Vistara
Certificate SignedChikhali, Pune 412114 |Promoter: Buildstrong Estate Realtors LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, Shop74 units in all
- Address
- Gat No 1150, Newale Vasti, , ChikhaliPIN 412114
- Designated bank account
- 82
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
4 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 22 Jun 2026 | A | Rental | ≈ ₹50,000 | — | |
| 4 May 2026 | Rental | ≈ ₹30,000 | — | ||
| 13 Apr 2026 | Rental | ≈ ₹40,000 | — | ||
| 25 Feb 2026 | Bldg Name · Unit FLAT | Rental | ≈ ₹50,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 6 months
The latest completion date on record passed 3 years and 4 months ago.
- Registered
- 25 Sep 2019
- Promised
- 30 Dec 2022
- Revised
- 30 Jun 2023
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100022491 | 25 Sep 2019 | 30 Dec 2022 | 30 Jun 2023 | Buildstrong Estate Realtors LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| A | 11 | 74 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
74 of 74 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 44.29 sq m · 477 sq ft | 4 | 4 |
| 2BHK | 44.33 sq m · 477 sq ft | 4 | 4 |
| 2BHK | 44.63 sq m · 480 sq ft | 4 | 4 |
| 2BHK | 44.7 sq m · 481 sq ft | 4 | 4 |
| 2BHK | 46.26 sq m · 498 sq ft | 5 | 5 |
| 2BHK | 46.62 sq m · 502 sq ft | 4 | 4 |
| 2BHK | 47.34 sq m · 510 sq ft | 5 | 5 |
| 2BHK | 47.73 sq m · 514 sq ft | 4 | 4 |
Show all 19 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 50.55 sq m · 544 sq ft | 5 | 5 |
| 2BHK | 50.59 sq m · 545 sq ft | 5 | 5 |
| 2BHK | 52.89 sq m · 569 sq ft | 4 | 4 |
| 2BHK | 52.93 sq m · 570 sq ft | 4 | 4 |
| 2BHK | 53.74 sq m · 578 sq ft | 5 | 5 |
| 2BHK | 55.22 sq m · 594 sq ft | 5 | 5 |
| 2BHK | 56.01 sq m · 603 sq ft | 4 | 4 |
| 2BHK | 57.51 sq m · 619 sq ft | 4 | 4 |
| Shop | 22.44 sq m · 242 sq ft | 1 | 1 |
| Shop | 23.83 sq m · 257 sq ft | 1 | 1 |
| Shop | 28.07 sq m · 302 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardBuildstrong.pdf · uploaded 22 Sep 2020Source
Legal
- Legal Title reportTitle Certificate - Vistara.pdf · uploaded 10 Sep 2019Source
- Declaration Form BDeclaration.pdf · uploaded 10 Sep 2019Source
- OtherSTP NOC from Drainage dept_1-10-2021.pdf · uploaded 31 Mar 2022Source
- OtherForm 2A FY 21 22 q4.pdf · uploaded 11 Apr 2022Source
- OtherDeclaration for Incorrect CC.pdf · uploaded 31 May 2022Source
Show all 128 documentsShow fewer documents
Legal
- OtherFY 2223 Q1 FORM 2A QAC.pdf · uploaded 11 Jul 2022Source
- OtherGE 162_BSR_Form 5_21-22.pdf · uploaded 17 Sep 2022Source
- OtherFY 2223 Q2 FORM 2A QAC.pdf · uploaded 13 Oct 2022Source
- OtherFY 2223 Q3 FORM 2A QAC.pdf · uploaded 12 Jan 2023Source
- OtherFY 2223 Q4 FORM 2A QC.pdf · uploaded 8 Apr 2023Source
- OtherForm 2A FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
Migrated
- 1 Copy of the legal title reportTitle Certificate - Vistara.pdf · uploaded 10 Sep 2019Source
- 1 Details of encumbrancesEncumbrances Certificate.pdf · uploaded 10 Sep 2019Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 10 Sep 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentFloor Plan 1.pdf · uploaded 10 Sep 2019Source
- 2 Building Plan Approval / NA Order for plotted developmentFloor Plan.pdf · uploaded 10 Sep 2019Source
- 1 Declaration in FORM BDeclaration.pdf · uploaded 10 Sep 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vistara Form 2.pdf · uploaded 10 Sep 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Vistara.pdf · uploaded 10 Sep 2019Source
- 1 Proforma of Allotment letterAllotment Letter Draft.pdf · uploaded 10 Sep 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Chikhali.pdf · uploaded 14 Sep 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 23 Sep 2019Source
- 1 PAN CardBuildstrong.pdf · uploaded 22 Sep 2020Source
- 2 Copy of Layout Approval (in case of layout)0001.pdf · uploaded 22 Sep 2020Source
- 3 Building Plan Approval / NA Order for plotted development0002.pdf · uploaded 22 Sep 2020Source
- 4 Building Plan Approval / NA Order for plotted development0003.pdf · uploaded 22 Sep 2020Source
- 5 Building Plan Approval / NA Order for plotted development0004.pdf · uploaded 22 Sep 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 22 Sep 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Buildstrong_Vistara_Plinth_certificate (2).pdf · uploaded 26 Mar 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form_1_July_21.pdf · uploaded 26 Jul 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_1_July_21.pdf · uploaded 19 Aug 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (June 2021).pdf · uploaded 19 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Rera Certificate_Vistara_13082021.pdf · uploaded 19 Aug 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_13-10-2021.pdf · uploaded 16 Oct 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_01-10-2021.pdf · uploaded 16 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (Sept 2021).pdf · uploaded 16 Oct 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_02-10-2021.pdf · uploaded 16 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_03-01-2022.pdf · uploaded 5 Mar 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_05-01-2022.pdf · uploaded 5 Mar 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_Q3_Oct 19 to Dec 19.pdf · uploaded 19 Mar 2022Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_Q4_Jan 20 to March 20.pdf · uploaded 19 Mar 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Q1_April 20 to June 20.pdf · uploaded 19 Mar 2022Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Q2_July 20 to Sept 20.pdf · uploaded 19 Mar 2022Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Q3_Oct 20 to Dec 20.pdf · uploaded 19 Mar 2022Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Q4_Jan 21 to March 21.pdf · uploaded 19 Mar 2022Source
- 3 Copy of Layout Approval (in case of layout)Revised Layout 1.pdf · uploaded 23 Mar 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentRevised Layout 2 (4 files merged).pdf · uploaded 23 Mar 2022Source
- 3 Commencement Certificates / NA Order for plotted development20211026164727.pdf · uploaded 23 Mar 2022Source
- 1 Declaration about Commencement CertificateDeclaration of Commencement Certificate 1.pdf · uploaded 23 Mar 2022Source
- 2 Declaration about Commencement CertificateDeclaration of Commencement Certificate 2.pdf · uploaded 23 Mar 2022Source
- 3 Declaration about Commencement CertificateDeclaration of Commencement Certificate 3.pdf · uploaded 23 Mar 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-RERA.pdf · uploaded 23 Mar 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_01102020.pdf · uploaded 23 Mar 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_02012021.pdf · uploaded 23 Mar 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_08042021.pdf · uploaded 23 Mar 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_23062021.pdf · uploaded 23 Mar 2022Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_24072021.pdf · uploaded 23 Mar 2022Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_28102021.pdf · uploaded 23 Mar 2022Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_30112021.pdf · uploaded 23 Mar 2022Source
- 1 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 23 Mar 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_24-07-2021.pdf · uploaded 23 Mar 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_05-10-2020.pdf · uploaded 23 Mar 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_16-01-2021.pdf · uploaded 23 Mar 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_14-04-2021.pdf · uploaded 23 Mar 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_17-03-2020.pdf · uploaded 23 Mar 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200233263931_For_Debtor_Based_Search_24_03_2022_12_12_00_070.pdf · uploaded 24 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)GE 458 Buildstrong Estate Realtors.pdf · uploaded 24 Mar 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)GE 459 Buildstrong Estate Realtors.pdf · uploaded 24 Mar 2022Source
- 1 OtherSTP NOC from Drainage dept_1-10-2021.pdf · uploaded 31 Mar 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_09-12-2019.pdf · uploaded 6 Apr 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_18-06-2020.pdf · uploaded 6 Apr 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_13-03-2020.pdf · uploaded 6 Apr 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_24-03-2021.pdf · uploaded 6 Apr 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_24-09-2020.pdf · uploaded 6 Apr 2022Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_24-12-2020.pdf · uploaded 6 Apr 2022Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_07-04-2022.pdf · uploaded 8 Apr 2022Source
- 2 OtherForm 2A FY 21 22 q4.pdf · uploaded 11 Apr 2022Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_08-04-2022.pdf · uploaded 12 Apr 2022Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_09-04-2022.pdf · uploaded 12 Apr 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCommencement Certificate dtd 09-09-2020.pdf · uploaded 4 May 2022Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Inventory 18-05-2022.pdf · uploaded 18 May 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Vistara Society Registration Certificate.pdf · uploaded 18 May 2022Source
- 3 OtherDeclaration for Incorrect CC.pdf · uploaded 31 May 2022Source
- 5 Commencement Certificates / NA Order for plotted developmentDeclaration for Incorrect CC.pdf · uploaded 3 Jun 2022Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)FY 2223 Q1 FORM 1 AC_Revised.pdf · uploaded 11 Jul 2022Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FY 2223 Q1 FORM 2 EC.pdf · uploaded 11 Jul 2022Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FY 2223 Q1 FORM 3 CAC .pdf · uploaded 11 Jul 2022Source
- 4 OtherFY 2223 Q1 FORM 2A QAC.pdf · uploaded 11 Jul 2022Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory 11-07-2022.pdf · uploaded 14 Jul 2022Source
- 5 OtherGE 162_BSR_Form 5_21-22.pdf · uploaded 17 Sep 2022Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)FY 2223 Q2 FORM 1 AC .pdf · uploaded 13 Oct 2022Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)FY 2223 Q2 FORM 2 EC .pdf · uploaded 13 Oct 2022Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FY 2223 Q2 FORM 3 CAC .pdf · uploaded 13 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)GE 162_BSR_Form 5_21-22.pdf · uploaded 13 Oct 2022Source
- 6 OtherFY 2223 Q2 FORM 2A QAC.pdf · uploaded 13 Oct 2022Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)FY 2223 Q3 FORM 1 AC .pdf · uploaded 12 Jan 2023Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)FY 2223 Q3 FORM 2 EC.pdf · uploaded 12 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A FY 21 22 q4.pdf · uploaded 12 Jan 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)FY 2223 Q3 FORM 3 CAC .pdf · uploaded 12 Jan 2023Source
- 7 OtherFY 2223 Q3 FORM 2A QAC.pdf · uploaded 12 Jan 2023Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Inventory 06-01-2023.pdf · uploaded 6 Feb 2023Source
- 2 CERSAI detailsCERSAI_Search_Report_200259670077_For_Debtor_Based_Search_06_02_2023_19_29_14_393.pdf · uploaded 6 Feb 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)FY 2223 Q4 FORM 1 AC.pdf · uploaded 7 Apr 2023Source
- 8 OtherFY 2223 Q4 FORM 2A QC.pdf · uploaded 8 Apr 2023Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)FY 2223 Q4 FORM 2 EC.pdf · uploaded 10 Apr 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FY 2223 Q4 FORM 3.pdf · uploaded 10 Apr 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC_Vistara.pdf · uploaded 26 Jun 2023Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4_LDG Letter.pdf · uploaded 26 Jun 2023Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
- 9 OtherForm 2A FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)GE 162_BSR_Form 5_22-23.pdf · uploaded 3 Oct 2023Source
Technical
- DocumentLayout.pdf · uploaded 10 Sep 2019Source
- DocumentFloor Plan 1.pdf · uploaded 10 Sep 2019Source
- DocumentFloor Plan.pdf · uploaded 10 Sep 2019Source
- Document0001.pdf · uploaded 22 Sep 2020Source
- Document0002.pdf · uploaded 22 Sep 2020Source
- Document0003.pdf · uploaded 22 Sep 2020Source
- Document0004.pdf · uploaded 22 Sep 2020Source
- DocumentRevised Layout 1.pdf · uploaded 23 Mar 2022Source
- DocumentRevised Layout 2 (4 files merged).pdf · uploaded 23 Mar 2022Source
Technical (Architect)
- DocumentForm 1 FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
Technical (Engineer)
- DocumentForm 2 FY 23 24 Q1.pdf · uploaded 10 Jul 2023Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikhali, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat No 1152
- South
- Gat No 1149
- East
- 12 mtr wide road
- West
- Gat No 1151
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Landmark Design Group | — |
| Chartered accountant | CA Madhusudan Jhanwar | — |
| Chartered accountant | L B Laddha & Co | — |
| Engineer | G.A Bhilare consultants | — |
| Other | Pushkaraj Consultancy | — |
Source: MahaRERA project page. Contact details are not shown.