Cloud 28

Certificate Signed

Bhugaon, Pune 412115 |Promoter: Oree Reality Pvt Ltd

22 Apr 2024Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
3Buildings
109Units registered67 booked (61%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, 1BHK, 3BHK109 units in all
Address
280/4 280/2, 4 Season Road, Near Song Bird SocietyPIN 412115
Designated bank account
119
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.48998, 73.75004
Cloud 28 is at latitude 18.48998, longitude 73.75004.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
22 Apr 2024
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005581622 Apr 202431 Dec 202930 Apr 2030Oree Reality Pvt LtdProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A31
B1161
C1247

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

67 of 109 units booked (61%), as the promoter reported to MahaRERA

2BHK · 87 units1BHK · 1 unit3BHK · 21 units
BuildingTypeCarpet areaUnitsBooked
A2BHK73.23 sq m · 788 sq ft10
B1BHK55.91 sq m · 602 sq ft10
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
Show all 109 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.21 sq m · 788 sq ft11
B2BHK73.23 sq m · 788 sq ft10
B2BHK73.23 sq m · 788 sq ft10
B2BHK73.23 sq m · 788 sq ft10
B2BHK73.23 sq m · 788 sq ft10
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.77 sq m · 794 sq ft11
B2BHK73.79 sq m · 794 sq ft10
B2BHK73.79 sq m · 794 sq ft10
B2BHK73.79 sq m · 794 sq ft10
B2BHK73.79 sq m · 794 sq ft10
B2BHK74.94 sq m · 807 sq ft11
B2BHK74.94 sq m · 807 sq ft10
B2BHK74.94 sq m · 807 sq ft10
B2BHK74.94 sq m · 807 sq ft11
B2BHK74.94 sq m · 807 sq ft10
B2BHK74.94 sq m · 807 sq ft10
B2BHK74.94 sq m · 807 sq ft10
B2BHK74.94 sq m · 807 sq ft10
B2BHK75 sq m · 807 sq ft10
B2BHK75 sq m · 807 sq ft10
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.87 sq m · 817 sq ft11
B2BHK75.93 sq m · 817 sq ft10
B2BHK75.93 sq m · 817 sq ft10
B2BHK119.28 sq m · 1,284 sq ft11
B2BHK122.03 sq m · 1,314 sq ft11
B2BHK122.6 sq m · 1,320 sq ft11
B3BHK91.02 sq m · 980 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft10
C2BHK75.77 sq m · 816 sq ft10
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.77 sq m · 816 sq ft11
C2BHK75.84 sq m · 816 sq ft10
C2BHK77.3 sq m · 832 sq ft10
C2BHK77.3 sq m · 832 sq ft11
C2BHK77.3 sq m · 832 sq ft10
C2BHK77.3 sq m · 832 sq ft10
C2BHK77.3 sq m · 832 sq ft10
C2BHK77.3 sq m · 832 sq ft11
C2BHK77.3 sq m · 832 sq ft11
C2BHK77.3 sq m · 832 sq ft11
C2BHK77.3 sq m · 832 sq ft10
C2BHK77.32 sq m · 832 sq ft10
C2BHK82.19 sq m · 885 sq ft10
C2BHK82.19 sq m · 885 sq ft11
C2BHK82.25 sq m · 885 sq ft10
C2BHK106.51 sq m · 1,146 sq ft10
C2BHK149.62 sq m · 1,610 sq ft10
C3BHK77.3 sq m · 832 sq ft10
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK106.42 sq m · 1,145 sq ft10
C3BHK106.42 sq m · 1,145 sq ft11
C3BHK208.9 sq m · 2,249 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 151 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardOree Pan Card .pdf · uploaded 29 Feb 2024Source
  • Other – FinanceDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
  • Other – Financedeclaration.pdf · uploaded 13 Apr 2024Source
  • Other – FinanceLand Owner Declaration.pdf · uploaded 16 Apr 2024Source

Legal

  • Legal Title reportSearch Report and Legal Title Report Bhugaon 03-04-2024.pdf · uploaded 4 Apr 2024Source
  • Declaration Form BForm B 6-4-23.pdf · uploaded 6 Apr 2024Source

Migrated

  • 1 PAN CardOree Pan Card .pdf · uploaded 29 Feb 2024Source
Show all 152 documentsShow fewer documents

Migrated

  • 1 Proforma of Allotment letterAnnexure 1 Allotment Letter .pdf · uploaded 21 Mar 2024Source
  • 1 a Details of encumbrances concerned to FinanceDeclaration Finance and Encumbrance.pdf · uploaded 30 Mar 2024Source
  • 1 b Details of encumbrances concerned to LegalDeclaration Finance and Encumbrance.pdf · uploaded 30 Mar 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of Other Real Estate Alok Jha .pdf · uploaded 30 Mar 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Separate Bank Account.pdf · uploaded 30 Mar 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDeclaration of other real estate Pooja awad.pdf · uploaded 2 Apr 2024Source
  • 1 Copy of the legal title reportSearch Report and Legal Title Report Bhugaon 03-04-2024.pdf · uploaded 4 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Annexure A Architect's Certificate Form 1.pdf · uploaded 5 Apr 2024Source
  • 1 Copy of Layout Approval (in case of layout)Sheet no One (1) (1).pdf · uploaded 6 Apr 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentSheet no One.pdf · uploaded 6 Apr 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentSheet no Two.pdf · uploaded 6 Apr 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentSheet no Three.pdf · uploaded 6 Apr 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentSheet no Four.pdf · uploaded 6 Apr 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentSheet no Five.pdf · uploaded 6 Apr 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentSheet no Six.pdf · uploaded 6 Apr 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentSheet no Seven.pdf · uploaded 6 Apr 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentSheet no Eight.pdf · uploaded 6 Apr 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentSheet no Nine.pdf · uploaded 6 Apr 2024Source
  • 10 Building Plan Approval / NA Order for plotted developmentSheet no Ten.pdf · uploaded 6 Apr 2024Source
  • 11 Building Plan Approval / NA Order for plotted developmentSheet no Eleven.pdf · uploaded 6 Apr 2024Source
  • 12 Building Plan Approval / NA Order for plotted developmentSheet no Twelve.pdf · uploaded 6 Apr 2024Source
  • 1 Commencement Certificates / NA Order for plotted development240405-CC.pdf · uploaded 6 Apr 2024Source
  • 1 Declaration about Commencement CertificateFormat D 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 Declaration in FORM BForm B 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Bhugaon Form 3 6 April 2024 (1).pdf · uploaded 6 Apr 2024Source
  • 1 Proforma of Agreement for saleOREE Realty RERA agreement 3rd revision.pdf · uploaded 6 Apr 2024Source
  • 1 Deviation Report with respect to Allotment letterDeclaration Allotment Letter 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeclaration Of Agreement 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 Other – FinanceDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 Other – TechnicalDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 2 Other – TechnicalDeclaration Cum Undertaking 6-4-23.pdf · uploaded 6 Apr 2024Source
  • 1 CERSAI detailsundertaking.pdf · uploaded 13 Apr 2024Source
  • 2 Other – Financedeclaration.pdf · uploaded 13 Apr 2024Source
  • 3 Other – FinanceLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
  • 3 Other – TechnicalLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
  • 4 Other – TechnicalForm B.pdf · uploaded 16 Apr 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bhugoan Form 1.pdf · uploaded 10 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)From -2.pdf · uploaded 10 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)From -3_11zon.pdf · uploaded 10 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Cloud 28.pdf · uploaded 17 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Cloud 28 .pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineering Certificarte Bhugaon cloud 28.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)From 1 Architect's Certificate.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Annexure D From 3 Cloud 28.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Annexure -B From -2.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Cloud 28 20 04 2025.pdf · uploaded 21 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3-Q4-CLOUD 28.pdf · uploaded 21 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 Cloud 28 20 4 25.pdf · uploaded 21 Apr 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 CLOUD 28 20 4 25.pdf · uploaded 21 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Cloud 28 20 4 25.pdf · uploaded 21 Apr 2025Source
  • 1 Copy of Layout Approval (in case of layout)Layout New Sanction Bhugaon.pdf · uploaded 9 Jun 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q1-JUNE 2024.pdf · uploaded 9 Jun 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q2-SEPTEMBER 2024.pdf · uploaded 9 Jun 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q3-DECEMBER 2024.pdf · uploaded 9 Jun 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Q4-MARCH-2025.pdf · uploaded 9 Jun 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 9 Jun 2025Source
  • 8 Building Plan Approval / NA Order for plotted developmentSheet 9-17.pdf · uploaded 9 Jun 2025Source
  • 16 Building Plan Approval / NA Order for plotted developmentSheet 17-17.pdf · uploaded 9 Jun 2025Source
  • 15 Building Plan Approval / NA Order for plotted developmentSheet 16-17.pdf · uploaded 9 Jun 2025Source
  • 14 Building Plan Approval / NA Order for plotted developmentSheet 15-17.pdf · uploaded 9 Jun 2025Source
  • 13 Building Plan Approval / NA Order for plotted developmentSheet 14-17.pdf · uploaded 9 Jun 2025Source
  • 12 Building Plan Approval / NA Order for plotted developmentSheet 13-17.pdf · uploaded 9 Jun 2025Source
  • 11 Building Plan Approval / NA Order for plotted developmentSheet 12-17.pdf · uploaded 9 Jun 2025Source
  • 10 Building Plan Approval / NA Order for plotted developmentSheet 11-17.pdf · uploaded 9 Jun 2025Source
  • 9 Building Plan Approval / NA Order for plotted developmentSheet 10-17.pdf · uploaded 9 Jun 2025Source
  • 7 Building Plan Approval / NA Order for plotted developmentSheet 8-17.pdf · uploaded 9 Jun 2025Source
  • 6 Building Plan Approval / NA Order for plotted developmentSheet 7-17.pdf · uploaded 9 Jun 2025Source
  • 5 Building Plan Approval / NA Order for plotted developmentSheet 6-17.pdf · uploaded 9 Jun 2025Source
  • 4 Building Plan Approval / NA Order for plotted developmentSheet 5-17.pdf · uploaded 9 Jun 2025Source
  • 3 Building Plan Approval / NA Order for plotted developmentSheet 4-17.pdf · uploaded 9 Jun 2025Source
  • 2 Building Plan Approval / NA Order for plotted developmentSheet 3-17.pdf · uploaded 9 Jun 2025Source
  • 1 Building Plan Approval / NA Order for plotted developmentSheet 2-17.pdf · uploaded 9 Jun 2025Source
  • 1 Disclosure of sold/ booked inventoryApril To June 2024.pdf · uploaded 9 Jun 2025Source
  • 2 Disclosure of sold/ booked inventoryJuly To September 2024.pdf · uploaded 9 Jun 2025Source
  • 3 Disclosure of sold/ booked inventoryOctoberTo December 2024.pdf · uploaded 9 Jun 2025Source
  • 4 Disclosure of sold/ booked inventoryJanuary To March 2025.pdf · uploaded 9 Jun 2025Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 9 Jun 2025Source
  • 1 Disclosure of sold/ booked inventory1 April 2024 to 30 June 2024.pdf · uploaded 1 Jul 2025Source
  • 2 Disclosure of sold/ booked inventory1 July 2024 to 30 September 2024.pdf · uploaded 1 Jul 2025Source
  • 3 Disclosure of sold/ booked inventory1 Oct 24 to 31 Dec 2024.pdf · uploaded 1 Jul 2025Source
  • 4 Disclosure of sold/ booked inventory1 Oct 24 to 31 Dec 2024.pdf · uploaded 1 Jul 2025Source
  • 5 Disclosure of sold/ booked inventory1 Jan 25 to 31 March 2025.pdf · uploaded 1 Jul 2025Source
  • Form 1Form 1-Q1-25-26.pdf · uploaded 18 Jul 2026Source
  • Form 2Form 2-Q1-25-26.pdf · uploaded 18 Jul 2026Source
  • Form 3fORM 3-Q1-25-26.pdf · uploaded 18 Jul 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold-Q1-25-26.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2From -2.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2From -2.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3From -3_11zon.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3From -3_11zon.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 1Bhugoan Form 1.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2Cloud 28 From 2.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2Cloud 28 From 2 10042026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 2Cloud 28 From 2 11072026.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Q3-25-26.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Q4-25-26.pdf · uploaded 12 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Q1-26-27.pdf · uploaded 12 Aug 2026Source

Technical

  • DocumentSheet no One.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Two.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Three.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Four.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Five.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Six.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Seven.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Eight.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Nine.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Ten.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Eleven.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no Twelve.pdf · uploaded 6 Apr 2024Source
  • DocumentSheet no One (1) (1).pdf · uploaded 6 Apr 2024Source
  • Other – TechnicalDeclaration 6-4-23.pdf · uploaded 6 Apr 2024Source
  • Other – TechnicalDeclaration Cum Undertaking 6-4-23.pdf · uploaded 6 Apr 2024Source
  • Other – TechnicalLand Owner Declaration.pdf · uploaded 16 Apr 2024Source
  • Other – TechnicalForm B.pdf · uploaded 16 Apr 2024Source
  • DocumentLayout New Sanction Bhugaon.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 2-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 3-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 4-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 5-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 6-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 7-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 8-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 9-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 10-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 11-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 12-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 13-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 14-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 15-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 16-17.pdf · uploaded 9 Jun 2025Source
  • DocumentSheet 17-17.pdf · uploaded 9 Jun 2025Source

Technical (Architect)

  • DocumentBhugoan Form 1.pdf · uploaded 10 Jul 2024Source
  • DocumentArchitect's Certificate Cloud 28 .pdf · uploaded 18 Oct 2024Source
  • DocumentFrom 1 Architect's Certificate.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Cloud 28 20 04 2025.pdf · uploaded 21 Apr 2025Source

Technical (Engineer)

  • DocumentEngineering Certificarte Bhugaon cloud 28.pdf · uploaded 18 Oct 2024Source
  • DocumentAnnexure -B From -2.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2 Cloud 28 20 4 25.pdf · uploaded 21 Apr 2025Source
  • DocumentCloud 28 From 2 11072026.pdf · uploaded 12 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhugaon, Mulshi taluka

Survey, CTS, gat or plot numbers

280/4 280/2

Boundaries

North
Survey No 280 owned by Kalidas Ingawale
South
Survey No 278 Owned by Swapnaja Ajit Waghamare
East
Survey No 279 Owner by Ranubai Tulshiram Chondhe
West
Road and Survey No 277

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrasad—
EngineerVikrant Kulkarni—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology