Misty Park

Certificate Signed

Chikhali, Pune 411062 |Promoter: Pruthvi Developers

Residential / Group HousingRERAP52100051759
27 Jun 2023Registered with MahaRERA
31 Dec 2026Promised completion
1Building
81Units registered10 booked (12%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK81 units in all
Address
Gat No 741, Bagvasti, PatilnagarPIN 411062
Designated bank account
87
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.41313, 73.48423
Misty Park is at latitude 18.41313, longitude 73.48423.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
27 Jun 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005175927 Jun 202331 Dec 202631 Dec 2026Pruthvi DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building A1381

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 of 81 units booked (12%), as the promoter reported to MahaRERA

2BHK · 46 units3BHK · 35 units
TypeCarpet areaUnitsBooked
2BHK53 sq m · 570 sq ft10
2BHK53.35 sq m · 574 sq ft10
2BHK57.57 sq m · 620 sq ft222
2BHK63.21 sq m · 680 sq ft113
2BHK63.3 sq m · 681 sq ft110
3BHK67.03 sq m · 722 sq ft10
3BHK74.73 sq m · 804 sq ft10
3BHK77.57 sq m · 835 sq ft102
Show all 11 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
3BHK79.65 sq m · 857 sq ft111
3BHK82.35 sq m · 886 sq ft111
3BHK87.05 sq m · 937 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 149 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN Pruthvi Developers.pdf · uploaded 28 May 2023Source
  • OthersDeclaration about Cost Change.pdf · uploaded 17 Jun 2026Source

Legal

  • Legal Title reportTitle Report_compressed.pdf · uploaded 2 Jun 2023Source
  • Declaration Form BForm B.pdf · uploaded 2 Jun 2023Source

Migrated

  • 1 PAN CardPAN Pruthvi Developers.pdf · uploaded 28 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 29 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0002_compressed.pdf · uploaded 29 May 2023Source
Show all 150 documentsShow fewer documents

Migrated

  • 2 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0006_compressed.pdf · uploaded 29 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0003_compressed.pdf · uploaded 29 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0004_compressed.pdf · uploaded 29 May 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0005_compressed.pdf · uploaded 29 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevise Commencement Cert_compressed.pdf · uploaded 29 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of sep bank account.pdf · uploaded 29 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineerscert.pdf · uploaded 30 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineersqualityassurancecert_compressed.pdf · uploaded 30 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Revise ArchCert.pdf · uploaded 1 Jun 2023Source
  • 1 Proforma of Agreement for saleMisty Park - Rera draft Agreement Pruthvi Developers (25R).pdf · uploaded 1 Jun 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Rera draft Agreement Pruthvi Developers (25R).pdf · uploaded 1 Jun 2023Source
  • 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 2 Jun 2023Source
  • 1 a Details of encumbrances concerned to FinanceNon Encumbrance letter.pdf · uploaded 2 Jun 2023Source
  • 1 b Details of encumbrances concerned to LegalNon Encumbrance letter.pdf · uploaded 2 Jun 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentOld Commencement Cert.pdf · uploaded 2 Jun 2023Source
  • 1 Declaration about Commencement CertificateDeclarationaboutcoommencement.pdf · uploaded 2 Jun 2023Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 2 Jun 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_MistyPark.pdf · uploaded 2 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 CA cert.pdf · uploaded 2 Jun 2023Source
  • 1 Disclosure of sold/ booked inventorydisclosuresoldbookedinventory.pdf · uploaded 6 Jun 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosurerealestate.pdf · uploaded 6 Jun 2023Source
  • 1 Proforma of Allotment letterAllottmentletter.pdf · uploaded 6 Jun 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation of allottment letter.pdf · uploaded 6 Jun 2023Source
  • 2 CERSAI detailsCersai Declaration.pdf · uploaded 8 Jun 2023Source
  • 2 Deviation Report with respect to Allotment letterDeviationreportsheetallottmentletter.pdf · uploaded 15 Jun 2023Source
  • 2 Deviation Report with respect to model copy of AgreementDeviation sheets of agreement to sale of Misty Park.pdf · uploaded 15 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 6 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 6 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 6 Jan 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_2023-24_3rdQuarter.pdf · uploaded 29 Mar 2024Source
  • 2 Disclosure of sold/ booked inventorySold n Unsold inventory_23-24_Q3.pdf · uploaded 29 Mar 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q3.pdf · uploaded 29 Mar 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2_23-24_Q3.pdf · uploaded 10 Apr 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1_2023-24_Q4.pdf · uploaded 12 Apr 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_23-23_Q4.pdf · uploaded 16 May 2024Source
  • 3 Disclosure of sold/ booked inventorySold n Unsold Inventory_23-24_Q4.pdf · uploaded 16 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q4.pdf · uploaded 16 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 3_23-24_Q4.pdf · uploaded 14 Jun 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q4.pdf · uploaded 14 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_23-24_Q4.pdf · uploaded 14 Jun 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 25 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 25 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 25 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 25 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 25 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 25 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1.pdf · uploaded 24 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2.pdf · uploaded 24 Apr 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3.pdf · uploaded 24 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryPromoters Disclosure.pdf · uploaded 24 Apr 2025Source
  • 2 Disclosure of sold/ booked inventoryPromoters Dislosure.pdf · uploaded 24 Apr 2025Source
  • 3 Disclosure of sold/ booked inventoryPtromoter Disclosure.pdf · uploaded 24 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cer fORM 2.pdf · uploaded 12 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert Form 2.pdf · uploaded 12 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 12 May 2025Source
  • Form 1Q-1 2023-24_Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 1Q-3-2023-24- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 26 Jul 2025Source
  • Form 1Q-4-2023-24 Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 1Q-1,2024-25 - Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 1Q-2-2024-25-6 Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 1Form 1 Q4.pdf · uploaded 26 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 26 Jul 2025Source
  • Form 2Q-1-2023-24_Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 2Q-3-2023-24_Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 2Form 2 Q4 23-24.pdf · uploaded 26 Jul 2025Source
  • Form 2Q-1_2024-25_Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 2Q-2-2024-25_Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 2Final Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 2Form 2 FY 2024-25.pdf · uploaded 26 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 26 Jul 2025Source
  • Form 3Q1 FY 2023-24 Form 3.pdf · uploaded 26 Jul 2025Source
  • Form 3Q3 FY 2023-24 (Form 3).pdf · uploaded 26 Jul 2025Source
  • Form 3Q4 FY 2023-24 Form 3.pdf · uploaded 26 Jul 2025Source
  • Form 3Q1 FY 2024-25 Form 3.pdf · uploaded 26 Jul 2025Source
  • Form 3Q2_FY 2024-25_Form 3.pdf · uploaded 26 Jul 2025Source
  • Form 3Form 3 Final.pdf · uploaded 26 Jul 2025Source
  • Form 3Form 3 Final.pdf · uploaded 26 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ-1_2023-24-1 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ-3-2023-24-2 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ-4-203-24-3 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ-1-2024-25-4 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryQ-2-2024-25-5 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryPromoter Disclosure.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryPromoter dis.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked InventoryPromoter dis.pdf · uploaded 26 Jul 2025Source
  • Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Signed Form 1.pdf · uploaded 16 Sep 2025Source
  • Withdrawal Update Form 2Signed Form 2.pdf · uploaded 16 Sep 2025Source
  • Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 16 Sep 2025Source
  • Withdrawal Update Form 1Form1 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2Form2 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3Form 3 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 for FY 2024-25-Misty Park.pdf · uploaded 12 Jan 2026Source
  • Form 2A (FY 2024-2025)Form 2A for FY 2024-25.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 1Form 1 for FY 2025-26 Q3.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 2Form 2 for FY 2025-26 Q3.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 3Form 3 for FY 2025-26 Q3 - Misty Park.pdf · uploaded 10 Feb 2026Source
  • Form 2A (FY 2025-2026)Form 2A FY 2025-26 Q4 Final.pdf · uploaded 22 May 2026Source
  • Withdrawal Update Form 1Form 1 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 1Form 1 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 2Form 2 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 2Form 2 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 3Form 3 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 3Form 3 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 1Form 1 For FY 2026-27 Q1.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 2Form 2 FY 2026-27 Q1 Final.pdf · uploaded 28 Jul 2026Source
  • Withdrawal Update Form 3Form 3 FY 2026-27 Q1 Final.pdf · uploaded 28 Jul 2026Source
  • Occupational CertificateCompletion Certificate.pdf · uploaded 28 Jul 2026Source
  • Occupational CertificateSccreenshot of OC mail to RERA.pdf · uploaded 28 Jul 2026Source

Technical

  • DocumentLayout_compressed.pdf · uploaded 29 May 2023Source
  • DocumentMYSCAN_20221222_0002_compressed.pdf · uploaded 29 May 2023Source
  • DocumentMYSCAN_20221222_0006_compressed.pdf · uploaded 29 May 2023Source
  • DocumentMYSCAN_20221222_0003_compressed.pdf · uploaded 29 May 2023Source
  • DocumentMYSCAN_20221222_0004_compressed.pdf · uploaded 29 May 2023Source
  • DocumentMYSCAN_20221222_0005_compressed.pdf · uploaded 29 May 2023Source
  • Document1.pdf · uploaded 25 Mar 2025Source
  • Document2.pdf · uploaded 25 Mar 2025Source
  • Document3.pdf · uploaded 25 Mar 2025Source
  • Document4.pdf · uploaded 25 Mar 2025Source
  • Document5.pdf · uploaded 25 Mar 2025Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 24 Apr 2025Source
  • DocumentForm 1 For FY 2026-27 Q1.pdf · uploaded 28 Jul 2026Source

Technical (Engineer)

  • DocumentEng Cer fORM 2.pdf · uploaded 12 May 2025Source
  • DocumentEng Cert Form 2.pdf · uploaded 12 May 2025Source
  • DocumentFORM 2.pdf · uploaded 12 May 2025Source
  • DocumentForm 2 FY 2026-27 Q1 Final.pdf · uploaded 28 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chikhali, Haveli taluka

Survey, CTS, gat or plot numbers

GAT NO 741(P)

Boundaries

North
Property Of Mr Prakash Gadiya In Gat No 741
South
Property Of Mr Suresh Gadiya In Gat No 741
East
Property Of Mr Bag In Gat No 1670
West
Internal 12 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArcon Associates—
Chartered accountantPankaj Surana & Co.—
EngineerJijaba Revaji Khemnar—
EngineerPrashil Padalkar—
OtherMadhav Gore—
OtherUpendra Purandare—
Registered real estate agentBharatth Chavaan—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology