North East Business Centre
Certificate SignedChikhali, Pune 411062 |Promoter: Shiv Properties
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Restaurant, Shop, Terrace102 units in all
- Address
- Plot No. 06 Gat No. 606 At Chikhali, Chikhali, ChikhaliPIN 411062
- Designated bank account
- 76
- Developed in phases
- No
Registered transactions
2 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 13 Feb 2026 | Primary sale | ≈ ₹16 L | ≈ ₹6,720 | ||
| 20 Jan 2026 | Primary sale | ≈ ₹11 L | ≈ ₹7,789 |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 11 Oct 2022
- Promised
- 30 Nov 2026
- Revised
- 30 Mar 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047204 | 11 Oct 2022 | 30 Nov 2026 | 30 Mar 2027 | Shiv Properties | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| North East Business Centre | 5 | 102 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
38 of 102 units booked (37%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Restaurant | 444.7 sq m · 4,787 sq ft | 1 | 0 |
| Shop | 11.28 sq m · 121 sq ft | 2 | 0 |
| Shop | 11.89 sq m · 128 sq ft | 2 | 1 |
| Shop | 12.94 sq m · 139 sq ft | 2 | 2 |
| Shop | 13.12 sq m · 141 sq ft | 14 | 8 |
| Shop | 19.34 sq m · 208 sq ft | 6 | 3 |
| Shop | 20.08 sq m · 216 sq ft | 1 | 1 |
| Shop | 20.09 sq m · 216 sq ft | 1 | 1 |
Show all 38 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 21.29 sq m · 229 sq ft | 1 | 1 |
| Shop | 21.71 sq m · 234 sq ft | 2 | 1 |
| Shop | 22.09 sq m · 238 sq ft | 1 | 0 |
| Shop | 22.12 sq m · 238 sq ft | 7 | 2 |
| Shop | 22.13 sq m · 238 sq ft | 6 | 4 |
| Shop | 27.3 sq m · 294 sq ft | 2 | 0 |
| Shop | 27.88 sq m · 300 sq ft | 6 | 0 |
| Shop | 30.72 sq m · 331 sq ft | 2 | 0 |
| Shop | 32.03 sq m · 345 sq ft | 1 | 0 |
| Shop | 32.36 sq m · 348 sq ft | 1 | 1 |
| Shop | 32.6 sq m · 351 sq ft | 1 | 0 |
| Shop | 32.67 sq m · 352 sq ft | 1 | 1 |
| Shop | 33 sq m · 355 sq ft | 1 | 1 |
| Shop | 34.53 sq m · 372 sq ft | 2 | 1 |
| Shop | 35.11 sq m · 378 sq ft | 8 | 5 |
| Shop | 35.12 sq m · 378 sq ft | 6 | 0 |
| Shop | 36.19 sq m · 390 sq ft | 1 | 0 |
| Shop | 36.29 sq m · 391 sq ft | 5 | 0 |
| Shop | 40.48 sq m · 436 sq ft | 1 | 0 |
| Shop | 43.74 sq m · 471 sq ft | 4 | 0 |
| Shop | 43.75 sq m · 471 sq ft | 3 | 1 |
| Shop | 44.71 sq m · 481 sq ft | 1 | 0 |
| Shop | 44.83 sq m · 483 sq ft | 3 | 0 |
| Shop | 45.36 sq m · 488 sq ft | 1 | 0 |
| Shop | 45.6 sq m · 491 sq ft | 1 | 0 |
| Shop | 46.7 sq m · 503 sq ft | 1 | 1 |
| Shop | 65.24 sq m · 702 sq ft | 1 | 1 |
| Shop | 65.26 sq m · 702 sq ft | 1 | 1 |
| Terrace | 53.59 sq m · 577 sq ft | 1 | 1 |
| Terrace | 61.6 sq m · 663 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 121 filings listed on MahaRERA's project page
Finance
- PAN CardSHIV PROPERTIES PAN.pdf · uploaded 1 Jul 2022Source
Legal
- Declaration Form BFORM B - Promoter.pdf · uploaded 1 Jul 2022Source
- Legal Title reportSEARCH REPORT 1.pdf · uploaded 19 Aug 2022Source
- Legal Title reportSR.pdf · uploaded 4 Oct 2022Source
- Declaration Form BNew FORM B.pdf · uploaded 22 May 2024Source
- OthersForm B for extension.pdf · uploaded 26 May 2025Source
Migrated
- 1 PAN CardSHIV PROPERTIES PAN.pdf · uploaded 1 Jul 2022Source
Show all 122 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)HPSC0077.pdf · uploaded 1 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC0078.pdf · uploaded 1 Jul 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC0079.pdf · uploaded 1 Jul 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentHPSC0080.pdf · uploaded 1 Jul 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentHPSC0081.pdf · uploaded 1 Jul 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentHPSC0081.pdf · uploaded 1 Jul 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentHPSC0082.pdf · uploaded 1 Jul 2022Source
- 7 Building Plan Approval / NA Order for plotted developmentHPSC0083.pdf · uploaded 1 Jul 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentHPSC0084.pdf · uploaded 1 Jul 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentHPSC0085.pdf · uploaded 1 Jul 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate _Centre.pdf · uploaded 1 Jul 2022Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 1 Jul 2022Source
- 1 Declaration in FORM BFORM B - Promoter.pdf · uploaded 1 Jul 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate_compressed.pdf · uploaded 13 Jul 2022Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance certificate.pdf · uploaded 27 Jul 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate Bank Account details.pdf · uploaded 27 Jul 2022Source
- 1 CERSAI detailsCERSAI - NORTH EAST BUSINESS CENTRE.pdf · uploaded 28 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Certificate - Legal.pdf · uploaded 12 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterDEVIATIO N REPORT WITH RESPECT TO ALLOTMENT LETTER.pdf · uploaded 12 Aug 2022Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION REPORT WITH RESPECT TO AGREEMENT TO SALE.pdf · uploaded 12 Aug 2022Source
- 1 Copy of the legal title reportSEARCH REPORT 1.pdf · uploaded 19 Aug 2022Source
- 1 Proforma of Allotment letterDRAFT AGREEMENT - AS PER RERA.pdf · uploaded 24 Aug 2022Source
- 2 Proforma of Allotment letterALLOTMENT LETTER - NEW.pdf · uploaded 15 Sep 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 22 Sep 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 1 Oct 2022Source
- 2 Copy of the legal title reportSR.pdf · uploaded 4 Oct 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A FORM - 3.pdf · uploaded 18 May 2024Source
- 2 Declaration in FORM BNew FORM B.pdf · uploaded 22 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect’s Certificate of Percentage of Completion of Work - Form 1.pdf · uploaded 22 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QUALITY ASSURANCE_DEC 2022.pdf · uploaded 22 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QUALITY ASSURANCE MAR2023.pdf · uploaded 22 May 2024Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY May 2024.pdf · uploaded 22 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 22 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 19 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold inventory(2).pdf · uploaded 19 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Engineer Certificate.pdf · uploaded 19 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form -5.pdf · uploaded 19 Feb 2025Source
- Form 1FY 23-24 1st Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 2FY 23-24 1st From 1 Eng Certificate.pdf · uploaded 23 May 2025Source
- Form 3FY 23-24 1st Qtr Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 23-24 1st Qtr Disclosure Sold unsold.pdf · uploaded 23 May 2025Source
- Form 1FY 23-24 2nd Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 2FY 23-24 2nd Qtr From 2.pdf · uploaded 23 May 2025Source
- Form 3FY 23-24 2nd Qtr Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 23-24 2nd Qtr Disclosure of Sold unsoald.pdf · uploaded 23 May 2025Source
- Form 1FY 23-24 3rd Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 2Form 2 · uploaded 23 May 2025Source
- Form 3FY 23-24 3rd Qtr Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 23-24 3rd Qtr Disclosure Sold unsold.pdf · uploaded 23 May 2025Source
- Form 1FY 23-24 4th Qtr ARCHITECTS CERTIFICA TE.pdf · uploaded 23 May 2025Source
- Form 2Form 2 ENGINEER'S CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 3FY 23-24 4th Qtr Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 23-24 4th Qtr Disclosure Sold undsold.pdf · uploaded 23 May 2025Source
- Form 1FY 22-23 4th Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 2FY 22-23 4th Qtr From - 2.pdf · uploaded 23 May 2025Source
- Form 3FY 22-23 4th Qtr Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 22-23 4th Qtr Disclosure of Sold unsold Inve.pdf · uploaded 23 May 2025Source
- Form 1FY 24-25 1st Form 1 ARCHITECTS CERTIFICATE.pdf · uploaded 23 May 2025Source
- Form 2FY 24-25 1st Form 2.pdf · uploaded 23 May 2025Source
- Form 31st Qtr 24-25 Form 3.pdf · uploaded 23 May 2025Source
- Disclosure of Sold and Booked InventoryFY 24-25 1st qtr Disclosure Sold unsold.pdf · uploaded 23 May 2025Source
- Form 1FY 24-25 2nd Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 26 May 2025Source
- Form 2FY 24-25 2nd Form 2.pdf · uploaded 26 May 2025Source
- Form 32nd Qtr 24-25 form 3 Signed.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked InventoryFY 24-25 2nd Qtr Disclosure sold unsold.pdf · uploaded 26 May 2025Source
- OthersQ 1.pdf · uploaded 26 May 2025Source
- Form 33rd Qtr 24-25 From 3 Signed.pdf · uploaded 26 May 2025Source
- Form 1FY 24-25 3rd Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 26 May 2025Source
- Form 2FY 24-25 3rd Form 2.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked InventoryFY 24-25 3rd Qtr Disclosure Sold unsold.pdf · uploaded 26 May 2025Source
- Form 1FY 24-25 4th Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 26 May 2025Source
- Form 2FY 24-25 4th Qtr Form 2.pdf · uploaded 26 May 2025Source
- Form 34th Qtr 24-25 From 3 Signed.pdf · uploaded 26 May 2025Source
- Disclosure of Sold and Booked InventoryFY 24-25 4th Qtr Disclosure Sold Unsold.pdf · uploaded 26 May 2025Source
- Form 2A (FY 2022-2023)2022-23.pdf · uploaded 26 May 2025Source
- Form 2A (FY 2023-2024)2023-24.pdf · uploaded 26 May 2025Source
- Form 5 (FY 2022-2023)2022-23.pdf · uploaded 26 May 2025Source
- Form 5 (FY 2023-2024)2023-24.pdf · uploaded 26 May 2025Source
- Withdrawal Update Form 1FY 24-25 4th Qtr ARCHITECTS CERTIFICATE.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 2FY 24-25 4th Qtr Form 2.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 34th Qtr 24-25 From 3 Signed.pdf · uploaded 30 May 2025Source
- Form 1Form 1 2022.pdf · uploaded 4 Jun 2025Source
- Form 2Form 2 2022.pdf · uploaded 4 Jun 2025Source
- Form 3Form 3 2022.pdf · uploaded 4 Jun 2025Source
- Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 4 Jun 2025Source
- Withdrawal Update Form 1Architects certificate.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 2Form2.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 3form 3 signed.pdf · uploaded 21 Jul 2025Source
- Withdrawal Update Form 1Form-1_compressed.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 3Form-3 Sign_compressed.pdf · uploaded 18 Oct 2025Source
- Withdrawal Update Form 1Architects Certificate.pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 2Engineers Certificate .pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 3CA Certificate .pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 1Form-1.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2Form-2.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3Form 3 - Sign.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1Form-1 Jun_26 Signed.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form-2 Jun_26 Sign.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form-3 Sign.pdf · uploaded 20 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A Shiv Properties.pdf · uploaded 3 Oct 2026Source
Technical
- DocumentHPSC0077.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0078.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0079.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0080.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0081.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0081.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0082.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0083.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0084.pdf · uploaded 1 Jul 2022Source
- DocumentHPSC0085.pdf · uploaded 1 Jul 2022Source
Technical (Architect)
Technical (Engineer)
- DocumentForm-2 Jun_26 Sign.pdf · uploaded 20 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikhali, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat No 606
- South
- 15 Mtr Internal Road
- East
- 30 Mtrs Main Road
- West
- 24 Sun Shine Residential Project
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Landmark Design Group Group | — |
| Chartered accountant | CA Dolly Gandhi | — |
| Chartered accountant | CA Navdeep Jindal and Associates | — |
| Chartered accountant | Sumeet Suresh Kate And Co | — |
| Engineer | G A Bhilare Consultants Pvt Ltd | — |
| Engineer | Rahul Mutha | — |
| Engineer | Zaheer Ahmed | — |
| Other | Shilpi Constructions | — |
Source: MahaRERA project page. Contact details are not shown.