Cloud 28
Certificate SignedBhugaon, Pune 412115 |Promoter: Oree Reality Pvt Ltd
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 2BHK, 1BHK, 3BHK109 units in all
- Address
- 280/4 280/2, 4 Season Road, Near Song Bird SocietyPIN 412115
- Designated bank account
- 119
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Apr 2024
- Promised
- 31 Dec 2029
- Revised
- 30 Apr 2030
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055816 | 22 Apr 2024 | 31 Dec 2029 | 30 Apr 2030 | Oree Reality Pvt Ltd | Project page |
3 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
67 of 109 units booked (61%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A | 2BHK | 73.23 sq m · 788 sq ft | 1 | 0 |
| B | 1BHK | 55.91 sq m · 602 sq ft | 1 | 0 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
Show all 109 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.21 sq m · 788 sq ft | 1 | 1 |
| B | 2BHK | 73.23 sq m · 788 sq ft | 1 | 0 |
| B | 2BHK | 73.23 sq m · 788 sq ft | 1 | 0 |
| B | 2BHK | 73.23 sq m · 788 sq ft | 1 | 0 |
| B | 2BHK | 73.23 sq m · 788 sq ft | 1 | 0 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.77 sq m · 794 sq ft | 1 | 1 |
| B | 2BHK | 73.79 sq m · 794 sq ft | 1 | 0 |
| B | 2BHK | 73.79 sq m · 794 sq ft | 1 | 0 |
| B | 2BHK | 73.79 sq m · 794 sq ft | 1 | 0 |
| B | 2BHK | 73.79 sq m · 794 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 1 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 1 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 74.94 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 75 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 75 sq m · 807 sq ft | 1 | 0 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.87 sq m · 817 sq ft | 1 | 1 |
| B | 2BHK | 75.93 sq m · 817 sq ft | 1 | 0 |
| B | 2BHK | 75.93 sq m · 817 sq ft | 1 | 0 |
| B | 2BHK | 119.28 sq m · 1,284 sq ft | 1 | 1 |
| B | 2BHK | 122.03 sq m · 1,314 sq ft | 1 | 1 |
| B | 2BHK | 122.6 sq m · 1,320 sq ft | 1 | 1 |
| B | 3BHK | 91.02 sq m · 980 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 0 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 0 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.77 sq m · 816 sq ft | 1 | 1 |
| C | 2BHK | 75.84 sq m · 816 sq ft | 1 | 0 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 1 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 1 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 1 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 1 |
| C | 2BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 77.32 sq m · 832 sq ft | 1 | 0 |
| C | 2BHK | 82.19 sq m · 885 sq ft | 1 | 0 |
| C | 2BHK | 82.19 sq m · 885 sq ft | 1 | 1 |
| C | 2BHK | 82.25 sq m · 885 sq ft | 1 | 0 |
| C | 2BHK | 106.51 sq m · 1,146 sq ft | 1 | 0 |
| C | 2BHK | 149.62 sq m · 1,610 sq ft | 1 | 0 |
| C | 3BHK | 77.3 sq m · 832 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 0 |
| C | 3BHK | 106.42 sq m · 1,145 sq ft | 1 | 1 |
| C | 3BHK | 208.9 sq m · 2,249 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 151 filings listed on MahaRERA's project page
Show all 152 documentsShow fewer documents
Migrated
- 1 Proforma of Allotment letterAnnexure 1 Allotment Letter .pdf · uploaded 21 Mar 2024Source
- 1 a Details of encumbrances concerned to FinanceDeclaration Finance and Encumbrance.pdf · uploaded 30 Mar 2024Source
- 1 b Details of encumbrances concerned to LegalDeclaration Finance and Encumbrance.pdf · uploaded 30 Mar 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Other Real Estate Alok Jha .pdf · uploaded 30 Mar 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Separate Bank Account.pdf · uploaded 30 Mar 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of other real estate Pooja awad.pdf · uploaded 2 Apr 2024Source
- 1 Copy of the legal title reportSearch Report and Legal Title Report Bhugaon 03-04-2024.pdf · uploaded 4 Apr 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Annexure A Architect's Certificate Form 1.pdf · uploaded 5 Apr 2024Source
- 1 Copy of Layout Approval (in case of layout)Sheet no One (1) (1).pdf · uploaded 6 Apr 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet no One.pdf · uploaded 6 Apr 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet no Two.pdf · uploaded 6 Apr 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet no Three.pdf · uploaded 6 Apr 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet no Four.pdf · uploaded 6 Apr 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet no Five.pdf · uploaded 6 Apr 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet no Six.pdf · uploaded 6 Apr 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet no Seven.pdf · uploaded 6 Apr 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet no Eight.pdf · uploaded 6 Apr 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentSheet no Nine.pdf · uploaded 6 Apr 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentSheet no Ten.pdf · uploaded 6 Apr 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentSheet no Eleven.pdf · uploaded 6 Apr 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentSheet no Twelve.pdf · uploaded 6 Apr 2024Source
- 1 Commencement Certificates / NA Order for plotted development240405-CC.pdf · uploaded 6 Apr 2024Source
- 1 Declaration about Commencement CertificateFormat D 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 Declaration in FORM BForm B 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Bhugaon Form 3 6 April 2024 (1).pdf · uploaded 6 Apr 2024Source
- 1 Proforma of Agreement for saleOREE Realty RERA agreement 3rd revision.pdf · uploaded 6 Apr 2024Source
- 1 Deviation Report with respect to Allotment letterDeclaration Allotment Letter 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 Deviation Report with respect to model copy of AgreementDeclaration Of Agreement 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 Other – FinanceDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 Other – TechnicalDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
- 2 Other – TechnicalDeclaration Cum Undertaking 6-4-23.pdf · uploaded 6 Apr 2024Source
- 1 CERSAI detailsundertaking.pdf · uploaded 13 Apr 2024Source
- 2 Other – Financedeclaration.pdf · uploaded 13 Apr 2024Source
- 3 Other – FinanceLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
- 3 Other – TechnicalLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
- 4 Other – TechnicalForm B.pdf · uploaded 16 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bhugoan Form 1.pdf · uploaded 10 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)From -2.pdf · uploaded 10 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)From -3_11zon.pdf · uploaded 10 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Cloud 28.pdf · uploaded 17 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Cloud 28 .pdf · uploaded 18 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineering Certificarte Bhugaon cloud 28.pdf · uploaded 18 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Architect's Certificate.pdf · uploaded 20 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Annexure D From 3 Cloud 28.pdf · uploaded 20 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Annexure -B From -2.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Cloud 28 20 04 2025.pdf · uploaded 21 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3-Q4-CLOUD 28.pdf · uploaded 21 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 Cloud 28 20 4 25.pdf · uploaded 21 Apr 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 CLOUD 28 20 4 25.pdf · uploaded 21 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Cloud 28 20 4 25.pdf · uploaded 21 Apr 2025Source
- 1 Copy of Layout Approval (in case of layout)Layout New Sanction Bhugaon.pdf · uploaded 9 Jun 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q1-JUNE 2024.pdf · uploaded 9 Jun 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q2-SEPTEMBER 2024.pdf · uploaded 9 Jun 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q3-DECEMBER 2024.pdf · uploaded 9 Jun 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q4-MARCH-2025.pdf · uploaded 9 Jun 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 9 Jun 2025Source
- 8 Building Plan Approval / NA Order for plotted developmentSheet 9-17.pdf · uploaded 9 Jun 2025Source
- 16 Building Plan Approval / NA Order for plotted developmentSheet 17-17.pdf · uploaded 9 Jun 2025Source
- 15 Building Plan Approval / NA Order for plotted developmentSheet 16-17.pdf · uploaded 9 Jun 2025Source
- 14 Building Plan Approval / NA Order for plotted developmentSheet 15-17.pdf · uploaded 9 Jun 2025Source
- 13 Building Plan Approval / NA Order for plotted developmentSheet 14-17.pdf · uploaded 9 Jun 2025Source
- 12 Building Plan Approval / NA Order for plotted developmentSheet 13-17.pdf · uploaded 9 Jun 2025Source
- 11 Building Plan Approval / NA Order for plotted developmentSheet 12-17.pdf · uploaded 9 Jun 2025Source
- 10 Building Plan Approval / NA Order for plotted developmentSheet 11-17.pdf · uploaded 9 Jun 2025Source
- 9 Building Plan Approval / NA Order for plotted developmentSheet 10-17.pdf · uploaded 9 Jun 2025Source
- 7 Building Plan Approval / NA Order for plotted developmentSheet 8-17.pdf · uploaded 9 Jun 2025Source
- 6 Building Plan Approval / NA Order for plotted developmentSheet 7-17.pdf · uploaded 9 Jun 2025Source
- 5 Building Plan Approval / NA Order for plotted developmentSheet 6-17.pdf · uploaded 9 Jun 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentSheet 5-17.pdf · uploaded 9 Jun 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentSheet 4-17.pdf · uploaded 9 Jun 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet 3-17.pdf · uploaded 9 Jun 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet 2-17.pdf · uploaded 9 Jun 2025Source
- 1 Disclosure of sold/ booked inventoryApril To June 2024.pdf · uploaded 9 Jun 2025Source
- 2 Disclosure of sold/ booked inventoryJuly To September 2024.pdf · uploaded 9 Jun 2025Source
- 3 Disclosure of sold/ booked inventoryOctoberTo December 2024.pdf · uploaded 9 Jun 2025Source
- 4 Disclosure of sold/ booked inventoryJanuary To March 2025.pdf · uploaded 9 Jun 2025Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 9 Jun 2025Source
- 1 Disclosure of sold/ booked inventory1 April 2024 to 30 June 2024.pdf · uploaded 1 Jul 2025Source
- 2 Disclosure of sold/ booked inventory1 July 2024 to 30 September 2024.pdf · uploaded 1 Jul 2025Source
- 3 Disclosure of sold/ booked inventory1 Oct 24 to 31 Dec 2024.pdf · uploaded 1 Jul 2025Source
- 4 Disclosure of sold/ booked inventory1 Oct 24 to 31 Dec 2024.pdf · uploaded 1 Jul 2025Source
- 5 Disclosure of sold/ booked inventory1 Jan 25 to 31 March 2025.pdf · uploaded 1 Jul 2025Source
- Form 1Form 1-Q1-25-26.pdf · uploaded 18 Jul 2026Source
- Form 2Form 2-Q1-25-26.pdf · uploaded 18 Jul 2026Source
- Form 3fORM 3-Q1-25-26.pdf · uploaded 18 Jul 2026Source
- Disclosure of Sold and Booked InventorySold Unsold-Q1-25-26.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2From -2.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2From -2.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3From -3_11zon.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3From -3_11zon.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 2Cloud 28 From 2.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 2Cloud 28 From 2 10042026.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 2Cloud 28 From 2 11072026.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 3Form 3 Q3-25-26.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 3Form 3 Q4-25-26.pdf · uploaded 12 Aug 2026Source
- Withdrawal Update Form 3Form 3 Q1-26-27.pdf · uploaded 12 Aug 2026Source
Technical
- DocumentSheet no One.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Two.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Three.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Four.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Five.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Six.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Seven.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Eight.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Nine.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Ten.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Eleven.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no Twelve.pdf · uploaded 6 Apr 2024Source
- DocumentSheet no One (1) (1).pdf · uploaded 6 Apr 2024Source
- Other – TechnicalDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
- Other – TechnicalDeclaration Cum Undertaking 6-4-23.pdf · uploaded 6 Apr 2024Source
- Other – TechnicalLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
- Other – TechnicalForm B.pdf · uploaded 16 Apr 2024Source
- DocumentLayout New Sanction Bhugaon.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 2-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 3-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 4-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 5-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 6-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 7-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 8-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 9-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 10-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 11-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 12-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 13-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 14-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 15-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 16-17.pdf · uploaded 9 Jun 2025Source
- DocumentSheet 17-17.pdf · uploaded 9 Jun 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Bhugaon, Mulshi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Survey No 280 owned by Kalidas Ingawale
- South
- Survey No 278 Owned by Swapnaja Ajit Waghamare
- East
- Survey No 279 Owner by Ranubai Tulshiram Chondhe
- West
- Road and Survey No 277
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Prasad | — |
| Engineer | Vikrant Kulkarni | — |
Source: MahaRERA project page. Contact details are not shown.