Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 5
- Unit types
- 3BHK, 4BHK, 2BHK, 3BHK DUPLEX306 units in all
- Address
- 207/208/1A/1B/3, BS Tupe (DP) Road, Malwadi, HadapsarPIN 411028
- Designated bank account
- 76
- Developed in phases
- Yes
Registered transactions
62 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 13 Oct 2026 | Bldg ऑरिगा · Unit 2403 | Primary sale | — | ≈ ₹12,801 | |
| 29 Sep 2026 | Bldg अट्रिया · Unit 404 | Primary sale | — | ≈ ₹12,111 | |
| 24 Sep 2026 | Bldg ऑरिगा · Unit 1803 | Primary sale | — | ≈ ₹11,711 | |
| 22 Sep 2026 | Bldg ऑरिगा · Unit 2002 | Primary sale | — | ≈ ₹13,382 | |
| 17 Sep 2026 | Bldg ऑरिगा · Unit 1002 | Primary sale | — | ≈ ₹13,297 | |
| 27 Aug 2026 | Bldg ऑरीगा · Unit 1302 | Primary sale | — | ≈ ₹12,704 | |
| 12 Aug 2026 | Bldg ऑरीगा · Unit 2202 | Primary sale | — | ≈ ₹12,874 | |
| 23 Jul 2026 | Bldg ऑरिगा · Unit 1602 | Primary sale | — | ≈ ₹12,706 | |
| 9 Jul 2026 | Bldg ऑरीगा · Unit 2302 | Primary sale | — | — | |
| 8 Jul 2026 | Bldg ऑरीगा · Unit 1001 | Primary sale | — | ≈ ₹12,536 | |
| 6 Jul 2026 | Bldg अट्रिया · Unit 303 | Primary sale | — | ≈ ₹12,052 | |
| 30 Jun 2026 | Bldg ऑरीगा · Unit 1401 | Primary sale | — | ≈ ₹12,960 | |
| 25 Jun 2026 | Bldg ऑरिगा · Unit 2302 | Primary sale | — | ≈ ₹12,875 | |
| 25 Jun 2026 | Bldg अट्रिया · Unit 503 | Primary sale | — | ≈ ₹12,052 | |
| 16 Jun 2026 | Bldg अट्रिया · Unit 804 | Primary sale | — | ≈ ₹12,214 | |
| 26 May 2026 | Bldg ऑरिगा · Unit 1902 | Primary sale | — | ≈ ₹12,706 | |
| 21 May 2026 | Bldg ऑरिगा · Unit 2102 | Primary sale | — | ≈ ₹12,704 | |
| 18 May 2026 | Bldg ऑरिगा · Unit 2002 | Primary sale | — | ≈ ₹12,535 | |
| 15 May 2026 | Bldg अट्रिया · Unit 403 | Primary sale | — | ≈ ₹12,052 | |
| 14 May 2026 | Bldg ऑरिगा · Unit 2202 | Primary sale | — | ≈ ₹12,958 | |
| 14 May 2026 | Bldg अट्रिया · Unit 501 | Primary sale | — | ≈ ₹12,163 | |
| 12 May 2026 | Bldg ऑरिगा · Unit 2101 | Primary sale | — | ≈ ₹12,704 | |
| 8 May 2026 | Bldg ऑरिगा · Unit 1903 | Primary sale | — | ≈ ₹12,327 | |
| 6 May 2026 | Bldg ऑरिगा · Unit 1402 | Primary sale | — | ≈ ₹12,535 | |
| 29 Apr 2026 | Bldg ऑरिगा · Unit 2104 | Primary sale | — | ≈ ₹12,327 | |
| 27 Apr 2026 | Bldg ऑरिगा · Unit 2104 | Primary sale | — | ≈ ₹12,208 | |
| 9 Apr 2026 | Bldg ऑरिगा · Unit 2302 | Primary sale | — | ≈ ₹12,874 | |
| 6 Apr 2026 | Bldg ॲक्विला · Unit 401 | Primary sale | — | ≈ ₹12,448 | |
| 27 Mar 2026 | Bldg अस्रिया · Unit 502 | Primary sale | — | ≈ ₹12,106 | |
| 27 Mar 2026 | Bldg ऑरिगा · Unit 2204 | Primary sale | — | ≈ ₹12,327 | |
| 23 Mar 2026 | Bldg ऑरिगा · Unit 1702 | Primary sale | — | ≈ ₹12,535 | |
| 23 Mar 2026 | Bldg ऑरिगा · Unit 2303 | Primary sale | — | ≈ ₹12,327 | |
| 16 Mar 2026 | Bldg ऑरिगा · Unit 1902 | Primary sale | — | ≈ ₹12,620 | |
| 16 Mar 2026 | Bldg ऑरिगा · Unit 2303 | Primary sale | — | ≈ ₹12,334 | |
| 12 Mar 2026 | Bldg ऑरिगा · Unit 802 | Primary sale | — | ≈ ₹12,535 | |
| 12 Mar 2026 | Bldg अँटरिया · Unit 603 | Primary sale | — | ≈ ₹11,898 | |
| 10 Mar 2026 | Bldg ऑरिगा · Unit 2003 | Primary sale | — | ≈ ₹12,209 | |
| 2 Mar 2026 | Bldg ऑरिगा · Unit 2101 | Primary sale | — | ≈ ₹12,620 | |
| 26 Feb 2026 | Bldg ऑरिगा · Unit 2304 | Primary sale | — | ≈ ₹12,564 | |
| 25 Feb 2026 | Bldg ऑरिगा · Unit 502 | Primary sale | — | ≈ ₹12,112 | |
| 25 Feb 2026 | Bldg ऑरिगा · Unit 501 | Primary sale | — | ≈ ₹12,112 | |
| 25 Feb 2026 | Bldg ऑरिगा · Unit 204 | Primary sale | — | ≈ ₹11,023 | |
| 20 Feb 2026 | Bldg ऑरिगा · Unit 2304 | Primary sale | — | ≈ ₹12,327 | |
| 20 Feb 2026 | Bldg ऑरिगा · Unit 2004 | Primary sale | — | ≈ ₹12,090 | |
| 20 Feb 2026 | Bldg अँटरिया · Unit 1001 | Primary sale | — | ≈ ₹12,276 | |
| 20 Feb 2026 | Bldg ऑरिगा · Unit 2204 | Primary sale | — | ≈ ₹12,208 | |
| 13 Feb 2026 | Bldg ऑरिगा · Unit 1901 | Primary sale | — | ≈ ₹12,706 | |
| 13 Feb 2026 | Bldg ऑरिगा · Unit 1901 | Primary sale | — | ≈ ₹12,706 | |
| 11 Feb 2026 | Bldg ऑरिगा · Unit 101 | Primary sale | — | ≈ ₹12,197 | |
| 11 Feb 2026 | Bldg ऑरिगा · Unit 1904 | Primary sale | — | ≈ ₹12,090 |
Astrana in numbers
Registered deals, summarised
Deedo has 62 registered documents at Astrana, from Jan 2026 to Oct 2026: 62 sales. The median registered sale works out to about ₹12,500 per sq ft, at a median of ₹1.49 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Astrana?
- The median registered sale works out to about ₹12,500 per sq ft, at a median of ₹1.49 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Astrana?
- 62 sales are registered at Astrana.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Astrana by Deedo, last updated with deals registered in Oct 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Jul 2028
- Registered
- 5 Apr 2024
- Promised
- 31 Jul 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055666 | 5 Apr 2024 | 31 Jul 2028 | 31 Jul 2028 | Dilip Baburao Tupe | Project page |
5 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Atria - Tower E | 28 | 56 |
| Auriga A - Tower A | 30 | 68 |
| Auriga B - Tower B | 30 | 68 |
| Auriga C - Tower C | 30 | 57 |
| Auriga D - Tower D | 30 | 57 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
236 of 306 units booked (77%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Atria - Tower E | 3BHK | 150.31 sq m · 1,618 sq ft | 3 | 3 |
| Atria - Tower E | 4BHK | 163.41 sq m · 1,759 sq ft | 28 | 8 |
| Atria - Tower E | 4BHK | 181.15 sq m · 1,950 sq ft | 25 | 11 |
| Auriga A - Tower A | 2BHK | 74.57 sq m · 803 sq ft | 10 | 10 |
| Auriga A - Tower A | 2BHK | 78.38 sq m · 844 sq ft | 18 | 18 |
| Auriga A - Tower A | 3BHK | 109.68 sq m · 1,181 sq ft | 36 | 35 |
| Auriga A - Tower A | 3BHK | 127.48 sq m · 1,372 sq ft | 4 | 2 |
| Auriga B - Tower B | 2BHK | 74.57 sq m · 803 sq ft | 10 | 10 |
Show all 17 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Auriga B - Tower B | 2BHK | 78.38 sq m · 844 sq ft | 18 | 15 |
| Auriga B - Tower B | 3BHK | 109.68 sq m · 1,181 sq ft | 36 | 31 |
| Auriga B - Tower B | 3BHK | 127.48 sq m · 1,372 sq ft | 4 | 1 |
| Auriga C - Tower C | 2BHK | 78.38 sq m · 844 sq ft | 24 | 24 |
| Auriga C - Tower C | 3BHK | 109.69 sq m · 1,181 sq ft | 30 | 27 |
| Auriga C - Tower C | 3BHK DUPLEX | 132.64 sq m · 1,428 sq ft | 3 | 0 |
| Auriga D - Tower D | 2BHK | 78.38 sq m · 844 sq ft | 24 | 23 |
| Auriga D - Tower D | 3BHK | 109.69 sq m · 1,181 sq ft | 30 | 18 |
| Auriga D - Tower D | 3BHK DUPLEX | 132.64 sq m · 1,428 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 240 filings listed on MahaRERA's project page
Finance
- PAN CardPan Dilip Tupe.pdf · uploaded 20 Mar 2024Source
Legal
- Legal Title reportTitle Report Astrana Phase 1.pdf · uploaded 20 Mar 2024Source
- Declaration Form BForm B Astrana.pdf · uploaded 20 Mar 2024Source
- Other – LegalRegistered POA_compressed.pdf · uploaded 31 Mar 2024Source
- Other – LegalDECLARATION NEW 3.pdf · uploaded 1 Apr 2024Source
- Other – LegalDeclaration regarding Revenue share 1 .pdf · uploaded 2 Apr 2024Source
- Other – LegalRevenue Share Decalaration (1).pdf · uploaded 21 Feb 2025Source
Show all 241 documentsShow fewer documents
Legal
- OthersASTRANA DEVIATION 5.pdf · uploaded 13 Aug 2025Source
Migrated
- 1 PAN CardPan Dilip Tupe.pdf · uploaded 20 Mar 2024Source
- 1 Copy of the legal title reportTitle Report Astrana Phase 1.pdf · uploaded 20 Mar 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentdoc01326920240318143357.pdf · uploaded 20 Mar 2024Source
- 1 Declaration in FORM BForm B Astrana.pdf · uploaded 20 Mar 2024Source
- 1 Proforma of Allotment letterAllotment Letter Astrana.pdf · uploaded 20 Mar 2024Source
- 1 Deviation Report with respect to Allotment letterallottment deviation.pdf · uploaded 20 Mar 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance legal and finance.pdf · uploaded 22 Mar 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrance legal and finance.pdf · uploaded 22 Mar 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank account details.pdf · uploaded 22 Mar 2024Source
- 1 Other – TechnicalPOA.pdf · uploaded 22 Mar 2024Source
- 1 Building Plan Approval / NA Order for plotted development2 layout 1_19 BuildPlan.pdf · uploaded 23 Mar 2024Source
- 2 Building Plan Approval / NA Order for plotted development1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 23 Mar 2024Source
- 3 Building Plan Approval / NA Order for plotted development7-19_compressed.pdf · uploaded 23 Mar 2024Source
- 4 Building Plan Approval / NA Order for plotted development8-19_compressed.pdf · uploaded 23 Mar 2024Source
- 5 Building Plan Approval / NA Order for plotted development10-19_compressed.pdf · uploaded 23 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted development11-19_compressed.pdf · uploaded 23 Mar 2024Source
- 7 Building Plan Approval / NA Order for plotted development14-19_compressed.pdf · uploaded 23 Mar 2024Source
- 8 Building Plan Approval / NA Order for plotted development15-19_compressed.pdf · uploaded 23 Mar 2024Source
- 9 Building Plan Approval / NA Order for plotted development16-19_compressed.pdf · uploaded 23 Mar 2024Source
- 1 Deviation Report with respect to model copy of AgreementNEW DEVIATION AFS REVISED.pdf · uploaded 27 Mar 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 28 Mar 2024Source
- 1 CERSAI detailsCERSAI report Declaration-output.pdf · uploaded 28 Mar 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Chartered Accountant's Certificate _compressed.pdf · uploaded 28 Mar 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST ASTRANA FINAL.pdf · uploaded 28 Mar 2024Source
- 2 Other – TechnicalOrder 50 ASTRANA.pdf · uploaded 28 Mar 2024Source
- 1 Declaration about Commencement CertificateDD about CC 2.pdf · uploaded 31 Mar 2024Source
- 1 Proforma of Agreement for sale1 Proforma of Agreement for sale REVISED.pdf · uploaded 31 Mar 2024Source
- 1 Other – LegalRegistered POA_compressed.pdf · uploaded 31 Mar 2024Source
- 2 Other – LegalDECLARATION NEW 3.pdf · uploaded 1 Apr 2024Source
- 3 Other – LegalDeclaration regarding Revenue share 1 .pdf · uploaded 2 Apr 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ASTRANA ARCHITECH Certificate .pdf · uploaded 19 Jul 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ATSRANA Engg certificate .pdf · uploaded 19 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryDBT Bulding Wise.pdf · uploaded 19 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)ASTRANA CA certificate .pdf · uploaded 19 Jul 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same2 Project Information (1).pdf · uploaded 19 Jul 2024Source
- 2 Deviation Report with respect to model copy of Agreementnew payment schedule.pdf · uploaded 19 Jul 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout 1.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 for C D.pdf · uploaded 17 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (1)_.pdf · uploaded 17 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate (FORM 2) for RERA.pdf · uploaded 17 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentcc revised.pdf · uploaded 17 Oct 2024Source
- 17 Building Plan Approval / NA Order for plotted developmentlayout 18.pdf · uploaded 17 Oct 2024Source
- 16 Building Plan Approval / NA Order for plotted developmentlayout 17.pdf · uploaded 17 Oct 2024Source
- 15 Building Plan Approval / NA Order for plotted developmentlayout 16.pdf · uploaded 17 Oct 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentlayout 15.pdf · uploaded 17 Oct 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentlayout 14.pdf · uploaded 17 Oct 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentlayout 13.pdf · uploaded 17 Oct 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentlayout 12.pdf · uploaded 17 Oct 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentlayout 11.pdf · uploaded 17 Oct 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentlayout 10.pdf · uploaded 17 Oct 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentlayout 9.pdf · uploaded 17 Oct 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentlayout 8.pdf · uploaded 17 Oct 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentlayout 7.pdf · uploaded 17 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentlayout 6.pdf · uploaded 17 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentLayout 5.pdf · uploaded 17 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentlayout 4.pdf · uploaded 17 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentlayout 3.pdf · uploaded 17 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentlayout 2.pdf · uploaded 17 Oct 2024Source
- 2 Disclosure of sold/ booked inventorysold unsold_.pdf · uploaded 17 Oct 2024Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Format D.pdf · uploaded 17 Oct 2024Source
- 1 Other – Technicalorder 50.pdf · uploaded 17 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation New.pdf · uploaded 17 Oct 2024Source
- 2 Other – TechnicalRERA astrana declaration.pdf · uploaded 24 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Astrana FORM 1.pdf · uploaded 16 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Astrana FORM 3.pdf · uploaded 16 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Astrana FORM 2.pdf · uploaded 16 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryASTRANA sold unsold_compressed.pdf · uploaded 16 Jan 2025Source
- 1 Other – LegalRevenue Share Decalaration (1).pdf · uploaded 21 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)GetUserDocumentFileContent (31).pdf · uploaded 25 Mar 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentdoc08806720250324203316_rotated.pdf · uploaded 25 Mar 2025Source
- 9 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 25 Mar 2025Source
- 18 Building Plan Approval / NA Order for plotted development18.pdf · uploaded 25 Mar 2025Source
- 17 Building Plan Approval / NA Order for plotted development17.pdf · uploaded 25 Mar 2025Source
- 16 Building Plan Approval / NA Order for plotted development16.pdf · uploaded 25 Mar 2025Source
- 15 Building Plan Approval / NA Order for plotted development15.pdf · uploaded 25 Mar 2025Source
- 14 Building Plan Approval / NA Order for plotted development14_compressed.pdf · uploaded 25 Mar 2025Source
- 13 Building Plan Approval / NA Order for plotted development13.pdf · uploaded 25 Mar 2025Source
- 12 Building Plan Approval / NA Order for plotted development12_compressed.pdf · uploaded 25 Mar 2025Source
- 11 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 25 Mar 2025Source
- 10 Building Plan Approval / NA Order for plotted development10_compressed.pdf · uploaded 25 Mar 2025Source
- 8 Building Plan Approval / NA Order for plotted development8_compressed.pdf · uploaded 25 Mar 2025Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 25 Mar 2025Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 25 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted development5 (5)_rotated_compressed.pdf · uploaded 25 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted development4 (1)_compressed.pdf · uploaded 25 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted development3 (1)_compressed.pdf · uploaded 25 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted development2 (2)_compressed.pdf · uploaded 25 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted development1 _2__1__compressed.pdf · uploaded 25 Mar 2025Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Format D__removed.pdf · uploaded 25 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ASTRANA Form 1 (2).pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ASTRANA Form 3.pdf · uploaded 17 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ASTRANA Form 2.pdf · uploaded 17 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryAstrana (15)_compressed.pdf · uploaded 22 Apr 2025Source
- Form 1FORM 1 ASTRANA June 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 1FORM 1 ASTRANA Sep 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 1FORM 1 ASTRANA Dec 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 1FORM 1 ASTRANA March 2025 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 2FORM 2 ASTRANA June 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 2FORM 2 ASTRANA Sep 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 2FORM 2 ASTRANA Dec 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 2FORM 2 ASTRANA March 2025 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 3FORM 3 ASTRANA June 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 3FORM 3 ASTRANA Sep 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 3FORM 3 ASTRANA Dec 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 3FORM 3 ASTRANA March 2025 Quarter.pdf · uploaded 7 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold declaration ASTRANA June 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold declaration Sep 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Disclosure of Sold and Booked Inventorysold unsold declaration ASTRANA Dec 2024 Quarter.pdf · uploaded 7 Jul 2025Source
- Disclosure of Sold and Booked Inventorysold unsold declaration ASTRANA March 2025 Quarter.pdf · uploaded 7 Jul 2025Source
- Form 1Form 1 - Astrana as on June 2025.pdf · uploaded 22 Jul 2025Source
- Form 2Form 2 - Astrana as on June 2025.pdf · uploaded 22 Jul 2025Source
- Form 3Form 3 - Astrana as on June 2025.pdf · uploaded 22 Jul 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Astrana as on June 2025.pdf · uploaded 22 Jul 2025Source
- Withdrawal Update Form 1Form 1 - Astrana as on Sep 2025.pdf · uploaded 13 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Astrana as on Sep 2025.pdf · uploaded 13 Jan 2026Source
- Withdrawal Update Form 3Form 3 - Astrana as on Sep 2025.pdf · uploaded 13 Jan 2026Source
- Withdrawal Update Form 1Form 1 - Astrana as on Dec 2025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Astrana as on Dec 2025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 - Astrana as on Dec 2025.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Form 1 Astrana Mar 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2 Astrana Mar 26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3 Astrana Mar 26_compressed.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1FORM 1 ASTRANA.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 2FORM 2 ASTRANA.pdf · uploaded 17 Jul 2026Source
- Withdrawal Update Form 3FORM 3 ASTRANA.pdf · uploaded 17 Jul 2026Source
- Form 2A (FY 2025-2026)Astarana Form 2A(2025-26).pdf · uploaded 10 Aug 2026Source
- Form 5 (FY 2024-2025)ASTRANA FORM - 5 of 2024-25.pdf · uploaded 19 Aug 2026Source
Technical
- Other – TechnicalPOA.pdf · uploaded 22 Mar 2024Source
- Document8-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document2 layout 1_19 BuildPlan.pdf · uploaded 23 Mar 2024Source
- Document10-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document11-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document14-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document15-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document16-19_compressed.pdf · uploaded 23 Mar 2024Source
- Document1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 23 Mar 2024Source
- Document7-19_compressed.pdf · uploaded 23 Mar 2024Source
- DocumentLayout.pdf · uploaded 28 Mar 2024Source
- Other – TechnicalOrder 50 ASTRANA.pdf · uploaded 28 Mar 2024Source
- DocumentLayout 1.pdf · uploaded 17 Oct 2024Source
- Documentlayout 2.pdf · uploaded 17 Oct 2024Source
- Documentlayout 3.pdf · uploaded 17 Oct 2024Source
- Documentlayout 4.pdf · uploaded 17 Oct 2024Source
- DocumentLayout 5.pdf · uploaded 17 Oct 2024Source
- Documentlayout 6.pdf · uploaded 17 Oct 2024Source
- Documentlayout 7.pdf · uploaded 17 Oct 2024Source
- Documentlayout 8.pdf · uploaded 17 Oct 2024Source
- Documentlayout 9.pdf · uploaded 17 Oct 2024Source
- Documentlayout 10.pdf · uploaded 17 Oct 2024Source
- Documentlayout 11.pdf · uploaded 17 Oct 2024Source
- Documentlayout 12.pdf · uploaded 17 Oct 2024Source
- Documentlayout 13.pdf · uploaded 17 Oct 2024Source
- Documentlayout 14.pdf · uploaded 17 Oct 2024Source
- Documentlayout 15.pdf · uploaded 17 Oct 2024Source
- Documentlayout 16.pdf · uploaded 17 Oct 2024Source
- Documentlayout 17.pdf · uploaded 17 Oct 2024Source
- Documentlayout 18.pdf · uploaded 17 Oct 2024Source
- Other – Technicalorder 50.pdf · uploaded 17 Oct 2024Source
- Other – TechnicalRERA astrana declaration.pdf · uploaded 24 Oct 2024Source
- DocumentGetUserDocumentFileContent (31).pdf · uploaded 25 Mar 2025Source
- Document1 _2__1__compressed.pdf · uploaded 25 Mar 2025Source
- Document2 (2)_compressed.pdf · uploaded 25 Mar 2025Source
- Document3 (1)_compressed.pdf · uploaded 25 Mar 2025Source
- Document4 (1)_compressed.pdf · uploaded 25 Mar 2025Source
- Document5 (5)_rotated_compressed.pdf · uploaded 25 Mar 2025Source
- Document6.pdf · uploaded 25 Mar 2025Source
- Document7.pdf · uploaded 25 Mar 2025Source
- Document8_compressed.pdf · uploaded 25 Mar 2025Source
- Document9.pdf · uploaded 25 Mar 2025Source
- Document10_compressed.pdf · uploaded 25 Mar 2025Source
- Document11.pdf · uploaded 25 Mar 2025Source
- Document12_compressed.pdf · uploaded 25 Mar 2025Source
- Document13.pdf · uploaded 25 Mar 2025Source
- Document14_compressed.pdf · uploaded 25 Mar 2025Source
- Document15.pdf · uploaded 25 Mar 2025Source
- Document16.pdf · uploaded 25 Mar 2025Source
- Document17.pdf · uploaded 25 Mar 2025Source
- Document18.pdf · uploaded 25 Mar 2025Source
- Document1-23 - Highlighted.pdf · uploaded 29 Sep 2025Source
- Document2-23.pdf · uploaded 29 Sep 2025Source
- Document3-23.pdf · uploaded 29 Sep 2025Source
- Document4-23.pdf · uploaded 29 Sep 2025Source
- Document5-23.pdf · uploaded 29 Sep 2025Source
- Document6-23.pdf · uploaded 29 Sep 2025Source
- Document7-23.pdf · uploaded 29 Sep 2025Source
- Document22-23.pdf · uploaded 29 Sep 2025Source
- Document23-23.pdf · uploaded 29 Sep 2025Source
- Document8-23 - TA.pdf · uploaded 29 Sep 2025Source
- Document9-23 - TA.pdf · uploaded 29 Sep 2025Source
- Document10-23 - TB.pdf · uploaded 29 Sep 2025Source
- Document11-23 - TB.pdf · uploaded 29 Sep 2025Source
- Document12-23 - TC.pdf · uploaded 29 Sep 2025Source
- Document13-23 - TC.pdf · uploaded 29 Sep 2025Source
- Document14-23 - TD.pdf · uploaded 29 Sep 2025Source
- Document15-23 - TD.pdf · uploaded 29 Sep 2025Source
- Document16-23 - TE.pdf · uploaded 29 Sep 2025Source
- Document17-23 - TE.pdf · uploaded 29 Sep 2025Source
- Document18-23 - TE.pdf · uploaded 29 Sep 2025Source
- DocumentPlan Page No 1 (2).pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 2.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 3.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 4.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 5.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 6.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 7.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 8.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 9.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 10.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 11.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 12.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 13.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 14.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 15.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 16.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 17.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 18.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 19.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 20.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 21.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 22.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 23.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 24.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 25.pdf · uploaded 23 Sep 2026Source
- DocumentPlan Page No 26.pdf · uploaded 23 Sep 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Hadapsar, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 Meters DP Road
- South
- Sr No 209 P
- East
- 24 Meters DP Road
- West
- Sr No 207 P and Sr No 208 1B P
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Engineer | Neha Balasaheb Bhakare | — |
Source: MahaRERA project page. Contact details are not shown.