Subhadra Heights

Certificate Signed

Bhosari, Pune 411026 |Promoter: Waghere Associates

22 Feb 2022Registered with MahaRERA
31 Mar 2027Promised completion
3Buildings
136Units registered71 booked (52%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
1BHK, 1RK, 2BHK, Shop136 units in all
Address
219/2B Bhosari, Bhosari, BhosariPIN 411026
Designated bank account
State Bank Of India
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.97905, 73.07555
Subhadra Heights is at latitude 18.97905, longitude 73.07555.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2027

Registered
22 Feb 2022
Promised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003356522 Feb 202231 Mar 202731 Mar 2027Waghere AssociatesProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing1044
B Wing1144
C Wing1248

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

71 of 136 units booked (52%), as the promoter reported to MahaRERA

1BHK · 65 units1RK · 3 units2BHK · 66 unitsShop · 2 units
BuildingTypeCarpet areaUnitsBooked
A Wing1BHK38.15 sq m · 411 sq ft210
A Wing1RK26.32 sq m · 283 sq ft10
A Wing2BHK50.01 sq m · 538 sq ft30
A Wing2BHK52.53 sq m · 565 sq ft130
A Wing2BHK52.58 sq m · 566 sq ft30
A Wing2BHK53 sq m · 570 sq ft10
A WingShop38.91 sq m · 419 sq ft10
A WingShop39.03 sq m · 420 sq ft10
Show all 22 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B Wing1BHK38.15 sq m · 411 sq ft60
B Wing1BHK44.91 sq m · 483 sq ft1515
B Wing1RK26.32 sq m · 283 sq ft10
B Wing2BHK52.51 sq m · 565 sq ft20
B Wing2BHK52.53 sq m · 565 sq ft30
B Wing2BHK53 sq m · 570 sq ft20
B Wing2BHK59.08 sq m · 636 sq ft88
B Wing2BHK63.39 sq m · 682 sq ft77
C Wing1BHK38.15 sq m · 411 sq ft40
C Wing1BHK44.91 sq m · 483 sq ft1919
C Wing1RK26.31 sq m · 283 sq ft11
C Wing2BHK52.51 sq m · 565 sq ft30
C Wing2BHK59.08 sq m · 636 sq ft99
C Wing2BHK63.39 sq m · 682 sq ft1212

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN_Waghere.pdf · uploaded 28 Jan 2022Source

Legal

  • Legal Title reportSearch_Title_Subhadra_Heights (1).pdf · uploaded 28 Jan 2022Source
  • Declaration Form BForm B_Affidavit_Subhadra Heights REVISED.pdf · uploaded 10 Feb 2022Source
  • Declaration Form BForm B Declaration by the Promoter.pdf · uploaded 2 Apr 2025Source

Migrated

  • 1 PAN CardPAN_Waghere.pdf · uploaded 28 Jan 2022Source
  • 1 Copy of the legal title reportSearch_Title_Subhadra_Heights (1).pdf · uploaded 28 Jan 2022Source
  • 1 Details of encumbrancesNon Incubrance Certificate_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
Show all 128 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Sanction Plan_20082021_1_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_1_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_2_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_3_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_4_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_5_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_6_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_7_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentSanction Plan_20082021_8_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC_20082021_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 1 Declaration about Commencement CertificateDeclation Commencement Certificate_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 1 Proforma of Allotment letterAllotment letter Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • 1 Declaration in FORM BForm B_Affidavit_Subhadra Heights REVISED.pdf · uploaded 10 Feb 2022Source
  • 1 CERSAI detailsAsset Based Search.pdf · uploaded 10 Feb 2022Source
  • 2 CERSAI detailsCERSAI Certificate_Subhadra Heights (1).pdf · uploaded 10 Feb 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Final_merged.pdf · uploaded 10 Feb 2022Source
  • 2 Proforma of Allotment letterDraft Agmt of Sale_Subhadra Heights_Draft.pdf · uploaded 10 Feb 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)WA Subhadra Heights Form 5.pdf · uploaded 28 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SUBHADRA HEIGHTS ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 17 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2.pdf · uploaded 17 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certifiacte Subhdra Heights 300623.pdf · uploaded 19 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Subhdra Heihgts 300623.pdf · uploaded 19 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2A Quality Assurance Subhadra Heights.pdf · uploaded 19 Aug 2023Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Subhadra Heights as on 30062023.pdf · uploaded 19 Aug 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Subhadra Heights June 2023_compressed.pdf · uploaded 19 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 2023 subhadra heights.pdf · uploaded 30 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - June 2023.pdf · uploaded 21 Mar 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 21 Mar 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - Dec 2023.pdf · uploaded 21 Mar 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - March 2024.pdf · uploaded 21 Mar 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - June 2024.pdf · uploaded 21 Mar 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - Sept 2024.pdf · uploaded 21 Mar 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - Dec 2024.pdf · uploaded 21 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate - March 2023.pdf · uploaded 21 Mar 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Sept 2023 - Sign.pdf · uploaded 21 Mar 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Dec 2024 - Sign.pdf · uploaded 21 Mar 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Sept 2024 - Sign.pdf · uploaded 21 Mar 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - June 2024 - Sign.pdf · uploaded 21 Mar 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - March 2024 - Sign.pdf · uploaded 21 Mar 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - Dec 2023 - Sign.pdf · uploaded 21 Mar 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - June 2023 - Signed.pdf · uploaded 21 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate - March 23 - Signed.pdf · uploaded 21 Mar 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - June 2023.pdf · uploaded 21 Mar 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Dec 2024.pdf · uploaded 21 Mar 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Sept 2024.pdf · uploaded 21 Mar 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - June 2024.pdf · uploaded 21 Mar 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - March 2024.pdf · uploaded 21 Mar 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Dec 2023.pdf · uploaded 21 Mar 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - Sept 2023.pdf · uploaded 21 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate - March 2023.pdf · uploaded 21 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - March 2023.pdf · uploaded 21 Mar 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Inventory - June 2023.pdf · uploaded 21 Mar 2025Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Inventory - Sept 2023.pdf · uploaded 21 Mar 2025Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Inventory - Dec 2023.pdf · uploaded 21 Mar 2025Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Inventory - March 2024.pdf · uploaded 21 Mar 2025Source
  • 6 Disclosure of sold/ booked inventoryDisclosure of Inventory - June 2024.pdf · uploaded 21 Mar 2025Source
  • 7 Disclosure of sold/ booked inventoryDisclosure of Inventory - Sept 2024.pdf · uploaded 21 Mar 2025Source
  • 8 Disclosure of sold/ booked inventoryDisclosure of Inventory - Dec 2024.pdf · uploaded 21 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Quality Assurance Certificate - March 2022.pdf · uploaded 21 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Quality Assurance Certificate - March 2024.pdf · uploaded 21 Mar 2025Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance certificate with Finance and Legal.pdf · uploaded 2 Apr 2025Source
  • 1 Declaration in FORM BForm B Declaration by the Promoter.pdf · uploaded 2 Apr 2025Source
  • 1 CERSAI detailsCERSAI Declaration.pdf · uploaded 2 Apr 2025Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance certificate with Finance and Legal.pdf · uploaded 2 Apr 2025Source
  • 1 Other – TechnicalPlinth Certificate.pdf · uploaded 2 Apr 2025Source
  • 1 Other – TechnicalPERT Chart.pdf · uploaded 22 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Anuual Audit Report Subhdra Heights FY 2023-24 Signed.pdf · uploaded 22 Apr 2025Source
  • Withdrawal Update Form 1Form 1 Architect Certificate - Sign.pdf · uploaded 10 Jun 2025Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate - Sign.pdf · uploaded 10 Jun 2025Source
  • Withdrawal Update Form 3CA Certificate - March 2025_Signed.pdf · uploaded 10 Jun 2025Source
  • Withdrawal Update Form 1Form 1 Architect Certificate - Sign.pdf · uploaded 27 Jun 2025Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate - Sign.pdf · uploaded 27 Jun 2025Source
  • Withdrawal Update Form 3CA Certificate - March 2025_Signed.pdf · uploaded 27 Jun 2025Source
  • Withdrawal Update Form 1Form 1 Architect Certificate - June 2025.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate - June 2025.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 3CA Certificate - June 2025 - Sign.pdf · uploaded 26 Aug 2025Source
  • Withdrawal Update Form 1Form 01 Subhdra Heights Sept 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 1Form 01 Subhdra Heigths Dec 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2Form 02 Subhdra Heights Sept 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 2Form 02 Subhdra Heights Dec 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3Form 03 Subhdra Heights Sept 25.pdf · uploaded 24 Feb 2026Source
  • Withdrawal Update Form 3Form 03 Subhdra Heights Dec 25.pdf · uploaded 24 Feb 2026Source
  • Form 5 (FY 2024-2025)Form 5 Annual Audit Report - Subhadhra Height FY 2024-25.pdf · uploaded 1 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Architects Certificate - March 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Engineers Certificate - March 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 3Form 3 CA certificate - March 2026.pdf · uploaded 25 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Architect Certificate June 2026.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 2Form 2 Engineer Certificate June 2026.pdf · uploaded 5 Aug 2026Source
  • Withdrawal Update Form 3Form 3 CA Certificate June 2026.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2A Quality Assurance Certificate - March 2025.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A Quality Assurance Certificate - March 2026.pdf · uploaded 5 Aug 2026Source

Technical

  • DocumentSanction Plan_20082021_1_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_1_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_2_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_3_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_4_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_5_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_6_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_7_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • DocumentSanction Plan_20082021_8_Subhadra Heights.pdf · uploaded 28 Jan 2022Source
  • Other – TechnicalPlinth Certificate.pdf · uploaded 2 Apr 2025Source
  • Other – TechnicalPERT Chart.pdf · uploaded 22 Apr 2025Source

Technical (Architect)

  • DocumentForm 1 Architect Certificate - March 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - June 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - Dec 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - March 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - June 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - Sept 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate - Dec 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 1 Architect Certificate June 2026.pdf · uploaded 5 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 Engineer Certificate - March 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - June 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - Sept 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - Dec 2023.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - March 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - June 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - Sept 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate - Dec 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 Engineer Certificate June 2026.pdf · uploaded 5 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhosari, Haveli taluka

Survey, CTS, gat or plot numbers

219/2B Bhosari

Boundaries

North
Property of S No 219-3-K
South
Property of Tanishq Co-op Hsg Soc
East
Village Dighi Boundary
West
Odha

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerChandrakant Sakole—
EngineerSachin Thakkar—

Source: MahaRERA project page. Contact details are not shown.