Shankeshwar Capital
Certificate SignedChikhali, Pune 412114 |Promoter: Nitin Chhaganlal Jain
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- —65 units in all
- Address
- GAT No. 524P, 526P, 527P, 528P, Jadhavwadi, ChikhaliPIN 412114
- Designated bank account
- 212
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 24 Jan 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100048864 | 24 Jan 2023 | 31 Dec 2027 | 30 Apr 2028 | Nitin Chhaganlal Jain | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building A | 14 | 65 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
65 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 65 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 156 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card - Nitin Sir.pdf · uploaded 6 Jan 2023Source
Legal
Migrated
- 1 PAN CardPan Card - Nitin Sir.pdf · uploaded 6 Jan 2023Source
- 1 Copy of the legal title reportSearch Title Report 18102022_compressed.pdf · uploaded 6 Jan 2023Source
- 1 a Details of encumbrances concerned to FinanceLegal Encumbrances.pdf · uploaded 6 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 6 Jan 2023Source
Show all 157 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalLegal Encumbrances.pdf · uploaded 6 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 6 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 6 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentIOD_compressed.pdf · uploaded 6 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentIOD 1_compressed.pdf · uploaded 6 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentIOD 2_compressed.pdf · uploaded 6 Jan 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentIOD 3_compressed.pdf · uploaded 6 Jan 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentIOD 4_compressed.pdf · uploaded 6 Jan 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentIOD 5_compressed.pdf · uploaded 6 Jan 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentIOD 6_compressed.pdf · uploaded 6 Jan 2023Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 6 Jan 2023Source
- 1 Declaration in FORM BForm B - SSP.pdf · uploaded 6 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate 03012023.pdf · uploaded 6 Jan 2023Source
- 1 CERSAI detailsCERSAI Report.pdf · uploaded 6 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure of Interest.pdf · uploaded 6 Jan 2023Source
- 1 Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 6 Jan 2023Source
- 1 Proforma of Agreement for saleLatest Draft Agreement.pdf · uploaded 6 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Bank Account.pdf · uploaded 6 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report wrt Allotment Letter.pdf · uploaded 6 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_compressed.pdf · uploaded 7 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 16 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT (1).pdf · uploaded 19 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch quarterly update.pdf · uploaded 17 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 capital 22052023_compressed.pdf · uploaded 22 May 2023Source
- 2 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 24 Sep 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1_compressed.pdf · uploaded 24 Sep 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2_compressed.pdf · uploaded 24 Sep 2023Source
- 10 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3_compressed.pdf · uploaded 24 Sep 2023Source
- 11 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4_compressed.pdf · uploaded 24 Sep 2023Source
- 12 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5_compressed.pdf · uploaded 24 Sep 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6_compressed.pdf · uploaded 24 Sep 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7_compressed.pdf · uploaded 24 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 24 Sep 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Form 1.pdf · uploaded 20 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Form 1.pdf · uploaded 20 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate - Form 1.pdf · uploaded 20 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Shankeshwar Capital.pdf · uploaded 31 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate - From 2 30062023.pdf · uploaded 1 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate - From 2 30092023.pdf · uploaded 1 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate - From 2 31122023.pdf · uploaded 1 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 Final_compressed.pdf · uploaded 1 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 Final_compressed.pdf · uploaded 1 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 Final_compressed.pdf · uploaded 1 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Shankeshwar Capital Q4.pdf · uploaded 29 Jun 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Form 1.pdf · uploaded 12 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 12 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineer's Certificate For Quality Assurance FORM 2A.pdf · uploaded 13 Jul 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form t Shankeshwar Capital.pdf · uploaded 15 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSP CA CERTIFICATE Q1.pdf · uploaded 3 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SSP CA CERTIFICATE Q2.pdf · uploaded 3 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital 30 06 24.pdf · uploaded 24 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital 30 09 24.pdf · uploaded 24 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Capital 31 12 24.pdf · uploaded 24 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01 07 24 Capital.pdf · uploaded 25 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 dt 30 09 24 Capital_compressed.pdf · uploaded 25 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA Certificate - Form 5 Dt 26 08 2024 Capital.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Form 3 Dt 12 03 2025 Shankeshwar Capital_compressed.pdf · uploaded 13 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate Form 2 Dt 31 12 2024 Shankeshwar Capital.pdf · uploaded 13 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Dt 01 04 2025 Shankeshwar Capital.pdf · uploaded 17 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Dt 31032025 - Shankeshwar Capital_compressed.pdf · uploaded 21 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2 - Dt 17042025 Shankeshwar Capital.pdf · uploaded 21 Apr 2025Source
- Form 5 (FY 2024-2025)form 5 with sign.pdf · uploaded 30 Sep 2025Source
- Form 5 (FY 2023-2024)form 5 with sign.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 1Architects Certificate - Form1 Dt 01-07-2025 Shankeshwar Capital (2).pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 1Architects Certificate - Form1 Dt 01-07-2025 Shankeshwar Capital (2).pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 2Engineers Certificate - Form 2 Date 30 06 2025 Shankeshwar Capital.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 2Engineers Certificate - Form 2 Date 30 06 2025 Shankeshwar Capital.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 3CA Certificate Form 3 Date30062025 Shankeshwar Capital.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 3CA Certificate Form 3 Date30062025 Shankeshwar Capital.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 2Form 2 Engineer Certificate - Capital Q2.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 3CA Certificate shree shankeshwar properties.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate - Capital Q3 OG.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 3CA Certificate Form 3 Dt 31-12-2025 Shankeshwar Capital.pdf · uploaded 24 Jan 2026Source
- Withdrawal Update Form 1Architects Certificate Form 1.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 2Engineers Certificate Form 2.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 3CA Certificate Form 3.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 1Architects Certificate Form 1.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate Form 2.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3CA Certificate Form 3 capital.pdf · uploaded 20 Jul 2026Source
- Form 5 (FY 2025-2026)Form 5 Shankeshwar Capital.pdf · uploaded 9 Sep 2026Source
- Form 2A (FY 2022-2023)Form 2A 22 23.pdf · uploaded 2 Oct 2026Source
- Form 2A (FY 2023-2024)Form 2A 23 24.pdf · uploaded 2 Oct 2026Source
- Form 2A (FY 2024-2025)Form 2A 24 25.pdf · uploaded 2 Oct 2026Source
- Form 2A (FY 2025-2026)Form 2A 25 26.pdf · uploaded 2 Oct 2026Source
Technical
- DocumentLayout_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 1_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 2_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 3_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 4_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 5_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentIOD 6_compressed.pdf · uploaded 6 Jan 2023Source
- DocumentLayout_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 1_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 2_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 3_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 4_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 5_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 6_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentBuilding Plan 7_compressed.pdf · uploaded 24 Sep 2023Source
- DocumentSheet No 1.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 2.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 3.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 4.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 6.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 7.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 8_11zon.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 9.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 11.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 12.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No 13.pdf · uploaded 20 Jun 2025Source
- DocumentSheet No- 1.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-2.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-3.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 4.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 5.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 6.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 7.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 8.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-9.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-10.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-11.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 12.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No-13.pdf · uploaded 14 Jul 2025Source
- DocumentSheet No- 1_11zon.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No- 2.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No- 3.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No- 4.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-5.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-6.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-7.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-8.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No- 9.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-10.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-11.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-12.pdf · uploaded 29 Nov 2025Source
- DocumentSheet No-13_11zon (1).pdf · uploaded 29 Nov 2025Source
Technical (Architect)
- DocumentForm 1 Capital 30 06 24.pdf · uploaded 24 Jan 2025Source
- DocumentForm 1 Capital 30 09 24.pdf · uploaded 24 Jan 2025Source
- DocumentForm 1 Capital 31 12 24.pdf · uploaded 24 Jan 2025Source
- DocumentArchitect's Certificate Dt 01 04 2025 Shankeshwar Capital.pdf · uploaded 17 Apr 2025Source
- DocumentArchitects Certificate Form 1.pdf · uploaded 20 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 01 07 24 Capital.pdf · uploaded 25 Jan 2025Source
- DocumentForm 2 dt 30 09 24 Capital_compressed.pdf · uploaded 25 Jan 2025Source
- DocumentEngineer's Certificate Form 2 Dt 31 12 2024 Shankeshwar Capital.pdf · uploaded 13 Mar 2025Source
- DocumentEngineers Certificate Form 2 - Dt 17042025 Shankeshwar Capital.pdf · uploaded 21 Apr 2025Source
- DocumentEngineers Certificate Form 2.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikhali, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18mtrs wide DP Road
- South
- Internal Road
- East
- 24mtrs wide DP Road
- West
- Property owned by Suresh Damu Jadhav - GAT No 529
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pramod S Shinde | — |
| Chartered accountant | Ganesh Mandlecha | — |
| Chartered accountant | NPSR & Associates - CA. Vivek N. Lahoti | — |
| Engineer | G. A. Bhilare Consultants Pvt. Ltd. | — |
| Engineer | Raghuveer jambhale | — |
| Other | Adv. Shrikant Keshav Kadam | — |
| Other | S R Design Hub | — |
Source: MahaRERA project page. Contact details are not shown.