Majestique Signature Towers Phase 1
Certificate SignedHaveli, Maharashtra 411045 |Promoter: Majestique Homes LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Address
- Survey no. 5/1, 5/2A, 5/2B, 5/3/1, 5/4/1, 6/4B Village Balewadi, BANER BALEWADI HIGH STREET ROAD, BALEWADIPIN 411045
- Designated bank account
- 171
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Sep 2024
The latest completion date on record passed 2 years and 1 month ago.
- Registered
- 16 Jul 2018
- Promised
- 30 Sep 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100017133 | 16 Jul 2018 | 30 Sep 2024 | 30 Sep 2024 | Majestique Homes LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building D | 19 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Documents
1 document held by Deedo, 187 filings listed on MahaRERA's project page
Finance
- PAN CardPAN MHLLP.pdf · uploaded 2 Jul 2018Source
Legal
- Declaration Form BForm B - Promoter.pdf · uploaded 2 Jul 2018Source
- Legal Title reportSearch.pdf · uploaded 5 Jul 2018Source
- Legal Title reportSearch 2020.pdf · uploaded 3 Aug 2020Source
- Other1-6.pdf · uploaded 13 Jul 2021Source
- Other7-12.pdf · uploaded 13 Jul 2021Source
- Other13-18.pdf · uploaded 13 Jul 2021Source
Show all 188 documentsShow fewer documents
Legal
- Other19-24.pdf · uploaded 13 Jul 2021Source
- Other25-30.pdf · uploaded 13 Jul 2021Source
- Other31-36.pdf · uploaded 13 Jul 2021Source
- Other37-42.pdf · uploaded 13 Jul 2021Source
- Other43-48.pdf · uploaded 13 Jul 2021Source
- Other49-54.pdf · uploaded 13 Jul 2021Source
- Other55-60.pdf · uploaded 13 Jul 2021Source
- Other61-66.pdf · uploaded 13 Jul 2021Source
- Other67-72.pdf · uploaded 13 Jul 2021Source
- Other73-76.pdf · uploaded 13 Jul 2021Source
- Other77-82.pdf · uploaded 13 Jul 2021Source
- Other83-88.pdf · uploaded 13 Jul 2021Source
- Other89-94.pdf · uploaded 13 Jul 2021Source
- Other95-100.pdf · uploaded 13 Jul 2021Source
- Other101-106.pdf · uploaded 13 Jul 2021Source
- Other107-112.pdf · uploaded 13 Jul 2021Source
- Other119-124.pdf · uploaded 13 Jul 2021Source
- Other125-130.pdf · uploaded 13 Jul 2021Source
- Other131-136.pdf · uploaded 13 Jul 2021Source
- Other137-142.pdf · uploaded 13 Jul 2021Source
- Other143-148.pdf · uploaded 13 Jul 2021Source
- Other149-154.pdf · uploaded 13 Jul 2021Source
- Other156-162.pdf · uploaded 13 Jul 2021Source
- Other163-168.pdf · uploaded 13 Jul 2021Source
- Other167-172.pdf · uploaded 13 Jul 2021Source
- Other173-178.pdf · uploaded 13 Jul 2021Source
- Other179-185.pdf · uploaded 13 Jul 2021Source
- Other186-191.pdf · uploaded 13 Jul 2021Source
- Other192-197.pdf · uploaded 13 Jul 2021Source
- Other198-203.pdf · uploaded 13 Jul 2021Source
- Other204-209.pdf · uploaded 13 Jul 2021Source
- Other216-221.pdf · uploaded 13 Jul 2021Source
- Other228-230.pdf · uploaded 13 Jul 2021Source
Migrated
- 1 PAN CardPAN MHLLP.pdf · uploaded 2 Jul 2018Source
- 1 Details of encumbrancesEncum letter.pdf · uploaded 2 Jul 2018Source
- 1 Building Plan Approval (IOD)BUILDING D 7-12.pdf · uploaded 2 Jul 2018Source
- 2 Building Plan Approval (IOD)BUILDING D 8-12.pdf · uploaded 2 Jul 2018Source
- 3 Building Plan Approval (IOD)BUILDING D 9-12.pdf · uploaded 2 Jul 2018Source
- 1 Declaration in FORM BForm B - Promoter.pdf · uploaded 2 Jul 2018Source
- 1 Commencement Certificates / NA Order for plotted development1 CC.pdf · uploaded 3 Jul 2018Source
- 2 Commencement Certificates / NA Order for plotted development2 CC.pdf · uploaded 3 Jul 2018Source
- 3 Commencement Certificates / NA Order for plotted development3 CC.pdf · uploaded 3 Jul 2018Source
- 4 Commencement Certificates / NA Order for plotted development4 CC.pdf · uploaded 3 Jul 2018Source
- 1 Copy of Layout Approval (in case of layout)DP LAYOUT.pdf · uploaded 4 Jul 2018Source
- 1 Copy of the legal title reportSearch.pdf · uploaded 5 Jul 2018Source
- 1 Certificates of CA (Form 3)FORM-3.pdf · uploaded 5 Jul 2018Source
- 1 Proforma of Allotment letterBalewadi - M Homes LLP_FINAL.pdf · uploaded 5 Jul 2018Source
- 1 Form 2ABUILDING D FORM 2A.pdf · uploaded 15 Jun 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.pdf · uploaded 25 Jan 2020Source
- 2 Proforma of Allotment letterMajestique Agreement.pdf · uploaded 15 Feb 2020Source
- 2 Details of encumbrancesEncum.pdf · uploaded 11 Jul 2020Source
- 2 Copy of the legal title reportSearch 2020.pdf · uploaded 3 Aug 2020Source
- 2 Copy of Layout Approval (in case of layout)01 LAYOUT.pdf · uploaded 21 Apr 2021Source
- 4 Building Plan Approval (IOD)09 D.pdf · uploaded 21 Apr 2021Source
- 5 Building Plan Approval (IOD)10 D.pdf · uploaded 21 Apr 2021Source
- 6 Building Plan Approval (IOD)11 D.pdf · uploaded 21 Apr 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Apr 2021Source
- 1 Disclosure of sold/ booked inventoryTower D_compressed.pdf · uploaded 11 Jun 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Majestique Homes LLP - D.pdf · uploaded 24 Jun 2021Source
- 1 Declaration about Commencement CertificateCircular 32 - Format D.pdf · uploaded 30 Jun 2021Source
- 2 Declaration about Commencement CertificateCircular 32 - Format D.pdf · uploaded 30 Jun 2021Source
- 2 Form 2AForm-2A_MHLLP.pdf · uploaded 30 Jun 2021Source
- 2 Disclosure of sold/ booked inventorySold Unsold Inventory_compressed.pdf · uploaded 30 Jun 2021Source
- 1 Other1-6.pdf · uploaded 13 Jul 2021Source
- 2 Other7-12.pdf · uploaded 13 Jul 2021Source
- 3 Other13-18.pdf · uploaded 13 Jul 2021Source
- 4 Other19-24.pdf · uploaded 13 Jul 2021Source
- 5 Other25-30.pdf · uploaded 13 Jul 2021Source
- 6 Other31-36.pdf · uploaded 13 Jul 2021Source
- 7 Other37-42.pdf · uploaded 13 Jul 2021Source
- 8 Other43-48.pdf · uploaded 13 Jul 2021Source
- 9 Other49-54.pdf · uploaded 13 Jul 2021Source
- 10 Other55-60.pdf · uploaded 13 Jul 2021Source
- 11 Other61-66.pdf · uploaded 13 Jul 2021Source
- 12 Other67-72.pdf · uploaded 13 Jul 2021Source
- 13 Other73-76.pdf · uploaded 13 Jul 2021Source
- 14 Other77-82.pdf · uploaded 13 Jul 2021Source
- 15 Other83-88.pdf · uploaded 13 Jul 2021Source
- 16 Other89-94.pdf · uploaded 13 Jul 2021Source
- 17 Other95-100.pdf · uploaded 13 Jul 2021Source
- 18 Other101-106.pdf · uploaded 13 Jul 2021Source
- 19 Other107-112.pdf · uploaded 13 Jul 2021Source
- 20 Other119-124.pdf · uploaded 13 Jul 2021Source
- 21 Other125-130.pdf · uploaded 13 Jul 2021Source
- 22 Other131-136.pdf · uploaded 13 Jul 2021Source
- 23 Other137-142.pdf · uploaded 13 Jul 2021Source
- 24 Other143-148.pdf · uploaded 13 Jul 2021Source
- 25 Other149-154.pdf · uploaded 13 Jul 2021Source
- 26 Other156-162.pdf · uploaded 13 Jul 2021Source
- 27 Other163-168.pdf · uploaded 13 Jul 2021Source
- 28 Other167-172.pdf · uploaded 13 Jul 2021Source
- 29 Other173-178.pdf · uploaded 13 Jul 2021Source
- 30 Other179-185.pdf · uploaded 13 Jul 2021Source
- 31 Other186-191.pdf · uploaded 13 Jul 2021Source
- 32 Other192-197.pdf · uploaded 13 Jul 2021Source
- 33 Other198-203.pdf · uploaded 13 Jul 2021Source
- 34 Other204-209.pdf · uploaded 13 Jul 2021Source
- 35 Other216-221.pdf · uploaded 13 Jul 2021Source
- 36 Other228-230.pdf · uploaded 13 Jul 2021Source
- 1 CERSAI details1 CERSAI details.pdf · uploaded 18 Jun 2022Source
- 3 Disclosure of sold/ booked inventorySignature D_compressed.pdf · uploaded 18 Jun 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Majestique Homes LLP - D_compressed.pdf · uploaded 18 Jun 2022Source
- 2 Certificates of CA (Form 3)Form-3.pdf · uploaded 26 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Majestique Homes LLP Form-5 D.pdf · uploaded 30 Nov 2022Source
- 3 Certificates of CA (Form 3)Majestique Homes LLP Form-3 D.pdf · uploaded 20 Feb 2023Source
- 4 Certificates of CA (Form 3)Majestique Homes LLP Form-3 D 2.pdf · uploaded 20 Feb 2023Source
- 5 Certificates of CA (Form 3)Form-3 - D Building_compressed.pdf · uploaded 20 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 23 Mar 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 23 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - BALEWADI BUILDING D.pdf · uploaded 23 Mar 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - BALEWADI BUILDING D.pdf · uploaded 23 Mar 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Mar 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Mar 2023Source
- 6 Certificates of CA (Form 3)FORM 3 - BALEWADI BUILDING D_compressed.pdf · uploaded 23 Mar 2023Source
- 7 Certificates of CA (Form 3)FORM 3 - BALEWADI BUILDING D_compressed (1).pdf · uploaded 23 Mar 2023Source
- 8 Certificates of CA (Form 3)FORM 3_compressed (14).pdf · uploaded 23 Mar 2023Source
- 9 Certificates of CA (Form 3)FORM 3_compressed (15).pdf · uploaded 23 Mar 2023Source
- 3 a Details of encumbrances concerned to Financeencum.pdf · uploaded 5 Mar 2024Source
- 1 b Details of encumbrances concerned to Legalencum.pdf · uploaded 5 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form-5-MGHLLP-Phase I-FY-2022-23.pdf · uploaded 5 Mar 2024Source
- 10 Certificates of CA (Form 3)Form-3-D-MHLLP-Q3-23-24_compressed.pdf · uploaded 8 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 5 FORM 1.pdf · uploaded 9 Mar 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 6 FORM 1.pdf · uploaded 9 Mar 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 7 FORM 1.pdf · uploaded 9 Mar 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 8 FORM1.pdf · uploaded 9 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 8 FORM1.pdf · uploaded 9 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)HOMES D-UPDATE 9 FORM 1.pdf · uploaded 9 Mar 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)D- FORM 1-UPDATE 10.pdf · uploaded 9 Mar 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)D-FORM1-UPDATE 11.pdf · uploaded 9 Mar 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)D-FORM1- UPDATE 12.pdf · uploaded 9 Mar 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 UPDATE 13.pdf · uploaded 9 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)D 20 21.pdf · uploaded 9 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)D 21 22.pdf · uploaded 9 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)D 22 23.pdf · uploaded 9 Mar 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 UPDATE 13.pdf · uploaded 11 Mar 2024Source
- 4 Disclosure of sold/ booked inventoryD_compressed (1).pdf · uploaded 8 May 2024Source
- 11 Certificates of CA (Form 3)Form-3-D-MHLLP-Q1-24-25.pdf · uploaded 8 May 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1.pdf · uploaded 11 May 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 UPDATE 16.pdf · uploaded 11 May 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 UPDATE 17.pdf · uploaded 11 May 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1.pdf · uploaded 11 May 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 UPDATE 19.pdf · uploaded 11 May 2024Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1.pdf · uploaded 11 May 2024Source
- 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1.pdf · uploaded 11 May 2024Source
- 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 2.pdf · uploaded 11 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)D FORM 2.pdf · uploaded 11 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)D FORM 2.pdf · uploaded 11 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 UPDATE 17.pdf · uploaded 11 May 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)D FORM 2.pdf · uploaded 11 May 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)D FORM 2.pdf · uploaded 11 May 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)D FORM 2.pdf · uploaded 11 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A D 23 24.pdf · uploaded 11 May 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDiscloser Aditya.pdf · uploaded 30 May 2024Source
- 1 Proforma of Agreement for saleRERA.pdf · uploaded 30 May 2024Source
- 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1.pdf · uploaded 2 Aug 2024Source
- 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 D.pdf · uploaded 9 Aug 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)D FORM 4.pdf · uploaded 5 Nov 2024Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society Regn Cert_D_M Signature Tower.pdf · uploaded 5 Nov 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPART COMPLETION -2024.pdf · uploaded 5 Nov 2024Source
- 2 Certificates of CA (Form 3)FORM 3 - D_compressed.pdf · uploaded 11 Nov 2024Source
- 1 Disclosure of sold/ booked inventorySold Unsold_compressed.pdf · uploaded 11 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)D MARCH 24 TO JULY 24.pdf · uploaded 19 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)D MARCH 24 TO JULY 24.pdf · uploaded 19 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA FORM 5 Majestique Homes LLP Phase 1 P52100017133.pdf · uploaded 17 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)D FORM 1 UPDATE 26.pdf · uploaded 27 Dec 2024Source
- 1 Certificates of CA (Form 3)FORM 3 D_compressed.pdf · uploaded 15 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryST - D_compressed.pdf · uploaded 1 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryD- ST_compressed.pdf · uploaded 26 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryD - mar 25_compressed.pdf · uploaded 14 Apr 2025Source
Technical
- DocumentBUILDING D 7-12.pdf · uploaded 2 Jul 2018Source
- DocumentBUILDING D 8-12.pdf · uploaded 2 Jul 2018Source
- DocumentBUILDING D 9-12.pdf · uploaded 2 Jul 2018Source
- DocumentDP LAYOUT.pdf · uploaded 4 Jul 2018Source
- Document01 LAYOUT.pdf · uploaded 21 Apr 2021Source
- Document09 D.pdf · uploaded 21 Apr 2021Source
- Document10 D.pdf · uploaded 21 Apr 2021Source
- Document11 D.pdf · uploaded 21 Apr 2021Source
Technical (Architect)
Technical (Engineer)
- DocumentD FORM 2.pdf · uploaded 11 May 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.