Hexa Towers Wing D

Certificate Signed

Dudulgaon, Pune 412105 |Promoter: Dml Associates

Residential / Group HousingRERAP52100046361
22 Jun 2022Registered with MahaRERA
31 Oct 2026Promised completion
1Building
139Units registered95 booked (68%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, LANDOWNER 1 BHK, LANDOWNER 2 BHK139 units in all
Address
Gat Number 219 And 221, Dudulgaon, Gat Number 219 And 221(P), Opposite Medas Touch Hotel, Dudulgaon, Moshi, DudulgaonPIN 412105
Designated bank account
109
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.68348, 73.87071
Hexa Towers Wing D is at latitude 18.68348, longitude 73.87071.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Oct 2026

Registered
22 Jun 2022
Promised
31 Oct 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210004636122 Jun 202231 Oct 202631 Oct 2026Dml AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing D14139

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

95 of 139 units booked (68%), as the promoter reported to MahaRERA

1BHK · 11 units2BHK · 85 unitsLANDOWNER 1 BHK · 2 unitsLANDOWNER 2 BHK · 41 units
TypeCarpet areaUnitsBooked
1BHK37.97 sq m · 409 sq ft1110
2BHK43.81 sq m · 472 sq ft55
2BHK44.33 sq m · 477 sq ft66
2BHK46.12 sq m · 496 sq ft1010
2BHK46.29 sq m · 498 sq ft11
2BHK46.67 sq m · 502 sq ft99
2BHK46.84 sq m · 504 sq ft11
2BHK48.12 sq m · 518 sq ft1111
Show all 24 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK48.12 sq m · 518 sq ft1111
2BHK48.45 sq m · 522 sq ft88
2BHK48.71 sq m · 524 sq ft22
2BHK50.71 sq m · 546 sq ft2020
2BHK50.89 sq m · 548 sq ft11
LANDOWNER 1 BHK37.97 sq m · 409 sq ft20
LANDOWNER 2 BHK43.81 sq m · 472 sq ft60
LANDOWNER 2 BHK44.33 sq m · 477 sq ft60
LANDOWNER 2 BHK44.5 sq m · 479 sq ft10
LANDOWNER 2 BHK46.12 sq m · 496 sq ft20
LANDOWNER 2 BHK46.67 sq m · 502 sq ft30
LANDOWNER 2 BHK48.12 sq m · 518 sq ft130
LANDOWNER 2 BHK48.45 sq m · 522 sq ft40
LANDOWNER 2 BHK48.63 sq m · 523 sq ft10
LANDOWNER 2 BHK50.71 sq m · 546 sq ft40
LANDOWNER 2 BHK50.89 sq m · 548 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 209 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardFirm PAN Card.pdf · uploaded 17 Jun 2022Source

Legal

  • Legal Title reportSearch_Report-1-11[1].pdf · uploaded 17 Jun 2022Source
  • Legal Title reportSearch_Report-12-20[1].pdf · uploaded 17 Jun 2022Source
  • Legal Title reportSearch_Report-21-29[1].pdf · uploaded 17 Jun 2022Source
  • Legal Title reportSearch_Report-30-37[1].pdf · uploaded 17 Jun 2022Source
  • Declaration Form BForm B DML Associates_compressed.pdf · uploaded 17 Jun 2022Source
Show all 211 documentsShow fewer documents

Migrated

  • 1 PAN CardFirm PAN Card.pdf · uploaded 17 Jun 2022Source
  • 1 Copy of the legal title reportSearch_Report-1-11[1].pdf · uploaded 17 Jun 2022Source
  • 2 Copy of the legal title reportSearch_Report-12-20[1].pdf · uploaded 17 Jun 2022Source
  • 3 Copy of the legal title reportSearch_Report-21-29[1].pdf · uploaded 17 Jun 2022Source
  • 4 Copy of the legal title reportSearch_Report-30-37[1].pdf · uploaded 17 Jun 2022Source
  • 1 Details of encumbrancesNo Encumbrance.pdf · uploaded 17 Jun 2022Source
  • 1 Copy of Layout Approval (in case of layout)1-14.pdf · uploaded 17 Jun 2022Source
  • 1 Building Plan Approval / NA Order for plotted development8-14 D.pdf · uploaded 17 Jun 2022Source
  • 2 Building Plan Approval / NA Order for plotted development7-14 D.pdf · uploaded 17 Jun 2022Source
  • 3 Building Plan Approval / NA Order for plotted development9-14 D.pdf · uploaded 17 Jun 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOM certificate.pdf · uploaded 17 Jun 2022Source
  • 1 Declaration about Commencement CertificateC C Declaration.pdf · uploaded 17 Jun 2022Source
  • 1 Declaration in FORM BForm B DML Associates_compressed.pdf · uploaded 17 Jun 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)D Form 1 architecture certificate.pdf · uploaded 17 Jun 2022Source
  • 1 CERSAI detailsCersai Undertaking.pdf · uploaded 17 Jun 2022Source
  • 2 CERSAI detailsCERSAI Search Report.pdf · uploaded 17 Jun 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 Jun 2022Source
  • 1 Proforma of Allotment letterANNEXURE 1.pdf · uploaded 17 Jun 2022Source
  • 2 Proforma of Allotment letterAGREEMENT TO SALE DRAFT.pdf · uploaded 17 Jun 2022Source
  • 2 Copy of Layout Approval (in case of layout)Copy Of Approval Layout_11zon.pdf · uploaded 10 Dec 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentnew C C.pdf · uploaded 10 Dec 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentIMG_136_compressed.pdf · uploaded 12 Dec 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentIMG_139_11zon.pdf · uploaded 12 Dec 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentIMG_141_11zon.pdf · uploaded 12 Dec 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentIMG_142_11zon.pdf · uploaded 12 Dec 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentIMG_143_11zon.pdf · uploaded 12 Dec 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentIMG_144_11zon.pdf · uploaded 12 Dec 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentIMG_145_11zon.pdf · uploaded 12 Dec 2022Source
  • 11 Building Plan Approval / NA Order for plotted developmentIMG_146_11zon.pdf · uploaded 12 Dec 2022Source
  • 12 Building Plan Approval / NA Order for plotted developmentIMG_147_11zon.pdf · uploaded 12 Dec 2022Source
  • 13 Building Plan Approval / NA Order for plotted developmentIMG_148_11zon.pdf · uploaded 12 Dec 2022Source
  • 14 Building Plan Approval / NA Order for plotted developmentIMG_149_11zon.pdf · uploaded 12 Dec 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentnew C C.pdf · uploaded 22 Aug 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Aug 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)D form 1 30-6-2023.pdf · uploaded 22 Aug 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)D form 2 30-6-2023.pdf · uploaded 22 Aug 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 22 Aug 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)D Wing 3 30-06-2023.pdf · uploaded 22 Aug 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 upload.pdf · uploaded 6 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 upload.pdf · uploaded 6 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Dec 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Dec 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 upload.pdf · uploaded 6 Dec 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Dec 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Dec 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2.pdf · uploaded 6 Dec 2024Source
  • 6 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 10 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 9 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 8 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 7 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 5 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 4 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 3 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 2 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 1 Disclosure of sold/ booked inventorySold circular.pdf · uploaded 6 Dec 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2A D Wing 22-23_11zon.pdf · uploaded 6 Dec 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form2A D Wing 23-24_11zon.pdf · uploaded 6 Dec 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 D wing.pdf · uploaded 10 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 upload.pdf · uploaded 10 Dec 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 D.pdf · uploaded 10 Dec 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 upload.pdf · uploaded 10 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 D.pdf · uploaded 10 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 10 Dec 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FOrm 2.pdf · uploaded 10 Dec 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02.pdf · uploaded 10 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 10 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02.pdf · uploaded 10 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 02 q1.pdf · uploaded 10 Dec 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 upload.pdf · uploaded 10 Dec 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentE AND D WING OCCUPANCY CERTIFICATE.pdf · uploaded 10 Dec 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)D wing Form 5 2022-23 scannned.pdf · uploaded 13 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)D wing Form 5 2023-24 Scaned.pdf · uploaded 13 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2223 D.pdf · uploaded 14 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 17 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A 2023-24.pdf · uploaded 17 Feb 2025Source
  • Form 5 (FY 2024-2025)Form 5 FY 24-25.pdf · uploaded 25 Nov 2025Source
  • Form 1Form 1 upload.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1 upload.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1 upload.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1 Q2.pdf · uploaded 4 Jun 2026Source
  • Form 1Form 1 Q2.pdf · uploaded 4 Jun 2026Source
  • Form 2FORM 02 FINAL.pdf · uploaded 4 Jun 2026Source
  • Form 2FORM 02.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2.pdf · uploaded 4 Jun 2026Source
  • Form 2FORM 02.pdf · uploaded 4 Jun 2026Source
  • Form 2FOrm 2.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 2Form 2 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 D.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 Q4 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 upload.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 D.pdf · uploaded 4 Jun 2026Source
  • Form 3Form 3 D.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 4 Jun 2026Source
  • Form 5 (FY 2022-2023)D wing Form 5 2022-23 scannned.pdf · uploaded 4 Jun 2026Source
  • Form 5 (FY 2023-2024)D wing Form 5 2023-24 Scaned.pdf · uploaded 4 Jun 2026Source
  • Form 2A (FY 2022-2023)Form 2A upload.pdf · uploaded 7 Jul 2026Source
  • Form 2A (FY 2023-2024)Form 2A upload.pdf · uploaded 7 Jul 2026Source
  • Form 2A (FY 2024-2025)Form 2A upload.pdf · uploaded 7 Jul 2026Source
  • Form 1Form 1 Q2.pdf · uploaded 24 Jul 2026Source
  • Form 2Form 2 upload.pdf · uploaded 24 Jul 2026Source
  • Form 3Form 3 D.pdf · uploaded 24 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold circular.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Q2.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 2 upload.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 2 upload.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 2 upload.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 2 upload.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 29 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 29 Jul 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_compressed.pdf · uploaded 29 Jul 2026Source
  • Occupational CertificateD and E WING OCCUPANCY CERTIFICATE.pdf · uploaded 18 Aug 2026Source
  • Occupational CertificateHIghlighted layout and parking upload.pdf · uploaded 18 Aug 2026Source
  • Occupational Certificate14 Sept 2023 Layout.pdf · uploaded 18 Aug 2026Source
  • Occupational CertificateCC 14 Sept 2023.pdf · uploaded 18 Aug 2026Source
  • Occupational CertificateLayout 13 June 2024 upload.pdf · uploaded 18 Aug 2026Source
  • Occupational CertificateCC 13 June 2024.pdf · uploaded 18 Aug 2026Source

Technical

  • Document1-14.pdf · uploaded 17 Jun 2022Source
  • Document8-14 D.pdf · uploaded 17 Jun 2022Source
  • Document7-14 D.pdf · uploaded 17 Jun 2022Source
  • Document9-14 D.pdf · uploaded 17 Jun 2022Source
  • DocumentCopy Of Approval Layout_11zon.pdf · uploaded 10 Dec 2022Source
  • DocumentIMG_136_compressed.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_139_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_141_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_142_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_143_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_144_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_145_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_146_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_147_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_148_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentIMG_149_11zon.pdf · uploaded 12 Dec 2022Source
  • DocumentHIghlighted layout and parking upload.pdf · uploaded 29 Jul 2026Source

Technical (Architect)

  • DocumentForm 1 upload.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1 upload.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1 upload.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1 Q2.pdf · uploaded 6 Dec 2024Source
  • DocumentForm 1.pdf · uploaded 14 Feb 2025Source
  • DocumentFORM 1.pdf · uploaded 29 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 02 q1.pdf · uploaded 10 Dec 2024Source
  • DocumentFORM 02.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2.pdf · uploaded 10 Dec 2024Source
  • DocumentFORM 02.pdf · uploaded 10 Dec 2024Source
  • DocumentFOrm 2.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentForm 2 upload.pdf · uploaded 10 Dec 2024Source
  • DocumentFORM 2.pdf · uploaded 29 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dudulgaon, Haveli taluka

Survey, CTS, gat or plot numbers

221(P)GAT NUMBER 219

Boundaries

North
Gat Number 222
South
Gat Number 220 And 198
East
Gat Number 234
West
18 Meter Wide Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin R. Patel—
Chartered accountantBankim Patel & Associates—
Chartered accountantNitish Vaidya—
EngineerGaurav D Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology