1 Goldleaf
Certificate SignedKarve Nagar, Pune 411052 |Promoter: Goldleaf Realtors
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- —172 units in all
- Address
- 14/4B/2/2A, 14/4B/2/3, 14/4B/2/4/A, 14/4B/2/5, 14/4B/2/6, 14/4B/2/7/A, 14/1C/4C, 14/1A/1/1, 14/1A/1/3/1, 30 M DP road, Karve nagarPIN 411052
- Designated bank account
- 99
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 31 Jan 2021
- Promised
- 30 Sep 2026
- Revised
- 30 Jan 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100028072 | 31 Jan 2021 | 30 Sep 2026 | 30 Jan 2027 | Goldleaf Realtors | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| 1 Goldleaf A Wing | 11 | 86 |
| 1 Goldleaf B Wing | 11 | 86 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
172 units registered
| Building | Type | Carpet area | Units |
|---|---|---|---|
| 1 Goldleaf A Wing | — | — | 86 |
| 1 Goldleaf B Wing | — | — | 86 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 230 filings listed on MahaRERA's project page
Finance
- PAN CardGOLDLEAF PANCARD.pdf · uploaded 20 Feb 2023Source
Legal
Show all 232 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesNon- Encumbrance Certificate.pdf · uploaded 22 Jan 2021Source
- 1 Copy of Layout Approval (in case of layout)2.PDF · uploaded 22 Jan 2021Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 22 Jan 2021Source
- 2 Building Plan Approval / NA Order for plotted development2.PDF · uploaded 22 Jan 2021Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 22 Jan 2021Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 22 Jan 2021Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 22 Jan 2021Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 22 Jan 2021Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 22 Jan 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.PDF · uploaded 22 Jan 2021Source
- 1 Declaration in FORM BForm B.pdf · uploaded 22 Jan 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 22 Jan 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 22 Jan 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3Final_compressed.pdf · uploaded 22 Jan 2021Source
- 1 Proforma of Allotment letterAGREEMENT FOR SALE.pdf · uploaded 22 Jan 2021Source
- 2 Copy of Layout Approval (in case of layout)Sheet No 2-2.pdf · uploaded 18 Mar 2021Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet No 1-6.pdf · uploaded 18 Mar 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 18 Mar 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 18 Mar 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 18 Mar 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 18 Mar 2021Source
- 2 Proforma of Allotment letterDraft Agreement rera.pdf · uploaded 13 Sep 2022Source
- 1 PAN CardGOLDLEAF PANCARD.pdf · uploaded 20 Feb 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentsanctioned plan.pdf · uploaded 20 Feb 2023Source
- 6 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 20 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Karvenagar - Form 2 - Engg Certificate - June 21_compressed.pdf · uploaded 20 Feb 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Karvenagar - Form 2 - Engg Certificate - Sept 21_compressed.pdf · uploaded 20 Feb 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Karvenagar - Form 2 - Engg Certificate - Dec 21_compressed.pdf · uploaded 20 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Karvenagar - Form 2 - Engg Certificate - March 22_compressed.pdf · uploaded 20 Feb 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Karvenagar - Form 2 - Engg Certificate - June22_compressed.pdf · uploaded 20 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)KArvenagar From 2A Quality engg - June 21_compressed.pdf · uploaded 20 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)KArvenagar From 2A Quality engg - Sept 21_compressed.pdf · uploaded 20 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)KArvenagar From 2A Quality engg - December 21_compressed.pdf · uploaded 20 Feb 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)KArvenagar From 2A Quality engg - March 22_compressed.pdf · uploaded 20 Feb 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)KArvenagar From 2A Quality engg - June 22_compressed.pdf · uploaded 20 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 30 06 21.pdf · uploaded 20 Feb 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Formm 3 30 09 21.pdf · uploaded 20 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Formm 3 30 09 21.pdf · uploaded 20 Feb 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31 12 21.pdf · uploaded 20 Feb 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31 3 22.pdf · uploaded 20 Feb 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30 6 22.pdf · uploaded 20 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 KN 2020-21.pdf · uploaded 20 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 KN 21-22.pdf · uploaded 20 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)KArvenagar From 2A Quality engg - June 21_compressed.pdf · uploaded 19 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)KArvenagar From 2A Quality engg - Sept 21_compressed.pdf · uploaded 19 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)KArvenagar From 2A Quality engg - December 21_compressed.pdf · uploaded 19 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)KArvenagar From 2A Quality engg - March 22_compressed.pdf · uploaded 19 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)KArvenagar From 2A Quality engg - June 22_compressed.pdf · uploaded 19 Oct 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Goldleaf-1.pdf · uploaded 19 Oct 2023Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold 1 Goldleaf-2.pdf · uploaded 19 Oct 2023Source
- 2 a Details of encumbrances concerned to FinanceNon Encumbrance Certificate.pdf · uploaded 20 Oct 2023Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance Certificate.pdf · uploaded 20 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Oct 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 22.pdf · uploaded 20 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 22 .pdf · uploaded 20 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 23.pdf · uploaded 20 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 23.pdf · uploaded 20 Oct 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 23.pdf · uploaded 20 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Sep 22.pdf · uploaded 20 Oct 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Dec 22 .pdf · uploaded 20 Oct 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)March 23.pdf · uploaded 20 Oct 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)June 23.pdf · uploaded 20 Oct 2023Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Sep 23.pdf · uploaded 20 Oct 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 22.pdf · uploaded 20 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 22.pdf · uploaded 20 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)March 23.pdf · uploaded 20 Oct 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)june 23 .pdf · uploaded 20 Oct 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 23.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form No 5 22 23.pdf · uploaded 20 Oct 2023Source
- 1 Proforma of Agreement for saleA Wing New Draft Agreement.pdf · uploaded 20 Oct 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 23.pdf · uploaded 9 Feb 2024Source
- 8 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Dec 23.pdf · uploaded 9 Feb 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 23.pdf · uploaded 9 Feb 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentBW SHEET 1.pdf · uploaded 16 Feb 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentBW SHEET 2.pdf · uploaded 16 Feb 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentBW SHEET 3.pdf · uploaded 16 Feb 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentBW SHEET 4.pdf · uploaded 16 Feb 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentBW SHEET 5.pdf · uploaded 16 Feb 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentBW SHEET 6.pdf · uploaded 16 Feb 2024Source
- 7 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 16 Feb 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 24.pdf · uploaded 26 Apr 2024Source
- 9 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)March 24.pdf · uploaded 26 Apr 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)march 24.pdf · uploaded 26 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)june 24.pdf · uploaded 30 Jul 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 24.pdf · uploaded 30 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)june 24.pdf · uploaded 30 Jul 2024Source
- 3 Disclosure of sold/ booked inventoryjune 24.pdf · uploaded 30 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryjune 24 2.pdf · uploaded 30 Jul 2024Source
- 5 Disclosure of sold/ booked inventoryjune 24 3.pdf · uploaded 30 Jul 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)june 24.pdf · uploaded 30 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Sep 24.pdf · uploaded 23 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dec 24.pdf · uploaded 19 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 24.pdf · uploaded 19 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC 24.pdf · uploaded 19 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDec 24.pdf · uploaded 19 Mar 2025Source
- 2 Disclosure of sold/ booked inventoryDec 24 2.pdf · uploaded 19 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Dec 24.pdf · uploaded 19 Mar 2025Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 18 Mar 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 18 Mar 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 18 Mar 2026Source
- Form 1FORM 1 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 2FORM 2 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 MARCH 2025_compressed.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 1FORM 1 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 2FORM 2 DEC 2023.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 DEC 2023.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 JUNE 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 JUNE 2022.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 1FORM 1 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 MARCH 2023.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 MARCH 2023.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 SEP 2023.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 SEP 2023.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 DEC 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 DEC 2022_compressed.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 SEP 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 SEP 2022.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 JUNE 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 JUNE 2022.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 1FORM 1 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 MARCH 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 MARCH 2022.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 DEC 2021.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 DEC 2021.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF DEC 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 SEP 2021.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 SEP 2021.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF SEP 2024.pdf · uploaded 26 Mar 2026Source
- Form 1Form 1 JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 JUNE 2021.pdf · uploaded 26 Mar 2026Source
- Form 3Form3 JUNE 2021.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF JUNE 2024.pdf · uploaded 26 Mar 2026Source
- Form 1FORM 1 MARCH 2025.pdf · uploaded 26 Mar 2026Source
- Form 2Form 2 MARCH 2022.pdf · uploaded 26 Mar 2026Source
- Form 3Form 3 MARCH 2022.pdf · uploaded 26 Mar 2026Source
- Disclosure of Sold and Booked InventoryGOLDLEAF MARCH 2024.pdf · uploaded 26 Mar 2026Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2024-2025)Form 2A Eng Cert MARCH 25.pdf · uploaded 14 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A Engg 31 MARCH 2026.pdf · uploaded 14 Aug 2026Source
- Withdrawal Update Form 1FORM 1 GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Withdrawal Update Form 2Form-2 Engineers Certificate.pdf · uploaded 1 Oct 2026Source
- Withdrawal Update Form 3Form 3 31 12 25 Goldleaf Realtors.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2020-2021)FORM 2A GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2021-2022)FORM 2A GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2022-2023)FORM 2A GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2023-2024)FORM 2A GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2026-2027)FORM 2A GOLDLEAF.pdf · uploaded 1 Oct 2026Source
- Form 5 (FY 2024-2025)Form 5 Goldleaf.pdf · uploaded 10 Oct 2026Source
- Form 5 (FY 2025-2026)Form 5 Goldleaf.pdf · uploaded 10 Oct 2026Source
Technical
- Document2.PDF · uploaded 22 Jan 2021Source
- Document1.pdf · uploaded 22 Jan 2021Source
- Document2.PDF · uploaded 22 Jan 2021Source
- Document3.pdf · uploaded 22 Jan 2021Source
- Document4.pdf · uploaded 22 Jan 2021Source
- Document5.pdf · uploaded 22 Jan 2021Source
- Document6.pdf · uploaded 22 Jan 2021Source
- Document7.pdf · uploaded 22 Jan 2021Source
- DocumentSheet No 2-2.pdf · uploaded 18 Mar 2021Source
- DocumentSheet No 1-6.pdf · uploaded 18 Mar 2021Source
- Documentsanctioned plan.pdf · uploaded 20 Feb 2023Source
- DocumentBW SHEET 1.pdf · uploaded 16 Feb 2024Source
- DocumentBW SHEET 2.pdf · uploaded 16 Feb 2024Source
- DocumentBW SHEET 3.pdf · uploaded 16 Feb 2024Source
- DocumentBW SHEET 4.pdf · uploaded 16 Feb 2024Source
- DocumentBW SHEET 5.pdf · uploaded 16 Feb 2024Source
- DocumentBW SHEET 6.pdf · uploaded 16 Feb 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Karve Nagar, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Playground
- South
- Cts 500
- East
- 30m Dp Road
- West
- Warje karvenagar boundry
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mukta Kulkarni | — |
| Chartered accountant | Kishor Wagh | — |
| Engineer | Balkrishna Sarode | — |
| Engineer | Harshad Ghotikar | — |
Source: MahaRERA project page. Contact details are not shown.
