Haveli, Maharashtra 412207 |Promoter: M/S. Sharad Shree Enterprises, M/s. Sharad Shree Enterprises

22 Jan 2018Registered with MahaRERAFirst of 5 registrations
31 Dec 2030Promised completionLatest across registrations
30 Apr 2028Revised completion3 of 5 registrations pushed back, by up to 2 years
4Buildings5 phases
232Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
RERA registrations
5
Phases
5
Buildings
4
Unit types
—232 units in all
Address
Gat No 1284 B, wagholi, wagholiPIN 412207
Designated bank account
109
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.55951, 73.95943
Majestique is at latitude 18.55951, longitude 73.95943.

Also registered as

Majestique Towers East Phase 1Majestique Towers East Phase 2Majestique Towers East Phase 05Majestique Towers East Phase-7Majestique Tower East Phase-9

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

P52100015020

The latest completion date on record passed 1 year and 10 months ago.

Registered
22 Jan 2018
Promised
31 Dec 2022
Revised
30 Dec 2024

Completion pushed back 2 years

P52100015183

The latest completion date on record passed 1 year and 10 months ago.

Registered
7 Feb 2018
Promised
31 Dec 2022
Revised
30 Dec 2024

Completion pushed back 4 months

P52100046709
Registered
30 Aug 2022
Promised
31 Dec 2027
Revised
30 Apr 2028

Completion promised for 31 Dec 2028

P52100078306
Registered
4 Dec 2024
Promised
31 Dec 2028
Show 1 more registrations

Completion promised for 31 Dec 2030

PR1260002503000
Registered
18 Mar 2026
Promised
31 Dec 2030

5 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001502022 Jan 201831 Dec 202230 Dec 2024M/S. Sharad Shree EnterprisesProject page
P521000151837 Feb 201831 Dec 202230 Dec 2024M/S. Sharad Shree EnterprisesProject page
P5210004670930 Aug 202231 Dec 202730 Apr 2028M/s. Sharad Shree EnterprisesProject page
P521000783064 Dec 202431 Dec 2028—M/s. Sharad Shree EnterprisesProject page
PR126000250300018 Mar 202631 Dec 2030—M/s. Sharad Shree EnterprisesProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsFloors with CCUnits
E10252896
E9252896
Wing F121—91
Wing F221—141

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

232 units registered

— · 232 units
RERABuildingTypeCarpet areaUnits
P52100046709Wing F1——91
P52100046709Wing F2——141

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

7 documents held by Deedo, 148 filings listed on MahaRERA's project page

Registration certificate (5)

  • Registration certificateP52100015183 · 10 Sep 2022ViewSource
  • Registration certificateP52100015020 · 4 Nov 2022ViewSource
  • Registration certificateP52100046709 · 31 Jan 2024ViewSource
  • Registration certificateP52100078306 · 4 Dec 2024ViewSource
  • Registration certificatePR1260002503000 · 18 Mar 2026ViewSource

Extension certificate (2)

  • Extension certificateP52100015183 · 10 Sep 2022ViewSource
  • Extension certificateP52100015020 · 2 Nov 2022ViewSource

Finance

  • PAN CardP52100046709 · 1 PAN Card.pdf · uploaded 23 Aug 2022Source
Show all 155 documentsShow fewer documents

Legal

  • Legal Title reportP52100046709 · 1 Copy of the legal title report.pdf · uploaded 23 Aug 2022Source
  • Declaration Form BP52100046709 · 1 Declaration in FORM B.pdf · uploaded 23 Aug 2022Source
  • Legal Title reportP52100046709 · STR_1284_compressed.pdf · uploaded 24 Aug 2022Source

Migrated

  • 1 PAN CardP52100046709 · 1 PAN Card.pdf · uploaded 23 Aug 2022Source
  • 1 Copy of the legal title reportP52100046709 · 1 Copy of the legal title report.pdf · uploaded 23 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceP52100046709 · 1 a Details of encumbrances concerned to Finance.pdf · uploaded 23 Aug 2022Source
  • 1 b Details of encumbrances concerned to LegalP52100046709 · 1 b Details of encumbrances concerned to Legal.pdf · uploaded 23 Aug 2022Source
  • 1 Copy of Layout Approval (in case of layout)P52100046709 · towers master layout.pdf · uploaded 23 Aug 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100046709 · scan0461.pdf · uploaded 23 Aug 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100046709 · CC_compressed.pdf · uploaded 23 Aug 2022Source
  • 1 Declaration about Commencement CertificateP52100046709 · 1 Declaration about Commencement Certificate.pdf · uploaded 23 Aug 2022Source
  • 1 Declaration in FORM BP52100046709 · 1 Declaration in FORM B.pdf · uploaded 23 Aug 2022Source
  • 1 CERSAI detailsP52100046709 · 1 CERSAI details (1).pdf · uploaded 23 Aug 2022Source
  • 1 Proforma of Allotment letterP52100046709 · 1 Proforma of the allotment letter and agreement for sale.pdf · uploaded 23 Aug 2022Source
  • 2 Proforma of Allotment letterP52100046709 · 2 Proforma of the allotment letter and agreement for sale.pdf · uploaded 23 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100046709 · 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 23 Aug 2022Source
  • 1 Deviation Report with respect to Allotment letterP52100046709 · 1 Deviation Report with respect to Allotment letter.pdf · uploaded 23 Aug 2022Source
  • 1 Deviation Report with respect to model copy of AgreementP52100046709 · 1 Deviation Report with respect to model copy of Agreement.pdf · uploaded 23 Aug 2022Source
  • 2 Copy of the legal title reportP52100046709 · STR_1284_compressed.pdf · uploaded 24 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · RERA FORM-3 (Sanctioned).pdf · uploaded 24 Aug 2022Source
  • 1 Other – TechnicalP52100046709 · Declaration F1F2.pdf · uploaded 24 Aug 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100046709 · scan0462.pdf · uploaded 25 Aug 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · PHASE 5_compressed.pdf · uploaded 3 Mar 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · Form-3_compressed (3).pdf · uploaded 3 Mar 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52100046709 · Master Layout_compressed.pdf · uploaded 21 Sep 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100046709 · CC_compressed.pdf · uploaded 12 Oct 2023Source
  • 3 Copy of Layout Approval (in case of layout)P52100046709 · towers wagholi rera (1)_compressed.pdf · uploaded 16 Oct 2023Source
  • 4 Copy of Layout Approval (in case of layout)P52100046709 · F1F2 Hatching Majestique Towers-RERA (1).pdf · uploaded 18 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryP52100046709 · Sold Unsold.pdf · uploaded 18 Oct 2023Source
  • 1 Proforma of Agreement for saleP52100046709 · 1 Proforma of Allotment letter.pdf · uploaded 18 Oct 2023Source
  • 5 Copy of Layout Approval (in case of layout)P52100046709 · f1f2-hatching-majestique-towers-rera_Compressed.pdf · uploaded 19 Oct 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · Phase 5 Architecture Certificate 050123.pdf · uploaded 2 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · Phase 5 Engg Certificate 050123.pdf · uploaded 2 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100046709 · Phase 5 Quality Assurance Certificate 050123.pdf · uploaded 2 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100046709 · 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf · uploaded 5 Jan 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100046709 · 2 Disclosure of Interest in Other Real Estate Organizations (1).pdf · uploaded 5 Jan 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100046709 · 3 Disclosure of Interest in Other Real Estate Organizations (1).pdf · uploaded 5 Jan 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsP52100046709 · 4 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 5 Jan 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsP52100046709 · 5 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 5 Jan 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · Phase5Form 1Architect Certificate 01072023.pdf · uploaded 9 Jan 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · Arch certificate Phase 5 51023.pdf · uploaded 9 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · Arch certificate Phase 5 80124.pdf · uploaded 9 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · Phase 5Engineer Certificate 01072023.pdf · uploaded 9 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · Phase 5 Engg Certificate 11023.pdf · uploaded 9 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · Phase 5 Engg Certificate 091024.pdf · uploaded 9 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · Phase V Form 3.pdf · uploaded 9 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · sharad shree enterprises 30-09-2023 (1).pdf · uploaded 9 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · sharad shree enterprises 31-12-2023 (1).pdf · uploaded 9 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100046709 · Phase V.pdf · uploaded 9 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100046709 · Phase 5 Quality Assurance Certificate 311223.pdf · uploaded 10 Jan 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · sharad shree enterprises 31-12-2023 final1.pdf · uploaded 11 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryP52100046709 · Sold Unsold 24 Jan.pdf · uploaded 12 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · CA Certificate 09012024.pdf · uploaded 12 Jan 2024Source
  • 6 Copy of Layout Approval (in case of layout)P52100046709 · MAJ-TOWERS-RERA-240124-min_compressed.pdf · uploaded 24 Jan 2024Source
  • 7 Copy of Layout Approval (in case of layout)P52100046709 · MAJ-TOWERS-RERA-240124.pdf · uploaded 24 Jan 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100046709 · F1 Commercial plans_compressed.pdf · uploaded 24 Jan 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100046709 · F1 Recreational floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100046709 · F1 Typical floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100046709 · F2 Commercial floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100046709 · F2 Residential flor plans 4th and above_compressed.pdf · uploaded 24 Jan 2024Source
  • 2 Declaration about Commencement CertificateP52100046709 · format d.pdf · uploaded 24 Jan 2024Source
  • 2 Proforma of Agreement for saleP52100046709 · Agreement_Draft_Residential_1284B_MHADA.pdf · uploaded 19 Mar 2024Source
  • 2 Deviation Report with respect to model copy of AgreementP52100046709 · Deviation Agreement_1284 Ph V_compressed.pdf · uploaded 22 Mar 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · F1 F2 Arch Phase 5 (25-06-24).pdf · uploaded 2 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · F1 F2 Engg Phase 5 (25-06-24).pdf · uploaded 2 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · Form 3 Ph V_compressed.pdf · uploaded 2 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · 6 F1 F2 Arch Phase 5 5-08-24.pdf · uploaded 10 Aug 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · 6 ENGG Certificate Phase 5 (5-08-24).pdf · uploaded 10 Aug 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · 10 Form-3 07-08-24_compressed (1).pdf · uploaded 10 Aug 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · 7 F1 F2 Arch Phase 5 15-10-24.pdf · uploaded 26 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · 11 Form -3 - Phase V_compressed.pdf · uploaded 26 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · 7 ENGG Certificate Phase 5 (15-10-24).pdf · uploaded 26 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100046709 · Master Layout-1.pdf · uploaded 13 Nov 2024Source
  • 2 Copy of Layout Approval (in case of layout)P52100046709 · F1 F2 MLayout.pdf · uploaded 13 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100046709 · 17 F1 COMM compressed.pdf · uploaded 13 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100046709 · 18 F1 Mhada compressed.pdf · uploaded 13 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100046709 · 19 F1 Dev compressed.pdf · uploaded 13 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100046709 · 20 F2 COMM compressed.pdf · uploaded 13 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100046709 · 21 F2 Res compressed.pdf · uploaded 13 Nov 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100046709 · 21 F2 Res compressed.pdf · uploaded 13 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · SSE FORM 3 Phase 5_compressed.pdf · uploaded 28 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100046709 · SSE FORM 5 Phase V.pdf · uploaded 29 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100046709 · TE - F1-F2_compressed.pdf · uploaded 15 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100046709 · TE - F1-F2_compressed.pdf · uploaded 23 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100046709 · Form2A (24-25).pdf · uploaded 15 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100046709 · form 2A 24-25 phase-5.pdf · uploaded 15 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · 8 F1 F2 Arch Phase 5 31-12-24.pdf · uploaded 16 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100046709 · 9 F1 F2 Arch Phase 5 01-04-25.pdf · uploaded 16 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · 8 ENGG Certificate Phase 5 (31-12-24).pdf · uploaded 16 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100046709 · 9 ENGG Certificate Phase 5 (01-04-25).pdf · uploaded 16 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100046709 · F1-F2 Mar 25_compressed.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100046709 · SSE FORM 3 Phase 5_compressed (1).pdf · uploaded 25 Apr 2025Source
  • Form 1P52100046709 · Form 1 Arch Phase 5 07-07-25.pdf · uploaded 22 Aug 2025Source
  • Form 2P52100046709 · Form 2 ENGG Certificate Phase 5 2024.pdf · uploaded 22 Aug 2025Source
  • Form 3P52100046709 · Form -3 - Phase V.pdf · uploaded 22 Aug 2025Source
  • Disclosure of Sold and Booked InventoryP52100046709 · Sold Unsold Ph 5 F1F2_compressed.pdf · uploaded 22 Aug 2025Source
  • Form 1P52100046709 · Form 1 Phase 5 SSE.pdf · uploaded 6 Nov 2025Source
  • Form 2P52100046709 · Form 2 Phase 5 SSE.pdf · uploaded 6 Nov 2025Source
  • Form 3P52100046709 · Form 3 SSE Phase 5 Q2_compressed.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventoryP52100046709 · Tower East -F1 & F2.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventoryP52100046709 · F1-F2- Towers East - Dec 2025.pdf · uploaded 17 Feb 2026Source
  • Form 3P52100046709 · SSE Phase 5 Q3_compressed.pdf · uploaded 17 Feb 2026Source
  • Form 2P52100046709 · form 2.pdf · uploaded 17 Feb 2026Source
  • Form 1P52100046709 · form 1.pdf · uploaded 17 Feb 2026Source
  • Form 1P52100046709 · 18 F1 F2 Arch Phase 5 31-03-26.pdf · uploaded 25 Apr 2026Source
  • Form 2P52100046709 · 18 ENGG Certificate Phase 5 (31-03-26).pdf · uploaded 25 Apr 2026Source
  • Form 3P52100046709 · SSE FORM 3 Phase 5 Q4.pdf · uploaded 25 Apr 2026Source
  • Disclosure of Sold and Booked InventoryP52100046709 · TE - F1-F2- 31-03-26_compressed.pdf · uploaded 25 Apr 2026Source
  • Form 1P52100046709 · 20 F1 F2 Arch Phase 5 30-06-26.pdf · uploaded 20 Jul 2026Source
  • Form 2P52100046709 · 20 ENGG Certificate Phase 5 (30-06-26).pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP52100046709 · TE - F1-F2- 30-06-26_compressed.pdf · uploaded 20 Jul 2026Source
  • Form 3P52100046709 · M TOWERS PH 5_compressed.pdf · uploaded 20 Jul 2026Source
  • Form 2A (FY 2022-2023)P52100046709 · form 2A 22-23 phase-5.pdf · uploaded 22 Jul 2026Source
  • Form 2A (FY 2023-2024)P52100046709 · form 2A 23-24 phase-5.pdf · uploaded 22 Jul 2026Source
  • Form 2A (FY 2024-2025)P52100046709 · form 2A 24-25 phase-5.pdf · uploaded 22 Jul 2026Source
  • Form 2A (FY 2025-2026)P52100046709 · form 2A 25-26 phase-5.pdf · uploaded 22 Jul 2026Source

Technical

  • DocumentP52100046709 · scan0461.pdf · uploaded 23 Aug 2022Source
  • DocumentP52100046709 · towers master layout.pdf · uploaded 23 Aug 2022Source
  • Other – TechnicalP52100046709 · Declaration F1F2.pdf · uploaded 24 Aug 2022Source
  • DocumentP52100046709 · scan0462.pdf · uploaded 25 Aug 2022Source
  • DocumentP52100046709 · Master Layout_compressed.pdf · uploaded 21 Sep 2023Source
  • DocumentP52100046709 · towers wagholi rera (1)_compressed.pdf · uploaded 16 Oct 2023Source
  • DocumentP52100046709 · F1F2 Hatching Majestique Towers-RERA (1).pdf · uploaded 18 Oct 2023Source
  • DocumentP52100046709 · f1f2-hatching-majestique-towers-rera_Compressed.pdf · uploaded 19 Oct 2023Source
  • DocumentP52100046709 · MAJ-TOWERS-RERA-240124-min_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · MAJ-TOWERS-RERA-240124.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · F1 Commercial plans_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · F1 Recreational floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · F1 Typical floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · F2 Commercial floor plan_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · F2 Residential flor plans 4th and above_compressed.pdf · uploaded 24 Jan 2024Source
  • DocumentP52100046709 · Master Layout-1.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · F1 F2 MLayout.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 17 F1 COMM compressed.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 18 F1 Mhada compressed.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 19 F1 Dev compressed.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 20 F2 COMM compressed.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 21 F2 Res compressed.pdf · uploaded 13 Nov 2024Source
  • DocumentP52100046709 · 21 F2 Res compressed.pdf · uploaded 13 Nov 2024Source

Technical (Architect)

  • DocumentP52100046709 · 6 F1 F2 Arch Phase 5 5-08-24.pdf · uploaded 10 Aug 2024Source
  • DocumentP52100046709 · 7 F1 F2 Arch Phase 5 15-10-24.pdf · uploaded 26 Oct 2024Source
  • DocumentP52100046709 · 8 F1 F2 Arch Phase 5 31-12-24.pdf · uploaded 16 Apr 2025Source
  • DocumentP52100046709 · 9 F1 F2 Arch Phase 5 01-04-25.pdf · uploaded 16 Apr 2025Source

Technical (Engineer)

  • DocumentP52100046709 · 6 ENGG Certificate Phase 5 (5-08-24).pdf · uploaded 10 Aug 2024Source
  • DocumentP52100046709 · 7 ENGG Certificate Phase 5 (15-10-24).pdf · uploaded 26 Oct 2024Source
  • DocumentP52100046709 · 8 ENGG Certificate Phase 5 (31-12-24).pdf · uploaded 16 Apr 2025Source
  • DocumentP52100046709 · 9 ENGG Certificate Phase 5 (01-04-25).pdf · uploaded 16 Apr 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wagholi, Haveli taluka

Survey, CTS, gat or plot numbers

1284/B/1 Plot No.11284/B/1 Plot No.21284/B/1 Plot No.31284/B/1 Plot No.41284/B/1 Plot No.51284/B/1 Plot No.6 of Wagholi PuneGat No 1284 BNew Gat No. 1284/B/1//Plot No.6

Boundaries

North
Gat No 1284 Part
South
Gat No 1284 Part
East
Road
West
Building E9E10

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectAr Pramod Dube—P52100046709
ArchitectJay Aeram Architect—P52100046709
Chartered accountantCa Sanket Bhandari—P52100046709
Chartered accountantSunanda Zore & Associates—P52100046709
EngineerMr Gulab A Bhilare—P52100046709

Source: MahaRERA project page. Contact details are not shown.