Dosti Greenscapes - Phase 3

Certificate Signed

Hadapsar, Pune 411013 |Promoter: Dosti Realty Limited

Residential / Group HousingRERAP52100077059
23 Jul 2024Registered with MahaRERA
31 Aug 2028Promised completion
31 Dec 2028Revised completionPushed back 4 months
2Buildings
334Units registered84 booked (25%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
2BHK334 units in all
Address
S No. 112/1A/Plot No. 1 of Peth Hadapsar, HAVELI HADAPSAR, HADAPSARPIN 411013
Designated bank account
85
Developed in phases
Yes

Registered transactions

230 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

All 230 records
Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
16 Oct 2026
Unit ए4-1505
Primary sale—≈ ₹12,090
14 Oct 2026
Unit ए4-2104
Primary sale—≈ ₹11,741
13 Oct 2026
Unit ए3-2101
Primary sale—≈ ₹11,948
5 Oct 2026
Unit ए3-504
Primary sale—≈ ₹11,619
24 Sep 2026
Unit ए4-1006
Primary sale—≈ ₹11,688
24 Sep 2026
Unit ए4-1508
Primary sale—≈ ₹11,911
21 Sep 2026
Unit ए4-1002
Primary sale—≈ ₹11,719
21 Sep 2026
Unit ए3-1503
Primary sale—≈ ₹11,850
21 Sep 2026
Unit ए4-1407
Primary sale—≈ ₹11,953
17 Sep 2026
Unit ए4-907
Primary sale—≈ ₹12,787
16 Sep 2026
Unit ए4-103
Primary sale—≈ ₹12,011
15 Sep 2026
Unit ए3-1708
Primary sale—≈ ₹11,619
15 Sep 2026
Unit ए4-606
Primary sale—≈ ₹11,846
11 Sep 2026
Unit ए3-1603
Primary sale—≈ ₹12,008
10 Sep 2026
Unit ए4-201
Primary sale—≈ ₹11,872
10 Sep 2026
Unit ए3-1702
Cancellation——
8 Sep 2026
Unit ए4-1001
Primary sale—≈ ₹11,872
5 Sep 2026
Unit ए3-904
Primary sale—≈ ₹11,619
31 Aug 2026
Unit ए3-1904
Primary sale—≈ ₹11,776
28 Aug 2026
Unit ए3-804
Primary sale—≈ ₹11,776
28 Aug 2026
Unit ए4-1008
Primary sale—≈ ₹11,911
27 Aug 2026
Unit ए4-104
Primary sale—≈ ₹12,011
27 Aug 2026
Unit ए4-905
Primary sale—≈ ₹11,619
27 Aug 2026
Unit ए4-1005
Primary sale—≈ ₹11,619
21 Aug 2026
Unit ए3-201
Primary sale—≈ ₹11,948
21 Aug 2026
Unit ए3-1808
Primary sale—≈ ₹11,776
20 Aug 2026
Unit ए3-102
Primary sale—≈ ₹11,948
4 Aug 2026
Unit ए
Mortgage——
30 Jul 2026
Unit ए3-2007
Primary sale—≈ ₹11,534
29 Jul 2026
Unit ए3-1502
Primary sale—≈ ₹11,948
27 Jul 2026
Unit ए3-1608
Primary sale—≈ ₹11,619
25 Jul 2026
Unit ए3-1907
Primary sale—≈ ₹11,376
24 Jul 2026
Unit ए3-2003
Primary sale—≈ ₹11,534
24 Jul 2026
Unit ए4-1807
Primary sale—≈ ₹11,953
10 Jul 2026
Unit ए4-1107
Primary sale—≈ ₹11,953
10 Jul 2026
Unit ए4-1905
Primary sale—≈ ₹11,619
7 Jul 2026
Unit ए4-2008
Primary sale—≈ ₹11,911
6 Jul 2026
Unit ए4-1405
Primary sale—≈ ₹11,462
29 Jun 2026
Unit ए3-1804
Primary sale—≈ ₹11,148
25 Jun 2026
Unit ए4-1201
Primary sale—≈ ₹11,719
25 Jun 2026
Unit ए3-108
Primary sale—≈ ₹11,776
25 Jun 2026
Unit ए4-501
Primary sale—≈ ₹11,567
24 Jun 2026
Unit ए3-1704
Primary sale—≈ ₹11,462
24 Jun 2026
Unit ए3-202
Primary sale—≈ ₹11,531
23 Jun 2026
Unit ए4-902
Primary sale—≈ ₹11,415
23 Jun 2026
Unit ए3-1002
Primary sale—≈ ₹11,670
19 Jun 2026
Unit ए3-1908
Primary sale—≈ ₹11,462
18 Jun 2026
Unit ए3-1602
Primary sale—≈ ₹11,531
18 Jun 2026
Unit ए3-704
Primary sale—≈ ₹10,049
17 Jun 2026
Unit ए4-1204
Primary sale—≈ ₹11,336

Dosti Greenscapes - Phase 3 in numbers

Registered deals, summarised

Deedo has 230 registered documents at Dosti Greenscapes - Phase 3, from Oct 2024 to Oct 2026: 224 sales, 3 mortgages. The median registered sale works out to about ₹11,500 per sq ft, at a median of ₹81 L a deal; 0% of sales were resales.

What is the price per sq ft at Dosti Greenscapes - Phase 3?
The median registered sale works out to about ₹11,500 per sq ft, at a median of ₹81 L a deal; 0% of sales were resales.
How many properties have been sold at Dosti Greenscapes - Phase 3?
224 sales are registered at Dosti Greenscapes - Phase 3.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Dosti Greenscapes - Phase 3 by Deedo, last updated with deals registered in Oct 2026.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
23 Jul 2024
Promised
31 Aug 2028
Revised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210007705923 Jul 202431 Aug 202831 Dec 2028Dosti Realty LimitedProject page

2 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

84 of 334 units booked (25%), as the promoter reported to MahaRERA

2BHK · 334 units
BuildingTypeCarpet areaUnitsBooked
Dosti Delta - Wing K and L - A3 Bldg - Wing K and Wing L2BHK58.8 sq m · 633 sq ft4016
Dosti Delta - Wing K and L - A3 Bldg - Wing K and Wing L2BHK59.17 sq m · 637 sq ft4314
Dosti Delta - Wing K and L - A3 Bldg - Wing K and Wing L2BHK66.87 sq m · 720 sq ft8649
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK58.82 sq m · 633 sq ft180
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK59.17 sq m · 637 sq ft211
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK61.04 sq m · 657 sq ft420
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK66.84 sq m · 719 sq ft212
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK67.08 sq m · 722 sq ft212
Dosti Glade- Wing M and N - A4 Bldg-Wing M and Wing N2BHK68.84 sq m · 741 sq ft420

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 87 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardDRL PAN CARD.pdf · uploaded 24 May 2024Source

Legal

  • Other – LegalDRL - General Authority BR.pdf · uploaded 27 May 2024Source
  • Declaration Form BForm B Phase 3_compressed.pdf · uploaded 28 May 2024Source
  • Legal Title reportTitle Certificate greenscapes 3.pdf · uploaded 21 Jun 2024Source

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentPLAN.pdf · uploaded 22 May 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentPLAN 2.pdf · uploaded 22 May 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC GREENSCAPE PHASE 3.pdf · uploaded 22 May 2024Source
Show all 88 documentsShow fewer documents

Migrated

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 22 May 2024Source
  • 1 Copy of Layout Approval (in case of layout)GREENSCAPES - CC LAYOUT PHASE 3.pdf · uploaded 23 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Achitect's Certificate Dosti Greencape Phase 3.pdf · uploaded 23 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance phase-3.pdf · uploaded 23 May 2024Source
  • 1 Proforma of Allotment letterPerfoma of Allotment Letter.pdf · uploaded 23 May 2024Source
  • 1 PAN CardDRL PAN CARD.pdf · uploaded 24 May 2024Source
  • 1 a Details of encumbrances concerned to FinanceFinancial and Legal Encumbrances.pdf · uploaded 27 May 2024Source
  • 1 b Details of encumbrances concerned to LegalFinancial and Legal Encumbrances.pdf · uploaded 27 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure 1.pdf · uploaded 27 May 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure 2.pdf · uploaded 27 May 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure Deepak sir.pdf · uploaded 27 May 2024Source
  • 4 Disclosure of Interest in Other Real Estate Organizationsdisclosure preeti.pdf · uploaded 27 May 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation report Allotment letter.pdf · uploaded 27 May 2024Source
  • 1 Other – LegalDRL - General Authority BR.pdf · uploaded 27 May 2024Source
  • 1 Declaration in FORM BForm B Phase 3_compressed.pdf · uploaded 28 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration on Bank Account.pdf · uploaded 29 May 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate- Dosti Greenscape Phase-3.pdf · uploaded 30 May 2024Source
  • 1 Proforma of Agreement for saleRERA AFS - Greenscapes Phase 3 - AFS.pdf · uploaded 30 May 2024Source
  • 1 Other – TechnicalPhase 3 declaration on CC addl.pdf · uploaded 10 Jun 2024Source
  • 1 Copy of the legal title reportTitle Certificate greenscapes 3.pdf · uploaded 21 Jun 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDEVIATION AGREEMENT FOR SALE TABULAR.pdf · uploaded 21 Jun 2024Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsChintan.pdf · uploaded 27 Jun 2024Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsSunil Bansal.pdf · uploaded 27 Jun 2024Source
  • 2 Other – TechnicalDosti GreenScape Pune 7-12 New.pdf · uploaded 27 Jun 2024Source
  • 3 Other – TechnicalDosti Greenscape Pune 7-12 Old.pdf · uploaded 27 Jun 2024Source
  • 4 Other – TechnicalDosti_letter[1].pdf · uploaded 8 Jul 2024Source
  • 1 CERSAI detailsREVISED CERSAI 1.pdf · uploaded 9 Jul 2024Source
  • 5 Other – TechnicalOrder No 50 Phase 3.pdf · uploaded 10 Jul 2024Source
  • 2 a Details of encumbrances concerned to Financephase 3.pdf · uploaded 18 Jul 2024Source
  • 2 b Details of encumbrances concerned to Legalphase 3.pdf · uploaded 18 Jul 2024Source
  • 1 Declaration about Commencement CertificateCC phase 3.pdf · uploaded 18 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dosti Greenscape PH3 Form1 Sep24.pdf · uploaded 15 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dosti Greenscape PH3 Form3 Sep24.pdf · uploaded 15 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dosti Greenscape PH3 Form2 Sep24.pdf · uploaded 15 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDosti Greenscape PH3.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dosti Greenscape Phase-3 Architect certificate.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dosti Greenscape Phase-3 CA certificate.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dosti Greenscape Phase-3 Engineer certificate.pdf · uploaded 16 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDosti Greenscape Phase-3 Sold Unsold.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Dosti Greenscape PH3 Achitect's certificate March2025.pdf · uploaded 11 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dosti Greenscape PH3 CA Certificate April2025.pdf · uploaded 11 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dosti Greenscape PH3 Engineer certificate March2025.pdf · uploaded 11 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Dosti Greenscape PH3 Quality certificate March2025.pdf · uploaded 11 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDOsti Greenscape PH3 Sold Unsold.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorydoc03651820250415190436.pdf · uploaded 16 Apr 2025Source
  • Form 1Dosti Greenscape PH3 Arch certificate June2025.pdf · uploaded 25 Jul 2025Source
  • Form 2Dosti Greenscape PH3 Engineer certificate June2025.pdf · uploaded 25 Jul 2025Source
  • Form 3Dosti Greenscape PH3 CA certificate June2025.pdf · uploaded 25 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDRL Greenscape PH3 Sold Unsold June2025.pdf · uploaded 25 Jul 2025Source
  • Form 5 (FY 2024-2025)DRL Pune PH3.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 1DRL Greenscapes Ph 3 Form 1 Sept25.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 2DRL Greenscapes Ph 3 Form 2 Sept25.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 3DRL Greenscapes Ph 3 Form 3 Sept25.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 1DRL Greenscapes Ph 3 Form 1 Dec25.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 2DRL Greenscapes Ph 3 Form 2 Dec25.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 3DRL Greenscapes Ph 3 Form 3 Dec25.pdf · uploaded 28 Jan 2026Source
  • Withdrawal Update Form 1DRL Greenscapes Ph 3 Form 1 Mar26.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 2DRL Greenscapes Ph 3 Form 2 Mar26.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 3DRL Greenscapes Ph 3 Form 3 Mar26.pdf · uploaded 6 May 2026Source
  • Form 2A (FY 2025-2026)Form 2A - DRL Dosti Greenscapes Ph 3.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 1DRL Greenscapes Ph 3 Form 1 Jun26.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 2DRL Greenscapes Ph 3 Form 2 Jun26.pdf · uploaded 3 Aug 2026Source
  • Withdrawal Update Form 3DRL Greenscapes Ph 3 Form 3 Jun26.pdf · uploaded 3 Aug 2026Source
  • Form 5 (FY 2025-2026)DRL Pune PH 3 2025-26.pdf · uploaded 3 Oct 2026Source

Technical

  • DocumentPLAN.pdf · uploaded 22 May 2024Source
  • DocumentPLAN 2.pdf · uploaded 22 May 2024Source
  • DocumentGREENSCAPES - CC LAYOUT PHASE 3.pdf · uploaded 23 May 2024Source
  • Other – TechnicalPhase 3 declaration on CC addl.pdf · uploaded 10 Jun 2024Source
  • Other – TechnicalDosti GreenScape Pune 7-12 New.pdf · uploaded 27 Jun 2024Source
  • Other – TechnicalDosti Greenscape Pune 7-12 Old.pdf · uploaded 27 Jun 2024Source
  • Other – TechnicalDosti_letter[1].pdf · uploaded 8 Jul 2024Source
  • Other – TechnicalOrder No 50 Phase 3.pdf · uploaded 10 Jul 2024Source

Technical (Architect)

  • DocumentDosti Greenscape PH3 Form1 Sep24.pdf · uploaded 15 Oct 2024Source
  • DocumentDosti Greenscape Phase-3 Architect certificate.pdf · uploaded 16 Jan 2025Source
  • DocumentDosti Greenscape PH3 Achitect's certificate March2025.pdf · uploaded 11 Apr 2025Source
  • DocumentDRL Greenscapes Ph 3 Form 1 Jun26.pdf · uploaded 3 Aug 2026Source

Technical (Engineer)

  • DocumentDosti Greenscape PH3 Form2 Sep24.pdf · uploaded 15 Oct 2024Source
  • DocumentDosti Greenscape Phase-3 Engineer certificate.pdf · uploaded 16 Jan 2025Source
  • DocumentDosti Greenscape PH3 Engineer certificate March2025.pdf · uploaded 11 Apr 2025Source
  • DocumentDRL Greenscapes Ph 3 Form 2 Jun26.pdf · uploaded 3 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Hadapsar, Haveli taluka

Survey, CTS, gat or plot numbers

S No. 112/1A/Plot No. 1 of Peth Hadapsar

Boundaries

North
Survey No 112A
South
Survey No 162B
East
Survey No 112A
West
Survey No 111B

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArchitect Jay R Vora—
ArchitectNeerja Purandare—
Chartered accountantBagade And Associates—
Chartered accountantManish Bardia And Co—
Chartered accountantTrupti—
EngineerParas R Vishwakarma—
EngineerSwapnil Londhe—
EngineerVaibhav Raghunath Kalambate—

Source: MahaRERA project page. Contact details are not shown.