Devesh Enclave
Certificate SignedBopodi, Pune 411003 |Promoter: Devesh Developers Joint Venture
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 1RK, 2BHK17 units in all
- Address
- 1327/1328/1329/1330/1331/1332/1333/1334/1335/1336/1348/1349/1350, Haveli, Bopodi GaothanPIN 411003
- Designated bank account
- 87
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 17 Oct 2024
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100077632 | 17 Oct 2024 | 31 Dec 2026 | 30 Apr 2027 | Devesh Developers Joint Venture | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Devesh Enclave | 5 | 17 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 17 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 467.35 sq m · 5,031 sq ft | 10 | 0 |
| 1RK | 56.32 sq m · 606 sq ft | 2 | 0 |
| 2BHK | 313.55 sq m · 3,375 sq ft | 5 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 184 filings listed on MahaRERA's project page
Finance
- PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
Show all 185 documentsShow fewer documents
Finance
- PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
Legal
- Legal Title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- Legal Title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- Legal Title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- Declaration Form BForm B.pdf · uploaded 7 Aug 2024Source
- Declaration Form BForm B.pdf · uploaded 7 Aug 2024Source
- Declaration Form BForm B.pdf · uploaded 7 Aug 2024Source
- Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
- Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
- Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
Migrated
- 4 PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- 1 Declaration about Commencement CertificateDECLARATION COMMENCEMENT.pdf · uploaded 6 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 6 Nov 2023Source
- 4 PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- 1 Declaration about Commencement CertificateDECLARATION COMMENCEMENT.pdf · uploaded 6 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 6 Nov 2023Source
- 4 PAN CardPAN OF FIRM.pdf · uploaded 6 Nov 2023Source
- 1 Declaration about Commencement CertificateDECLARATION COMMENCEMENT.pdf · uploaded 6 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 6 Nov 2023Source
- 1 CERSAI detailsundertaking Bopodi.pdf · uploaded 5 Jan 2024Source
- 1 CERSAI detailsundertaking Bopodi.pdf · uploaded 5 Jan 2024Source
- 1 CERSAI detailsundertaking Bopodi.pdf · uploaded 5 Jan 2024Source
- 1 PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
- 2 PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- 3 PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
- 1 PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
- 2 PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- 3 PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
- 1 PAN CardBholanath Tiwari Pan card.pdf · uploaded 2 Aug 2024Source
- 2 PAN CardPramod Tiwari pan card.pdf · uploaded 2 Aug 2024Source
- 3 PAN CardNivrutti Bahirat Pan card.pdf · uploaded 2 Aug 2024Source
- 1 Copy of the legal title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Allotment letter_Allotment_Letter.pdf · uploaded 7 Aug 2024Source
- 1 Declaration in FORM BForm B.pdf · uploaded 7 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 With Sign new.pdf · uploaded 7 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Approval.pdf · uploaded 7 Aug 2024Source
- 2 CERSAI detailsCersai Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation report With Allotment Letter.pdf · uploaded 7 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report With Sale of Agreement.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 7 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizations10 Disclosure of Interest Bholanath Sir Legal.pdf · uploaded 7 Aug 2024Source
- 1 Copy of the legal title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Allotment letter_Allotment_Letter.pdf · uploaded 7 Aug 2024Source
- 1 Declaration in FORM BForm B.pdf · uploaded 7 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 With Sign new.pdf · uploaded 7 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Approval.pdf · uploaded 7 Aug 2024Source
- 2 CERSAI detailsCersai Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation report With Allotment Letter.pdf · uploaded 7 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report With Sale of Agreement.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 7 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizations10 Disclosure of Interest Bholanath Sir Legal.pdf · uploaded 7 Aug 2024Source
- 1 Copy of the legal title reportLegal title Report.pdf · uploaded 7 Aug 2024Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 a Details of encumbrances concerned to FinanceLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Allotment letter_Allotment_Letter.pdf · uploaded 7 Aug 2024Source
- 1 Declaration in FORM BForm B.pdf · uploaded 7 Aug 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 With Sign new.pdf · uploaded 7 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 7 Aug 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Approval.pdf · uploaded 7 Aug 2024Source
- 2 CERSAI detailsCersai Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation report With Allotment Letter.pdf · uploaded 7 Aug 2024Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 7 Aug 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Encumbrances Report.pdf · uploaded 7 Aug 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeviation report With Sale of Agreement.pdf · uploaded 7 Aug 2024Source
- 1 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 7 Aug 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizations10 Disclosure of Interest Bholanath Sir Legal.pdf · uploaded 7 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentDeclaration.pdf · uploaded 17 Aug 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentAnnexure A.pdf · uploaded 17 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentDeclaration.pdf · uploaded 17 Aug 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentAnnexure A.pdf · uploaded 17 Aug 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentDeclaration.pdf · uploaded 17 Aug 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentAnnexure A.pdf · uploaded 17 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- 3 a Details of encumbrances concerned to Finance1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 1 Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
- 2 Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- 3 Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- 3 b Details of encumbrances concerned to Legal1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 2 Disclosure of Interest in Other Real Estate Organizations11 Disclosure of Interest Pramod Sir Legal.pdf · uploaded 10 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Form B.pdf · uploaded 10 Oct 2024Source
- 3 a Details of encumbrances concerned to Finance1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 1 Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
- 2 Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- 3 Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- 3 b Details of encumbrances concerned to Legal1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 2 Disclosure of Interest in Other Real Estate Organizations11 Disclosure of Interest Pramod Sir Legal.pdf · uploaded 10 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Form B.pdf · uploaded 10 Oct 2024Source
- 3 a Details of encumbrances concerned to Finance1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 1 Other – LegalSale deed-.pdf · uploaded 10 Oct 2024Source
- 2 Other – LegalSale sees-1.pdf · uploaded 10 Oct 2024Source
- 3 Other – LegalMain Property Card 1.pdf · uploaded 10 Oct 2024Source
- 3 b Details of encumbrances concerned to Legal1 Encumbrances - Finance.pdf · uploaded 10 Oct 2024Source
- 2 Disclosure of Interest in Other Real Estate Organizations11 Disclosure of Interest Pramod Sir Legal.pdf · uploaded 10 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Form B.pdf · uploaded 10 Oct 2024Source
- 2 Proforma of Allotment letter3 Proforma Allotment Letter Legal.pdf · uploaded 11 Oct 2024Source
- 3 Disclosure of Interest in Other Real Estate Organizations9 Disclosure of Interest Anil Bahirat Legal.pdf · uploaded 11 Oct 2024Source
- 2 Proforma of Allotment letter3 Proforma Allotment Letter Legal.pdf · uploaded 11 Oct 2024Source
- 3 Disclosure of Interest in Other Real Estate Organizations9 Disclosure of Interest Anil Bahirat Legal.pdf · uploaded 11 Oct 2024Source
- 2 Proforma of Allotment letter3 Proforma Allotment Letter Legal.pdf · uploaded 11 Oct 2024Source
- 3 Disclosure of Interest in Other Real Estate Organizations9 Disclosure of Interest Anil Bahirat Legal.pdf · uploaded 11 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 Architecture Certificate-.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 With Sign new.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 Engineere certificate.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1-Architecture form.pdf · uploaded 12 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate (Form 3).pdf · uploaded 12 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 Sign.pdf · uploaded 12 May 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory.pdf · uploaded 12 May 2025Source
- Form 1Form 1-Architecture form.pdf · uploaded 25 Jul 2025Source
- Form 2Form 2- Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 3Form 3 -Chartered Accountant Certificate.pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Of Sold, Booked Inventory.pdf · uploaded 25 Jul 2025Source
- Form 1Form 1-Architecture form.pdf · uploaded 25 Jul 2025Source
- Form 2Form 2- Engineers Certificate.pdf · uploaded 25 Jul 2025Source
- Form 3CA Certificate (Form 3).pdf · uploaded 25 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold booked inventory.pdf · uploaded 25 Jul 2025Source
- Form 1Form 1 Architect Certificate.pdf · uploaded 18 Aug 2025Source
- Form 2Form 2 Engineers Certificate.pdf · uploaded 18 Aug 2025Source
- Form 3Form 3 CA certiicate .pdf · uploaded 18 Aug 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold, Booked Inventory.pdf · uploaded 18 Aug 2025Source
- Form 1Form 1 - Architect Certificate.pdf · uploaded 18 Oct 2025Source
- Form 2Form 2 - Engineer Certificate.pdf · uploaded 18 Oct 2025Source
- Form 3Form 3 - CA Certificate_page-0001.pdf · uploaded 18 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold and booked Inventory_page-0001.pdf · uploaded 18 Oct 2025Source
- Form 2A (FY 2024-2025)4. Form 2A Sign - Scan.pdf · uploaded 25 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 - CA Certificate.pdf · uploaded 2 Dec 2025Source
- Form 1Form 1 - Architect Certificate.pdf · uploaded 11 Feb 2026Source
- Form 2Form 2 - Engineer Certificate.pdf · uploaded 11 Feb 2026Source
- Form 3Form 3 - CA Certificate.pdf · uploaded 11 Feb 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked Inventory.pdf · uploaded 11 Feb 2026Source
- Form 1Form 1 - Architect Certificate.pdf · uploaded 7 May 2026Source
- Form 2Form -2- Engineer Certificate.pdf · uploaded 7 May 2026Source
- Form 3Form3- CA Certificate.pdf · uploaded 7 May 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of inventory.pdf · uploaded 7 May 2026Source
Technical
- DocumentLayout Approval.pdf · uploaded 7 Aug 2024Source
- DocumentLayout Approval.pdf · uploaded 7 Aug 2024Source
- DocumentLayout Approval.pdf · uploaded 7 Aug 2024Source
- DocumentBuilding Approval.pdf · uploaded 7 Aug 2024Source
- DocumentBuilding Approval.pdf · uploaded 7 Aug 2024Source
- DocumentBuilding Approval.pdf · uploaded 7 Aug 2024Source
Technical (Architect)
- Document10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- Document10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- Document10 Architecture Certificate-.pdf · uploaded 7 Oct 2024Source
- Document10 Architecture Certificate-.pdf · uploaded 20 Feb 2025Source
- DocumentFrom 1-Architecture form.pdf · uploaded 12 May 2025Source
Technical (Engineer)
- Document11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- Document11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- Document11 Engineere certificate.pdf · uploaded 7 Oct 2024Source
- Document11 Engineere certificate.pdf · uploaded 20 Feb 2025Source
- DocumentFROM 2 Sign.pdf · uploaded 12 May 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Bopodi
Survey, CTS, gat or plot numbers
Boundaries
- North
- 22
- South
- 22
- East
- 14
- West
- 21
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Patel And Associates | — |
| Chartered accountant | Deelip Balaso Kurade | — |
| Chartered accountant | Ksn And Associates | — |
| Engineer | Sharad Ranpise | — |
| Engineer | Sv & Associates | — |
Source: MahaRERA project page. Contact details are not shown.