Amorapolis

Certificate Signed

Dhanori, Pune 411015 |Promoter: Krisna Nirmaan Skyscraper LLP

27 Nov 2018Registered with MahaRERAFirst of 3 registrations
30 May 2023Promised completionLatest across registrations
3Buildings3 phases
208Units registered207 booked (100%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
RERA registrations
3
Phases
3
Buildings
3
Unit types
2BHK, 3BHK, 1BHK, 2 BHK, 3 BHK208 units in all
Address
12/4, Adjacent To Porwal Road, PunePIN 411015
Designated bank account
109
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.60200, 73.90600
Amorapolis is at latitude 18.60200, longitude 73.90600.

Also registered as

Amorapolis B WingAmorapolis A WingAmorapolis C Wing

Registered transactions

830 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.

All 830 records
Registered transactions in this project
RegisteredUnitTypeConsideration₹ / sq.ftDocument
Oct 2026Rental₹50–55k—
Oct 2026
Bldg Name · Unit D-1005
Rental₹65–70k—
Oct 2026
Bldg Name · Unit F-603
Rental₹55–60k—
Oct 2026
Bldg Name · Unit F-302
Rental₹50–55k—
Sep 2026
Bldg Name · Unit D-902
Rental₹45–50k—
Sep 2026Rental₹50–55k—
Sep 2026
Bldg Name · Unit E-305
Rental₹70–75k—
Sep 2026Rental₹1–1.25 L—
Sep 2026
Bldg Name · Unit F1102
Rental₹50–55k—
Sep 2026Rental₹55–60k—
Sep 2026
Bldg Name · Unit E-1205
Rental₹70–75k—
Sep 2026
Bldg Name · Unit F-606
Rental₹60–65k—
Sep 2026
Bldg Name · Unit E-1003
Rental₹70–75k—
Aug 2026
Bldg Name · Unit D301
Rental₹50–55k—
Aug 2026
Bldg Name · Unit D
Rental₹60–65k—
Aug 2026
Bldg इ
Resale₹1–1.25 Cr≈ ₹12,500
Aug 2026
Bldg Name · Unit F-1001
Rental₹50–55k—
Aug 2026
Bldg Name · Unit G-1004
Rental₹60–65k—
Aug 2026
Bldg Name · Unit H-303
Rental₹65–70k—
Aug 2026
Bldg Name · Unit D-1103
Rental₹75–80k—
Aug 2026
Bldg Name · Unit 702
Rental₹40–45k—
Aug 2026Rental₹50–55k—
Jul 2026
Bldg Name · Unit E-1302
Rental₹60–65k—
Jul 2026Rental₹50–55k—
Jul 2026Rental₹60–65k—
Jul 2026
Bldg Name · Unit G-904
Rental₹10–15k—
Jul 2026Rental₹50–55k—
Jul 2026
Mortgage——
Jul 2026
Bldg Name · Unit D-706
Rental₹55–60k—
Jul 2026
Bldg Name · Unit F-602
Rental₹70–75k—
Jun 2026
Unit E
Rental₹50–55k—
Jun 2026Rental₹60–65k—
Jun 2026
Mortgage——
Jun 2026
Bldg Name · Unit F
Rental₹50–55k—
Jun 2026
Bldg Name · Unit Flat
Rental₹40–45k—
Jun 2026Rental₹15–20k—
Jun 2026
Bldg Name · Unit FLAT
Rental₹60–65k—
Jun 2026Rental₹50–55k—
May 2026Rental₹55–60k—
May 2026
Bldg Name · Unit H-102
Rental₹50–55k—
May 2026
Bldg Name · Unit E
Rental₹80–85k—
May 2026
Bldg Name · Unit F-201
Rental₹50–55k—
May 2026Rental₹60–65k—
May 2026
Bldg Name · Unit 1101
Rental₹60–65k—
May 2026
Amorapolis A
Rental₹50–55k—
May 2026Rental₹50–55k—
May 2026
Bldg Name · Unit F-203
Rental₹60–65k—
May 2026
Bldg Name · Unit H-204
Rental₹50–55k—
May 2026
Bldg Name · Unit F
Rental₹50–55k—
May 2026
Bldg Name · Unit F
Rental₹50–55k—

Amorapolis in numbers

Registered deals, summarised

Deedo has 830 registered documents at Amorapolis, from Apr 2019 to Oct 2026: 453 sales, 334 leave and licence agreements, 35 mortgages. The median registered sale works out to about ₹8,100 per sq ft, at a median of ₹65 L a deal; 2% of sales were resales.

What is the price per sq ft at Amorapolis?
The median registered sale works out to about ₹8,100 per sq ft, at a median of ₹65 L a deal; 2% of sales were resales.
How many properties have been sold at Amorapolis?
453 sales are registered at Amorapolis, 10 of them resales.
Are properties at Amorapolis rented out?
Yes: 334 leave and licence agreements are registered at Amorapolis.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amorapolis by Deedo, last updated with deals registered in Oct 2026.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

P52100018687

The latest completion date on record passed 3 years and 10 months ago.

Registered
27 Nov 2018
Promised
30 Dec 2022

Completion promised for 30 Dec 2022

P52100018864

The latest completion date on record passed 3 years and 10 months ago.

Registered
6 Dec 2018
Promised
30 Dec 2022

Completion promised for 30 May 2023

P52100021001

The latest completion date on record passed 3 years and 5 months ago.

Registered
27 May 2019
Promised
30 May 2023

3 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001868727 Nov 201830 Dec 202230 Dec 2022Krisna Nirmaan Skyscraper LLPProject page
P521000188646 Dec 201830 Dec 202230 Dec 2022Krisna Nirmaan Skyscraper LLPProject page
P5210002100127 May 201930 May 202330 May 2023Krisna Nirmaan Skyscraper LLPProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Amorapolis A1778
Amorapolis B Wing1752
Amorapolis C Wing1778

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

207 of 208 units booked (100%), as the promoter reported to MahaRERA

2BHK · 76 units3BHK · 52 units1BHK · 2 units2 BHK · 26 units3 BHK · 52 units
RERABuildingTypeCarpet areaUnitsBooked
P52100018864Amorapolis A2BHK64.06 sq m · 690 sq ft2626
P52100018864Amorapolis A3BHK92.91 sq m · 1,000 sq ft5252
P52100018687Amorapolis B Wing1BHK44.04 sq m · 474 sq ft21
P52100018687Amorapolis B Wing2BHK65.2 sq m · 702 sq ft5050
P52100021001Amorapolis C Wing2 BHK64.18 sq m · 691 sq ft2626
P52100021001Amorapolis C Wing3 BHK93.13 sq m · 1,002 sq ft5252

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

3 documents held by Deedo, 108 filings listed on MahaRERA's project page

Registration certificate (3)

  • Registration certificateP52100021001 · 8 Sep 2021ViewSource
  • Registration certificateP52100018687 · 9 Sep 2021ViewSource
  • Registration certificateP52100018864 · 9 Sep 2021ViewSource

Legal

  • Declaration Form BP52100018864 · form B.pdf · uploaded 19 Nov 2018Source
  • Declaration Form BP52100018687 · form B.pdf · uploaded 19 Nov 2018Source
  • Legal Title reportP52100018687 · 2.pdf · uploaded 19 Nov 2018Source
  • Legal Title reportP52100018864 · title search report 240R (1).pdf · uploaded 5 Dec 2018Source
  • Declaration Form BP52100021001 · form b.pdf · uploaded 20 May 2019Source
Show all 111 documentsShow fewer documents

Legal

  • Legal Title reportP52100021001 · TITLE SEARCH.pdf · uploaded 20 May 2019Source

Migrated

  • 1 Details of encumbrancesP52100018864 · Declaration for encumbarance.pdf · uploaded 19 Nov 2018Source
  • 1 Copy of Layout Approval (in case of layout)P52100018864 · layout 01-07.pdf · uploaded 19 Nov 2018Source
  • 1 Building Plan Approval (IOD)P52100018864 · IOD 01-02.pdf · uploaded 19 Nov 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100018864 · cc.pdf · uploaded 19 Nov 2018Source
  • 1 Declaration in FORM BP52100018864 · form B.pdf · uploaded 19 Nov 2018Source
  • 1 Proforma of Allotment letterP52100018864 · ALLOTMENT LETTER temp.pdf · uploaded 19 Nov 2018Source
  • 1 Copy of the legal title reportP52100018687 · 2.pdf · uploaded 19 Nov 2018Source
  • 1 Details of encumbrancesP52100018687 · Declaration for encumbarance.pdf · uploaded 19 Nov 2018Source
  • 1 Copy of Layout Approval (in case of layout)P52100018687 · layout 01-07.pdf · uploaded 19 Nov 2018Source
  • 1 Building Plan Approval (IOD)P52100018687 · IOD 01-02.pdf · uploaded 19 Nov 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100018687 · cc.pdf · uploaded 19 Nov 2018Source
  • 1 Declaration in FORM BP52100018687 · form B.pdf · uploaded 19 Nov 2018Source
  • 1 Proforma of Allotment letterP52100018687 · ALLOTMENT LETTER temp.pdf · uploaded 19 Nov 2018Source
  • 1 Certificates of CA (Form 3)P52100018864 · Building A form 3 amorapolis (1).pdf · uploaded 20 Nov 2018Source
  • 1 Certificates of CA (Form 3)P52100018687 · Building B form 3 amorapolis (1).pdf · uploaded 20 Nov 2018Source
  • 1 Copy of the legal title reportP52100018864 · title search report 240R (1).pdf · uploaded 5 Dec 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018864 · A building.pdf · uploaded 20 May 2019Source
  • 2 Certificates of CA (Form 3)P52100018864 · Form 3 - Krishna Buil-A Revised.pdf · uploaded 20 May 2019Source
  • 1 Copy of the legal title reportP52100021001 · TITLE SEARCH.pdf · uploaded 20 May 2019Source
  • 1 Details of encumbrancesP52100021001 · declaration.pdf · uploaded 20 May 2019Source
  • 1 Copy of Layout Approval (in case of layout)P52100021001 · IOD 01-02.pdf · uploaded 20 May 2019Source
  • 1 Building Plan Approval (IOD)P52100021001 · building proposed plan 01-07.pdf · uploaded 20 May 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100021001 · commencement certificate.pdf · uploaded 20 May 2019Source
  • 1 Declaration in FORM BP52100021001 · form b.pdf · uploaded 20 May 2019Source
  • 1 Certificates of CA (Form 3)P52100021001 · Form 3 - Krishna LLP Build C.pdf · uploaded 20 May 2019Source
  • 1 Proforma of Allotment letterP52100021001 · ALLOTMENT LETTER temp.pdf · uploaded 20 May 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018687 · B building.pdf · uploaded 20 May 2019Source
  • 2 Certificates of CA (Form 3)P52100018687 · Form 3 - Krishna Buil_B Revised.pdf · uploaded 20 May 2019Source
  • 1 Form 2AP52100018864 · IMG_20190621_0001.pdf · uploaded 22 Jun 2019Source
  • 1 Form 2AP52100018687 · IMG_20190621_0001.pdf · uploaded 22 Jun 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018864 · form 2 a building.pdf · uploaded 21 Aug 2019Source
  • 2 Form 2AP52100018864 · form 2 quality certificate.pdf · uploaded 21 Aug 2019Source
  • 3 Certificates of CA (Form 3)P52100018864 · Amorapolis A Building.pdf · uploaded 21 Aug 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018687 · form 2 b building.pdf · uploaded 21 Aug 2019Source
  • 2 Form 2AP52100018687 · form 2 quality certificate.pdf · uploaded 21 Aug 2019Source
  • 3 Certificates of CA (Form 3)P52100018687 · Amorapolis B Building.pdf · uploaded 21 Aug 2019Source
  • 4 Certificates of CA (Form 3)P52100018864 · FORM 3 A BUILDING.pdf · uploaded 1 Feb 2020Source
  • 2 Certificates of CA (Form 3)P52100021001 · FORM 3 C BUILDING.pdf · uploaded 1 Feb 2020Source
  • 4 Certificates of CA (Form 3)P52100018687 · form 3 b building.pdf · uploaded 1 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100018864 · form 5 A BUILDING.pdf · uploaded 5 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100018687 · FORM 5 B BUILDING.pdf · uploaded 5 Feb 2020Source
  • 5 Certificates of CA (Form 3)P52100018864 · a.pdf · uploaded 6 Nov 2020Source
  • 6 Certificates of CA (Form 3)P52100018864 · A Building Form 3 Q1.pdf · uploaded 6 Nov 2020Source
  • 7 Certificates of CA (Form 3)P52100018864 · A Building Form 3 Q2.pdf · uploaded 6 Nov 2020Source
  • 3 Certificates of CA (Form 3)P52100021001 · c.pdf · uploaded 6 Nov 2020Source
  • 4 Certificates of CA (Form 3)P52100021001 · C Wing Rera form 3 Q1.pdf · uploaded 6 Nov 2020Source
  • 5 Certificates of CA (Form 3)P52100021001 · C Building Form 3 Q2.pdf · uploaded 6 Nov 2020Source
  • 5 Certificates of CA (Form 3)P52100018687 · b.pdf · uploaded 6 Nov 2020Source
  • 6 Certificates of CA (Form 3)P52100018687 · B Wing Rera form 3 Q1.pdf · uploaded 6 Nov 2020Source
  • 7 Certificates of CA (Form 3)P52100018687 · B Building Form 3 Q2.pdf · uploaded 6 Nov 2020Source
  • 3 Form 2AP52100018864 · Form 2A - March 2021.pdf · uploaded 19 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100018864 · Form 2A - December 2020.pdf · uploaded 19 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021001 · Form 2A - March 2021.pdf · uploaded 19 May 2021Source
  • 3 Form 2AP52100018687 · Form 2A - December 2020.pdf · uploaded 19 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100018687 · Form 2A - March 2021.pdf · uploaded 19 May 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100018864 · A Wing.pdf · uploaded 16 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021001 · C Wing.pdf · uploaded 16 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100018687 · B Wing.pdf · uploaded 16 Jun 2021Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100018864 · Amorapolis completion cert ABC.pdf · uploaded 23 May 2022Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)P52100018864 · DocScanner 23 May 2022 17-56.pdf · uploaded 23 May 2022Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100021001 · Amorapolis completion cert ABC.pdf · uploaded 23 May 2022Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100018687 · Amorapolis completion cert ABC.pdf · uploaded 23 May 2022Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)P52100018687 · DocScanner 23 May 2022 17-56.pdf · uploaded 23 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100018864 · KNSL FORM 5 A.pdf · uploaded 23 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100018864 · KNSL A Building.pdf · uploaded 23 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100018687 · KNSL FORM 5 B.pdf · uploaded 23 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100018687 · KNSL B BUILDING 2122.pdf · uploaded 23 Feb 2023Source
  • 4 Form 2AP52100018864 · A Wing.pdf · uploaded 17 May 2023Source
  • 8 Certificates of CA (Form 3)P52100018864 · FY2223 Q3 A WING.pdf · uploaded 17 May 2023Source
  • 6 Certificates of CA (Form 3)P52100021001 · C Wing.pdf · uploaded 17 May 2023Source
  • 7 Certificates of CA (Form 3)P52100021001 · FY2223 Q3 C WING.pdf · uploaded 17 May 2023Source
  • 8 Certificates of CA (Form 3)P52100018687 · B Wing.pdf · uploaded 17 May 2023Source
  • 9 Certificates of CA (Form 3)P52100018687 · FY2223 Q3 B WING.pdf · uploaded 17 May 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018864 · FORM 2 - 02-05-2023 a wing.pdf · uploaded 15 Jul 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100018687 · FORM 2 b wing.pdf · uploaded 15 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100018864 · 2nd page A Wing.pdf · uploaded 30 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021001 · signed Form 5 C Wing.pdf · uploaded 30 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100018687 · signed Form 5 B Wing.pdf · uploaded 30 Sep 2023Source
  • 1 Other – TechnicalP52100021001 · Form 4 A B C Wing.pdf · uploaded 18 Oct 2023Source
  • 2 Other – TechnicalP52100021001 · Occupancy Certificate A B C Wing.pdf · uploaded 18 Oct 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100018864 · signed Form 5 A Wing.pdf · uploaded 30 Nov 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100018864 · Form 2A KNSL A Wing FY 21-22.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100018864 · Form 2A KNSL A Wing FY 22-23.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021001 · Form 2A KNSL C Wing FY 19-20.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021001 · Form 2A KNSL C Wing FY 21-22.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100021001 · Form 2A KNSL C Wing FY 22-23.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100018687 · Form 2A KNSL B Wing FY 21-22.pdf · uploaded 6 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100018687 · Form 2A KNSL B Wing FY 22-23.pdf · uploaded 6 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100018864 · KNSL A Wing - Sold Booked Inventory.pdf · uploaded 8 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100021001 · KNSL C Wing - Sold Booked Inventory.pdf · uploaded 8 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100018687 · KNSL B Wing - Sold Booked Inventory.pdf · uploaded 8 Jan 2024Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)P52100021001 · 1 Architect’s Certificate on Completion of Project (Form 4).pdf · uploaded 30 Jan 2024Source

Technical

  • DocumentP52100018864 · IOD 01-02.pdf · uploaded 19 Nov 2018Source
  • DocumentP52100018864 · layout 01-07.pdf · uploaded 19 Nov 2018Source
  • DocumentP52100018687 · IOD 01-02.pdf · uploaded 19 Nov 2018Source
  • DocumentP52100018687 · layout 01-07.pdf · uploaded 19 Nov 2018Source
  • DocumentP52100021001 · IOD 01-02.pdf · uploaded 20 May 2019Source
  • DocumentP52100021001 · building proposed plan 01-07.pdf · uploaded 20 May 2019Source
  • Other – TechnicalP52100021001 · Form 4 A B C Wing.pdf · uploaded 18 Oct 2023Source
  • Other – TechnicalP52100021001 · Occupancy Certificate A B C Wing.pdf · uploaded 18 Oct 2023Source

Technical (Engineer)

  • DocumentP52100018864 · FORM 2 - 02-05-2023 a wing.pdf · uploaded 15 Jul 2023Source
  • DocumentP52100018687 · FORM 2 b wing.pdf · uploaded 15 Jul 2023Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dhanori

Survey, CTS, gat or plot numbers

12/412/4P

Boundaries

North
Open Space
South
Internal Road
East
Building C
West
Building A

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
Architectcubix architect—P52100021001
ArchitectCubix Architect Associates—P52100018864
ArchitectCubix Architect Associates—P52100018687
Chartered accountantCA Sumit Chandwani—P52100021001
Chartered accountantCA Sumit Chandwani—P52100018864
Chartered accountantCA Sumit Chandwani—P52100018687
EngineerSpectrum Consultans—P52100021001
EngineerSpectrum Consultants—P52100018864
Show all 15 professionalsShow fewer professionals
RoleNameRegistration no.RERA
EngineerSpectrum Consultants—P52100018687
Registered real estate agentAmit Satpal Gogia—P52100018687
Registered real estate agentNikhil Uttamrao Nazirkar—P52100018864
Registered real estate agentRakesh Kumar Maurya—P52100021001
Registered real estate agentSagar Mohan Nanaware—P52100018864
Registered real estate agentSagar Mohan Nanaware—P52100018687
Registered real estate agentTayjasvini Ujjainawaal—P52100018864

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology