Unique Youtopia
Certificate SignedKharadi, Pune 411014 |Promoter: Unique Associates
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 3
- Phases
- 3
- Buildings
- 7
- Unit types
- 1BHK, 2BHK, 3BHK, Shop, 2.5BHK, 2.5BHK Land Owner, 2BHK Land Owner, Shop Land Owner, 3BHK Land Owner773 units in all
- Address
- 18/1, 18/2, 18/3, 19/1, 19/2, Kharadi, River Road, Thite NagarPIN 411014
- Designated bank account
- 109
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
3 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 8 Sep 2026 | Unit 1008 | Resale | ≈ ₹1.09 Cr | ≈ ₹15,311 | |
| 2 Sep 2026 | Bldg Name · Unit A1-302 | Rental | ≈ ₹10,000 | — | |
| 26 May 2026 | Bldg Name · Unit A | Rental | ≈ ₹70,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2026
P52100046003The latest completion date on record passed 4 months ago.
- Registered
- 15 Jun 2022
- Promised
- 30 Jun 2026
Completion pushed back 4 months
P52100047371- Registered
- 27 Oct 2022
- Promised
- 30 Sep 2026
- Revised
- 30 Jan 2027
Completion pushed back 4 months
P52100080485- Registered
- 10 Jun 2025
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
3 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100046003 | 15 Jun 2022 | 30 Jun 2026 | 30 Jun 2026 | Unique Associates | Project page |
| P52100047371 | 27 Oct 2022 | 30 Sep 2026 | 30 Jan 2027 | Unique Associates | Project page |
| P52100080485 | 10 Jun 2025 | 31 Dec 2028 | 30 Apr 2029 | Unique Associates | Project page |
7 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A9 | 14 | 84 |
| Wing - A10 | 14 | 112 |
| Wing - A4 | 15 | 127 |
| Wing - A5 | 14 | 110 |
| Wing - A6 | 15 | 125 |
| Wing - A7 | 15 | 103 |
| Wing - A8 | 14 | 112 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
291 of 773 units booked (38%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100046003 | A9 | 1BHK | 36.14 sq m · 389 sq ft | 2 | 2 |
| P52100046003 | A9 | 2BHK | 43.69 sq m · 470 sq ft | 26 | 24 |
| P52100046003 | A9 | 2BHK | 46.58 sq m · 501 sq ft | 56 | 48 |
| P52100047371 | Wing - A10 | 1BHK | 50 sq m · 538 sq ft | 4 | 3 |
| P52100047371 | Wing - A10 | 2BHK | 66.45 sq m · 715 sq ft | 80 | 39 |
| P52100047371 | Wing - A10 | 3BHK | 79.34 sq m · 854 sq ft | 28 | 17 |
| P52100047371 | Wing - A4 | 1BHK | 49.69 sq m · 535 sq ft | 2 | 2 |
| P52100047371 | Wing - A4 | 2BHK | 65.77 sq m · 708 sq ft | 28 | 14 |
Show all 59 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100047371 | Wing - A4 | 2BHK | 66.14 sq m · 712 sq ft | 26 | 12 |
| P52100047371 | Wing - A4 | 3BHK | 79.67 sq m · 858 sq ft | 26 | 14 |
| P52100047371 | Wing - A4 | 3BHK | 88.41 sq m · 952 sq ft | 28 | 14 |
| P52100047371 | Wing - A4 | Shop | 29.47 sq m · 317 sq ft | 5 | 0 |
| P52100047371 | Wing - A4 | Shop | 30.47 sq m · 328 sq ft | 1 | 0 |
| P52100047371 | Wing - A4 | Shop | 30.5 sq m · 328 sq ft | 1 | 0 |
| P52100047371 | Wing - A4 | Shop | 32.33 sq m · 348 sq ft | 4 | 0 |
| P52100047371 | Wing - A4 | Shop | 44.45 sq m · 478 sq ft | 1 | 0 |
| P52100047371 | Wing - A4 | Shop | 45.45 sq m · 489 sq ft | 1 | 0 |
| P52100047371 | Wing - A4 | Shop | 46.51 sq m · 501 sq ft | 2 | 0 |
| P52100047371 | Wing - A4 | Shop | 47.11 sq m · 507 sq ft | 2 | 0 |
| P52100047371 | Wing - A5 | 2BHK | 65.77 sq m · 708 sq ft | 28 | 11 |
| P52100047371 | Wing - A5 | 2BHK | 66.14 sq m · 712 sq ft | 26 | 9 |
| P52100047371 | Wing - A5 | 3BHK | 79.67 sq m · 858 sq ft | 28 | 10 |
| P52100047371 | Wing - A5 | 3BHK | 88.41 sq m · 952 sq ft | 28 | 14 |
| P52100047371 | Wing - A6 | 1BHK | 49.69 sq m · 535 sq ft | 2 | 1 |
| P52100047371 | Wing - A6 | 2BHK | 65.77 sq m · 708 sq ft | 14 | 4 |
| P52100047371 | Wing - A6 | 2BHK | 65.93 sq m · 710 sq ft | 14 | 6 |
| P52100047371 | Wing - A6 | 2BHK | 66.14 sq m · 712 sq ft | 54 | 29 |
| P52100047371 | Wing - A6 | 3BHK | 79.96 sq m · 861 sq ft | 14 | 8 |
| P52100047371 | Wing - A6 | 3BHK | 89.16 sq m · 960 sq ft | 14 | 10 |
| P52100047371 | Wing - A6 | Shop | 13.47 sq m · 145 sq ft | 1 | 0 |
| P52100047371 | Wing - A6 | Shop | 29.43 sq m · 317 sq ft | 7 | 0 |
| P52100047371 | Wing - A6 | Shop | 32.33 sq m · 348 sq ft | 2 | 0 |
| P52100047371 | Wing - A6 | Shop | 32.37 sq m · 348 sq ft | 2 | 0 |
| P52100047371 | Wing - A6 | Shop | 44.45 sq m · 478 sq ft | 1 | 0 |
| P52100080485 | Wing - A7 | 1BHK | 48.87 sq m · 526 sq ft | 4 | 0 |
| P52100080485 | Wing - A7 | 2.5BHK | 77.5 sq m · 834 sq ft | 9 | 0 |
| P52100080485 | Wing - A7 | 2.5BHK Land Owner | 77.5 sq m · 834 sq ft | 5 | 0 |
| P52100080485 | Wing - A7 | 2BHK | 64.88 sq m · 698 sq ft | 9 | 0 |
| P52100080485 | Wing - A7 | 2BHK | 65.35 sq m · 703 sq ft | 14 | 0 |
| P52100080485 | Wing - A7 | 2BHK | 66.15 sq m · 712 sq ft | 27 | 0 |
| P52100080485 | Wing - A7 | 2BHK Land Owner | 64.88 sq m · 698 sq ft | 5 | 0 |
| P52100080485 | Wing - A7 | 2BHK Land Owner | 65.35 sq m · 703 sq ft | 10 | 0 |
| P52100080485 | Wing - A7 | 2BHK Land Owner | 66.15 sq m · 712 sq ft | 15 | 0 |
| P52100080485 | Wing - A7 | Shop | 29.42 sq m · 317 sq ft | 2 | 0 |
| P52100080485 | Wing - A7 | Shop | 35.16 sq m · 378 sq ft | 1 | 0 |
| P52100080485 | Wing - A7 | Shop Land Owner | 32.32 sq m · 348 sq ft | 1 | 0 |
| P52100080485 | Wing - A7 | Shop Land Owner | 47.92 sq m · 516 sq ft | 1 | 0 |
| P52100080485 | Wing - A8 | 1BHK | 48.39 sq m · 521 sq ft | 2 | 0 |
| P52100080485 | Wing - A8 | 1BHK | 48.43 sq m · 521 sq ft | 2 | 0 |
| P52100080485 | Wing - A8 | 2BHK | 64.88 sq m · 698 sq ft | 14 | 0 |
| P52100080485 | Wing - A8 | 2BHK | 64.91 sq m · 699 sq ft | 6 | 0 |
| P52100080485 | Wing - A8 | 2BHK | 66.15 sq m · 712 sq ft | 25 | 0 |
| P52100080485 | Wing - A8 | 2BHK Land Owner | 64.88 sq m · 698 sq ft | 12 | 0 |
| P52100080485 | Wing - A8 | 2BHK Land Owner | 64.91 sq m · 699 sq ft | 6 | 0 |
| P52100080485 | Wing - A8 | 2BHK Land Owner | 66.15 sq m · 712 sq ft | 17 | 0 |
| P52100080485 | Wing - A8 | 3BHK | 88.72 sq m · 955 sq ft | 8 | 0 |
| P52100080485 | Wing - A8 | 3BHK | 89.14 sq m · 959 sq ft | 9 | 0 |
| P52100080485 | Wing - A8 | 3BHK Land Owner | 88.72 sq m · 955 sq ft | 6 | 0 |
| P52100080485 | Wing - A8 | 3BHK Land Owner | 89.14 sq m · 959 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 283 filings listed on MahaRERA's project page
Registration certificate (3)
Finance
- PAN CardP52100046003 · Unique Associates_PAN CARD.pdf · uploaded 2 Jun 2022Source
- PAN CardP52100047371 · Unique Associates_PAN CARD.pdf · uploaded 12 Sep 2022Source
- PAN CardP52100080485 · PAN Card.pdf · uploaded 17 Mar 2025Source
- Other – FinanceP52100080485 · Declaration of Landowner Bank Account.pdf · uploaded 27 May 2025Source
Legal
- Legal Title reportP52100046003 · Title Certificate.pdf · uploaded 2 Jun 2022Source
Show all 286 documentsShow fewer documents
Legal
- Legal Title reportP52100046003 · Title Report.pdf · uploaded 2 Jun 2022Source
- Declaration Form BP52100046003 · Form B - Promoter.pdf · uploaded 2 Jun 2022Source
- Declaration Form BP52100047371 · Form B - Developer.pdf · uploaded 12 Sep 2022Source
- Legal Title reportP52100047371 · Legal Title Report.pdf · uploaded 13 Oct 2022Source
- Other – LegalP52100047371 · Sample Agreement.pdf · uploaded 18 Oct 2022Source
- Declaration Form BP52100080485 · Form B.pdf · uploaded 17 Mar 2025Source
- Legal Title reportP52100080485 · Title Search Report Annexure.pdf · uploaded 21 Apr 2025Source
Migrated
- 1 PAN CardP52100046003 · Unique Associates_PAN CARD.pdf · uploaded 2 Jun 2022Source
- 1 Copy of the legal title reportP52100046003 · Title Certificate.pdf · uploaded 2 Jun 2022Source
- 2 Copy of the legal title reportP52100046003 · Title Report.pdf · uploaded 2 Jun 2022Source
- 1 Details of encumbrancesP52100046003 · No Encumbrances Undertaking.pdf · uploaded 2 Jun 2022Source
- 2 Details of encumbrancesP52100046003 · No Security Undertaking.pdf · uploaded 2 Jun 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100046003 · Layout Approval.pdf · uploaded 2 Jun 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100046003 · Building Plan.pdf · uploaded 2 Jun 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100046003 · Building CC.pdf · uploaded 2 Jun 2022Source
- 1 Declaration about Commencement CertificateP52100046003 · Format D.pdf · uploaded 2 Jun 2022Source
- 1 Declaration in FORM BP52100046003 · Form B - Promoter.pdf · uploaded 2 Jun 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1 - Architect Certificate.pdf · uploaded 2 Jun 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2 - Engineer Certificate.pdf · uploaded 2 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100046003 · Quality Assurance Certificate.pdf · uploaded 2 Jun 2022Source
- 1 CERSAI detailsP52100046003 · CERSAI_Search_Report KODRE.pdf · uploaded 2 Jun 2022Source
- 2 CERSAI detailsP52100046003 · CERSAI_Search_Report_unique associates.pdf · uploaded 2 Jun 2022Source
- 1 Disclosure of sold/ booked inventoryP52100046003 · Sold Unsold Inventory.pdf · uploaded 2 Jun 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 2 Jun 2022Source
- 1 Proforma of Allotment letterP52100046003 · Proforma of Allotment Letter.pdf · uploaded 2 Jun 2022Source
- 2 Proforma of Allotment letterP52100046003 · APPLICATION FORM.pdf · uploaded 2 Jun 2022Source
- 3 Proforma of Allotment letterP52100046003 · Flat Agreement - RERA Model.pdf · uploaded 2 Jun 2022Source
- 3 CERSAI detailsP52100046003 · CERSAI Search Report Asset Based Search 18.pdf · uploaded 3 Jun 2022Source
- 4 CERSAI detailsP52100046003 · CERSAI Search Report Asset Based Search 19.pdf · uploaded 3 Jun 2022Source
- 1 PAN CardP52100047371 · Unique Associates_PAN CARD.pdf · uploaded 12 Sep 2022Source
- 1 a Details of encumbrances concerned to FinanceP52100047371 · Declaration of No Encumbrance related to Finance.pdf · uploaded 12 Sep 2022Source
- 1 b Details of encumbrances concerned to LegalP52100047371 · Declaration of No Encumberance regarding Legal.pdf · uploaded 12 Sep 2022Source
- 1 Copy of Layout Approval (in case of layout)P52100047371 · Layout.pdf · uploaded 12 Sep 2022Source
- 1 Declaration in FORM BP52100047371 · Form B - Developer.pdf · uploaded 12 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100047371 · Separate Bank Account Details.pdf · uploaded 12 Sep 2022Source
- 1 Deviation Report with respect to Allotment letterP52100047371 · Deviation report - Allotment Letter.pdf · uploaded 12 Sep 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100047371 · CC.pdf · uploaded 19 Sep 2022Source
- 1 Declaration about Commencement CertificateP52100047371 · Declaration About Commencement.pdf · uploaded 19 Sep 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Architect Certificate.pdf · uploaded 19 Sep 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Engineers Certificate.pdf · uploaded 19 Sep 2022Source
- 1 Proforma of Agreement for saleP52100047371 · Allottment letter.pdf · uploaded 22 Sep 2022Source
- 1 Proforma of Allotment letterP52100047371 · Allottment letter.pdf · uploaded 22 Sep 2022Source
- 1 Copy of the legal title reportP52100047371 · Legal Title Report.pdf · uploaded 13 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-01.pdf · uploaded 13 Oct 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-02.pdf · uploaded 13 Oct 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-03.pdf · uploaded 13 Oct 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-04.pdf · uploaded 13 Oct 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-05.pdf · uploaded 13 Oct 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-06.pdf · uploaded 13 Oct 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-07.pdf · uploaded 13 Oct 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-08.pdf · uploaded 13 Oct 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-09.pdf · uploaded 13 Oct 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-10.pdf · uploaded 13 Oct 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-11.pdf · uploaded 13 Oct 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-12.pdf · uploaded 13 Oct 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-13.pdf · uploaded 13 Oct 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-14.pdf · uploaded 13 Oct 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-15.pdf · uploaded 13 Oct 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-16.pdf · uploaded 13 Oct 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-17.pdf · uploaded 13 Oct 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-18.pdf · uploaded 13 Oct 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-19.pdf · uploaded 13 Oct 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-20.pdf · uploaded 13 Oct 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-21.pdf · uploaded 13 Oct 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-22.pdf · uploaded 13 Oct 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-23.pdf · uploaded 13 Oct 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-24.pdf · uploaded 13 Oct 2022Source
- 25 Building Plan Approval / NA Order for plotted developmentP52100047371 · Scan_1108-25.pdf · uploaded 13 Oct 2022Source
- 1 CERSAI detailsP52100047371 · CERSAI Report.pdf · uploaded 13 Oct 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · CA Certificate.pdf · uploaded 13 Oct 2022Source
- 1 Other – LegalP52100047371 · Sample Agreement.pdf · uploaded 18 Oct 2022Source
- 1 Deviation Report with respect to model copy of AgreementP52100047371 · No Deviation from Agreement to Sale.pdf · uploaded 19 Oct 2022Source
- 2 Proforma of Agreement for saleP52100047371 · Draft Agreement.pdf · uploaded 28 Oct 2022Source
- 2 Deviation Report with respect to Allotment letterP52100047371 · Deviation Report - Allotment Letter.pdf · uploaded 28 Oct 2022Source
- 2 Deviation Report with respect to model copy of AgreementP52100047371 · Deviation Report - Agreement.pdf · uploaded 28 Oct 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1 - P3.pdf · uploaded 16 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2 - P3.pdf · uploaded 16 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3 - P3.pdf · uploaded 16 Apr 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1 - P2.pdf · uploaded 16 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2 - P2.pdf · uploaded 16 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3 - P2.pdf · uploaded 16 Apr 2023Source
- 1 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 1 May 2023Source
- 2 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 1 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 21 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 21 Jul 2023Source
- 2 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory 15-07-2023.pdf · uploaded 21 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 21 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 21 Jul 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 21 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory 15-07-2023.pdf · uploaded 21 Jul 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 21 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100047371 · Form 5 (2022-23).pdf · uploaded 7 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100046003 · Form 5 (2022-23).pdf · uploaded 7 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 18 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 18 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 18 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 18 Jan 2024Source
- 3 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 18 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 18 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 18 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 18 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 18 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 18 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 18 Jan 2024Source
- 4 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 18 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 18 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 18 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 22 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 22 Apr 2024Source
- 4 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 22 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 22 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 22 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 22 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 22 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 22 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 30 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 30 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 30 Jul 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 30 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 30 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 30 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 1 Aug 2024Source
- 6 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 1 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 4 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 4 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 4 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 4 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 4 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 4 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 6 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100047371 · Form 5 (2023-24).pdf · uploaded 6 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 6 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100046003 · Form 5 (2023-24).pdf · uploaded 6 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 20 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 6 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 6 Mar 2025Source
- 1 PAN CardP52100080485 · PAN Card.pdf · uploaded 17 Mar 2025Source
- 1 a Details of encumbrances concerned to FinanceP52100080485 · Encumbrance Certificate.pdf · uploaded 17 Mar 2025Source
- 1 Proforma of Allotment letterP52100080485 · Allotment Letter.pdf · uploaded 17 Mar 2025Source
- 1 Declaration in FORM BP52100080485 · Form B.pdf · uploaded 17 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100080485 · Commencement Certificate.pdf · uploaded 17 Mar 2025Source
- 1 Declaration about Commencement CertificateP52100080485 · Format D.pdf · uploaded 17 Mar 2025Source
- 1 CERSAI detailsP52100080485 · CERSAI Report.pdf · uploaded 17 Mar 2025Source
- 1 Deviation Report with respect to Allotment letterP52100080485 · Deviation Report - Allotment Letter.pdf · uploaded 17 Mar 2025Source
- 1 b Details of encumbrances concerned to LegalP52100080485 · Encumbrance Certificate.pdf · uploaded 17 Mar 2025Source
- 1 Other – TechnicalP52100080485 · Annexure A.pdf · uploaded 17 Mar 2025Source
- 1 Deviation Report with respect to model copy of AgreementP52100080485 · Deviation Report - Agreement.pdf · uploaded 17 Mar 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52100080485 · Disclosure for Finance.pdf · uploaded 17 Mar 2025Source
- 1 Copy of Layout Approval (in case of layout)P52100080485 · Layout.pdf · uploaded 19 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100080485 · Plan 1.pdf · uploaded 19 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100080485 · Plan 2.pdf · uploaded 19 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100080485 · Plan 3.pdf · uploaded 19 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100080485 · Plan 4.pdf · uploaded 19 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100080485 · Plan 5.pdf · uploaded 19 Mar 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100080485 · Disclosure of Interest.pdf · uploaded 19 Mar 2025Source
- 1 Proforma of Agreement for saleP52100080485 · Sample Agreement.pdf · uploaded 20 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100047371 · Form 1.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100047371 · Form 3.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100047371 · Form 2.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100047371 · Disclosure of Inventory.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046003 · Form 1.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046003 · Form 3.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046003 · Form 2.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100046003 · Disclosure of Inventory.pdf · uploaded 20 Apr 2025Source
- 1 Copy of the legal title reportP52100080485 · Title Search Report Annexure.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100080485 · CA Certificate.pdf · uploaded 22 Apr 2025Source
- 2 Other – TechnicalP52100080485 · Area Change Receipt.pdf · uploaded 19 May 2025Source
- 3 Other – TechnicalP52100080485 · Plot Area Declaration.pdf · uploaded 19 May 2025Source
- 4 Other – TechnicalP52100080485 · Plot Area Change Letter.pdf · uploaded 19 May 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P52100080485 · Declaration regarding RERA Designated Bank Accounts.pdf · uploaded 27 May 2025Source
- 1 Other – FinanceP52100080485 · Declaration of Landowner Bank Account.pdf · uploaded 27 May 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100080485 · Bank Letter.pdf · uploaded 27 May 2025Source
- Withdrawal Update Form 1P52100046003 · Form 1.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 1P52100046003 · Form 1.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 2P52100046003 · Form 2.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 2P52100046003 · Form 2.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 3P52100046003 · Form 3.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 3P52100046003 · Form 3.pdf · uploaded 5 Jan 2026Source
- Occupational CertificateP52100046003 · Kharadi 18 part 2 A3A9 OC 18122025.pdf · uploaded 5 Jan 2026Source
- Withdrawal Update Form 1P52100080485 · Form 1.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1P52100080485 · Form 1.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2P52100080485 · Form 2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2P52100080485 · Form 2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3P52100080485 · Form 3.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3P52100080485 · Form 3.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1P52100080485 · Form 1 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100080485 · Form 2 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100080485 · Form 3 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100047371 · Form 1.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100047371 · Form 1 Sep.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100047371 · Form 1 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100047371 · Form 2.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100047371 · Form 2 Sep.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2P52100047371 · Form 2 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100047371 · Form 3.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100047371 · Form 3 Sep.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3P52100047371 · Form 3 Dec.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1P52100047371 · Form 1 PH3.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 2P52100047371 · Form 2 PH3.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 3P52100047371 · Form 3 PH3.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1P52100080485 · Form 1 Mar.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 2P52100080485 · Form 2 Mar.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 3P52100080485 · Form 3 Mar.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 1P52100046003 · Form 1.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 1P52100046003 · Form 1.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 2P52100046003 · Form 2.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 2P52100046003 · Form 2.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 3P52100046003 · Form 3.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 3P52100046003 · Form 3.pdf · uploaded 24 Jun 2026Source
- Withdrawal Update Form 1P52100080485 · Form 1 Ph IV.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2P52100080485 · Form 2 Ph IV.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3P52100080485 · Form 3 Ph IV.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1P52100047371 · Form 1 PH3.pdf · uploaded 5 Aug 2026Source
- Withdrawal Update Form 2P52100047371 · Form 2 PH3.pdf · uploaded 5 Aug 2026Source
- Withdrawal Update Form 3P52100047371 · Form 3 PH3.pdf · uploaded 5 Aug 2026Source
- Form 2A (FY 2025-2026)P52100080485 · Quality Asurance Certificate PH 4.pdf · uploaded 7 Sep 2026Source
- Form 2A (FY 2025-2026)P52100047371 · Quality Asurance Certificate PH 3.pdf · uploaded 7 Sep 2026Source
Technical
- DocumentP52100046003 · Layout Approval.pdf · uploaded 2 Jun 2022Source
- DocumentP52100046003 · Building Plan.pdf · uploaded 2 Jun 2022Source
- DocumentP52100047371 · Layout.pdf · uploaded 12 Sep 2022Source
- DocumentP52100047371 · Scan_1108-01.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-02.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-03.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-04.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-05.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-06.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-07.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-08.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-09.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-10.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-11.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-12.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-13.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-14.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-15.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-16.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-17.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-18.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-19.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-20.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-21.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-22.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-23.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-24.pdf · uploaded 13 Oct 2022Source
- DocumentP52100047371 · Scan_1108-25.pdf · uploaded 13 Oct 2022Source
- Other – TechnicalP52100080485 · Annexure A.pdf · uploaded 17 Mar 2025Source
- DocumentP52100080485 · Layout.pdf · uploaded 19 Mar 2025Source
- DocumentP52100080485 · Plan 1.pdf · uploaded 19 Mar 2025Source
- DocumentP52100080485 · Plan 2.pdf · uploaded 19 Mar 2025Source
- DocumentP52100080485 · Plan 3.pdf · uploaded 19 Mar 2025Source
- DocumentP52100080485 · Plan 4.pdf · uploaded 19 Mar 2025Source
- DocumentP52100080485 · Plan 5.pdf · uploaded 19 Mar 2025Source
- Other – TechnicalP52100080485 · Area Change Receipt.pdf · uploaded 19 May 2025Source
- Other – TechnicalP52100080485 · Plot Area Declaration.pdf · uploaded 19 May 2025Source
- Other – TechnicalP52100080485 · Plot Area Change Letter.pdf · uploaded 19 May 2025Source
Technical (Architect)
- DocumentP52100047371 · Form 1.pdf · uploaded 4 Nov 2024Source
- DocumentP52100046003 · Form 1.pdf · uploaded 4 Nov 2024Source
- DocumentP52100047371 · Form 1.pdf · uploaded 20 Jan 2025Source
- DocumentP52100046003 · Form 1.pdf · uploaded 20 Jan 2025Source
- DocumentP52100047371 · Form 1.pdf · uploaded 20 Apr 2025Source
- DocumentP52100046003 · Form 1.pdf · uploaded 20 Apr 2025Source
- DocumentP52100047371 · Form 1 PH3.pdf · uploaded 21 Apr 2026Source
- DocumentP52100046003 · Form 1.pdf · uploaded 24 Jun 2026Source
- DocumentP52100080485 · Form 1 Ph IV.pdf · uploaded 4 Aug 2026Source
Technical (Engineer)
- DocumentP52100047371 · Form 2.pdf · uploaded 4 Nov 2024Source
- DocumentP52100046003 · Form 2.pdf · uploaded 4 Nov 2024Source
- DocumentP52100047371 · Form 2.pdf · uploaded 20 Jan 2025Source
- DocumentP52100046003 · Form 2.pdf · uploaded 20 Jan 2025Source
- DocumentP52100047371 · Form 2.pdf · uploaded 20 Apr 2025Source
- DocumentP52100046003 · Form 2.pdf · uploaded 20 Apr 2025Source
- DocumentP52100047371 · Form 2 PH3.pdf · uploaded 21 Apr 2026Source
- DocumentP52100046003 · Form 2.pdf · uploaded 24 Jun 2026Source
- DocumentP52100080485 · Form 2 Ph IV.pdf · uploaded 4 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kharadi
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot P1
- South
- 24 mtr DP Road
- East
- 9 mtr Internal Road
- West
- Plot P4 and Sr No 20
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Anish Damodar Tambe | — | P52100047371 |
| Architect | Anish Damodar Tambe | — | P52100080485 |
| Architect | Anish Damodar Tambe | — | P52100046003 |
| Architect | Anish Tambe | — | P52100080485 |
| Chartered accountant | AGH & Associates | — | P52100080485 |
| Chartered accountant | Harsh Julaniya | — | P52100080485 |
| Chartered accountant | Harsh Julaniya | — | P52100046003 |
| Chartered accountant | Harsh Julaniya | — | P52100047371 |
Show all 14 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Akshay Chakke | — | P52100047371 |
| Engineer | Akshay Chakke | — | P52100080485 |
| Engineer | Rajendra Kumar Gole | — | P52100080485 |
| Engineer | Rajendra Kumar Gole | — | P52100047371 |
| Engineer | Rajendra Kumar Gole | — | P52100046003 |
| Engineer | Rajendrakumar Raghunath Gole | — | P52100080485 |
Source: MahaRERA project page. Contact details are not shown.