 BHK28.49 sq m · 307 sq ft10498
Cd-11 Sector 21 RK20.9 sq m · 225 sq ft88
Cd-11 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-11 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-12 Sector 21 BHK28.49 sq m · 307 sq ft108101
Cd-12 Sector 21 RK20.9 sq m · 225 sq ft44
Cd-12 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-12 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-13 Sector 21 BHK28.49 sq m · 307 sq ft108105
Cd-13 Sector 21 RK20.9 sq m · 225 sq ft43
Cd-13 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-13 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-14 Sector 21 BHK28.49 sq m · 307 sq ft10838
Cd-14 Sector 21 RK20.9 sq m · 225 sq ft44
Cd-14 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-14 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-15 Sector 21 BHK28.49 sq m · 307 sq ft10831
Cd-15 Sector 21 RK20.9 sq m · 225 sq ft44
Cd-15 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-15 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-16 Sector 21 BHK28.49 sq m · 307 sq ft108103
Cd-16 Sector 21 RK20.9 sq m · 225 sq ft44
Cd-16 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-16 Sector 2Shop type b22.45 sq m · 242 sq ft44
Cd-21 BHK28.49 sq m · 307 sq ft10699
Cd-21 RK20.9 sq m · 225 sq ft88
Cd-2Shop type a14.54 sq m · 157 sq ft66
Cd-2Shop type b22.45 sq m · 242 sq ft44
Cd-31 BHK28.49 sq m · 307 sq ft10698
Cd-31 RK20.9 sq m · 225 sq ft88
Cd-3Shop type a14.54 sq m · 157 sq ft66
Cd-3Shop type b22.45 sq m · 242 sq ft44
Cd-41 BHK28.49 sq m · 307 sq ft106103
Cd-41 RK20.9 sq m · 225 sq ft87
Cd-4Shop type a14.54 sq m · 157 sq ft66
Cd-4Shop type b22.45 sq m · 242 sq ft44
Cd-51 BHK28.49 sq m · 307 sq ft106102
Cd-51 RK20.9 sq m · 225 sq ft88
Cd-5Shop type a14.54 sq m · 157 sq ft66
Cd-5Shop type b22.45 sq m · 242 sq ft44
Cd-61 BHK28.49 sq m · 307 sq ft10697
Cd-61 RK20.9 sq m · 225 sq ft88
Cd-6Shop type a14.54 sq m · 157 sq ft66
Cd-6Shop type b22.45 sq m · 242 sq ft44
Cd-71 BHK28.49 sq m · 307 sq ft10698
Cd-71 RK20.9 sq m · 225 sq ft88
Cd-7Shop type a14.54 sq m · 157 sq ft66
Cd-7Shop type b22.45 sq m · 242 sq ft44
Cd-81 BHK28.49 sq m · 307 sq ft106102
Cd-81 RK20.9 sq m · 225 sq ft88
Cd-8Shop type a14.54 sq m · 157 sq ft66
Cd-8Shop type b22.45 sq m · 242 sq ft44
Cd-9 Sector 21 BHK28.49 sq m · 307 sq ft10496
Cd-9 Sector 21 RK20.9 sq m · 225 sq ft86
Cd-9 Sector 2Shop type a14.54 sq m · 157 sq ft66
Cd-9 Sector 2Shop type b22.45 sq m · 242 sq ft44
S13.5 BHK95.49 sq m · 1,028 sq ft2615
S14.5 BHK118.73 sq m · 1,278 sq ft2825
S23.5 BHK95.49 sq m · 1,028 sq ft2625
S24.5 BHK118.73 sq m · 1,278 sq ft2820

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 136 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPAN Card of Bebanco Developers Ltd.pdf · uploaded 31 Jul 2017Source

Legal

  • Legal Title reportFinal Title.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BForm B.pdf · uploaded 31 Jul 2017Source
  • Declaration Form Bscanned copy of Affidavit.pdf · uploaded 30 May 2024Source

Migrated

  • 1 PAN CardPAN Card of Bebanco Developers Ltd.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of the legal title reportFinal Title.pdf · uploaded 31 Jul 2017Source
Show all 138 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesDetails of Encumberances.pdf · uploaded 31 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 31 Jul 2017Source
  • 1 Building Plan Approval (IOD)Commencement Certificate- Sector I-MPMC.pdf · uploaded 31 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate- Sector I-MPMC.pdf · uploaded 31 Jul 2017Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Proforma of Allotment letterFinal Agreement Allotment Letter.pdf · uploaded 31 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 26 Mar 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 26 Mar 2018Source
  • 1 Certificates of CA (Form 5)BDL CA Certificate.pdf · uploaded 18 Dec 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS_CERTIFICATE_COMPRESSED.pdf · uploaded 10 Jun 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS_CERTIFICATE_COMPRESSED.pdf · uploaded 10 Jul 2019Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE.pdf · uploaded 10 Jul 2019Source
  • 2 Certificates of CA (Form 5)CA Certificate.pdf · uploaded 10 Jul 2019Source
  • 3 Certificates of CA (Form 5)CA Certificate.pdf · uploaded 10 Jul 2019Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate.pdf · uploaded 18 Feb 2020Source
  • 4 Certificates of CA (Form 5)CA Certfificate-Form 5 for 31-01-20.pdf · uploaded 18 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA Certificate.pdf · uploaded 18 Feb 2020Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-Architect's Certificate.pdf · uploaded 10 Feb 2021Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2-Engineers Certificate 31-12-20.pdf · uploaded 10 Feb 2021Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202106_Ar.pdf · uploaded 31 Jan 2022Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202109_Ar.pdf · uploaded 31 Jan 2022Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202112_Ar.pdf · uploaded 31 Jan 2022Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202103_Er.pdf · uploaded 31 Jan 2022Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202109_Er.pdf · uploaded 31 Jan 2022Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202112_Er.pdf · uploaded 31 Jan 2022Source
  • 2 Certificates of CA (Form 3)202109_CA.pdf · uploaded 31 Jan 2022Source
  • 3 Certificates of CA (Form 3)202112_CA.pdf · uploaded 31 Jan 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)2020-21_Form-5.PDF · uploaded 31 Jan 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202203_Ar.pdf · uploaded 14 Apr 2022Source
  • 4 Certificates of CA (Form 3)202203_CA.pdf · uploaded 14 Apr 2022Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202209_Ar.pdf · uploaded 1 Nov 2022Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202209_Er.pdf · uploaded 1 Nov 2022Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202212_Ar.pdf · uploaded 20 Jan 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202212_Er.pdf · uploaded 20 Jan 2023Source
  • 1 CERSAI details202112_CERSAI.pdf · uploaded 20 Jan 2023Source
  • 2 CERSAI details202203_CERSAI.pdf · uploaded 20 Jan 2023Source
  • 3 CERSAI details202212_CERSAI.pdf · uploaded 20 Jan 2023Source
  • 5 Certificates of CA (Form 3)202212_CA.pdf · uploaded 20 Jan 2023Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architecture Certificate.pdf · uploaded 17 Apr 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202203_Er.pdf · uploaded 17 Apr 2023Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202206_Er.pdf · uploaded 17 Apr 2023Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate.pdf · uploaded 17 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form-2A_2021-22.pdf · uploaded 17 Apr 2023Source
  • 6 Certificates of CA (Form 3)202206_CA.pdf · uploaded 17 Apr 2023Source
  • 7 Certificates of CA (Form 3)202209_CA.pdf · uploaded 17 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5_2021-22.pdf · uploaded 17 Apr 2023Source
  • 4 CERSAI details202212_CERSAI.pdf · uploaded 20 Apr 2023Source
  • 5 CERSAI details202303_CERSAI.pdf · uploaded 20 Apr 2023Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 14 Jul 2023Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Form 2.pdf · uploaded 14 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A_2022-23.pdf · uploaded 14 Jul 2023Source
  • 8 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 4 Oct 2023Source
  • 9 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 4 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)4 Certificates of CA (Form 5).pdf · uploaded 4 Oct 2023Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202309_Ar.pdf · uploaded 20 Jan 2024Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202312_Ar.pdf · uploaded 20 Jan 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202309_Er.pdf · uploaded 20 Jan 2024Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202312_Er.pdf · uploaded 20 Jan 2024Source
  • 10 Certificates of CA (Form 3)202309_CA.pdf · uploaded 20 Jan 2024Source
  • 11 Certificates of CA (Form 3)202312_CA.pdf · uploaded 20 Jan 2024Source
  • 12 Certificates of CA (Form 3)201709_CA.pdf · uploaded 14 Mar 2024Source
  • 13 Certificates of CA (Form 3)201712_CA.pdf · uploaded 14 Mar 2024Source
  • 14 Certificates of CA (Form 3)201803_CA.pdf · uploaded 14 Mar 2024Source
  • 15 Certificates of CA (Form 3)201806_CA.pdf · uploaded 14 Mar 2024Source
  • 16 Certificates of CA (Form 3)201809_CA.pdf · uploaded 14 Mar 2024Source
  • 17 Certificates of CA (Form 3)201812_CA.pdf · uploaded 14 Mar 2024Source
  • 18 Certificates of CA (Form 3)201903_CA.pdf · uploaded 14 Mar 2024Source
  • 19 Certificates of CA (Form 3)201906_CA.pdf · uploaded 14 Mar 2024Source
  • 20 Certificates of CA (Form 3)201909_CA.pdf · uploaded 14 Mar 2024Source
  • 21 Certificates of CA (Form 3)201912_CA.pdf · uploaded 14 Mar 2024Source
  • 22 Certificates of CA (Form 3)202003_CA.pdf · uploaded 14 Mar 2024Source
  • 23 Certificates of CA (Form 3)202006_CA.pdf · uploaded 14 Mar 2024Source
  • 24 Certificates of CA (Form 3)202009_CA.pdf · uploaded 14 Mar 2024Source
  • 25 Certificates of CA (Form 3)202012_CA.pdf · uploaded 14 Mar 2024Source
  • 26 Certificates of CA (Form 3)202103_CA.pdf · uploaded 14 Mar 2024Source
  • 27 Certificates of CA (Form 3)202106_CA.pdf · uploaded 14 Mar 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDLK Declaration.pdf · uploaded 19 Mar 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsJDK Declaration.pdf · uploaded 19 Mar 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsNDK Declaration.pdf · uploaded 19 Mar 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBDL Declaration.pdf · uploaded 19 Mar 2024Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202403_Ar.pdf · uploaded 19 Apr 2024Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202403_Er.pdf · uploaded 19 Apr 2024Source
  • 1 Disclosure of sold/ booked inventory202403_Sold.pdf · uploaded 19 Apr 2024Source
  • 28 Certificates of CA (Form 3)202403_CA.pdf · uploaded 19 Apr 2024Source
  • 2 Declaration in FORM Bscanned copy of Affidavit.pdf · uploaded 30 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A_2023-24.pdf · uploaded 30 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)2022-23_Form-5.pdf · uploaded 30 May 2024Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)202406_Ar.pdf · uploaded 23 Jul 2024Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)202406_Er.pdf · uploaded 23 Jul 2024Source
  • 29 Certificates of CA (Form 3)202406_CA.pdf · uploaded 23 Jul 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)I_MPMC_Form-1.pdf · uploaded 18 Oct 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)I_MPMC_Form-2.pdf · uploaded 18 Oct 2024Source
  • 1 Disclosure of sold/ booked inventory202406_Sold.pdf · uploaded 20 Oct 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate- Form 2.pdf · uploaded 28 Apr 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate- Form 1 (1).pdf · uploaded 25 Jun 2025Source
  • 1 Certificates of CA (Form 3)202409_Form-3_Part1.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of CA (Form 3)202409_Form-3_Part2.pdf · uploaded 25 Jun 2025Source
  • 3 Certificates of CA (Form 3)CA Certificate - Form 3.pdf · uploaded 25 Jun 2025Source
  • 4 Certificates of CA (Form 3)202503_Form-3_Part1.pdf · uploaded 25 Jun 2025Source
  • 5 Certificates of CA (Form 3)202503_Form-3_Part2.pdf · uploaded 25 Jun 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engr 300924.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Form 2.pdf · uploaded 25 Jun 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate- Form 1 (1).pdf · uploaded 25 Jun 2025Source
  • 1 Certificates of CA (Form 3)202409_Form-3_Part1.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of CA (Form 3)202409_Form-3_Part2.pdf · uploaded 25 Jun 2025Source
  • 3 Certificates of CA (Form 3)CA Certificate - Form 3.pdf · uploaded 25 Jun 2025Source
  • 4 Certificates of CA (Form 3)202503_Form-3_Part1.pdf · uploaded 25 Jun 2025Source
  • 5 Certificates of CA (Form 3)202503_Form-3_Part2.pdf · uploaded 25 Jun 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engr 300924.pdf · uploaded 25 Jun 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Form 2.pdf · uploaded 25 Jun 2025Source

Technical

  • DocumentCommencement Certificate- Sector I-MPMC.pdf · uploaded 31 Jul 2017Source
  • DocumentLayout.pdf · uploaded 31 Jul 2017Source

Technical (Architect)

  • Document202406_Ar.pdf · uploaded 23 Jul 2024Source
  • DocumentI_MPMC_Form-1.pdf · uploaded 18 Oct 2024Source
  • DocumentArchitect Certificate Form 1.pdf · uploaded 25 Jun 2025Source
  • DocumentArchitect Certificate- Form 1 (1).pdf · uploaded 25 Jun 2025Source
  • DocumentArchitect Certificate Form 1.pdf · uploaded 25 Jun 2025Source
  • DocumentArchitect Certificate- Form 1 (1).pdf · uploaded 25 Jun 2025Source

Technical (Engineer)

  • Document202406_Er.pdf · uploaded 23 Jul 2024Source
  • DocumentI_MPMC_Form-2.pdf · uploaded 18 Oct 2024Source
  • DocumentEngineer Certificate- Form 2.pdf · uploaded 28 Apr 2025Source
  • DocumentForm 2 Engr 300924.pdf · uploaded 25 Jun 2025Source
  • DocumentEngineer Certificate Form 2.pdf · uploaded 25 Jun 2025Source
  • DocumentForm 2 Engr 300924.pdf · uploaded 25 Jun 2025Source
  • DocumentEngineer Certificate Form 2.pdf · uploaded 25 Jun 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Lohgaon, Haveli taluka

Survey, CTS, gat or plot numbers

32 part

Boundaries

North
S No 25
South
S No 39
East
S No 31
West
32 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectV Ka—
EngineerAmol Tambe—
EngineerElematic India Pvt Ltd—
OtherB E Billimoria & Co Ltd—

Source: MahaRERA project page. Contact details are not shown.