Misty Park
Certificate SignedChikhali, Pune 411062 |Promoter: Pruthvi Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK81 units in all
- Address
- Gat No 741, Bagvasti, PatilnagarPIN 411062
- Designated bank account
- 87
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 27 Jun 2023
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100051759 | 27 Jun 2023 | 31 Dec 2026 | 31 Dec 2026 | Pruthvi Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building A | 13 | 81 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
10 of 81 units booked (12%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 53 sq m · 570 sq ft | 1 | 0 |
| 2BHK | 53.35 sq m · 574 sq ft | 1 | 0 |
| 2BHK | 57.57 sq m · 620 sq ft | 22 | 2 |
| 2BHK | 63.21 sq m · 680 sq ft | 11 | 3 |
| 2BHK | 63.3 sq m · 681 sq ft | 11 | 0 |
| 3BHK | 67.03 sq m · 722 sq ft | 1 | 0 |
| 3BHK | 74.73 sq m · 804 sq ft | 1 | 0 |
| 3BHK | 77.57 sq m · 835 sq ft | 10 | 2 |
Show all 11 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 79.65 sq m · 857 sq ft | 11 | 1 |
| 3BHK | 82.35 sq m · 886 sq ft | 11 | 1 |
| 3BHK | 87.05 sq m · 937 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 149 filings listed on MahaRERA's project page
Finance
Legal
Show all 150 documentsShow fewer documents
Migrated
- 2 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0006_compressed.pdf · uploaded 29 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0003_compressed.pdf · uploaded 29 May 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0004_compressed.pdf · uploaded 29 May 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentMYSCAN_20221222_0005_compressed.pdf · uploaded 29 May 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentRevise Commencement Cert_compressed.pdf · uploaded 29 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of sep bank account.pdf · uploaded 29 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineerscert.pdf · uploaded 30 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineersqualityassurancecert_compressed.pdf · uploaded 30 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Revise ArchCert.pdf · uploaded 1 Jun 2023Source
- 1 Proforma of Agreement for saleMisty Park - Rera draft Agreement Pruthvi Developers (25R).pdf · uploaded 1 Jun 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Rera draft Agreement Pruthvi Developers (25R).pdf · uploaded 1 Jun 2023Source
- 1 Copy of the legal title reportTitle Report_compressed.pdf · uploaded 2 Jun 2023Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrance letter.pdf · uploaded 2 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance letter.pdf · uploaded 2 Jun 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentOld Commencement Cert.pdf · uploaded 2 Jun 2023Source
- 1 Declaration about Commencement CertificateDeclarationaboutcoommencement.pdf · uploaded 2 Jun 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 2 Jun 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_MistyPark.pdf · uploaded 2 Jun 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 CA cert.pdf · uploaded 2 Jun 2023Source
- 1 Disclosure of sold/ booked inventorydisclosuresoldbookedinventory.pdf · uploaded 6 Jun 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosurerealestate.pdf · uploaded 6 Jun 2023Source
- 1 Proforma of Allotment letterAllottmentletter.pdf · uploaded 6 Jun 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation of allottment letter.pdf · uploaded 6 Jun 2023Source
- 2 CERSAI detailsCersai Declaration.pdf · uploaded 8 Jun 2023Source
- 2 Deviation Report with respect to Allotment letterDeviationreportsheetallottmentletter.pdf · uploaded 15 Jun 2023Source
- 2 Deviation Report with respect to model copy of AgreementDeviation sheets of agreement to sale of Misty Park.pdf · uploaded 15 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 6 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 6 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 6 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_2023-24_3rdQuarter.pdf · uploaded 29 Mar 2024Source
- 2 Disclosure of sold/ booked inventorySold n Unsold inventory_23-24_Q3.pdf · uploaded 29 Mar 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q3.pdf · uploaded 29 Mar 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2_23-24_Q3.pdf · uploaded 10 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1_2023-24_Q4.pdf · uploaded 12 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_23-23_Q4.pdf · uploaded 16 May 2024Source
- 3 Disclosure of sold/ booked inventorySold n Unsold Inventory_23-24_Q4.pdf · uploaded 16 May 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q4.pdf · uploaded 16 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 3_23-24_Q4.pdf · uploaded 14 Jun 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_23-24_Q4.pdf · uploaded 14 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_23-24_Q4.pdf · uploaded 14 Jun 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 25 Mar 2025Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 25 Mar 2025Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 25 Mar 2025Source
- 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 25 Mar 2025Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 25 Mar 2025Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 25 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1.pdf · uploaded 24 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2.pdf · uploaded 24 Apr 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3.pdf · uploaded 24 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryPromoters Disclosure.pdf · uploaded 24 Apr 2025Source
- 2 Disclosure of sold/ booked inventoryPromoters Dislosure.pdf · uploaded 24 Apr 2025Source
- 3 Disclosure of sold/ booked inventoryPtromoter Disclosure.pdf · uploaded 24 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cer fORM 2.pdf · uploaded 12 May 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Cert Form 2.pdf · uploaded 12 May 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 12 May 2025Source
- Form 1Q-1 2023-24_Form 1.pdf · uploaded 26 Jul 2025Source
- Form 1Q-3-2023-24- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 26 Jul 2025Source
- Form 1Q-4-2023-24 Form 1.pdf · uploaded 26 Jul 2025Source
- Form 1Q-1,2024-25 - Form 1.pdf · uploaded 26 Jul 2025Source
- Form 1Q-2-2024-25-6 Form 1.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1 Q4.pdf · uploaded 26 Jul 2025Source
- Form 1Form 1.pdf · uploaded 26 Jul 2025Source
- Form 2Q-1-2023-24_Form 2.pdf · uploaded 26 Jul 2025Source
- Form 2Q-3-2023-24_Form 2.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2 Q4 23-24.pdf · uploaded 26 Jul 2025Source
- Form 2Q-1_2024-25_Form 2.pdf · uploaded 26 Jul 2025Source
- Form 2Q-2-2024-25_Form 2.pdf · uploaded 26 Jul 2025Source
- Form 2Final Form 2.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2 FY 2024-25.pdf · uploaded 26 Jul 2025Source
- Form 2Form 2.pdf · uploaded 26 Jul 2025Source
- Form 3Q1 FY 2023-24 Form 3.pdf · uploaded 26 Jul 2025Source
- Form 3Q3 FY 2023-24 (Form 3).pdf · uploaded 26 Jul 2025Source
- Form 3Q4 FY 2023-24 Form 3.pdf · uploaded 26 Jul 2025Source
- Form 3Q1 FY 2024-25 Form 3.pdf · uploaded 26 Jul 2025Source
- Form 3Q2_FY 2024-25_Form 3.pdf · uploaded 26 Jul 2025Source
- Form 3Form 3 Final.pdf · uploaded 26 Jul 2025Source
- Form 3Form 3 Final.pdf · uploaded 26 Jul 2025Source
- Form 3Form 3.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryQ-1_2023-24-1 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryQ-3-2023-24-2 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryQ-4-203-24-3 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryQ-1-2024-25-4 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryQ-2-2024-25-5 Disclosure of sold_ booked inventory.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryPromoter Disclosure.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryPromoter dis.pdf · uploaded 26 Jul 2025Source
- Disclosure of Sold and Booked InventoryPromoter dis.pdf · uploaded 26 Jul 2025Source
- Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Signed Form 1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Signed Form 2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Signed Form 1.pdf · uploaded 16 Sep 2025Source
- Withdrawal Update Form 2Signed Form 2.pdf · uploaded 16 Sep 2025Source
- Withdrawal Update Form 3Signed Form 3 Final.pdf · uploaded 16 Sep 2025Source
- Withdrawal Update Form 1Form1 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 2Form2 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 for Q2.pdf · uploaded 29 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 for FY 2024-25-Misty Park.pdf · uploaded 12 Jan 2026Source
- Form 2A (FY 2024-2025)Form 2A for FY 2024-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1Form 1 for FY 2025-26 Q3.pdf · uploaded 10 Feb 2026Source
- Withdrawal Update Form 2Form 2 for FY 2025-26 Q3.pdf · uploaded 10 Feb 2026Source
- Withdrawal Update Form 3Form 3 for FY 2025-26 Q3 - Misty Park.pdf · uploaded 10 Feb 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 2025-26 Q4 Final.pdf · uploaded 22 May 2026Source
- Withdrawal Update Form 1Form 1 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 1Form 1 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 2Form 2 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 2Form 2 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 3Form 3 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 3Form 3 FY 2025-26 Q4 Final.pdf · uploaded 4 Jun 2026Source
- Withdrawal Update Form 1Form 1 For FY 2026-27 Q1.pdf · uploaded 28 Jul 2026Source
- Withdrawal Update Form 2Form 2 FY 2026-27 Q1 Final.pdf · uploaded 28 Jul 2026Source
- Withdrawal Update Form 3Form 3 FY 2026-27 Q1 Final.pdf · uploaded 28 Jul 2026Source
- Occupational CertificateCompletion Certificate.pdf · uploaded 28 Jul 2026Source
- Occupational CertificateSccreenshot of OC mail to RERA.pdf · uploaded 28 Jul 2026Source
Technical
- DocumentLayout_compressed.pdf · uploaded 29 May 2023Source
- DocumentMYSCAN_20221222_0002_compressed.pdf · uploaded 29 May 2023Source
- DocumentMYSCAN_20221222_0006_compressed.pdf · uploaded 29 May 2023Source
- DocumentMYSCAN_20221222_0003_compressed.pdf · uploaded 29 May 2023Source
- DocumentMYSCAN_20221222_0004_compressed.pdf · uploaded 29 May 2023Source
- DocumentMYSCAN_20221222_0005_compressed.pdf · uploaded 29 May 2023Source
- Document1.pdf · uploaded 25 Mar 2025Source
- Document2.pdf · uploaded 25 Mar 2025Source
- Document3.pdf · uploaded 25 Mar 2025Source
- Document4.pdf · uploaded 25 Mar 2025Source
- Document5.pdf · uploaded 25 Mar 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikhali, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Property Of Mr Prakash Gadiya In Gat No 741
- South
- Property Of Mr Suresh Gadiya In Gat No 741
- East
- Property Of Mr Bag In Gat No 1670
- West
- Internal 12 Mtr Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Arcon Associates | — |
| Chartered accountant | Pankaj Surana & Co. | — |
| Engineer | Jijaba Revaji Khemnar | — |
| Engineer | Prashil Padalkar | — |
| Other | Madhav Gore | — |
| Other | Upendra Purandare | — |
| Registered real estate agent | Bharatth Chavaan | — |
Source: MahaRERA project page. Contact details are not shown.