Nexus Emerald

Certificate Signed

Borhadewadi, Pune 412105 |Promoter: Vyankatesh Realconstro LLP

Residential / Group HousingRERAP52100050035
6 Mar 2023Registered with MahaRERA
31 Dec 2026Promised completion
2Buildings
112Units registered93 booked (83%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
2BHK, 3BHK112 units in all
Address
GAT NUMBER 79 (Part), Borhadewadi, Gat No 79, BorhadewadiPIN 412105
Designated bank account
220
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
6 Mar 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000500356 Mar 202331 Dec 202631 Dec 2026Vyankatesh Realconstro LLPProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Unit A756
Unit B756

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

93 of 112 units booked (83%), as the promoter reported to MahaRERA

2BHK · 84 units3BHK · 28 units
BuildingTypeCarpet areaUnitsBooked
Unit A2BHK43.06 sq m · 463 sq ft76
Unit A2BHK43.34 sq m · 467 sq ft76
Unit A2BHK50.68 sq m · 546 sq ft76
Unit A2BHK50.88 sq m · 548 sq ft76
Unit A2BHK52.56 sq m · 566 sq ft77
Unit A2BHK52.66 sq m · 567 sq ft76
Unit A3BHK69.7 sq m · 750 sq ft75
Unit A3BHK70.51 sq m · 759 sq ft76
Show all 16 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Unit B2BHK42.97 sq m · 463 sq ft76
Unit B2BHK43.23 sq m · 465 sq ft73
Unit B2BHK50.68 sq m · 546 sq ft76
Unit B2BHK50.88 sq m · 548 sq ft76
Unit B2BHK52.56 sq m · 566 sq ft76
Unit B2BHK52.95 sq m · 570 sq ft77
Unit B3BHK68.65 sq m · 739 sq ft75
Unit B3BHK70.51 sq m · 759 sq ft76

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 215 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN CARD VENKATESH.pdf · uploaded 26 Nov 2022Source

Legal

  • Declaration Form BFORM-B_PROMOTER.pdf · uploaded 21 Dec 2022Source
  • Other – LegalCLARIFICATION_LETTER.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4430-1-9.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4430-10-16.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4430-17-24.pdf · uploaded 4 Jan 2023Source
Show all 217 documentsShow fewer documents

Legal

  • Other – LegalDOC_4430-25-31.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4435-1-7.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4435-8-14.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4435-15-21.pdf · uploaded 4 Jan 2023Source
  • Other – LegalDOC_4435-22-28.pdf · uploaded 4 Jan 2023Source
  • Legal Title reportSEARCH_EMERALD (2).pdf · uploaded 16 Jan 2023Source
  • Legal Title reportLEGAL OPINION 18-02-2023.pdf · uploaded 18 Feb 2023Source
  • Declaration Form BForm B.pdf · uploaded 21 Apr 2025Source

Migrated

  • 1 PAN CardPAN CARD VENKATESH.pdf · uploaded 26 Nov 2022Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 26 Nov 2022Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 26 Nov 2022Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 26 Nov 2022Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 26 Nov 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentNA_ORDER.pdf · uploaded 26 Nov 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 26 Nov 2022Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 26 Nov 2022Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 26 Nov 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A.pdf · uploaded 26 Nov 2022Source
  • 1 Deviation Report with respect to Allotment letterDEVIATION_REPORT_ALLOTMENT LETTER.pdf · uploaded 26 Nov 2022Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 20 Dec 2022Source
  • 1 a Details of encumbrances concerned to FinanceNO_ENC_FIN_LEG.pdf · uploaded 21 Dec 2022Source
  • 1 b Details of encumbrances concerned to LegalNO_ENC_FIN_LEG.pdf · uploaded 21 Dec 2022Source
  • 1 Declaration in FORM BFORM-B_PROMOTER.pdf · uploaded 21 Dec 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_CERTIFICATE_EMERALD.pdf · uploaded 4 Jan 2023Source
  • 1 Other – LegalCLARIFICATION_LETTER.pdf · uploaded 4 Jan 2023Source
  • 2 Other – LegalDOC_4430-1-9.pdf · uploaded 4 Jan 2023Source
  • 3 Other – LegalDOC_4430-10-16.pdf · uploaded 4 Jan 2023Source
  • 4 Other – LegalDOC_4430-17-24.pdf · uploaded 4 Jan 2023Source
  • 5 Other – LegalDOC_4430-25-31.pdf · uploaded 4 Jan 2023Source
  • 6 Other – LegalDOC_4435-1-7.pdf · uploaded 4 Jan 2023Source
  • 7 Other – LegalDOC_4435-8-14.pdf · uploaded 4 Jan 2023Source
  • 8 Other – LegalDOC_4435-15-21.pdf · uploaded 4 Jan 2023Source
  • 9 Other – LegalDOC_4435-22-28.pdf · uploaded 4 Jan 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsVYANKATESH_Annexure_A_JJM.pdf · uploaded 8 Jan 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsVYANKATESH_Annexure_A.pdf · uploaded 8 Jan 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - SATISH SONAWANE.pdf · uploaded 8 Jan 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - ANIRUDHA PRADHAN.pdf · uploaded 9 Jan 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - HANUMANT GAIKWAD.pdf · uploaded 9 Jan 2023Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - LAXMIKANT KOLE.pdf · uploaded 9 Jan 2023Source
  • 7 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - SANJAY PRADHAN.pdf · uploaded 9 Jan 2023Source
  • 8 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - SRP.pdf · uploaded 9 Jan 2023Source
  • 9 Disclosure of Interest in Other Real Estate OrganizationsEmerald_Annexure A - NRP.pdf · uploaded 9 Jan 2023Source
  • 1 Copy of the legal title reportSEARCH_EMERALD (2).pdf · uploaded 16 Jan 2023Source
  • 2 Copy of the legal title reportLEGAL OPINION 18-02-2023.pdf · uploaded 18 Feb 2023Source
  • 2 Commencement Certificates / NA Order for plotted development1.pdf · uploaded 18 Feb 2023Source
  • 1 Other – TechnicalCERTIFICATE PLOT 1 AND 2_0001.pdf · uploaded 18 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01 23-02-2023.pdf · uploaded 23 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 02 23-02-2023.pdf · uploaded 23 Feb 2023Source
  • 1 Proforma of Agreement for saleAFS 23-02-2023.pdf · uploaded 23 Feb 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDEVI AFS 23-02-2023.pdf · uploaded 23 Feb 2023Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameVYANKATESH - DECLARATION BANK ACC.pdf · uploaded 24 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)8) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2023.pdf · uploaded 5 Mar 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)10) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf · uploaded 5 Mar 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)9) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf · uploaded 5 Mar 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)11) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf · uploaded 5 Mar 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-03-2023.pdf · uploaded 5 Mar 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-06-2023.pdf · uploaded 5 Mar 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 10-10-2023.pdf · uploaded 5 Mar 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-12-2023.pdf · uploaded 5 Mar 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)2) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2023.pdf · uploaded 5 Mar 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)3) CA CERTIFICATE NEXUS EMERALD DATE 30-06-2023.pdf · uploaded 5 Mar 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)4) CA CERTIFICATE NEXUS EMERALD DATE 10-10-2023.pdf · uploaded 5 Mar 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)5) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2023.pdf · uploaded 5 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)1) FORM - 5 DATE - 31-01-2024 FY 22-23.pdf · uploaded 5 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)12) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf · uploaded 22 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6) NEXUS INFRAWELL- ENG CERTIFICATE - DATE- 31-03-2024.pdf · uploaded 22 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)13) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-06-2024.pdf · uploaded 20 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)14) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-09-2024.pdf · uploaded 20 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)6) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf · uploaded 27 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)7) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf · uploaded 27 Dec 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)8) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf · uploaded 27 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)15) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf · uploaded 4 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)6) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2024.pdf · uploaded 4 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 31-12-2024.pdf · uploaded 13 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 CA CERTIFICATE NEXUS EMERALD DATE 30 06 2024.pdf · uploaded 20 Mar 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 CA CERTIFICATE NEXUS EMERALD DATE 30 09 2024.pdf · uploaded 20 Mar 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)6VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf · uploaded 15 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 10-02-2023.pdf · uploaded 15 Apr 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE-31-03-2025 (WORK PROGRESSING REPORT).pdf · uploaded 15 Apr 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)11) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf · uploaded 15 Apr 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)14) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-09-2024.pdf · uploaded 15 Apr 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)10) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2024.pdf · uploaded 15 Apr 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)15) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf · uploaded 15 Apr 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)13) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf · uploaded 15 Apr 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)9) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf · uploaded 15 Apr 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)8) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf · uploaded 15 Apr 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)7) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf · uploaded 15 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2024_compressed.pdf · uploaded 15 Apr 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Dec - 2024).pdf · uploaded 15 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-03-2023 (mar-23).pdf · uploaded 15 Apr 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)8) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf · uploaded 15 Apr 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)7) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf · uploaded 15 Apr 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)6) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf · uploaded 15 Apr 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)5) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-12-2023 (dec-23).pdf · uploaded 15 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)4) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 10-10-2023 (sep-23).pdf · uploaded 15 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)3) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-06-2023 (june-23).pdf · uploaded 15 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)1) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 2-12-2022 (29-11-22).pdf · uploaded 15 Apr 2025Source
  • 1 Other – TechnicalQAC 2024-25_0001.pdf · uploaded 15 Apr 2025Source
  • 2 Other – TechnicalWork Progress And Updation Deatails.pdf · uploaded 15 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QAC 2022-23_0001.pdf · uploaded 15 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QAC 2023-24_0001.pdf · uploaded 15 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)2) FORM - 5 DATE - 01-01-2023 to 31-03-2024.pdf · uploaded 15 Apr 2025Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 21 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 01.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 03_compressed.pdf · uploaded 21 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory_compressed.pdf · uploaded 21 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)16) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 05042025.pdf · uploaded 2 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)10) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March 2025).pdf · uploaded 2 May 2025Source
  • Form 14 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2023.pdf · uploaded 26 Aug 2025Source
  • Form 15 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf · uploaded 26 Aug 2025Source
  • Form 16 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf · uploaded 26 Aug 2025Source
  • Form 17 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf · uploaded 26 Aug 2025Source
  • Form 18 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf · uploaded 26 Aug 2025Source
  • Form 19 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2024.pdf · uploaded 26 Aug 2025Source
  • Form 110 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-09-2024.pdf · uploaded 26 Aug 2025Source
  • Form 111 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf · uploaded 26 Aug 2025Source
  • Form 112 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 05-04-2025 MARCH-25.pdf · uploaded 26 Aug 2025Source
  • Form 113 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 25-07-2025 JUNE-25.pdf · uploaded 26 Aug 2025Source
  • Form 22) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-03-2023 (mar-23).pdf · uploaded 26 Aug 2025Source
  • Form 23) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-06-2023 (june-23).pdf · uploaded 26 Aug 2025Source
  • Form 24) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 10-10-2023 (sep-23).pdf · uploaded 26 Aug 2025Source
  • Form 25) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-12-2023 (dec-23).pdf · uploaded 26 Aug 2025Source
  • Form 26) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf · uploaded 26 Aug 2025Source
  • Form 27) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf · uploaded 26 Aug 2025Source
  • Form 28) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf · uploaded 26 Aug 2025Source
  • Form 29) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Dec - 2024).pdf · uploaded 26 Aug 2025Source
  • Form 210) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March 2025).pdf · uploaded 26 Aug 2025Source
  • Form 211) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June 2025).pdf · uploaded 26 Aug 2025Source
  • Form 32) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2023 (mar-23).pdf · uploaded 26 Aug 2025Source
  • Form 33) CA CERTIFICATE NEXUS EMERALD DATE 30-06-2023 (june-23).pdf · uploaded 26 Aug 2025Source
  • Form 34) CA CERTIFICATE NEXUS EMERALD DATE 10-10-2023.pdf · uploaded 26 Aug 2025Source
  • Form 35) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2023 (dec-23).pdf · uploaded 26 Aug 2025Source
  • Form 36) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2024.pdf · uploaded 26 Aug 2025Source
  • Form 37 CA CERTIFICATE NEXUS EMERALD DATE 30 06 2024.pdf · uploaded 26 Aug 2025Source
  • Form 38 CA CERTIFICATE NEXUS EMERALD DATE 30 09 2024.pdf · uploaded 26 Aug 2025Source
  • Form 39) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2024_compressed.pdf · uploaded 26 Aug 2025Source
  • Form 310) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2025_compressed.pdf · uploaded 26 Aug 2025Source
  • Form 311) CA CERTIFICATE NEXUS EMERALD DATE 30-06-2025_compressed.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory1 SOLD UNSOLD VYANKATESH LLP (1-1-2023 to 31-03-2023) QTR-4.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory2 SOLD UNSOLD VYANKATESH LLP (1-4-2023 to 30-06-2023) QTR-1.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory3 SOLD UNSOLD VYANKATESH LLP (1-7-2023 to 30-09-2023) QTR-2.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory4 SOLD UNSOLD VYANKATESH LLP (1-10-2023 to 31-12-2023) QTR-3.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory5 SOLD UNSOLD VYANKATESH LLP (1-1-2024 to 31-03-2024) QTR-4.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory6 SOLD UNSOLD VYANKATESH LLP (1-4-2024 to 30-06-2024) QTR-1.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory7 SOLD UNSOLD VYANKATESH LLP (1-7-2024 to 30-09-2024) QTR-2.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory8 SOLD UNSOLD VYANKATESH LLP (1-10-2024 to 31-12-2024) QTR-3.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory9 SOLD UNSOLD VYANKATESH LLP (1-1-2025 to 31-03-2025) QTR-4.pdf · uploaded 26 Aug 2025Source
  • Disclosure of Sold and Booked Inventory10 SOLD UNSOLD VYANKATESH LLP (1-4-2025 to 30-06-2025) QTR-1.pdf · uploaded 26 Aug 2025Source
  • Form 5 (FY 2022-2023)1) FORM - 5 DATE - 31-01-2024 FY 22-23.pdf · uploaded 26 Aug 2025Source
  • Form 5 (FY 2023-2024)2) FORM - 5 DATE - 01-01-2023 to 31-03-2024.pdf · uploaded 26 Aug 2025Source
  • Form 5 (FY 2024-2025)3) FORM - 5 (01-04-2024 to 31-03-2025) Date 07-08-2025.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 114 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 01-10-2025 Sep 25.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 212) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (SEP-2025).pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 312) CA CERTIFICATE NEXUS EMERALD DATE 30-09-2025_compressed.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - Dec 2025.pdf · uploaded 6 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Dec 2025.pdf · uploaded 6 Apr 2026Source
  • Withdrawal Update Form 3Form 3 - Dec 2025.pdf · uploaded 6 Apr 2026Source
  • Form 2A (FY 2024-2025)Form 2A - 2024-25.pdf · uploaded 6 Apr 2026Source
  • Withdrawal Update Form 1F1.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 2F2.pdf · uploaded 9 Apr 2026Source
  • Withdrawal Update Form 3F3.pdf · uploaded 9 Apr 2026Source
  • Form 5 (FY 2025-2026)Nexus Emerald- FORM - 5.pdf · uploaded 9 Apr 2026Source
  • Occupational CertificateCompletion Certificate - Nexus Emerald with OC confirmation.pdf · uploaded 22 Jun 2026Source

Technical

  • DocumentLAYOUT.pdf · uploaded 26 Nov 2022Source
  • Document2.pdf · uploaded 26 Nov 2022Source
  • Document3.pdf · uploaded 26 Nov 2022Source
  • Document4.pdf · uploaded 26 Nov 2022Source
  • DocumentNA_ORDER.pdf · uploaded 26 Nov 2022Source
  • Other – TechnicalCERTIFICATE PLOT 1 AND 2_0001.pdf · uploaded 18 Feb 2023Source
  • Other – TechnicalQAC 2024-25_0001.pdf · uploaded 15 Apr 2025Source
  • Other – TechnicalWork Progress And Updation Deatails.pdf · uploaded 15 Apr 2025Source
  • DocumentPlan 01.pdf · uploaded 6 Apr 2026Source
  • DocumentPlan 01.pdf · uploaded 6 Apr 2026Source
  • DocumentPlan 02.pdf · uploaded 6 Apr 2026Source
  • DocumentPlan 03.pdf · uploaded 6 Apr 2026Source
  • DocumentPlan 04.pdf · uploaded 6 Apr 2026Source
  • DocumentPlan 05.pdf · uploaded 6 Apr 2026Source

Technical (Architect)

  • Document13) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-06-2024.pdf · uploaded 20 Dec 2024Source
  • Document14) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-09-2024.pdf · uploaded 20 Dec 2024Source
  • Document15) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf · uploaded 4 Jan 2025Source
  • Document5 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 10-02-2023.pdf · uploaded 15 Apr 2025Source
  • Document6VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf · uploaded 15 Apr 2025Source
  • Document7) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf · uploaded 15 Apr 2025Source
  • Document8) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf · uploaded 15 Apr 2025Source
  • Document9) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf · uploaded 15 Apr 2025Source
  • Document13) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf · uploaded 15 Apr 2025Source
  • Document15) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf · uploaded 15 Apr 2025Source
  • Document10) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2024.pdf · uploaded 15 Apr 2025Source
  • Document14) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-09-2024.pdf · uploaded 15 Apr 2025Source
  • Document11) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf · uploaded 15 Apr 2025Source
  • DocumentVYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE-31-03-2025 (WORK PROGRESSING REPORT).pdf · uploaded 15 Apr 2025Source
  • DocumentForm 01.pdf · uploaded 21 Apr 2025Source
  • Document16) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 05042025.pdf · uploaded 2 May 2025Source
  • DocumentF1.pdf · uploaded 9 Apr 2026Source

Technical (Engineer)

  • Document6) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf · uploaded 27 Dec 2024Source
  • Document7) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf · uploaded 27 Dec 2024Source
  • Document8) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf · uploaded 27 Dec 2024Source
  • Document9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 31-12-2024.pdf · uploaded 13 Jan 2025Source
  • Document1) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 2-12-2022 (29-11-22).pdf · uploaded 15 Apr 2025Source
  • Document2) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-03-2023 (mar-23).pdf · uploaded 15 Apr 2025Source
  • Document3) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-06-2023 (june-23).pdf · uploaded 15 Apr 2025Source
  • Document4) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 10-10-2023 (sep-23).pdf · uploaded 15 Apr 2025Source
  • Document5) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-12-2023 (dec-23).pdf · uploaded 15 Apr 2025Source
  • Document6) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf · uploaded 15 Apr 2025Source
  • Document7) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf · uploaded 15 Apr 2025Source
  • Document8) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf · uploaded 15 Apr 2025Source
  • Document9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Dec - 2024).pdf · uploaded 15 Apr 2025Source
  • Document10) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March 2025).pdf · uploaded 2 May 2025Source
  • DocumentF2.pdf · uploaded 9 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Borhadewadi, Haveli taluka

Survey, CTS, gat or plot numbers

Gat No. 79(P)Plot No. 02

Boundaries

North
Remaining Land of Gat No 79
South
Property Of Vitthal Jadhav and Others of Gat No 79
East
Road
West
Remaining Land of Gat No 79

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUday Kulkarni—
Chartered accountantCA Ganesh Sunil Mandalecha Chartered Accountants—
Chartered accountantDjiraj Manoj Baldota—
Chartered accountantMohamadyasir A Bagwan—
Chartered accountantShubham S Bora—
EngineerAjinkya A Lahigude—
EngineerDipali D Kashid—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology