Kamal Residency
Certificate SignedChikhali, Pune 412105 |Promoter: M/S Varad Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK60 units in all
- Address
- S No 1334 P, Chikhali, ChikhaliPIN 412105
- Designated bank account
- 119
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Mar 2027
- Registered
- 2 Mar 2022
- Promised
- 30 Mar 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100033597 | 2 Mar 2022 | 30 Mar 2027 | 30 Jun 2025 | M/S Varad Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Kamal Residency | 6 | 60 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
35 of 60 units booked (58%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 41.61 sq m · 448 sq ft | 12 | 4 |
| 1BHK | 41.66 sq m · 448 sq ft | 24 | 13 |
| 1BHK | 43.07 sq m · 464 sq ft | 12 | 8 |
| 1BHK | 43.13 sq m · 464 sq ft | 12 | 10 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 168 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardComapny Pan card.pdf · uploaded 7 Feb 2022Source
Show all 171 documentsShow fewer documents
Legal
- Declaration Form BDocScanner Feb 27, 2025 1-15 PM(1).pdf · uploaded 27 Feb 2025Source
Migrated
- 1 PAN CardComapny Pan card.pdf · uploaded 7 Feb 2022Source
- 1 Copy of the legal title reportSearch Report (2)_compressed.pdf · uploaded 7 Feb 2022Source
- 2 Copy of the legal title reportFormat A (3).pdf · uploaded 7 Feb 2022Source
- 1 Details of encumbrancesEncumbrance (2).pdf · uploaded 7 Feb 2022Source
- 1 Copy of Layout Approval (in case of layout)layout plan .pdf · uploaded 7 Feb 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentparking floor plan .pdf · uploaded 7 Feb 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan.pdf · uploaded 7 Feb 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement (2).pdf · uploaded 7 Feb 2022Source
- 1 Declaration about Commencement CertificateFormat D (2).pdf · uploaded 7 Feb 2022Source
- 1 Declaration in FORM BForm B - Promoter_compressed.pdf · uploaded 7 Feb 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 7 Feb 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Kamal Residency.pdf · uploaded 7 Feb 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Certificate_20220221_0001.pdf · uploaded 7 Feb 2022Source
- 1 Proforma of Allotment letterDRAFT AGREEMENT.pdf · uploaded 7 Feb 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 8 Feb 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200229758650_For_Asset_Based_Search_08_02_2022_12_46_04_985.pdf · uploaded 8 Feb 2022Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 8 Feb 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kaagaz_20220625_163530987636.pdf · uploaded 3 Aug 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Kamal Residency_compressed.pdf · uploaded 3 Aug 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_20220721_0001_compressed.pdf · uploaded 3 Aug 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 22 Oct 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 22 Oct 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Letter For Rera 2022_12_15 (1)_compressed.pdf · uploaded 4 Jan 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)kamal Residance.pdf · uploaded 4 Jan 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)rera certificate varad_230103_193416 (1).pdf · uploaded 4 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 18 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 kamal.pdf · uploaded 17 Apr 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Kamal Archt.pdf · uploaded 23 Jun 2023Source
- 1 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 23 Jun 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kamal Residency F2.pdf · uploaded 1 Jul 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3.pdf · uploaded 22 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)2023_10_04 architect certificate (1).pdf · uploaded 4 Oct 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kamal Residency.pdf · uploaded 4 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)kamal resi.pdf · uploaded 23 Oct 2023Source
- 2 Disclosure of sold/ booked inventorysold unsold upto 30_9_23_231023_141717.pdf · uploaded 23 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)rera certificate (1).pdf · uploaded 23 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.pdf · uploaded 23 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Annexure 1.pdf · uploaded 2 Dec 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Annexure 1.pdf · uploaded 11 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Crtf.pdf · uploaded 11 Jan 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 11 Jan 2024Source
- 3 Disclosure of sold/ booked inventorySold Unsold.pdf · uploaded 3 Feb 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - March 2024 3 (1).pdf · uploaded 15 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 kamal Residency.pdf · uploaded 15 Apr 2024Source
- 4 Disclosure of sold/ booked inventorySold Unsold upto 31_3_24_240420_174810 (2).pdf · uploaded 20 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_11zon (1).pdf · uploaded 23 Apr 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_11zon (1).pdf · uploaded 23 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)signed F1.pdf · uploaded 17 Jul 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)signed Form 2.pdf · uploaded 17 Jul 2024Source
- 5 Disclosure of sold/ booked inventorysigned sold unsold.pdf · uploaded 17 Jul 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)signed F3.pdf · uploaded 17 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 13 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 13 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Kamal Residency (2) (1).pdf · uploaded 13 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryRERA SOLD UNSOLD INVENTORY.pdf · uploaded 13 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)kamal Residency(2) (1).pdf · uploaded 22 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2022-2023 form 2A.pdf · uploaded 22 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 2023-2024.pdf · uploaded 22 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 (1)_241120_174211.pdf · uploaded 22 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Letter For Rera 2022_12_15 (1)_compressed.pdf · uploaded 3 Dec 2024Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR 29 (13).pdf · uploaded 4 Dec 2024Source
- 7 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR 29 (7).pdf · uploaded 4 Dec 2024Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR 29 (4).pdf · uploaded 4 Dec 2024Source
- 5 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR 29 (15).pdf · uploaded 4 Dec 2024Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR 29 (11).pdf · uploaded 4 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)GetUserDocumentFileContent (34) (1).pdf · uploaded 5 Dec 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Certificate _20221124_0001_241205_113049_11zon.pdf · uploaded 5 Dec 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Certificate _20221124_0001_241205_113049_compressed.pdf · uploaded 5 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (7) (1).pdf · uploaded 5 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (23) (1).pdf · uploaded 5 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (9) (1).pdf · uploaded 5 Dec 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (4) (1).pdf · uploaded 5 Dec 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1) (1).pdf · uploaded 5 Dec 2024Source
- 8 Disclosure of sold/ booked inventoryRera sold-unsold inventory upto 30_09_2024_241113_154135.pdf · uploaded 6 Dec 2024Source
- 1 Declaration in FORM BP52100033597_FileName_2.pdf · uploaded 9 Jan 2025Source
- 1 Declaration about Commencement CertificateDeclaration Commencement.pdf · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)rera varad 2 1 25.pdf · uploaded 12 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Doc 01-24-202511zon.pdf · uploaded 12 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 12 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)kamal recidency dec qtr.pdf · uploaded 12 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryNew Doc 01-24-2025.pdf · uploaded 12 Feb 2025Source
- 1 Declaration in FORM BDocScanner Feb 27, 2025 1-15 PM(1).pdf · uploaded 27 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySold.pdf · uploaded 27 Feb 2025Source
- Form 1March 2022 Form 1.pdf · uploaded 30 May 2025Source
- Form 2March 2022 form 2 kamal Residency (1).pdf · uploaded 30 May 2025Source
- Form 3March 2022 Form 3_compressed.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryMarch 2022 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1June 2022 Form 1.pdf · uploaded 30 May 2025Source
- Form 2june 2022 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Jun 2022 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryJun 2022 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Sep 2022 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Sep 2023 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Sep 2022 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventorySep 2022 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Dec 2022 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Dec 2022 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Dec 2022 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryDec 2022 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1March 2023 Form 1.pdf · uploaded 30 May 2025Source
- Form 2March 2023 form 2.pdf · uploaded 30 May 2025Source
- Form 3March 2023 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryMarch 2023 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1June 2023 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Jun 2023 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Jun 2023 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryJun 2023 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Sep 2023 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Sep 2023 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Sep 2023 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventorySep 2023 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Dec 2023 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Dec 2023 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Dec 2023 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryDec 2023 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1March 2024 Form 1.pdf · uploaded 30 May 2025Source
- Form 2March 2024 Form 2.pdf · uploaded 30 May 2025Source
- Form 3March 2024 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryMarch 2024 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1jun 2024 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Jun 2024 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Jun 2024 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryJun 2024 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Spe 2024 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Sep 2024 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Sep 2024 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventorySep 2024 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Dec 2024 Form 1.pdf · uploaded 30 May 2025Source
- Form 2Dec 2024 Form 2.pdf · uploaded 30 May 2025Source
- Form 3Dec 2024 Form 3.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryDec 2024 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1March 2025 Form 1.pdf · uploaded 30 May 2025Source
- Form 2March 2025 Form 2 kamal Residency (1).pdf · uploaded 30 May 2025Source
- Form 3March 2025 Form 3_compressed.pdf · uploaded 30 May 2025Source
- Disclosure of Sold and Booked InventoryMarch 2025 Sold Unsold.pdf · uploaded 30 May 2025Source
- Form 1Form 1s.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 s.pdf · uploaded 19 Sep 2025Source
- Form 3CA Certificate Jun 2025.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryRera sold-unsold 30_06_2025.pdf · uploaded 19 Sep 2025Source
- Form 2A (FY 2021-2022)Form 2A 2021-22.pdf · uploaded 19 Sep 2025Source
- Form 2A (FY 2022-2023)Form 2A 2022-23.pdf · uploaded 19 Sep 2025Source
- Form 2A (FY 2023-2024)Form 2A 2023-24.pdf · uploaded 19 Sep 2025Source
- Form 5 (FY 2021-2022)Form 5 2021-22.pdf · uploaded 19 Sep 2025Source
- Form 5 (FY 2022-2023)Form 5 2022-23.pdf · uploaded 19 Sep 2025Source
- Form 5 (FY 2023-2024)Form 5 2022-23.pdf · uploaded 19 Sep 2025Source
- Withdrawal Update Form 1signed F1.pdf · uploaded 6 Apr 2026Source
- Withdrawal Update Form 2signed Form 2.pdf · uploaded 6 Apr 2026Source
- Withdrawal Update Form 3signed F3.pdf · uploaded 6 Apr 2026Source
- Form 2A (FY 2024-2025)Site Supervisor_s Certificate - 2024-25 (1).pdf · uploaded 6 Aug 2026Source
- Form 2A (FY 2025-2026)Site Supervisor_s Certificate - 2025-26.pdf · uploaded 6 Aug 2026Source
Technical
Technical (Architect)
- Documentsigned F1.pdf · uploaded 17 Jul 2024Source
- DocumentArchitect Certificate Form 1.pdf · uploaded 13 Nov 2024Source
- DocumentArchitect Letter For Rera 2022_12_15 (1)_compressed.pdf · uploaded 3 Dec 2024Source
- DocumentGetUserDocumentFileContent (34) (1).pdf · uploaded 5 Dec 2024Source
- Documentrera varad 2 1 25.pdf · uploaded 12 Feb 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikhali, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Mr Suresh Mahadeo Virkar
- South
- Mr Ganesh Kashinath Shinde
- East
- Gat No 1333 Through Mr Chavhan And Mr Karat
- West
- Manapa Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Cp Design Studio | — |
| Chartered accountant | Anita L Limaye | — |
| Chartered accountant | Mahesh Malhotra | — |
| Engineer | Mr Sankalp M Patil | — |
| Engineer | Rohinee Badgujar | — |
| Other | Mr Ganesh Shinde | — |
Source: MahaRERA project page. Contact details are not shown.